OCEAN COUNTY ARES EMERGENCY GENERATOR USE By WX2NJ. The following was taken from September and October Ocean County ARES Newsletters in 2012:

Similar documents
OWNER S MANUAL AND INSTALLATION INSTRUCTIONS

Critical Home Power. Economical Manual start Whole House AC Power For Amateurs. Hugh Maguire N1QGE

INSTALLATION AND OPERATING INSTRUCTIONS

Standby Electric Generators for Alaskan Residences. Advice & Installation

Select and safely install a home generator

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE

Supply-Side PV Connections

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Backup Generation Application

GENERAL INFORMATION 1.01 PURPOSE

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

Demand Switch NEFA20 Plus. Installation Guide. Please read this entire guide before beginning the installation!

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

DIY 15 Amp Portable Generator Transfer Switch

Components for your PV Solar Electric System

32 IAEI NEWS March. April

Electric Drive Vehicle Infrastructure Training. Instructor s Manual. National Alternative Fuels Training Consortium

Residential Standby Power

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Overcurrent Protection (2014 NEC) (Homestudy)

TESCO THE EASTERN SPECIALTY COMPANY Date: 05/04/15 Canal Street and Jefferson Avenue Bristol, PA 19007

Service Entrance Methods

Micro3 Grid Tied Residential Package

SURFACE TRACK (120/250V) SPECIFICATIONS

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

GET GROUNDED. Renewable Energy System Grounding Basics

Electrical Safety. Electrical Safety Webinar. Electrical. Printing Industries Alliance Printing Industries Alliance 1

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

TRANSMISSION SYSTEMS

How To AC Couple Grid Tied Inverters with OutBack Frequency Shifting Inverters

ACSI MODEL 1440 POWER SUPPLY INSTALLATION INSTRUCTIONS

Installation and Construction Notes for EVSE4

Motor Protection. Presented By. Scott Peele PE

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

Back Up Essential Circuits or Your Whole House. Protect the things that matter most.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

A. Submit manufacturer's literature and technical data before starting work.

INSTALLATION INSTRUCTIONS

Generator Fire Safety: Generator assemblies should be located outside the building.

OutdoorXUPS-600AHV-8364

Overcurrent Protection According to the 2011 NEC

ECET Distribution System Protection. Overcurrent Protection

/ 120-VOLT ELECTRICAL SYSTEM

Ten Deadly Conditions to Check for in Your Boat's Electrical System - Part 2

ENGINEERING SPECIFICATION

Design Standards NEMA

Table of Contents. Electrical Service Requirements. 1. General Requirements

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

IMPORTANT SAFETY INSTRUCTIONS

Guidelines for Inverter-Based Micro-Generating Facility (10 kw and Smaller)

Advanced Guide To Understanding Assembly Short-Circuit Current Rating WITH ENGINEERING SOLUTIONS AND OVERCURRENT PROTECTION DEVICES TO ENHANCE SCCR

8300 Series Installation Guidelines

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

Pretest Module 24 Three-phase Service Entrance

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Design considerations for generator set mounted paralleling breakers

FACT SHEET Standard: Electrical Safety

Off Grid Cabin Special Pkg 1-170W PV

ELECTRICAL HAZARD EXAMPLES

Quick Connection Panel (QCP) Installation Guide

ALL PURPOSE CNC/HEAVY DUTY

An average of one worker is electrocuted on the job every day There are four main types of electrical injuries:

NET METERING ENROLLMENT APPLICATION REFERENCE GUIDE

Plan Ahead or Bust the Electric Budget

Learning Module 10: Loadcenters. 101 Basic Series

672W Off Grid Residential Package

StorEdge Solar and Energy Storage System Review

Off Grid Residential Package 1.0KW

RS4000 Setup. Before you install the RS4000 system, check to ensure that nothing was damaged or lost during shipping.

Electricity 1

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTEGRID TRACK (120V) SPECIFICATIONS

CLIF NOTES SERIES (Competent Leveraging of Information and Facts) ELECTRICAL

Electrical Equipment and Terminology

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

Solar PV Standard Electrical Plan

TABLE II Electrical Permit Fees

2000 Cooper Bussmann, Inc. Page 1 of 9 10/04/00

Ensuring the Safety Of Medical Electronics

Gay E. Canough. OFF-GRID Design. Dr. Gay E. Canough, Master trainer. Living Off the Grid

Going the Distance - Solving Power Reach Issues With Diverse DAS Solutions

Standby Power Systems Standby Power Systems

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

Standby Power Systems

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

Standby Generators. Our company does electrical and

North America Phase Converters & Electrical Supply

National Electric Transportation. Meeting

COMMERCIAL HANDBOOK 2013 EDITION MATANUSKA ELECTRIC ASSOCIATION, INC. PALMER, ALASKA

Home Generator Systems BUYING GUIDE

Owner's/Installation Manual

SECTION VARIABLE FREQUENCY DRIVE UNITS

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

50 AMP Smart Energy Management System Model 800 SERVICE MANUAL 50 AMP SMART EMS. 50 Amp EMS Display Panel P/N A I N A I N

Mar H: SUPPLEMENTAL PARALLELING GEAR (16315-H)

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Transcription:

The following was taken from September and October Ocean County ARES Newsletters in 2012: I recently purchased a used 9KW dual-fuel (gasoline/propane) generator from a gentleman in Atlantic County, who used the unit for less that 100 hours during the massive June 29, 2012 storm that swept through Southern NJ and many parts of the East Coast. Part of the sale included a heavy-duty power cable and connectors to tie the unit into your home power system. Unfortunately, the connector setup that was used on the cable was illegal and is commonly known as a lineman killer. It involved feeding the generator 120/240 volt output directly into a dryer outlet and backfeeding power into your home electrical system. If, by chance, the main breaker was closed on the home power panel, 240 volts would be fed back into the utility companies power transformer secondary winding and would power dead utility conductors with high voltage at or near the primary voltage rating of the utility transformer. This practice is a violation of the National Electric Code (NEC) and has unfortunately taken the lives of linemen. If you have ever been in a Home Center during the threat of a power failure or during a power failure, you will see customers by the dozens scrambling to obtain connectors for this type of setup. The cable terminates in a typical dryer plug with male prongs, which have the ability to be live and unprotected to anyone coming in contact with the connector. The purpose of this and next months articles, is to outline the correct way to connect a generator to a home power system. First, you must plan ahead. The time to arrange a generator connection scheme is not after you have already lost power, but well ahead of the power outage. This should be part of your family emergency plan that many talk up, but few act out. I m going to assume that the generator to be used is a portable type device and not a permanent installed generator. Permanent installed generators are normally installed by licensed personnel and meet the requirements of the NEC. The first setup is the simplest and merely involves plugging loads to be powered into outlets on the generator by the use of heavy extension cords, which then may pass through open windows and/or door openings. This may be fine to power a refrigerator and some portable lights, but what if the user wants to power a 240 volt well pump and a furnace (for Winter outages) and possibly a cooling/heating inverter (for Summer cooling). The second setup involves the installation of a transfer switch to the main breaker of the power panel of your residence. Any work on your electrical system has to be performed by licensed electricians or as a homeowner, you can do the work after obtaining proper permits and inspections. The photo below shows a typical whole house transfer panel (tan colored panel on bottom) installed in such a manner that either utility power is supplied to the distribution breaker panel (with the left hand 100 amp breakers closed) or generator power is being fed to the distribution breaker panel (with the right hand Page 1 of 5

60 amp breakers closed). A physical UL interlock prevents both utility and generator breakers from being shut and the same time. Conduit passes out the back of the transfer panel and allows injection of 120/240 volt generator power up to 30 amps (7500 watts) via a UL approved power inlet box on the outside of the residence. Appropriate breakers would have to be opened or closed on the distribution panel in order not to overload the generator and balance the load. Watt meters are also available to monitor the generator feed to help balance the load between neutral and each side of the line. Because of the way in which larger portable generators are designed, they generate power in two equal halves. A generator which has an output of 5000 continuous running watts, for example, generates power from two 2500 watt sides. This type of installation also allows the operation of any 240 volts appliances connected to the distribution panel as long as the generator capacity is not exceeded. As you can see, there is a lot to the process and an early plan can save a lot of frustration and confusion in an emergency. Put together a family emergency plan NOW and save yourself grief in the future. Next month I ll cover a third option of a transfer panel for selected circuits on a breaker distribution panel. Page 2 of 5

Last month I discussed the use of a whole-house electrical transfer panel to interface an emergency generator into your electrical system and this month I would like to discuss the use of a Power Transfer Panel for selected circuits. Pictured below is a typical Transfer Panel for selected circuits. This particular panel is for six circuits, but many others are available. This panel is available with a power inlet (from the generator) on the panel next to the two wattmeters or (as shown below) is covered with a plate and the generator inlet box can be mounted anywhere and routed to the transfer box via conduit. In this particular installation, the Power Inlet Box is directly behind the Transfer Panel on the outside wall of the home (close to the utility meter pan). The beauty of this type of Transfer Panel is that a circuit can be transferred over to generator power simply by toggling a selector switch from LINE to GEN. It is wired to the main breaker distribution panel between a branch circuit breaker and the associated load. In the LINE position, the load is connected directly to the branch circuit breaker and passes through the Transfer Panel toggle switch. In the GEN position, the load is connected to the circuit breaker above each toggle switch and then to the generator. This provides a branch breaker when connected to the generator and isolates the power from the main breaker distribution panel and prevents power feedback into the utility company. Dual wattmeters allow you to monitor and balance the load on your generator since power is generated in two equal halves. Note that the two center toggle switches (C and D) are tied together. This is for a 230 volt well pump. All other circuits are 120 volt. In the installation shown below, the six circuits that were selected feed a well pump, refrigerator, chest freezer, heating boiler (including circ pumps) and general lighting circuits. When utility power is restored (which can be detected by other circuits becoming energized), each toggle switch can be easily be returned to the LINE position. As with any electrical work, this type of panel would be installed by a licensed electrician with the proper permits. Once it is installed, generator power can be safely transferred to selected circuits and eliminates temporary cords and cables from running through windows and doors. It reduces the burden of trying to find the best way of getting power to critical loads during power outages when you are under enough stress during an emergency and it is easy to make a mistake. Page 3 of 5

A typical six circuit Transfer Panel for selected circuits Page 4 of 5

GENERATOR IN USE DURING SUPERSTORM SANDY October 2012 The generator ran for 54 hours continuous operation until utility power was restored. Since the fuel source is a 250 gallon above ground tank, no shutdown was required as is the case with gasoline engines. Most service stations were closed due to the loss of utility power and gasoline was at a premium. A heavy chain lock was also added after this photo was taken to prevent theft. The generator is also in view of an infrared closed circuit camera system. Bob Murdock, WX2NJ Ocean County ARES Emergency Coordinator Page 5 of 5