Revision Date Reviewed By Authorised By. V1 18/07/2017 C Reynolds P FitzPatrick Review Date 20/07/2018 Change Details Task

Similar documents
V2 02/11/15 D Newton P FitzPatrick. Changes to coupling and uncoupling processes Task. Coupling and Uncoupling Coupling. Uncoupling.

Revision Date Reviewed By Authorised By. V3 22/01/2018 D Newton P FitzPatrick. processes Task. Coupling and Uncoupling Coupling.

Personal Protective Equipment Standards

SIDE PULL WINCHING WITH THE 35K WINCH TWO PART LINE WARNING

SAFE WORK PROCEDURE SWP 053 TRACTOR OPERATION DOC. NO. D15/81228

Hazardous Energy Control Procedure Appendix

FOUR POST LIFT STRONGMAN TOOLS. Manual to be used with only Strongman Tools Ltd 4 Post Lift

Revision History. 1. PURPOSE To set forth minimum site requirements for the construction, use and maintenance of portable ladders.

Ashvale Light Bulb Replacement - Qualitative Risk Assessment Ref: - LBRA/14 Brian Urquhart

Coupling & Uncoupling of Trailers Tool Box Talk

LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK

Technical Test Theory Lorry Loader A36

CHECKLIST & COMPONENTS

Meuangvang Development Co.LTD Standard Working Procedure 013 Jump Starting Vehicles

AIRPORT TERMINAL SERVICES, Inc. Jet Bridge Module

Work Instructions: Inspecting Forklifts

MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel:

HAULING EQUIPMENT with TRUCK and TRAILER COMBINATION

CPM Technical Guide / Load Configuration. Load configuration for customers. Concrete Safety for Life

SAFETY AND HYGIENE REGULATIONS DESCRIPTION OF A FORKLIFT TRUCK GENERAL RECOMMENDATIONS

LIFT TRUCK SAFETY OPERATOR TRAINING

Installation Guide Rollerdor RD55 Econ Roller Garage Door

Standard Operating Procedure

Ensure staff are trained in use of equipment

SAFETY ALERT - # TOWING INCIDENT

Ladders LADDER 2 WARNINGS:

40% Strains, Sprains & Overexertions. Figure 48. Percent of injury type by occupation, Specialized Freight, Movers % 14%

Waste & Litter Collection utilizing the Rear Loading Compactor

Risk Assessment Form

Safe Work Procedure Hydraulic Log Loader / Hoechuck

How to fold your MGB top (pre 1970 pack away top & frame)

Meuangvang Development Co.LTD Standard Working Procedure 010 Pushing a Bogged Dump Truck

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

_ST 018_Minimum_Safety_Instructions_for_Cargo_securing_ENG' Standard. Minimum Safety Instructions for Cargo securing

U Series Installation Guide

Track Work Information Sheet 2P036 How to change a plain wooden sleeper by hand

1. Cranes. 3. Hazardous Chemicals. 4. Signs. 2. Trenching and Excavations

APPARATUS BACKING SOG. This guideline shall apply to all members of the Stoney Point Fire Department (SPFD) and shall be adhered to by all members.

Advice and safety instructions. for Trafikverket track areas

Driver s Responsibilities and Duties For the Port Adelaide 457mm Gauge Railway

South African Colliery Engineers Association Conveyor Safety

Developed by Engineer Bobby Bartlett February 2012

GUIDANCE NOTES. Solar Collectors. On-Roof Installation (First Fix) Please leave these instructions with the User. Baxi Heating UK Ltd 2012

Safety, Health & Environment Contractor Induction

Safe Working on or near low voltage electrical installations & equipment

VP, Facilities and Construction Management

Vehicle and Container Fall Protection

Regulations for truck drivers

PAGE 1 OF 6 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S450 Motor Vehicle Safety REV /01/09

Operation of Mini buses Policy Engage MAT

ATLAS 2000 SINGLE LINE HYDRAULIC HOIST

Pandan Terminal. Site Requirements.

Installation Guide Rollerdor RD77 Econ Roller Garage Door

Flexfence Tension Unit. with Hand Pump. Product Manual. Release 02/16.

MAINTENANCE WORK INSTRUCTION. Mech OFF Replace Head Pulley CVXXX

Close Approach to Power Lines. Close Approach to Power Lines v

SAFETY TECHNIQUES FOR SPECIAL NEEDS BUS DRIVERS

User Manual Hoof trimmingcrush:sa0010. Version: User manual. Hoof trimming crush SA0010

Installation Guide Rollerdor RD55 Econ Roller Garage Door

Safe Work Procedure Wheel Loader

PROCEDURE. Revision: 1. Author: D Steel CONTENTS

PORTABLE ELECTRICAL EQUIPMENT SAFE OPERATING PROCEDURE

Northern Concrete Construction, Inc. Safety Management System. Authority: President

PORTABLE LADDER SAFETY PROGRAM

Safe Driving Standards & Procedures

Support and management of this policy. Ensure policy is adhered to by all employees. Follow requirements contained in this policy.

TELESCOPIC LADDER MODEL NO: TL-2B / TL-3B

Uncontrolled When Printed. + To manage the risks to health and safety arising from the use of vehicles whilst undertaking Santos activities.

Guidelines for the Safe Use of Mobile Electric Patient Lifting Hoists

Safe Operating Procedure LADDER - Single

Vehicle Management Policy and Procedure Document No: VMPol 001

ESSENTIAL SAFETY RESOURCES

AUTO EXTRICATION / STABILIZATION

LOADING THE TDRT WARNING LOADING/UNLOADING OPERATION

Concrete Delivery Requirements

LIGHT DUTY ROLL UP DOOR

Technical test - Theory. No. Question Answers Max. Mark

Control, Safe Use and Operation of Forklift Trucks and Sideloaders

Summary Report for Individual Task M-1314 Perform Coupling Operations Status: Approved

Notice to all Users of the Weigh Northland Gantries

TJ Drivers Knowledge Assessment

Assembly of the Multi Applicational Safety System

For: Model Year Jeep Wrangler/TJ Part Number: For: Model Year Jeep Wrangler/TJ Part Number: 58709

Port Houston Health, Safety, Security, and Environment Policy Document

Theory Test Questions Contents

2002 Convertible Cloth Sleeve Convertible Cloth Attachment

PT4 Pump Station, Turkey

Technical Test Theory Mobile Elevating Work Platform - Boom A26

Safe Work Instruction

Automotive Lifting Equipment

waste collection Overview Vehicle Service Management Material Handlers Drivers % 10% 20% Other 30%

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

Tillman Insurance Agency, Inc. Driver Safety Manual

Minimum required on Engine Co. Attic ladder Roof ladder with hooks Extension ladder

PURPOSE POLICY. Page 1 of 6 / S.O.G Highway Operations Pascal Arnes Chief of Fire

Ladder Safety Program

Support T10552 T10595 T40386

The University of Montana Safety Manual - Chapter 4

2.3.2 Hydrant Maintenance

LOG CHOP. Hydraulic Wood Guillotine. Owners Illustrated Instruction Book & Parts List

Transcription:

Safe Working Procedure: TAT SWP 018 v1 Raising and lowering Mega trailer roof Risk Assessment Ref: TAT - RA018 Revision Date Reviewed By Authorised By V1 18/07/2017 C Reynolds P FitzPatrick Review Date 20/07/2018 Change Details Task Raising and Lowering Mega trailer roof Scope Raising and lowering Mega trailer roof o See TAT SWP 001 Tools & Equipment Required o See TAT SWP002 o See TAT SWP004 Persons Involved Supervisor for the Task Hazards Driver Loading Site Supervisor Trips, Slips, Manual handling, REPORTING PROCEDURE Whilst carrying out the task as instructed within this Safe Working Procedure, if one or more of the controlled steps cannot be undertaken, the following instruction must be followed: - 1. STOP the task 2. If possible without further risk, make the area safe 3. Report to your team leader or section manager immediately for guidance Only trained and authorised personnel can carry out these tasks. Personal Protective Equipment The above Personal Protection Equipment should be worn prior to entering the loading site General Safety It is the duty of all employees to comply with the following Safe Working Procedure designed to provide a code of good practice and conduct with the objective of preventing accidents or harm. At all times employees must work in a safe manner both to prevent personal injury to themselves or others. 1

Pre start Safety Check Before raising or lowering a Mega trailer roof you should consider the following points, to identify:- 1. If you have the correct equipment (roof pole) 2. That you are wearing minimum Personal Protection Equipment (Helmet fitted with chin strap; high visibility vest; safety shoes; covered arms and legs) 3. If the trailer is parked on even ground 4. If it is possible to open and close the roof from the ground 5. If all trip hazards have been removed from the area 6. If you can open and close the roof without walking backwards 7. If the weather will allow the operation to be performed safely 8. If there is sufficient lighting to perform tasks safely 9. If there is sufficient space around the trailer to perform task safely 2

Raising a Mega trailer roof Open rear doors, but do not secure back as need access to trailer pillars and curtain tensioners. Fig 1 and 2. Raise rear Header bar on roof (refer to SWP002 Opening and Closing a Sliding Roof) Unclip curtains (refer to SWP004 Opening and Closing Side Curtains) Fig. 1 Fig. 2 Release Rear Curtain tensioners first on both sides (important that the rear tensioner is done first as there is risk of the front adjusting arms springing out and potentially causing injury if curtain is under tension). Fig 3, 4 and 5 Fig. 3 Fig. 4 Fig. 5 Go back to front of trailer and release front adjusting arms on both sides. Fig. 6, 7 and 8. Fig. 6 3 Fig. 7

Fig. 7 Fig. 8 Lift curtain poles out on both sides.- Fig. 9 Fig. 9 Open curtains but only slightly on both sides. Fig. 10 Fig. 10 Proceed to rear of trailer and remove rear curtain poles out on both sides. Fig. 11 Fig. 11 Open curtains but only slightly on both sides. Fig 12 Fig. 12 4

Release jack handles on all 4 corners. Fig. 13 Fig. 13 Pulling jack handle bar towards you, commence raising roof evenly at all 4 corners (for example, count 4 pumps on each jack handle) and continue until roof is to required height. Fig. 14, 15 and 16 Fig. 14 Fig. 15 Fig. 16 Bring curtains to front or rear as directed by loading team (refer to SWP004 Opening and Closing Side Curtains) 5

Lowering a Mega trailer roof Mega trailer roof in raised position. Fig. 1 Fig. 1 Re-fit jack handle into housings on all 4 corners. Fig. 2 and 3. Fig. 2 Fig. 3 Release pressure by pressing the button located in the housing to lower roof. Lower roof evenly by pushing button in slightly on each corner until all 4 corners are lowered back into position. Fig. 4 and 5. Fig. 4 Close rear Header bar down into locked position (refer to SWP002 Opening and Closing a Sliding Roof) Fig. 5 Close and secure rear doors. Fig. 6 Close and secure side curtains (refer to SWP004 Opening and Closing a Side curtain) Fig. 6 6 Fig. 7