Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Similar documents
SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

White River Electric Association, Inc. Net Metering Information & Service Requirements

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below:

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Louisville Gas and Electric Company

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

Louisiana Net Metering Service. Customer Information Package

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

NET METER REQUEST FORM

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

Consumer Guidelines for Electric Power Generator Installation and Interconnection

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

To complete the process for a net metering interconnection, please follow the steps below:

Net Metering Program

TERMS AND CONDITIONS

Distributed Generation Interconnection Policy

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES

MISSOURI SERVICE AREA

Noble County Rural Electric Membership Corporation

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

S T A F F R E P O R T

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Municipality Generator Interconnection Application Single Meter Application Part I

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

Definitions. Scope. Customer Generation Interconnection Requirements

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

London Hydro Connection Checklist

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

COMMUNITY SOLAR PROGRAM

TILLAMOOK PEOPLE S UTILITY DISTRICT

Interconnection Process for Generation Systems

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Noble County Rural Electric Membership Corporation

TERMS AND CONDITIONS XXV. NET METERING CUSTOMERS AND SMALL AGRICULTURAL GENERATORS

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Net Metering Service. Customer Information Package

To complete the process for a net metering interconnection, please follow the steps below:

ELECTRIC DIVISION CUSTOMER-OWNED RENEWABLE GENERATION INFORMATION PACKAGE

2014 RENEWABLE ENERGY PHOTOVOLTAIC Fact Sheet

Indiana - Net Metering Service. Customer Information Package

REVISION NO.: 7 EFFECTIVE: 07/07/16

New Hampshire Electric Cooperative s (NHEC) Above the Cap Interconnection (Net Metering) Application Instructions

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Umatilla Electric Cooperative Net Metering Rules

Douglas Electric Cooperative Roseburg, Oregon

To complete the process for a net metering interconnection, please follow the steps below:

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

Schedule SP SOLAR PURCHASE (Experimental)

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

Solar*Rewards Frequently asked questions system size and customer usage

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

ARKANSAS PUBLIC SERVICE COMMISSION NET-METERING RULES

Net +Plus Connection Code

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Adopted: September 24, 2015 Version: Version 1.0

NET METERING APPLICATION

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Electrical District No. 3 SOLAR Q & A

To complete the process for a net metering interconnection, please follow the steps below:

JEA Distributed Generation Policy Effective April 1, 2018

REBATE APPLICATION. 1. Rebate Applicant Information. 2. Dealer Information OKLAHOMA NATURAL GAS COMPRESSED NATURAL GAS (CNG)

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

Public Access Electric Vehicle Charging Station Rebate Program Agreement

24. SOLAR INCENTIVE PROGRAM II

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

ARKANSAS PUBLIC SERVICE COMMISSION

REQUIREMENTS FOR GRID INTERCONNECTION OF RENEWABLE GENERATION SYSTEMS

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

AGRALITE ELECTRIC COOPERATIVE 320 EAST HIGHWAY 12 P.O. BOX 228 BENSON, MN PHONE: (320) FAX: (320)

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Transcription:

Processed Date Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Customer s Printed Name Installation Street Address Account Number Please note: Columbia Water & Light can limit the number of interconnection agreements if the total of interconnected facilities already approved in a calendar year equals or exceeds 1% of the City s single-hour peak load for the previous year. Whereas (Customer) currently receives electricity from Columbia Water & Light (CWL) and wishes to interconnect an approved electric generating facility to CWL and sell electrical energy to CWL. NOW, THEREFORE, THE CUSTOMER AGREES: 1. 2. 3. 4. 5. GENERATING FACILITY: The solar powered generating equipment owned and operated by the customer or The Facility (as detailed on the form in this agreement) must be solely powered by solar energy and must have an electrical output that is compatible with the CWL electrical system as specified in Section 27-36, 27-105 and 27-120 of the City of Columbia Code of Ordinances. Also, the facility must be located on customer s premises and have a maximum total output rating of no more than 100 Kilowatts and must be intended primarily to offset part or all of the customer s own electrical requirements. CUSTOMER RESPONSIBILITIES: Customer agrees to accept responsibility for the design, installation and operation of the facility. Customer agrees to obtain all necessary permitting including building permits from Columbia s Community Development Department s Building and Site Development Division prior to any construction or installation thereof. Customer agrees to bear all costs for equipment and labor to connect the facility to the CWL electric distribution system. Customer agrees to reimburse CWL for any and all losses, damages, claims, penalties, or liability that may arise from operations of the facility. RENEWABLE ENERGY CREDIT: These credits are defined in the Columbia Code of Ordinances 27-36. Customer grants CWL permission to use the renewable energy credits (REC) or attributes inherent in the electrical output from the facility. Customer agrees to not sell or transfer any renewable energy attributes arising from the electricity produced by the facility that would prevent or deter CWL from utilizing such renewable attributes. Solar customers can choose to retain their renewable energy credits and receive a lower payment for net energy. Please see section 6 below. TERM: This agreement shall commence on the completion of the final CWL inspection and shall remain in effect until terminated by either party upon thirty (30) days prior written notice, provided, however, that this agreement will terminate automatically upon: a. Any change in ownership of the facility or the premises upon which the facility is located. b. Any change in the size or nature of the facility or relocation of the facility at the customer s premises. c. Any change of ownership of the location listed in this agreement (if customer is not an individual or family). DEFINITION OF NET ENERGY: Net energy is the difference in electrical energy supplied to the Customer from CWL s electrical supply system and the electrical energy supplied to CWL from the Customer, during any specific billing period. Net energy is measured in kilowatt hours (KWH). page 1 of 4

6. PRICE AND PAYMENT FOR NET ENERGY: Customer shall be billed for net energy in accordance with the normal billing procedures as set forth in the Customer s rate schedule. All energy supplied by the Customer will be credited at the rate per kilowatt hour agreed to in the following chart. The applicable rate will be decided by the Customer and approved by the CWL representative. CUSTOMER: select applicable net metering rate preference Customer s Initials Type of Payment for Net Energy For solar generated energy and the utility retaining the renewable energy credits, the Customer shall receive credit per kilowatt hour equal to the Customer s current applicable rate schedule. For solar generated energy with the Customer retaining the renewable energy credits, the Customer shall receive credit per kilowatt hour based upon the avoided average energy market price at the Columbia pricing node. This price will be adjusted each fiscal year based on the previous year s average. For non-solar renewable generated energy, Customer shall receive a rate credit based upon the avoided average energy market price at the Columbia pricing node. This price will be adjusted each fiscal year based on the previous year s average. NOTE for solar generators (with utility retaining the RECs): For billing periods in which the net energy is less than zero, credits for the amount of net energy shall be applied to the account. Credits can be carried over and applied to the next billing cycle except for the March billing in which any credits remaining after the March billing will be removed without compensation to the Customer. 7. INTERCONNECTION STANDARDS: Customer agrees that the generating facility complies with all applicable safety, performance, synchronization, interconnection and reliability standards established by the Missouri Public Service Commission, the National Electrical Safety Code, National Electrical Code, the Institute of Electrical and Electronics Engineers, and Underwriters Laboratories for distributed generation. The following standards shall also be met for solar systems: a. National Electrical Code (NEC) including but not limited to NEC Articles 690 (guidelines outlining the installation of the system including structural and electrical components) and NEC 705 (regarding the safety and warning signs of the system) b. Underwriters Laboratories (UL) including but not limited to UL 1741 (Standard for Static Inverters and Charge Controllers for Use in Photovoltaic Systems) and UL 1703 (Standard for Safety: Flat Plate Photovoltaic Modules and Panels) c. Institute of Electrical and Electronics Engineers (IEEE) Standards including but not limited to 1547-2003 (Standard for Interconnecting Distributed Resources with Electric Power Systems) d. Customer s system shall contain a switch, circuit breaker, fuse or other easily accessible device or feature located in immediate proximity to the Customer s metering equipment that would allow a utility worker the ability to manually and instantly disconnect the generating facility from CWL s distribution system. 8. 9. OVER-CURRENT PROTECTION: The Customer agrees to provide an over-current protective device at the service panel that is dedicated only to the facility and is capable of interrupting the maximum available fault current. The over-current protective device shall be clearly marked to indicate power source and the connection to CWL. DISCONNECTION: The Customer agrees to install a manual, lockable, load-break disconnect switch with clear indication of the switch position in a location at or near the main point of service that is easily visible and accessible to CWL personnel. The disconnect switch shall provide a point of separation between the facility and the CWL electric system. page 2 of 4

9. 10. 11. 12. DISCONNECTION: CWL may open the disconnect switch to isolate the Customer s system from the CWL electric system for any reason that CWL deems necessary including but not limited to: maintenance, emergency work, unsafe or hazardous conditions, adverse affects to the electric service or other Customers, or for any failure of the facility to comply with codes and/or regulations. Should the facility be disconnected and locked by CWL for any reason the Customer agrees to not remove, tamper or bypass the disconnect for any reason until such time that CWL has approved the restoration of the interconnection between the facility and the CWL electric system. OPERATIONAL STANDARDS: The Customer agrees to furnish, install, and operate all equipment required for the safe operation of the facility interconnected to CWL s electrical supply system without cost to CWL. This includes, but is not limited to, all equipment necessary to maintain automatic synchronism with CWL s electrical supply system and automatic disconnect between the facility and CWL s electrical supply system in the event of overload or outage of CWL s electrical supply system. The facility must be designed to operate within allowable operating standards for CWL s electrical supply system. INSTALLATION AND MAINTENANCE: Customer agrees to maintain all equipment on the Customer s side of the delivery point, including the required disconnect device, in satisfactory operating condition. INDEMNITY, LIABILITY AND INSURANCE REQUIREMENTS: The Customer agrees to hold harmless CWL for any damage to property as a result of any failure or malfunction thereof. CWL shall not be liable, indirectly or directly, for permitting or continuing to allow the interconnection of the facility or for the acts or misuse or omissions of the Customer or the failure or malfunction of any Customer-owned equipment that causes loss or injury, including death, to any party. Whenever any liabilities are incurred by either or both of the parties for damages caused by injuries to either party (or their employees or agents) or the property of either party, or caused by injuries to other persons on either party s property arising out of the subject matter of this agreement, then the liabilities for such damages between the parties will be as follows: 13. a. b. c. d. e. Each party will be liable for all damages because of injuries to persons or property caused solely by its negligence or solely by its failure to comply with this agreement. Each party will be liable for all damages to its own property that are caused by the concurrent negligence of both parties, or that are due to causes that cannot be traced to the sole negligence of the other party, to the extent of its negligence therefore. Each party will be liable for all damages due to injuries to itself or its own employees or agents that are caused by the concurrent negligence of either party, or that are due to causes that cannot be traced to the sole negligence of either party; provided that in no event will a party be liable for damages because of injuries to itself or its own employees and agents in any amount in excess of applicable worker s compensation insurance and provided further that this agreement will in no way impair the right of the injured party or its employee or agent to the extent that a third party negligence proximately caused injuries or damages to party or its employee or agent. In the event of claims brought to recover damages because of injuries to persons not employees of either party and because of injuries to property not belonging to either party that are alleged to be caused by the concurrent negligence of both parties or are alleged to be due to causes that cannot be traced to the sole negligence of either party, the parties agree no right of indemnification will exist, so that in all such claims, the issues of liabilities will be determined as a matter of contribution and not as a matter of indemnity. Neither party will have any liability whatsoever for any special, indirect, consequential or punitive damages. Insurance: if the Customer s system is rated over 10 kilowatts then the Customer agrees to carry no less than $100,000 of liability insurance that provides for the coverage of all risk of liability for personal injuries (including death) and damage to property arising out of or caused by the operation of the net metering unit. PRE-OPERATION INSPECTION: Prior to interconnection the Customer shall obtain an electrical permit from the City of Columbia allowing the attachment of the facility to the building s electric service. The facility and associated interconnection equipment shall be inspected and approved by a designated inspector of the City of Columbia prior to interconnection. Customer agrees to pay costs for the permit and inspection as required by the City of Columbia. page 3 of 4

14. 15. ACCESS: Authorized CWL employees shall have the right to enter the Customer s property at any time for the purposes of inspection, operating the disconnect device or maintaining CWL property. ACKNOWLEDGMENTS REGARDING AGREEMENT: By signing below, the Customer acknowledges that he/she understands and agrees to the terms of this Agreement and that the Customer may not connect the facility to CWL s electric distribution system until the Customer has received approval from the City of Columbia. CWL must approve of any changes that occur from what was submitted in the site diagram to what is installed at the site by the Customer. The Customer agrees to bear all costs for the equipment and labor to connect and install the facility to the CWL electric system. This agreement shall not be construed to imply a joint venture or partnership between the parties. Customer s Printed Name Customer s Signature Date page 4 of 4

0/00/0000 Processed Date Columbia Water & Light Solar Powered Electric Generating Facility Information NOTE This form must be turned in along with the Interconnection and Net Metering Agreement and the site diagram before you proceed with your project. Columbia Water & Light reserves the right to refuse a net metering arrangement or a solar system rebate for any customers not following the utility s guidelines. I will I will not be requesting a Columbia Water & Light solar system rebate. Pre-approval is required for solar system rebates. You will be notified after submitting this form that your project is eligible. Section 1: Customer Information Name Mailing Address Street Address (if different from above) Daytime Phone Evening Phone E-mail Address Utility Customer Account Number (from utility bill) Section 2: Photovoltaic Net Metering Facility Information Number of panels Estimated annual kilowatt hour output Inverter Manufacturer Watts per panel Inverter Power Rating Watts total output of system Inverter Location Inverter Model Manual Disconnect Location PV Module Model PV Module Manufacturer PV Module Power Rating PV Module Location Orientation (from the South, in degrees) Kilowatts Tilt Section 3: Installation Information Licensed Electrician or Contractor # Mailing Address Daytime Phone Cell Phone Installation Date For CWL use only Insurance needed? Yes Customer s rate classification No residential Copy of insurance certificate (above 10 kw) small general large general industrial Notes on customer s project Type of net metering agreement: solar generation + RECs solar generation without RECs Date inspected Staff person inspecting system Rebate amount Kilowatt rating Estimated kwh output HPwES participation? Yes No

0/00/0000 Processed Date Columbia Water & Light Wind Powered Electric Generating Facility Information NOTE This form must be turned in along with the Interconnection and Net Metering Agreement and the site diagram before you proceed with your project. Columbia Water & Light reserves the right to refuse a net metering arrangement for any customers not following the utility s guidelines. Section 1: Customer Information Name Mailing Address Street Address (if different from above) Evening Phone Daytime Phone E-mail Address Utility Customer Account Number (from utility bill) Section 2: Wind Net Metering Facility Information Number of wind turbines Wind Turbine Manufacturer Total output of system Kilowatts Wind Turbine Location Inverter Manufacturer Watts Per Turbine Inverter Serial Number Inverter Model Inverter Location Inverter Power Rating Manual Disconnect Location Wind Turbine Model Watts Wind Turbine Power Rating Section 3: Installation Information Licensed Electrician or Contractor # Mailing Address of Installer Daytime Phone of Installer For CWL use only Insurance needed? Yes Customer s rate classification Installation Date No residential Copy of insurance certificate (above 10 kw) small general large general Notes on customer s project Date inspected Staff person inspecting system Rebate amount Kilowatt rating Estimated kwh output industrial

Columbia Water & Light Site Diagram for Net Metered Renewable Energy Systems Columbia Water & Light would like to know the approximate location of you renewable energy system so we can review your plans and be prepared for you to be connected to our system through a net metering arrangement. Please use the labels below to show the location on your structure of the meter, the disconnect switch, the breaker/fuse box and the applicable renewable energy system. Please mark on your diagram which direction is north. Please label the following. Use an arrow to point to north on your property. LABELS: M D B Meter Disconnect Breaker/Fuse box Select one of the following and label accordingly. PV W O Photovoltaic Wind Other type of renewable energy system (please list which type) Notes sample B N M D PV