StorEdge Wiring Guide & On Site Checklist - Europe, Australia & South Africa

Similar documents
StorEdge TM Solution Applications with the StorEdge Interface and LG Chem Batteries Connection and Configuration (Europe, APAC, South Africa)

StorEdge TM Solution Applications with the StorEdge Interface and LG Chem Batteries Connection and Configuration (Europe, APAC, South Africa)

SolarEdge. StorEdge Solution Applications. Connection and Configuration Guide. For Europe, APAC & South Africa Version 1.1

SolarEdge. StorEdge Solution Applications. Connection and Configuration Guide. For North America Version 1.0

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

* Protected from tools and particles greater than 2.5 millimeters * Protected form low pressure water jets from any direction

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

StorEdge Solar and Energy Storage System Review

Your home and business energy independance. Energy Bundle CA5000TPV-3D

SP PRO KACO Managed AC Coupling

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

Remote Monitoring System

Battery & Energy Meter Quick Guide

Installing a Programmed Fronius SCERT in a Managed AC Coupled system

8 Troubleshooting and Maintenance

SP PRO ABB Managed AC Coupling

Battery & Energy Meter Quick Guide

PowerCommand 500/550 Remote Monitoring System

SOLAREDGE S STOREDGE SOLUTION

ENERGY MANAGER. Installation Manual

PV Master OPERATION MANUAL

RS485 MODBUS Card. User Manual. Before you start to install this card, please read this User Manual carefully

Residential SolarEdge StorEdge

Information Technology and Economic Development: An Introduction to the Research Issues

Features MICRO-0.25-I MICRO-0.3-I PRODUCTS PANEL

PowerCommand iwatch Wireless

My Reserve 500 Install Guide

PLUS PLUS & PRO. Installation manual

Off Grid Solar Inverter. LVS 50M User Manual

The StorEdge Solution. Enabling Energy Independence

TOP SMART intelligent position monitor:

Level Plus. Magnetostrictive Liquid Level Transmitters with Temposonics Technology. LP-Series SE Replacement Installation Manual

The StorEdge Solution

Operation and Maintenance

FLÄKTGROUP PM-MOTOR WITH INTEGRATED FC 106 FREQUENCY CONVERTER

SolarEdge Single Phase StorEdge Inverter for Europe, APAC & South Africa

3 Phase Power Systems - Designed for Canada

AIS and 40 kva 400 V. Site Preparation and Installation Manual

Goodwe 5048ES with BYD B-BOX (2.5-10) Installation Guide

1. Introduction OHY1P kW Hybrid Inverter USER MANUAL V2.0

SNMP dedicated to ORVALDI Solar Infini

User Manual. Hybrid PV Inverter. Version: 2.1

Feed-in management with Solar-Log

n Operator s Manual n Redundant Control Unit FOR CFR UNINTERRUPTIBLE POWER SUPPLIES FROM ALPHA TECHNOLOGIES

CHANGE YOUR ENERGY CHARGE YOUR LIFE

LDX-U20 is a microprocessor controlled DC-UPS rated 20 A usable in 12 V or 24 V systems.

DIESEL Engine Fire Pump Controllers Features

ET9500 BEMS Interface Box Configuration Guide

ORVALDI Solar Infini 5kW

SE8300 Series Installation Guide 24 Vac Low Voltage

CLA-VAL e-drive-34. User Manual. Motorised Pilots. CLA-VAL Europe LIN072UE - 04/16

Installation Guide Smart-UPS On-Line SRT1000/1500 UXI-NCLI, SRT1000/1500 UXI-LI, Tower/Rack-Mount

Allen-Bradley 1397 Pulse Encoder Interface Card

MCS-BMS-GATEWAY STARTUP GUIDE Covers Model No. FPC-C35

Factory Packaged Controls. OE (AAON Part No. V12090) MODGAS-X Controller Field Technical Guide

On Line UPS. LUC 1000E / LUC 2000E / LUC 3000E User Manual

Pre-announcement. Transformerless Solar Inverters

ABB - DMPC PG Solar, Nov 2016 ABB: a leading company in solar The most comprehensive value proposition

Quick User Manual SH5K Grid-Connected Hybrid Inverter

User Manual Back-UPS BC500-RS, BC650-RS 650 VA 230 V

SolarMax S series (United Kingdom) Maximising solar plant yields can be so easy.

INTECH Micro 2300-RTD6

MPPT75HV MAXIMUM POWER POINT TRACKING SOLAR BATTERY CHARGE CONTROLLER

User Manual. SP10000 Premium

SH5K+ Hybrid Inverter Overview & Installation.

User Manual. Hybrid 4KW PV Inverter. Version: 1.2

Dusty / Dusty Ex. Low-Cost Broken Bag Detection. Operating Instructions. SWR engineering Messtechnik GmbH

Operations Manual Pika Harbor Smart Battery

Quick User Manual SH3K6 / SH4K6 Grid-Connected Hybrid Inverter

User Manual Solar Charge Controller 3KW

& Operation Manual. Growatt 10000HY. Installation GR-UM-A03-A-00

ENERGY SOLUTIONS RESIDENTIAL STORAGE BATTERY SYSTEM

REVOLUTIONIZE YOUR GAS DENSITY AND PURITY MEASUREMENT TECHNOLOGY

Fingerprint/Card Terminal AC-6000 V2.0

ECCII to ECCIII Upgrade Kit

Rectangular photoelectric proximity switches

WORLD MOTOR VEHICLE PRODUCTION BY COUNTRY AND TYPE QUARTERS June 14, 2018

User Manual. Solar Charge Controller 3KW

AUSTRIA. Table 1. FDI flows in the host economy, by geographical origin. (Millions of US dollars)

Communicator Installation Sheet. Version 1.0.1

1. INTERNATIONAL OVERVIEW. 1.0 Area and population. population (1,000) area

:34 1/15 Hub-4 / grid parallel - manual

Model H30 Operation Manual

Spain s exports by oil product group and country of destination. Year Corporación de Reservas Estratégicas de Productos Petrolíferos

ATyS M Modular Transfer Switching Equipment from 40 to 160 A

PowerCommand Paralleling Systems. Robust Paralleling System Solutions For Reliable Performance

Primary energy. 8 Consumption 9 Consumption by fuel. 67 th edition

LS1024BP/ LS2024BP. Solar Charge Controller USER MANUAL

X11CA-IM MASTER MODULE

5P 650 AU 5P 650i R 5P 850 AU 5P 850i R 5P 1150 AU 5P 1150i R 5P 1550 AU 5P 1550i R. User's guide

BYD Battery-Box LV Installation Guidance

UGE-4K Off-Grid Controller OWNER S MANUAL

Quick User Manual SH5K-20 Grid-Connected Hybrid Inverter

SimpliPhi Power PHI Battery

BP Statistical Review of World Energy June 2017

Installation and Operation Manual Back-UPS BX800CI-ZA/BX1100CI-ZA

LSE kw. Outdoor packaged unit. Air/water chillers and heat pumps LSE PLUS

AE R2 December CoreSense Diagnostics v2.11 for Copeland Discus Compressors AE R2. Table of Contents

Transcription:

StorEdge Wiring Guide & On Site Checklist - Europe, Australia & South Africa This document contains a battery wiring guide and on site checklist with steps for post-installation verification of a StorEdge system. For more details, please refer to the StorEdge Installation Guide supplied with the StorEdge Inverter or StorEdge Interface. For additional assistance contact SolarEdge Support (refer to Support and Contact Information on page 11. Wiring Guide Wiring Types and Connectors To connect the battery to the StorEdge Inverter/Interface, use the following wiring types and connectors: Recommended cable type (min-max cross section) SolarEdge connector Type B/B1 Tesla battery connector Type C Tesla battery connector DC: 6mm² (2.5-6mm²), 600V insulated BAT DC + DC + + tab RED Thermal: 2-wire shielded twisted pair cable 1.5mm² (1.3-2.5mm 2 ), 600V insulated Control and monitoring: 5-wire shielded twisted pair cable 0.2mm² (0.2-1.5mm 2 ), 600V insulated. CAT5 600V insulated can also be used. Wiring Diagrams BAT DC + DC - - tab BLACK Type E/E1 Tesla battery connector/cable Ground Ground Ground Green or Yellow/Green Battery Thermal - THERMAL + N/A N/A En (enable) ENABLE EN EN / Orange V+ LOGIC+ LG+ LG+ / Brown G (RS485) LOGIC- N/A N/A B - (RS485) COM LO CM- CM- / Yellow A + (RS485) COM HI CM+ CM+ / Blue Table 1: Wiring Types and Connectors The diagrams on the following pages illustrate the connection of the different battery types to the StorEdge Inverter/Interface and meter, and the connection of two batteries to each other. Pay attention to the wire colors and battery DIP switch setup. 1

Wiring Diagrams Connecting to the StorEdge Inverter Type B Tesla Battery StorEdge Inverter SolarEdge Modbus Meter Figure 1: Type B/B1 Battery Connected to a StorEdge Inverter Type C Tesla Battery StorEdge Inverter SolarEdge Modbus Meter Figure 2: Type C Battery Connected to a StorEdge Inverter 2

Type E Tesla Battery StorEdge Inverter SolarEdge Modbus Meter Wiring Diagrams Connecting to the StorEdge Interface Figure 3: Type E/E1 Battery Connected to a StorEdge Inverter Type B Tesla Battery StorEdge Interface Inverter SolarEdge Modbus Meter Figure 4: Type B/B1 Battery Connected to a StorEdge Interface 3

Type C Tesla Battery StorEdge Interface Inverter SolarEdge Modbus Meter Figure 5: Type C Battery Connected to a StorEdge Interface Type E Tesla Battery StorEdge Interface Inverter SolarEdge Modbus Meter Figure 6: Type E/E1 Battery Connected to a StorEdge Interface 4

Wiring Diagrams Two Batteries Figure 7: Type B/B1 - Two-Battery Connection To the StorEdge Inverter/ StorEdge Interface Figure 8: Type C - Two-Battery Connection 5

To the StorEdge Inverter/ StorEdge Interface Figure 9: Type B and Type E - Two-Battery Connection To the StorEdge Inverter/ StorEdge Interface 6

Post Installation Verification and Configuration Figure 10: Type C and Type E - Two-Battery Connection Follow the checklist below to verify that the systems is properly connected and configured. The checklist is suitable for a system with a single StorEdge Inverter/Interface, a single battery and a single SolarEdge Modbus Meter installed at the grid connection point (see diagram below). For other system configurations follow the steps in the StorEdge Installation Guide supplied with the StorEdge Inverter or StorEdge Interface Figure 11: StorEdge System with StorEdge Inverter (left) and with StorEdge Interface (right) 7

Step Verification Action Checked 1 Installation and Wiring 1.1 Verify the distance between components complies with the distances detailed in the supplied installation guide. 1.2 Take a photograph of the battery thermal controller and send to SolarEdge support (useful for future debugging if necessary.) 1.3 Take a photograph of the StorEdge Interface (if installed) and send to SolarEdge support. 1.4 Take a photograph of the installation and send to SolarEdge support. 1.5 Verify that the battery splash cover is closed. 1.6 Verify that the backed-up loads panel is wired. 1.7 Verify that all DC, communication and AC cabling connections are completed as follows: 1.7.1 Check AC wiring and circuit breaker. 1.7.2 Check string DC input voltage. Expect 1V per optimizer in the string. 1.7.3 Verify that grounding is properly connected in the battery, inverter or StorEdge Interface. 1.7.4 Check DC wiring to the battery (see Table 1). Pull on the connections and verify that all are secured and tight. 1.7.5 For Type B batteries: Check thermal connection to the battery (see Table 1). Pull on the connections and verify that all are secured and tight. 1.7.6 Check connections to the battery including DIP switch setup as described in the supplied installation guide. 1.7.7 Check connections to the meter. 1.7.8 Check connections between the StorEdge Interface and the inverter (if applicable). 1.7.9 Check that a 9V battery is installed in the StorEdge Inverter (if applicable). 1.7.10 Check meter AC and CT connections including CT direction: Connect the meter to power supply. Check the LEDs: when configured as export/import meter: green=import, red=export; when configured as consumption meter LED should be green. 1.7.11 Check connection to the internet with one of the following options: Ethernet, Wi-Fi, Cellular, ZigBee Module. 2 Commissioning 2.1 Switch on the inverter AC. 2.2 Activate the inverter using the SE card. 2.3 Perform pairing when the modules are exposed to sunlight. 2.4 Switch the inverter ON/OFF switch to OFF. 3 RS485 Configuration Verification (for 1 Battery and 1 meter) 3.1 If not already OFF, switch OFF the StorEdge Connection Unit switch (for StorEdge inverter). 3.2 Switch the inverter ON/OFF switch to OFF. 3.3 Devices 8

Step Verification Action Checked 3.4 Meter 3.5 Battery 3.3.1 Setup > Communication > RS485-1 > Multi Devices 3.4.1 Setup > Communication > RS485-1 > Meter 2 > Meter ID (2), Device Type <MTR>, Protocol<WN>, CT Rating (check CT label), Device ID <2> Meter Function (E+I). 3.4.2 Verify Device Type > Revenue Meter 3.4.3 Verify Protocol > Meter 3.4.4 Verify that Device ID is set to 2. 3.4.5 Verify CT value that appears on the CT label: CT Rating > <xxxxa>. 3.4.6 If CT resets to 0, check the communication to the meter. 3.4.7 For a meter installed at the grid connection point select Meter Func.> Export+Import. 3.5.1 Setup > Communication > RS485-1 > Battery 1 > Battery ID (24). 3.6 Optional: RS485 Expansion Kit 4 RS485 Connection Verification 3.6.1 For a multi-inverter system install and configure an RS485 Expansion Kit. Refer to its installation guide: http://www.solaredge.com/files/pdfs/rs485_expansion_kit_installation_guide.pdf Press the inverter external LCD light button to display the status screens one after the other until a screen like the following is displayed: 4.1 Check the RS485 communication status: 4.1.1 Verify that the number under Prot displays the number of configured devices. 4.1.2 Verify that the number under ## displays the number of communicating devices. 4.2 Check the meter(s): In the meter(s) status screen check that the status is OK. If Comm. Error appears, refer to the troubleshooting section in the supplied installation guide. 5 Check Battery Connection 5.1 Scroll through the menus until you reach the battery status screen. Check the battery information: BSN (battery serial number), ID (should be 24; 25 for a 2 nd battery), SOE (battery capacity in percentage), PWR (charge/discharge power), Total (total discharged energy) and the State (Charging/Discharging, Idle, Init or Fault). 9

Step Verification Action Checked 6 Inverter + Battery Firmware Upgrade 6.1 Insert a micro SD card with the latest firmware version available on http://solaredge.com/storedge/firmware. 6.2 Close the inverter cover and the StorEdge Interface cover (if applicable). 6.3 Switch on both the inverter ON/OFF switch and the StorEdge Interface (if applicable). 6.4 Using the external LCD light button go to, Maintenance > SW upgrade > Yes, wait for Running script to finish, duration 5min + 25min per battery. Battery Firmware Version Check 6.5 Switch OFF the inverter and wait 3 minutes. 6.6 Setup > Communication > RS485-1 > Battery 1 > Battery Info 7 Setup StorEdge Operating Mode 7.1 Turn ON the inverter. 7.2 Check charge or discharge according to the current condition. 7.3 Set up the operating mode according to one of the following options: Maximize Self Consumption 7.3.1 Setup > Power Control > Energy Manager > Energy Control > Max self-consume Charge/Discharge Profile Programming 7.3.2 Setup > Power Control > Energy Manager > Energy Control > Time of Use Backup Only 7.3.3 Setup > Power Control > Energy Manager > Energy Control > Backup only 7.4 Optional: Set additional StorEdge options AC Charge 7.4.1 Setup > Power Control > Energy Manager > Storage Ctrl > AC Charge > Enable Backup reserve 7.4.1 Setup > Power Control > Energy Manager > Storage Ctrl > Backup Rsvd > {Value} 10

Support and Contact Information If you have technical queries concerning our products, please contact us: Australia (+61) 1800 465 567 support@solaredge.net.au APAC (Asia Pacific) (+972) 073 2403118 support-asia@solaredge.com China(+86) 21 6212 5536 support_china@solaredge.com France and Belgium (+33) 0800 917 410 support@solaredge.fr DACH and Rest of Europe (+49) 089 454 59730 support@solaredge.de Italy (+39) 800 784 824 support@solaredge.it Japan (+81) 03 5530 9360 support@solaredge.jp Netherlands (+31) 0800 0221 089 support@solaredge.nl United Kingdom (+44) 0800 028 1183 support-uk@solaredge.com US & Canada (+1) 510 498 3200 ussupport@solaredge.com Greece (+30) 00800 125574 Middle East & Africa (+972) 073 2403118 South Africa (+27) 0800 982 659 Turkey(+972) 073 240 3118 Worldwide (+972) 073 240 3118 support@solaredge.com Before contact, make sure to have the following information at hand: Inverter and power optimizer model numbers Serial number of the product in question The error indicated on the inverter screen or on the SolarEdge monitoring portal, if there is such an indication. System configuration information, including the type and number of modules connected and the number and length of strings. The communication method to the SolarEdge monitoring portal, if the site is connected Inverter software version as appears in the ID status screen. 11