Removal/installation instructions for Series NRX (IZMX) drawout levering (racking) mechanism

Similar documents
Installation Instructions for Interlocking Trip Indicator with Remote Reset for Magnum Low Voltage Circuit Breakers

Reprogramming guide. Power Defense ICCB. Instructional Leaflet IL EN WARNING WARNING. Instructions apply to:

Two-way cable interlock kit for Magnum drawout circuit breakers

Installation and removal instructions for Series NRX RF fixed breaker three-way Type 32 cable interlock kit

3-way multi-family drawout cable interlock kit - type 32 - RF

Two-way cable interlock kit for Magnum fixed circuit breakers

Factory Authorized Mechanism Enhancement (FAME)

Digitrip Retrofit System for General Electric AKR/AKRU-6D/7D-30S Series Breakers

Installation Instructions for KPS and KPH Circuit Breakers and Molded Case Switches

COOPER POWER SERIES. Current-Limiting Type NXC (C-Rated) Fuse Installation Instructions. Fusing Equipment MN132014EN

Digitrip Retrofit System for the Federal Pioneer 25-H(L)-2, 30-H(L)-2, 30-H(L)-3, and 30-3 Breakers

O & M Manual for the EATON Generator Ready Loadcenter

Effective November 2016 Supersedes September 1998 (S )

Instruction Booklet IB E. Contents

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod

COOPER POWER SERIES. Testing a motor capacitor on a voltage regulator procedure instructions. Voltage Regulators MN225064EN

Instructions for VCP-W Simple Electrical Ground & Test Device (SEG&TD) with simplified interlock scheme - bottom terminal set version

Digitrip Retrofit System for Allis-Chalmers LA-600 F Electrically Operated Fused Breakers

Installation Instructions for R-Frame G-Series (RG) 310+ Trip Unit

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing

COOPER POWER SERIES. Edison Modular Fuse (EMF) Installation Instructions. Fusing Equipment MN132031EN

COOPER POWER. SERIES CMU Medium voltage power fuse installation instructions. Fusing Equipment MN132032EN

Effective June 2016 New Issue

Instructions for using Functional Test Kit on Digitrip 520 and 1150 family of Power Circuit Breaker Trip Units and Series G and FD MCCB Trip Units

Digitrip Retrofit System for Allis-Chalmers G-25 Breakers

COOPER POWER SERIES. S.T.A.R. Hot line voltage indicator installation instructions. Fault Indicators MN320011EN. Indicator boot.

Digitrip Retrofit System for BBC LKD 8 Breakers

COOPER POWER SERIES. KA662R tank-lifting windlass assembly and installation instructions. Recloser Mountings MN280071EN

COOPER POWER SERIES. RTE EL-BAY-O-NET FUSE Re-Fusing Instructions. Fusing Equipment MN132024EN

COOPER POWER SERIES. ELSG Full-Range Current-Limiting Fuse Re-Fusing Instructions. Fusing Equipment MN132017EN

Digitrip Retrofit System for Siemens-Allis RLX-1600 Breakers

COOPER POWER SERIES. QD5 Quik-Drive tap-changer reversing neutral stationary contact asssembly kit A26 installation instructions

COOPER POWER SERIES. UltraSIL polymer-insulated D-73P disconnect switches installation instructions. Switches MN008004EN

COOPER POWER SERIES. K-Limiter back-up current-limiting fuse installation instructions. Fusing Equipment MN132010EN

COOPER POWER SERIES. HX-CB loadbreak fuse cutout installation instructions. Fusing Equipment MN132011EN

COOPER POWER SERIES. 200 A loadbreak junction 15 and 25 kv class installation instructions. Loadbreak Connectors MN650015EN

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN

COOPER POWER SERIES. S.T.A.R. type LVR faulted circuit indicator installation instructions. Fault Indicators MN320005EN

COOPER POWER SERIES. Screened Separable Connectors MN650023EN. Effective October 2016 Supersedes March 2012 (IS )

COOPER POWER SERIES. Screened Separable Connectors MN650024EN. Effective October 2016 Supersedes March 2012 (IS )

Effective March 2015 Supersedes S August 2012

COOPER POWER SERIES. Pad-mounted Switchgear MN285019EN. Effective March 2017 Supersedes February 2007 (S )

COOPER POWER SERIES. Expulsion fuse installation instructions. Capacitors MN230005EN. Effective November 2016 Supersedes November 2001 (S )

Magnum Breaker Remote Racking Device (MRR1000)

COOPER POWER SERIES. KA1169R Closing Coil Transfer-Switch Accessory Operation. Reclosers MN280069EN

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN

CM52 Network Protector with Arc Flash Reduction Module

COOPER POWER SERIES. Dielectric grease application to recloser cable instructions. Reclosers MN280070EN

Digitrip Retrofit System for the ITE LG-3000 (Frameless) Circuit Breaker

Type NR oil switch installation and operation instructions

Digitrip Retrofit System for the General Electric AKR 6D/7D-30/50 and AKRT 6D/7D-50 Series Breakers

TVSS Installation for RLCM/CHGENLC, RLCU, and CHGEN ATSs

CCP2-FLR1-21_ flange-rod operating mechanism

High-voltage primary bushings installation instructions

Effective November 2016 Supersedes February 2012 (S )

COOPER POWER SERIES. High-voltage primary bushings installation instructions. OEM Equipment MN800008EN

Flush Mount AIN ALPHA Meters. General. Hardware Kit

38 kv Type VCPW-HD Simple Electrical Ground & Test Device (SEG&TD) lower terminal instruction booklet

Effective May 2017 Supersedes December 2004 (S )

COOPER POWER SERIES. Mercury switch to microswitch retrofit kit KA349WE installation instructions. Reclosers MN280022EN

COOPER POWER SERIES. Electronic control battery testing, charging, and replacement instructions. Reclosers MN280074EN

COOPER POWER SERIES. Types 4H single-phase and 6H three-phase vacuum interrupter conversion kits. Reclosers MN280014EN

www. ElectricalPartManuals. com Digitrip Retrofit System for BBC LKD 8 Breakers IL 33-LK8-2

COOPER POWER SERIES. 600 A 15/25 kv class T-OP II connector assembly installation instructions. Deadbreak Apparatus Connectors MN650048EN

COOPER POWER SERIES. Quick Connect Assembly (QCA) Retrofit Kit, General Electric Installation Instructions. Voltage Regulators MN225075EN

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

www. ElectricalPartManuals. com Instructions for Field Testing of Ground Fault Systems Utilizing Cutler-Hammer Magnum DS Circuit Breakers

Simple Electrically Operated Ground & Test Device For use in Type VCP-W Switchgear rated up to 15kV, 25 and 40kA UPPER TERMINAL SET VERSION

COOPER POWER SERIES. KA146W5 single pole-mounting hanger; KA146W2 tank lifting windlass assembly and installation instructions. Reclosers MN280039EN

Effective May 2017 Supersedes January 2003 (S )

COOPER POWER SERIES. KA716L7001 adjustable control valve kit for Types L, E, 4E, V4E, and V4L reclosers installation and adjustment instructions

DANGER. See Wiring Diagrams on page 7 for illustrations of both internal and connection wiring diagrams. WARNING

Magnum breaker remote racking device (MRR1000)

Type DTU De-energized Tap Changer Application, Installation & Selection Guide. IL A Instruction Leaflet Page 1 September, 2003

50 / 75 / 150 DHP [Cable or Hard Bus Application] Ground and Test Device

Installation Instructions for R-Frame Circuit Breakers and Molded Case Switches

COOPER POWER SERIES. Surge arrester interchangeable fuse cutout combination installation instructions. Surge Arresters MN235004EN

Advanced Test Equipment Rentals ATEC (2832)

www. ElectricalPartManuals. com Digitrip Retrofit System for the Westinghouse DA-50 IL 33-DAC-2 WARNING

Instructions for installation, operation, and maintenance of medium voltage VC-W MR2 (integral racking)

dfdf 34.5 kv and 69 kv, Type O Plus C II Condenser Bushings Technical Guide

SPX9000 FR10 FR12 Adjustable Frequency Drives

COOPER POWER SERIES. Types D and DV recloser installation instructions. Reclosers MN280030EN

! WARNING I.L D WARNING GENERAL INFORMATION

Freedom FlashGard Aftermarket Kit Installation Manual

Installation Power Management Unit Battery Cables and Battery Harness

Installation Instructions for Series C F-Frame 310+ Electronic Circuit Breaker Types FDE, HFDE, FDCE

RotoTract Remote Racking Operating Manual

www. ElectricalPartManuals. com Digitrip Retrofit System for Allis-Chalmers LA-4000 F Fused Breakers IL 33-A1K-1 WARNING

COOPER POWER SERIES. 600 A 15/25 kv class BOL-T and separable splice connector assembly installation instructions

Installation Instructions for Series C F-Frame 310+ Electronic Circuit Breaker Types FDE, HFDE, FDCE

PMD DRIVER RELOCATION KIT For Chevy 6.5L Diesel Trucks

COOPER POWER SERIES. 600 A 15 kv and 25 kv class BT-TAP connector system installation instructions. Deadbreak Apparatus Connectors MN650004EN

AMVAC TM and ADVAC TM Breaker commissioning procedures

COOPER POWER SERIES. 600 A 35 kv class BT-TAP connector system installation instructions. Deadbreak Apparatus Connectors MN650003EN

O & M Manual for the EGSU Automatic Transfer Switch with RTC-100 Control and Integral Loadcenter-100 Amp

COOPER POWER SERIES. Fused loadbreak elbow connector installation instructions. Loadbreak Apparatus Connectors MN650014EN

COOPER POWER SERIES. Metal-enclosed capacitor banks installation instructions. Power Capacitors MN230010EN

The Ultimate Smart Grid Solution INSTRUCTION MANUAL

Users Guide for Ac-sync

Transcription:

Effective October 2010 Supersedes June 2010 IL01301018EH03 Removal/installation instructions for Series NRX (IZMX) drawout levering (racking) mechanism WARNING (1) ONLY QUALIFIED ELECTRICAL PERSONNEL SHOULD BE PERMITTED TO WORK ON THE EQUIPMENT. (2) ALWAYS DE-ENERGIZE PRIMARY AND SECONDARY CIRCUITS IF A CIRCUIT BREAKER CANNOT BE REMOVED TO A SAFE WORK LOCATION. (3) DRAWOUT CIRCUIT BREAKERS SHOULD BE LEVERED (RACKED) OUT TO THE DISCONNECT POSITION. (4) ALL CIRCUIT BREAKERS SHOULD BE SWITCHED TO THE OFF POSITION AND MECHANISM SPRINGS DISCHARGED. FAILURE TO FOLLOW THESE STEPS FOR ALL PROCEDURES DESCRIBED IN THIS INSTRUCTION LEAFLET COULD RESULT IN DEATH, BODILY INJURY, OR PROPERTY DAMAGE. WARNING THE INSTRUCTIONS CONTAINED IN THIS AWA AND ON PRODUCT LABELS HAVE TO BE FOLLOWED. OBSERVE THE FIVE SAFETY RULES: DISCONNECTING ENSURE THAT DEVICES CANNOT BE ACCIDENTALLY RESTARTED VERIFY ISOLATION FROM THE SUPPLY EARTHING AND SHORT-CIRCUITING COVERING OR PROVIDING BARRIERS TO ADJACENT LIVE PARTS DISCONNECT THE EQUIPMENT FROM THE SUPPLY. USE ONLY AUTHORIZED SPARE PARTS IN THE REPAIR OF THE EQUIPMENT. THE SPECIFIED MAINTENANCE INTERVALS AS WELL AS THE INSTRUCTIONS FOR REPAIR AND EXCHANGE MUST BE STRICTLY ADHERED TO PREVENT INJURY TO PERSONNEL AND DAMAGE TO THE SWITCHBOARD. Section 1: General information The drawout levering mechanism provides all the required capabilities to lever (rack) a circuit breaker into and out of a drawout cassette (Figure 1). It permits the circuit breaker to reach three drawout positions (DISCONNECT, TEST, CONNECT), and includes a mechanical position indicator that is visible from the front of the circuit breaker. Right and left side sheets, already attached to the mechanism, provide the means for securely mounting the mechanism to the breaker body. The side sheets include breaker lifting handles, as well as drawout wheels that allow the breaker to move into and out of the cassette on the cassette s drawout rails. Lifting Handle One M5 x 25 Mounting Screw and Nut (ground/earth connection) Four M5 x 16 Mounting Side Sheets Five M5 x 12 Mounting Lifting Handle Position Indicator Levering Mechanism Figure 1. Drawout Levering Mechanism

Effective October 2010 Section 2: Removal of drawout levering mechanism Remove the circuit breaker from its drawout cassette to a suitable work surface. Proceed with the following seven steps: Step 1: Remove the four screws holding the front cover in place (two on each side of the cover). Figure 4. Step 3 Figure 2. Step 1 Step 2: Remove the front cover. Pull down on the charging handle to simplify removal. Step 4: Note in Step 4 and 4a graphics on page 3 that the left and right side sheets are each attached with five screws. Two M5 x 16 screws go through each lifting handle on both sides. The left side uses three M5 x 12 and the right side two M5 x 12 and one M5 x 25 screws that go directly into the breaker. All of the mounting screws are secured by small square nuts positioned in individual mounting slots. The one M5 x 25 screw is used in conjunction with an M5 nut on the inside of the breaker housing to provide a grounding (earthing connection). Make sure that all square nuts are accounted for to ensure that none are dropped into any part of the breaker. Breaker Right Side Two M5 x 16 Figure 3. Step 2 Two M5 x 12 Step 3: Carefully lay the circuit breaker back until it rests on its primary finger clusters as shown. One M5 x 25 Screw and Nut (ground/earth connection) Figure 5. Step 4 2 EATON CORPORATION www.eaton.com

Effective October 2010 Breaker Left Side Section 3: Installation of drawout levering mechanism It is recommended that the new mounting hardware supplied with a new drawout levering mechanism be used to mount a new mechanism. The installation process may be simplified if the top and bottom finger cluster shrouds and primary stabs are first removed from the rear outer corners of the breaker. Proceed with the following 11 steps: Step 1: If necessary, remove the front cover from the breaker by performing Steps 1 and 2 of Section 2. Two M5 x 16 Three M5 x 12 Figure 6. Step 4a Step 5: Remove the five screws from each side sheet as shown. Step 2: If necessary, make sure the breaker is resting back on its primary finger clusters as described and shown in Step 3 of Section 2. Step 3: Place the 10 small square nuts supplied in the nut retention slots, five on each side of the breaker as shown. Be careful not to drop any mounting hardware into the breaker itself. Figure 7. Step 5 Step 6: After all 10 mounting screws are removed, carefully slide the levering mechanism off of the breaker as shown. Square Nut Retention Slots Figure 9. Step 3 Step 4: Position the levering mechanism as shown for installation on the circuit breaker. Figure 8. Step 6 Step 7: Follow the instructions outlined in Section 3 to install another levering mechanism. EATON CORPORATION www.eaton.com 3

Effective October 2010 Step 7: Insert two of the M5 x 16 screws provided into the slots in the lifting handle, and then into the slots in the top of the side sheet. Screw the two screws into the small square nuts, and loosely hand tighten. Make certain that these two screws are recessed into the handle so as not to interfere with removal of the accessory tray. Figure 10. Step 4 Step 5: Carefully slide the mechanism into place as shown so the mounting slots and holes in the side sheets line up with the square nuts installed in Step 3. Figure 13. Step 7 Figure 11. Step 5 Step 6: Connect the top of one side sheet first by aligning the slots in the lifting handle with the slots in the top of the side sheet as shown. Step 8: Insert the three remaining mounting screws provided into the mounting holes in the same side sheet started with in Step 7, and screw them into the small square nuts. Keep in mind that the one M5 x 25 mounting screw and M5 nut provided are only used on the right side of the breaker, and provide for a grounding (earthing) connection to the breaker mechanism. The M5 x 25 screw goes through the side of the breaker housing and is secured from the inside by the M5 nut. If the mounting process was started on the left side of the breaker, three M5 x 12 screws only would be used in this step. Loosely hand tighten these screws also. Figure 12. Step 6 4 EATON CORPORATION www.eaton.com

Effective October 2010 Breaker Right Side Shown Two M5 x 12 One M5 x 25 Screw and Nut Figure 14. Step 8 Step 9: Perform Steps 6, 7, and 8 again on the other side of the breaker with the other side sheet. Step 10: Once both sides are connected, complete the mounting process by firmly hand tightening all mounting screws on both sides of the circuit breaker. Step 11: Replace the front cover and secure it in place with the mounting screws previously removed in Step 1. EATON CORPORATION www.eaton.com 5

Effective October 2010 Disclaimer of warranties and limitation of liability The information, recommendations, descriptions, and safety notations in this document are based on Eaton Corporation s ( Eaton ) experience and judgment, and may not cover all contingencies. If further information is required, an Eaton sales office should be consulted. Sale of the product shown in this literature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between Eaton and the purchaser. THERE ARE NO UNDERSTANDINGS, AGREEMENTS, WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON. THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability, or otherwise for any special, indirect, incidental, or consequential damage or loss whatsoever, including but not limited to damage or loss of use of equipment, plant or power system, cost of capital, loss of power, additional expenses in the use of existing power facilities, or claims against the purchaser or user by its customers resulting from the use of the information, recommendations, and descriptions contained herein. The information contained in this manual is subject to change without notice. Eaton Corporation Electrical Group 1000 Cherrington Parkway Moon Township, PA 15108 United States 877-ETN-CARE (877-386-2273) Eaton.com 2010 Eaton Corporation All Rights Reserved Printed in USA Publication No. IL01301018E October 2010 PowerChain Management is a registered trademark of Eaton Corporation. All other trademarks are property of their respective owners.