Top-of-Pole Mount for 8 Modules (TPM8) For Module Types D, E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Similar documents
Top-of-Pole Mount for 15 Modules (TPM15) For Module Types E, F, & G ASSEMBLY INSTRUCTIONS

Top-of-Pole Mount for 1 Module (TPM1) For Module Type H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G When High Wind Version (HWV) or 6h x 2w, L

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G

Top-of-Pole Mount for 2 Modules (TPM2) For Module Types C, D, E, F, G, & H

Top-of-Pole Mount for 6 Modules (TPM6) For Module Type D

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 4 Modules (TPM4) For Module Types D, E, F, & G

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C

MULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D SP PCN

MULTI-POLE MOUNT LARGE GROUND MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

MULTI-POLE MOUNT MULTI-POLE MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

TILT KIT - POWER RAIL P8 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev E SP3436 PCN

POWER RAIL P4 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev A PCN

POWER RAIL TM P8. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN

POWER XPRESS TM. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN

Sunwize Power Ready Express Quick Start

INSTALLATION & OWNER S MANUAL

FRONT STABILIZER BAR KIT

QUALITY MOUNTING HARDWARE SOLUTIONS FOR THE PV SOLAR INDUSTRY

Sunwize Water Pumping Kit Quick Start

CHEVY SILVERADO CREW CAB RX3 Includes models equipped with DEF tank

LIGHT DUTY ROLL UP DOOR

Embedded Rack Slide-out System

panelclaw.com Polar Bear III for 10 Degree

Hitch Receiver OEM INSTALLATION MANUAL

Renogy MTS-TM100. Flat Roof Tilt Mount E Philadelphia St, Ontario, CA Version: 1.1

INSTALLATION INSTRUCTIONS

(2) 10mm Quick Release Bolts with Pivot Washers (4) 10mm Flat Washers (2) 10mm Nylon Lock Nuts. (4) 10mm Plastic Washers

Van Rack Installation Manual Dodge ProMaster

3. WIRING AND INSTALLATION PROCEDURES 3.1 System wiring diagrams 4.LOCATION SELECTION 5. TOWER 6.1 SINGLE WIND GENERATOR 6.2CONTROLLER WIRING 6.

BXR5203 RBW Li l Rocker & X-16 Curt E16 Installation Instructions. PinLock. Serial Number

Universal Splice Tray Installation Instructions

w w w. h d o n l i n e s h o p. d e ELECTRA-GLO LIGHT BARS GENERAL INSTALLATION -J04723 REV Kit Number Models Kit Contents

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Center Drive Tube. Gussets

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Nanometrics Solar Power System

225 CARTRIDGE DUAL SEAL

INSTALLATION INSTRUCTIONS SEMI-HIDDEN WINCH MOUNT Part Number:70005 Application: Ford Super Duty

A-dec 371L or 571L Dental Light on an A-dec 361, 362, or 363 Support Center INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS HD BUMPER AND WINCH MOUNTING KIT Part Number: 74777, Application: 08-NEWER FORD SUPER DUTY WARNING

Installation Instructions

Universal Side of Pole Mount

Installation Instructions

Assembly Instructions

LOCKN LOAD MOUNTING KIT

POLY TIP-DOWN WINDSHIELD KIT

POLY TIP-DOWN WINDSHIELD KIT

GPS AutoSteer System Installation Manual

WARNING NOTICE CAUTION ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS WHEEL-TO- WHEEL

LPE C5 Battery Relocation Kit

INSTALLATION & OWNER S MANUAL

INSTALLATION INSTRUCTIONS Horizontal Array Pole Clamp Models: KTA-220/225 and KTA-320/325

INSTALLATION INSTRUCTIONS

On-A-Roll Lifter Instruction Manual for Standard Models Read Before Use!

INSTALLATION INSTRUCTIONS

TOYOTA RAV RUNNING BOARD

TRACK EXTENSION KIT P/N OWNER S MANUAL ATTENTION DEALER: CUSTOMER MUST RECEIVE A COPY OF THIS MANUAL AT THE TIME OF SALE.

SERVICE PROGRAM SP NOVEMBER 2007 SERVICE MANAGERS / PARTS MANAGERS NOTE:

SUT-450-I ASSEMBLY REQUIREMENTS

MM Tubular K-Member, (Mm5KM-7)

Custom Side of Pole Mount

OnBoard Drum Major Podium

Single Seat Trailer. Owner s manual and safety instructions

Signal Mirror Installation Instructions

INSTALLATION & OWNER S MANUAL

Electric Through Frame Slide-Out

Turning Point Pin Box. by Trailair OWNER'S MANUAL

EZ LINER EXPRESS USERS MANUAL

Three-Wheel Drive Kit for Greensmaster 3300 Triflex, 3400 Triflex, 3320 Triflex, Triflex Hybrid, and 3420 Triflex Traction Units Model No.

INSTALLATION INSTRUCTIONS

TOYOTA KLUGER / HIGHLANDER. (2010 Production Onwards) INTEGRATED SIDE STEPS INSTALLATION INSTRUCTION. 60 Minutes

Installation Instructions

INSTALLATION INSTRUCTIONS HD BUMPER AND WINCH MOUNTING KIT Part Number: 70650, 70651, Application: 05-NEWER FORD SUPER DUTY WARNING

Installation Instructions READ THOROUGHLY BEFORE BEGINNING Signature Series Rail Kit Dodge Ram Trucks-all, including Mega-cabs

Installation, Operation and Maintenance Instructions

PART NUMBER: E361SAJ302

CANVAS DOOR KIT P/N , APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

Installation Instructions

255 Cartridge Dual Seal

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION & OWNER S MANUAL

HIGH RISE POWER ANGLE KIT

INSTALLATION INSTRUCTIONS GRILLE GUARD TOYOTA TUNDRA TOYOTA SEQUOIA PART # 2067/2067-2

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS WHEEL-TO- WHEEL

MODEL BA735QC. Instruction Manual. Qwik Change Extension Arm

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Road / PO Box 186 Humboldt, KS P: F:

2.88 OD Universal Mast Mount

DeZURIK DR 125 ROTARY DIAPHRAGM ACTUATOR

INSTALLATION & OWNER S MANUAL

Transcription:

Top-of-Pole Mount for 8 Modules (TPM8) For Module Types D, E, F, G, & H ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 2, Rev F SP3297-2 PCN 121712-33

Top-of-Pole Mount for 8 Modules (TPM8) For Module Types D, E, F, G & H A few words about the product The TPM8 for module types D, E, F, G & H is designed to mount on 6 or 8 inch SCH40/80 galvanized steel pipe (installer supplied). Pipe size and foundation requirements are based on several factors including the array surface area, maximum design wind speed, exposure category, soil type, steepest expected tilt angle, and above-ground clearance. For foundation and pipe size recommendations on a specific installation, please contact us at: Phone: 800-260-3792 Email: info@plpsolar.com WARNING: Follow the procedures and precautions in these instructions carefully. About these Assembly Instructions These instructions... Ÿ Are intended to be used by individuals with sufficient technical skills for the task. Knowledge and use of hand tools, measuring devices and torque values is also required. Ÿ Include various precautions in the forms of Notes, Cautions, and Warnings. These are to assist in the assembly process and/or to draw attention to the fact that certain assembly steps may be dangerous and could cause serious personal injury and/or damage to components. Following the step-by-step procedures and these precautions should minimize the risk of any personal injury or damage to components while making the installation not only safe but an efficient process. Required Tools 7/16 inch wrench or socket for 1/4 inch module hardware 9/16 inch wrench or socket for 3/8 inch hardware 3/4 inch wrench or socket for 1/2 inch hardware 1-1/8 inch wrench or socket for 3/4 inch Pivot hardware 1-1/2 inch wrench or socket for 1 inch Pivot hardware (when Mounting Sleeve is for 8 pipe) Torque wrench Ratchet wrench Ratchet extension bar 3 to 6 foot level Tape Measure Square Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F) 1 of 13

1 2 11 3 10 5 **9 8 *7 6 Top-of-Pole Mount for 8 Modules for Module Types D, E, F, G & H Parts Identification 4 2 of 13 Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F)

CAUTION: Use care while working around the structure during assembly. There could be components that create hazards or obstruct free movement causing serious bodily injury. Many are at head/eye level. Move slowly and with care around the work area. Step 1: Install the Mounting Sleeve on Vertical Pipe Before installing the Mounting Sleeve, verify that the Mounting Pole is plumb to the ground and hasn't shifted or leaned while the concrete footing has cured. The Mounting Sleeve slips on top of the Mounting Pole and has four 1/2 Set s which are used to secure it to the Mounting Pole. (See Figure 1-1) A. Slip the Mounting Sleeve on top of Mounting Pole and slide it down until it rests/bottoms out on top of Mounting Pole. B. Rotate the Mounting Sleeve so the Support Bar Pivot Tab is pointing north and the Vertical Towers are leaning south. C. Secure the Mounting Sleeve by tightening the four 1/2 Set s. Torque each Set to 55-60 ft.-lbs. E S N W Mounting Sleeve Mounting Pole Vertical Towers Leaning South Support Bar Pivot Tab pointing North Set s Set s Figure 1-1: Installing the Mounting Sleeve CAUTION: This is a two person activity. The must be held in place by one person while the second person aligns it and secures it to the Mounting Sleeve using the Pivot and the 1/2 hardware. Failure to do so could lead to serious personal injury. Step 2: Install the to the Mounting Sleeve The is attached to the Mounting Sleeve using the Pivot that passes through its two Vertical Towers and the Support Bar. The Support Bar is attached to the on one end and the Support Bar Pivot Tab of the Mounting Sleeve on the other end using 3/8 or 1/2 hardware. A. Remove the Support Bar from the and re-install in the 15 elevation set point. Secure with the 3/8 or 1/2 hardware and finger tighten. (See Figure 2-1) 65 55 45 35 25 15 15 Position Support Bar Elevation Set Points Figure 2-1: Positioning Support Bar Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F) 3 of 13

NOTE: Although this system offers six elevation set points, for ease of assembly, set the angle to its lowest setting of 15-degrees. Optimum tilt setting of the rack will take place later in these instructions. B. Remove the Pivot from the Mounting Sleeve and also collect the 3/8 or 1/2 x 1-3/4 bolt, flat washers and lock washer needed to secure the Support Bar to its Pivot Tab on the Mounting Sleeve. (See Figure 2-2) C. Orient the to the Mounting Sleeve with its Lower Support Bar positioned on the same side of the Mounting Sleeve as the Support Bar Pivot Tab. D. Slide the between the two vertical mounting tabs, aligning the thru-hole of the with the holes of the two Vertical Towers. E. Insert the Pivot along with one flat washer through the one Vertical Tower and the exiting the second Vertical Tower on the opposite side. Secure with the remaining flat washer, lock washer and hex nut. For now, finger tighten only to allow movement for the next step. Flat Washer Vertical Towers Flat Washer 3/4 or 1 Hex Nut Lock Washer 3/4 or 1 x 5-1/2 Pivot Mounting Sleeve Figure 2-2: Installing the F. Pivot the and the Support Bar to align the mounting holes of the Support Bar with its Pivot Tab on the Mounting Sleeve. Slide the Support Bar over the Pivot Tab. Insert the 3/8 or 1/2 x 1-3/4 bolt and one flat washer through the Support Bar and Mounting Tab and secure it with the remaining flat washer, lock washer and hex nut. Torque hardware on both ends of Support Bar at 32-34 ft.-lbs. for 3/8 hardware or 72-80 ft.-lbs. for 1/2 hardware. (See Figure 2-3) 4 of 13 Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F)

Pivot Tab Support Bar Lock Washer 3/8 or 1/2 x 1-3/4 3/8 or 1/2 Hex Nut G. Figure 2-3: Securing Support Bar to Mounting Sleeve Return and tighten the Pivot. The Pivot cannot be left loose - the Mounting Sleeve Vertical Towers must be firmly clamped to the sides of the eliminating any gaps between the Vertical Towers and the. Torque to 125-150+ ft.-lbs. for 3/4 hardware or 330-350 ft.- lbs. for 1 hardware. (See Figure 2-4) WRONG CORRECT Visible Gaps Pivot Visible Gaps Towers No Gaps Pivot No Gaps Towers Figure 2-4: Tighten and Torque the Pivot Step 3: Install the s to the s run in an E-W direction and are secured to the mounting angles ( welded to the ) using 3/8 square flat washers along with 3/8 x 3-1/4 bolts and hardware. There are two types of s, the difference being the width of the Module Rail mounting tabs welded to the s. These tabs are either 2 long or 3-1/2 long. The s with the 3-1/2 wide tabs are used where Module Rails are butt spliced. This is located at the center N-S position of the Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F) 5 of 13

. s with 2 wide tabs are used to the north and south of the center-most. (See Figure 3-1) s are mounted to the outside of the mounting angles (these are welded to the ); they are not nested into the Mounting Angles. (See Figure 3-2) W S N E South has 2 long Tabs Center has 3 ½ long Tabs North has 2 long Tabs s Figure 3-1: Positioning on relative to Tab Widths CORRECT WRONG Mounting Angle Figure 3-2: Positioning relative to Mounting Angles 6 of 13 Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F)

CAUTION: This is a two person activity. s are long and unstable before they are fully secured to the. Cross- Bars must be held in place by one person while the second person aligns and secures them to the. Failure to do so could lead to serious personal injury. Installing the s W A. Starting at the N-S center position of the, install the with the 3-1/2 long mounting tabs. (See Figure 3-3) B. Position the on the outside of the center mounting angle of the. Align the mounting holes and secure using 3/8 flat and square washers along with the 3/8 x 3-1/4 bolts and lock washer placing the square flat washer against the. Tighten hardware and Torque to 30-32 ft.-lbs. S N E 3/8 Square Washer 3/8 x 3-1/4 with 3-1/2 Tabs CAUTION: Be sure to place the 3/8 square washers on the surface of the and not the Mounting Angles of the. Failure to do so will damage the surface of the when the attaching hardware is tightened. Lock Washer 3/8 Nut Center Mounting Angle Figure 3-3: Installing s on the C. Continue using these steps to install the north and south most s to the. Refer to Figure 3-2 as needed for proper positioning. Step 4: Install the Module Rails to the s Module Rails run in an N-S direction and are secured to the mounting tabs of the s (these are welded to the s) using 3/8 x 1 bolts and hardware. Module Rails have different end configurations and must be installed with these differences in mind. One end has an angle cut while the other end is square cut. The angled ends are oriented to the N-S outer edges of the rack while the square cut is oriented inboard forming a butt joint between two Module Rail ends. Additionally, Module Rails are installed differently depending on whether they are mounted inboard or on the outer edges of the s. (See Figure 4-1) Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F) 7 of 13

CAUTION: This is a two person activity. Module Rails are unstable before they are fully secured to the s. Module Rails must be held in place by one person while the second person aligns and secures them to the s. Failure to do so could lead to serious personal injury. Mounting Tab View looking North Module Rail (in Red) NOTE: Finger-tighten the Module Rails to the s while installing. When all Module Rails are installed, re-tighten to specified torque values. Figure 4-1: Orientation of Module Rails to s Start by installing the inboard sections of Module Rail first and work outward A. Referring to Figure 4-1 for orientation of the inboard Module Rails, position the first section of Module Rail (with its angle cut end positioned north) at the northern most position on the s. Align the Module Rail mounting holes with the holes of the mounting tabs and secure with 3/8 x 1 bolts and hardware. Finger-tighten for now. (See Figure 4-2) N NOTE: Double check the orientation of inboard to outboard Module Rails. If they are installed differently from these instructions the mounting holes will not align to the holes of the PV Modules. W E S Lock Washer 3/8 Nut Module Rail Beveled-End 3/8 x 1 s Square-End Figure 4-2: Installing the Northern-most Inboard Module Rails to s 8 of 13 Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F)

B. Install the next Module Rail creating a butt joint with the previously installed Module Rail. C. Position Module Rail with its angle cut end positioned south and its square cut end butting up to the end of the previously installed Module Rail. Secure with 3/8 x 1 bolts and hardware. Finger-tighten for now. (See Figure 4-3) N W S E Square-End Lock Washer 3/8 Nut 3/8 x 1 s Module Rail Beveled-End Figure 4-3: Installing the Southern-most Inboard Module Rails to s NOTE: Double check the orientation of inboard to outboard Module Rails. If they are installed differently from these instructions the mounting holes will not align to the holes of the PV Modules. Next, install the outboard sections of Module Rail A. Referring to Figure 4-1 for orientation of the outboard Module Rails, position the first section of Module Rail (with its angle cut end positioned north) at the northern most position on the s. Align the Module Rail mounting holes with the holes of the mounting tabs and secure with 3/8 x 1 bolts and hardware. Finger-tighten for now. (See also Figure 4-4) B. Install the next Module Rail creating a butt joint with the previously installed Module Rail. (See Figure 4-5) C. Position Module Rail with its angle cut end positioned south and its square cut end butting up to the end of the previously installed Module Rail. Secure with 3/8 x 1 bolts and hardware. Finger-tighten for now. (See Figure 4-5) Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F) 9 of 13

W S N E Beveled-End 3/8 x 1 Flat Washer 3/8 Nut Lock Washer s Module Rail Square-End Figure 4-4: Installing the Northern-most outboard Module Rails to s W S N E Square-End 3/8 x 1 Lock Washer 3/8 Nut Module Rail Beveled-End Figure 4-5: Installing the Southern-most outboard Module Rails to s 10 of 13 Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F)

CAUTION: This is a two person activity. PV Modules are heavy and unstable before they are fully secured to the Module Rails. PV Modules must be held in place by one person while the second person aligns and secures them to the Module Rails. Failure to do so could lead to serious personal injury and damaged components. Step 5: Installing PV Modules to Module Rails PV Modules are secured to the Module Rails using 1/4 x 3/4 bolts and hardware. Start with the southern most PV Modules and work in a northern direction. This provides a measure of safety as the previously installed southern Modules can help to hold the next in-line northern Module in place during installation. A. Place the southern most PV Module in place on the Module Rails. Align the mounting holes and secure with 1/4 x 3/4 bolts and hardware. Each Module has four attachment points. Finger-tighten for now. (See Figure 5-1) Module 1/4 Nut Lock Washer 1/4 x 3/4 Module Rail Figure 5-1: Installing PV Modules to Module Rails CAUTION: Be certain to go back and tighten all Module Rail and PV Module mounting hardware and torque to the specified values. Failure to do so could lead to structural failure, damaged components and/or serious personal injury. B. Continue in this manner to install all southern most PV Modules first and then work in a northern direction installing the remaining Modules. Step 6: Now return and tighten mounting hardware. A. Return and tighten each set of the 3/8 mounting hardware, securing the Module Rails to the s. Torque all at 32-34 ft.-lbs. B. Return and tighten each set of 1/4 mounting hardware, securing the PV Modules to the Module rails. Torque all at 6-8 ft.-lbs. Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F) 11 of 13

CAUTION: Do not attempt to remove the Pivot during tilt adjustments! Removal could lead to serious personal injury or death. Adjustments are made with the Pivot hardware loosened but in place. Step 7: Adjust the Tilt Angle of the Rack To adjust the tilt angle, loosen the Pivot hardware and removing the Support Arm upper hardware attaching the Support Arm to the. Use great care in this procedure as it can be dangerous if the procedure is not completed as described with a minimum of two people. (See Figure 7-1) A. While one person holds the south edge of rack, the other loosens the Pivot and removes the upper 3/8 or 1/2 hardware attaching the Support Bar to the. CAUTION: This is a two person activity. As the Pivot is loosened and the Support Bar hardware is removed, the rack is heavy and unstable. The rack must be held in place by one person while the second person loosens and removes the hardware and then re-installs/tightens the hardware back in place. Failure to do so could lead to serious personal injury and damaged components. Loosen Pivot Figure 7-1: Preparing to Adjust the Tilt Angle Remove Support Arm Hardware (upper hardware only) B. Tilt the rack to the desired elevation angle (15, 25, 35, 45, 55, or 65 ) and re-attach the Support Bar to the placing the 3/8 or 1/2 hardware in the appropriate hole matching the desired elevation. Torque to 32-34 ft.-lbs. for 3/8 hardware or 72-80 ft.-lbs. for 1/2 hardware. (See Figure 7-2) Support Bar 65 55 45 35 25 15 Elevation Set Points Figure 7-2: Setting the Tilt Angle (continued on next page) 12 of 13 Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F)

C. Re-tighten the Pivot. After changing the tilt angle and tightening the Support Bar hardware, the Pivot must be re-tightened. The Pivot cannot be left loose - the Mounting Sleeve Vertical Towers must be firmly clamped to the sides of the eliminating any gaps between the Vertical Towers and the. Torque to 125-150+ ft.-lbs. for 3/4 hardware or 330-350 ft.-lbs. for 1 hardware. (See Figure 7-3) WRONG CORRECT Visible Gaps Pivot Visible Gaps Towers No Gaps Pivot No Gaps Towers Figure 7-3: Tighten and Torque the Pivot Assembly Instructions, Top-of-Pole Mount (TPM8) For Module Types D, E, F, G, & H (Version 2, Rev F) 13 of 13

Albuquerque Office 1700 Louisiana Blvd., Suite 130 Albuquerque, NM 87110 Corporate Headquarters 660 Beta Drive Mayfield Village, OH 44143 Telephone: 800.260.3792 Fax: 505.889.3548 www.preformed.com E-mail: info@plpsolar.com 2017 Preformed Line Products PCN 121712-33 Version 2, Rev F SP3297-2