WIDE SPAN SHELVING PAGE 1 OF 10

Similar documents
Mini-Racking Proposals

Mini-Racking Proposals

SHELVING PRODUCTS. Maximize Your Storage Space

Mini-Racking MINI-RACKING SPIDER MINI-RACKING SYSTEM

U.S. Price List. UPDATED Nov 3, 2018

INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER

Clipper Defined. Shelving. Clipper Hi-Performance Shelving Systems. Growth with. Penco Hi-Performance Shelves. Growth with

Spider Shelving System

TYPICAL SPECIFICATION ECP Steel Pier PPB-300 Utility Bracket System

each end Nominal (6',7',8') is Actual Nominal -35/16" Nominal Depth is Actual Depth 8,000 lbs 8,000 lbs 8,000 lbs 8,000 lbs 8,000 lbs 8,000 lbs

Hi-Tech specially designed components allow for fast and easy assembly.

Series 300B Features 3/4 Particle Board Decking

S/6EA CARRIAGE & ELECTRICAL INSTALLATION INSTRUCTIONS PART VI CARRIAGE ASSEMBLY ELECTRICAL WIRING PART III THE FESTOON RACKING ELECTRICAL HOOK-UPS

Spider Shelving System

Lifting height 5.5" - 72" with adapters " Height overall 165" Width between columns 122" Drive through 109" Width overall 151.

Cetra Assembly Instructions

FastRak Shelving Pages Cantilever Racks Pages Archive Shelving Pages 26-27

Warehouse Merchandising and Rack Solutions

Installation Guide 4097M

ILLUSTRATED PRICE BOOK

Fabric Studio Custom Roll Shades Installation Instructions

Installation Instructions

6 Inch Oval Step Board

Full Subpanel. Additional Mounting Hardware

Opening Quality Doors Around The World. Installation Instructions Bi-Parting Freight Doors - Q Style (Power and Manual)

Checker Unload Checkstand Installation Instructions

MULTI-POLE MOUNT LARGE GROUND MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

Installation STUD JOIST A237R SPECIFICATIONS. Width Height Depth Weight Max. Spacing between Mounts Max. Load

Car Gate - Q Style Installation Instructions.

WILSONSTAK CANTILEVER SHELVING DETAIL SHEETS

Installation Instructions Vanishing Lid Bracket

Assembly and Modular Table Power System Installation Instructions for Train Tables

Installation Instructions

Slump Master III Slump Inspection and Safety Platform for Single & Double Units

** DO NOT EXCEED THE RECOMMENDED VEHICLE TOWING WEIGHT RATING ** DODGE RAM 1500

Spider Shelving System

Installation Instructions

Installation Instructions

Start-up and Operation

Installation Instructions

Installation Instructions

Clutch Operated Roller Shade with Fascia Installation Instructions

Frequently Asked Questions

Installation Guide 4099H

Installation Instructions Tigertop

Midwest Roadside Safety Facility

Installation Information 2009 Model 300 Dumbwaiter

Instructions for Ordering

Installation Instructions Supertop for Truck

Installation Instructions

UMS Storage Rack ASSEMBLY INSTRUCTIONS Chief Automotive Systems, Inc.

Front HD Bumper. Part No. FHDB003TI. PARTS LIST: Qty Part Description Qty Part Description

Self-Stabilizing Hand Truck Table of Contents:

Installation Instructions

Roller Shades CORD LOOP. Head Rail, Fascia and No Head Rail. Installation & Care Instructions

Racking/Shelving. Redirack Profiles** Centennial Profiles* Other dimensions available. Call your Material Handling Specialist today!

Installation Instructions

VIBRATING WIRE SURFACE STRAIN GAUGE. Model SM-5B. Roctest Limited, All rights reserved.

Dodge SuperRail Mounting Kit #3516

Auto-Lift Operating System

Installation Instructions Studio Makeup Station

INSTRUCTION MANUAL 16K - Fifth Wheel Hitch

RECOMMENDED PROCEDURE FOR INSTALLATION OF DRILLCO MAXI-BOLT ANCHORS

Installation Instructions Capacity 10,000 lbs. (100 Series Lift)

Superstrut. Metal Framing. Threaded Products and Hardware. Channel Nuts. Design Data. Screw Threads. Finish and special materials

Midwest Roadside Safety Facility

Installation Instructions QUARTER STICK Fits: 2 Speed (Powerglide) or 3 Speed (Turbo-Hydramatic)

Wildcat System Instructions

Fisher 657 Diaphragm Actuator Sizes and 87

Contents. Section 5: Adjustments Ball Detect Adjustment Transport Band Tension Adjustment

Part# Description Q'TY

INSTALLATION MANUAL MODEL 1200 FULL SIZE TRUCK MODEL 1205 COMPACT SIZE TRUCK

Spider Shelving System

Instructions for 2-row monitoring only

Adult Car Plans. A comprehensive guide to help you build an official Soap Box Derby Adult Car

SHELVING SYSTEM Shelving system and Mini-Racking

Installation Instructions

TYPICAL SPECIFICATION

Installation Instructions

4' x 10' Assembly Instructions. We re Here To Help! Call Toll Free Section Roll In Dock Shown

INSTALLATION & OWNER S MANUAL

WARNING! THIS SHIFTER IS FOR RACING USE ONLY. NOT FOR STREET USE!

g in lv e h s s s ltle o b

ASSEMBLY & OPERATION INSTRUCTION MANUAL

HiBoy Maverick/Commander Doors Part # HiBoy4 Maverick/Commander Doors Black

DRAGO 12 ROW FOLDING HEAD QD2 TOOLBAR MOUNT STALK STOMPER

Installation Instructions

Hydro Cut Series Walk-Behind Mowers

Traction Tread Grating - Design Load Table of Contents & Advantages

Cabinet Free Universal Assist Lifter Instructions

Durulite Door Hardware Manual

PRODUCT LABEL. ID Tag: XP 2000 Manual. When ordering parts, have your ASI job number and door number available.

Important Information

OFFICE PARTITIONS. Data Port Openings. Use cable tie bracket to dress data cables under panels. STEP 1

AND MAINTENANCE MANUAL

Installation Instructions

Installation Instructions

4" Oval Nerf Bar. Part No. A1535S/B. PARTS LIST: Qty Part Description Qty Part Description

Installation Instructions

2011 Cadillac CTS Coupe EGX Exhaust Tip & Rear Valance Mesh Accent Kit Part #: Complete E

Transcription:

WIDE SPAN SHELVING PAGE 1 OF 10 I N S T A L L A T I O N I N S T R U C T I O N S PAGE 2-3 PARTS IDENTIFICATION NOTE! This publication is intended to be a generic installation instruction for Madix Wide Span, and may possibly be subject to change as required by local building codes...consult the building inspection department at job site. PAGE 4-5 BASIC INSTALLATION PAGE 6-7 INSTALLATION OF EXTRAS PAGE 8 LOAD CAPACITY PAGE 9 SAFETY PAGE 10 ANCHORING TO FLOOR

WIDE SPAN SHELVING PAGE 2 OF 10 P A R T S I D E N T I F I C A T I O N LIGHT DUTY REGULAR DUTY LIGHT DUTY = LD REGULAR DUTY = RD HEAVY DUTY = HD RDWSFB FRONT WIDE SPAN HEAVY DUTY DIMENSIONS Deck Supports Beams Actual Frame Actual Beam Length Depth Length Length Inside of Brackets 18" 20" 48" 48 3/16" 24" 26" 60" 60 3/16" 30" 32" 72" 72 3/16" 36" 38" 84" 84 3/16" 42" 44" 96" 96 3/16" 48" 50 - - LIGHT DUTY = LD REGULAR DUTY = RD HEAVY DUTY = HD RDWSDS WIDE SPAN DECK SUPPORT REGULAR DUTY REGULAR DUTY = RD HEAVY DUTY = HD RDWSF WIDE SPAN HEAVY DUTY HEIGHT DIMENSIONS Frame Actual Frame Actual Depth Depth Height Height 18" 20" 48" 48 " 24" 26" 60" 60" 30" 32" 72" 72" 36" 38" 84" 84" 42" 44" 96" 96" 48" 50" 108" 108" - - 120" 120"

WIDE SPAN SHELVING PAGE 3 OF 10 P A R T S I D E N T I F I C A T I O N REGULAR DUTY = RD HEAVY DUTY = HD WIDE SPAN DECK SEALED = S UNSEALED = U RDWSD -U PARTICLE BOARD DECKS...dimensions Frame Actual Beam Actual Depth Depth Length Length 18" 18" 48" 47 29/32" 24" 23 29/32" 60" 60" 30" 30" 72" 72" 36" 36" 84" 84" 42" 42" 96" 96" 48" 48" - - WIDE SPAN NOMINAL GRID SIZE...3"o.c. WSWMS -3 PIECE WIRE GRID DECK WIRE GRID NOMINAL PIECE FLOW THROUGH FTWSD WIDE SPAN DECK NOMINAL NOMINAL PIECE WIRE GRID DECKS, and FLOW THROUGH DECKS...dimensions Frame Actual Piece Actual Depth Depth Length Length 18" 17 3/4" 24" 23 3/4" 24" 23 3/4" 36" 35 3/4" 30" 29 3/4" 48" 47 3/4" 36" 35 3/4" - - 42" 41 3/4" - - 48" 47 3/4" - - WIRE GRID and FLOW THROUGH PIECE S RUN PARALLEL TO S COMBINATIONS OF # OF DECK PIECE S SUPPORTS 36" 36" 2 48" 48" 2 60" 24" plus 36" 4 72" 36" plus 36" 4 84" 36" plus 48" 4 96" 48" plus 48" 4 FLOW THROUGH

WIDE SPAN SHELVING PAGE 4 OF 10 1 Snap chalklines on floor as shown for shelving layout. See diagram on page one for dimensions. 2 3 Raise first frame to vertical position and install first beam...frame will now stand alone. NOTE! If floor anchors or extension frames are to be used, they should be installed prior to raising frames to the vertical position...see pages 5-6. Raise second frame to vertical and install free end of first beam... install second beam on opposite side. 4 Install upper beams at designated levels. 5 If using Dart Clips: Press dart clips through beam bracket and upright on under side of beam as shown. Insert one dart clip at each end of all beams. Insert dart clip from inside upright if using LD beams. If using Retainer Pins: Insert one leg of a retainer pin through beam bracket and upright. Insert one pin at each end of all beams. 1 2 END LINE TOP OF UPRIGHT BOTTOM OF UPRIGHT B A S I C I N S T A L L A T I O N DART CLIP WDC-50...pack of 50 RETAINER PIN WSREP AISLE LINE 5 4 3 Insert dart clip from inside upright if using LD beams. NOTE: Retainer pins and dart clips serve the same purpose - to retain beam connections IMPORTANT: ANY USED AS A PRODUCT RETAINER MUST BE BOLTED THROUGH BOTH UPRIGHTS.

WIDE SPAN SHELVING PAGE 5 OF 10 6 Repeat assembly sequence with remaining frames, beams and dart clips/retainer pins. NOTE! If back to back runs are being installed, see page 6 for back to back connectors. 7 Holding the deck support at an angle to the beam, squeeze the open side and insert into the beam, then swing the free end around to the opposite beam, squeeze the open side and insert into the beam. wood decks... three deck supports B A S I C I N S T A L L A T I O N DECK SUPPORTS... QUANTITY & LOCATION all decks... two deck supports wire grid and flow through decks... four deck supports 7 8 9 8 Squeeze the open side of the deck support at each end just inside the beam and rotate upwards as shown. 9 Correct installed position will look like this...see above for quantity of deck supports per beam length. 10 Repeat with the remaining deck supports in the shelving run. 10 11 Install all decks in the shelving run. 11

WIDE SPAN SHELVING PAGE 6 OF 10 12 13 14 The first sections of the back to back run should be erected with beams at top and bottom of the four frames. Locate the connectors just below the top beams and just above the bottom beams. Secure with the fasteners as shown. Repeat with the remaining sections. Install all intermediate beams as required, then install a third connector as close as possible to the mid-point of the frames. Complete the shelving run with the deck supports and decks. A I N S T A L L A T I O N O F E X T R A S B BACK TO BACK CONNECTOR WSBBC-2-24 WSBBC-2-24 HARDWARE PACK #7200-079 QTY. ITEM DESCRIPTION A 48 1/4-20 x 2 1/4" carriage bolt B 48 1/4-20 wing nut A...indicates item, where used. 15 In the sixth square hole from the top of the lower frame, insert a stop to prevent the connector from dropping to the floor. 16 17 18 19 Insert connector into frame with flat center of connector facing the slotting. Screw connector to lower frame with provided fasteners...remove the stop. Repeat above with the 2nd upright of the frame. Lower upper frame onto connectors and secure through the sixth hole up from the joint. CONNECTORS WSFC-2 C D WSFC-2 HARDWARE PACK #7200-078 QTY. ITEM DESCRIPTION C 4 1/4-20 x 2" Phillips truss head machine screw D 4 1/4-20 hex nut C...indicates item, where used. C D

WIDE SPAN SHELVING PAGE 7 OF 10 FLOOR ANCHOR WSFA-2 I N S T A L L A T I O N O F E X T R A S NOTE! IF HEIGHT, OR TOTAL HEIGHT OF CONNECTED S, IS MORE THAN SIX TIMES THE...S MUST BE SECURED WITH FLOOR ANCHORS. 20 Insert floor anchors into the bottom of each frame. They will only insert at 45 O to the frame. Make sure that anchors are inserted so that they will not project into aisles or cross aisles. 21 22 Follow directions on page 4 to step 6, except do not install dart clips on bottom beams. Secure beams to frames through the floor anchor as shown. The screw will go through at one of the two locations, depending on the beam size. Check run alignment to chalkline prior to drilling floor for expansion bolts. Due to varying floor conditions, expansion bolts must be ordered separately. If they were not ordered initially, but are required, see page 8 to order from Madix or purchase locally. A B C A LEVELING SHIM WSLS-10C Ten pack of galvanized shims...dimpled to fit in bottom of upright and maintain stacking interlock. WSFA-2 HARDWARE PACK #7200-080 QTY. ITEM DESCRIPTION 2 1/4-20 x 2 1/2" round head machine screw 2 1/4-20 hex nut 2 1/4" flat washer A...indicates item, where used. 20 21 C B TOP CAP WSTC - -CL Packs of 4 or 48 clear plastic top caps, two per frame. Tap into top of each frame upright.

WIDE SPAN SHELVING PAGE 8 OF 10 HAND STACK ONLY! POWERED FORK TRUCKS OR STACKERS ARE NOT RECOMMENDED FOR USE ON WIDE SPAN SHELVING L O A D S A F E T Y LOADING Frame loading is the vertical load, measured in pounds, that can be applied on any Wide span frame. Each Wide span frame will bear ONE HALF OF THE LOAD ON EACH PAIR that it supports. ALL S HAVE 10,000 POUND LOAD CAPACITY!! Height to Depth Ratio: Ratio should not exceed 6 to 1 measuring to the top of top most load. If ratio exceeds 6 to 1 the constraint can be overcome with proper anchoring or external bracing of the rack structure. CONSULT YOUR STRUCTURAL ENGINEER FOR SOLUTIONS. Based on evenly distributed loads Based on 96 beam length, all frame widths MAXIMUM LOAD CAPACITY...PER PAIR LIGHT REGULAR HEAVY # OF DECK DUTY DUTY DUTY SUPPORTS 48" 1000 # 1600 # 3000 # 2 60" 1000 # 1600 # 3000 # 3 72" 1000 # 1600 # 3000 # 3 84" 1000 # 1600 # 3000 # 3 96" 1000 # 1600 # 3000 # 3

WIDE SPAN SHELVING PAGE 9 OF 10 S A F E T Y D U R I N G I N S T A L L A T I O N GENERAL 1. Contact the local building department prior to starting installation to check on any restrictions. 2. Only parts and accessories produced or supplied by Madix are covered by Madix warranty. 3. Installation sequence must be followed exactly for assembly and leveling. 4. Under no circumstances should damaged parts be used. 5. Do not use shelving parts or accessories for any purpose other than originally intended. 6. Installation instructions with product load ratings are included with each order and must be followed carefully. 7. Merchandisers must be made aware of possible overloading as specified in load ratings. If you do not receive these, please contact your sales or customer service representative. 8. Initial installation or relocation of Madix gondola, wall or racking fixtures should be supervised exclusively by qualified personnel. RACKING... S / S 9. Observe all prohibitions in the installation instructions on the use of powered lifts. 10. A minimum of four people are required to erect frames taller than 8. 11. Be sure all beams or accessories are completely seated and locked or secured in frame slotting. 12. Ladders, if used, should be at least frame height. 13. Never stand on lower beams to install upper beams. 14. Do not walk on decks, especially wire grid. 15. Never try to move a completed racking run, especially if merchandised.

WIDE SPAN SHELVING PAGE 10 OF 10 A N C H O R I N G T O T H E F L O O R EXPANSION BOLTS FOR FLOOR ANCHORS...50 expansion bolts, 3/8-16 x 3 1/2 POWERS/ Power-Stud+SD2 concrete anchors or other ICC (ICBO) approved expansion bolts. SFA-EB50: See below for other ICC (ICBO) approved expansion bolts which may be used. NOTE! The expansion anchors provided by Madix for floor anchoring at this site have been supplied by one of the firms listed below. All the anchors have been tested and approved as stated by the following ICC (ICBO) report numbers and all are manufactured in the United States or Canada. If the anchors are not provided by Madix and field substitution other than listed be proven, Madix cannot be held responsible. Should verification be required, call Madix Customer Service at: 800.776.2349.........................................................................ICC (ICBO) # COBRA ANCHORS CORP., Parawedge concrete anchors.............................er-2350 S1 DIVERSIFIED FASTENING SYSTEMS, DFS Wedge anchor...........................er-4194 S1 GUNNEBO FASTENING CORP.,Drop-in concrete anchors.............................er-3219 S1 HILTI, INC., Kwik-bolt-TZ concrete anchors........................................esr-1917 MKT FASTENING, High Load Anchor SZ............................................AC-193 ITW RAMSET/RED HEAD, ITW Ramset stud, Trubolt wedge concrete anchors.......esr-2251 MARKSMAN MANUFACTURING CO., Thunderstud wedge and sleeve anchor..............er-2713 S1 POWERS FASTENING INNOV., Power-Stud+SD2 concrete anchors.....................esr-2502 WEJ-IT, Wej-it anchors bolt and ANKR-TITE wedge anchor............................er-1825 CYW, INC., POWER BULL, Wedge anchor...............................................................esr-2254 *Embedment must be minimum 5x bolt diameter. OTHER ICC (ICBO) APPROVED ANCHORING MATIERALS... not furnished by Madix PNEUMATIC OR POWDER-DRIVEN STEEL STUDS AND NAILS HILTI, INC., Hilti low velocity powder actuated or pneumatically driven fasteners..............esr-1663 ITW RAMSET/RED HEAD, Ramset Powder-Actuated and PowerPoint fasteners..............esr-1799 ADHESIVE/ EPOXY ANCHORS HILTI, INC., HIT-HY 150 Adhesive anchor system..................................... ESR-2678 ITW RAMSET/RED HEAD, ITW Red Head Epcon system Ceramic 6+ epoxy anchors......... ESR-3577 P. O. B O X 7 2 9 / T E R R E L L, T E X A S 7 5 1 6 0 / 9 7 2. 5 6 3. 5 7 4 4 / 8 0 0. 7 7 6. 2 3 4 9 P. O. B O X 1 7 7 / G O O D W A T E R, A L A B A M A 3 5 0 7 2 / 2 0 5. 8 3 9. 6 3 5 4 / 8 0 0. 6 3 3. 6 2 8 2 R E V # E C N # R E V I S I O N B Y DAT E R E V # E C N # R E V I S I O N B Y DAT E 01 5-13950 UPDATED TO CORRECT ANCHOR INFO SAM 1/7/14 5*18143 ADDED BOLTING REQ. TO PG 4 NRD 09/12/16 02 5*14150 ADDED HEIGHT/ RATIO CAB 02/14/14 03 5*16478 SHOWED LD DART CLIP ON PG 4 TED 06/29/15