POWER SESSION. DP3 Class Power System Solutions for Dynamically Positioned Vessels

DP INNOVATION. A Novel Solution to Common Mode Failures in DP Class 2 Power Plant

Optimizing Energy Efficiency for DP Vessels for Variable Operational Risks

Appendix A. Power Management System Test Guidelines

Regulatory frameworks for Dynamically Positioned vessels operating in closed bustie mode: the grey zone

POWER. Improving Engine Utilization in DP Vessels

Using cloud to develop and deploy advanced fault management strategies

Keynote Address. DPPS A Petrobras DP Safety Program

Alf Kåre Ådnanes; ABB BU Marine & Cranes, 2010-November Energy efficiency and fuel consumption of marine and offshore vessels Technical possibilities

DP Conference, Houston October 17-18, Challenges related to propulsion equipment and their interface to the Dynamic Positioning System

A Novel Solution to Common Mode Failures in DP Class 2 Power Plant

Optimization of Power and Station Keeping Installations by a Total System Design Approach

Developments on Remote DP Control and Autopilot with Collision Avoidance System

Hardware Testing of Photovoltaic Inverter Loss of Mains Protection Performance

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

SA Power Networks Commissioning Witnessing Checklist

Ekip Link logic- zone discrimination protection system

Offshore Application of the Flywheel Energy Storage. Final report

Efficient and flexible solution

From academia to industry Commercializing research on propulsion and hydrodynamics. Øyvind Smogeli Chief Operating Officer

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

The Benefits of Podded Propulsion in the Offshore Market

Guideline for Parallel Grid Exit Point Connection 28/10/2010

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING THE ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

Nobert Bulten Petra Stoltenkamp Wärtsilä Propulsion Technology

Artesis MCM Case Studies. March 2011

Dynamic Adjustment Procedure for 700-series Digital Controls. Application Note (Revision A,8/1998) Original Instructions

Response to Surabaya incident

MARINE. Decrease fuel consumption and emissions with shaft generators and drives

A new era in asset protection

Marine Technology Society

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

Onboard DC Grid. Jan Fredrik DP Conference 2011; Houston. for enhanced DP operation in ships

CMAL Hybrid Ferries. Hybrid Ferries. Conference on electric mobility. Andrew Flockhart Caledonian Maritime Assets Ltd

Power Quality. Power Factor Wiring and Service. Background. Introduction. bchydro.com

Grid Impacts of Variable Generation at High Penetration Levels

NERC Load Modeling Activities. Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

MARINE VESSEL REPOWER APPLICATION

LOW VOLTAGE WIND CONVERTERS. ABB wind turbine converters ACS880, 800 kw to 8 MW

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

Navis NavDP 4000 Series

Experiences in a Motor Protection Retrofit

Certain Model Year Tacoma 2TR-FE Vehicles Exhaust Pipe Replacement for Catalytic Converter

E-15 Uninterruptible Power Systems (UPS)

Risk. Analyzing Petrobras DP Incidents

Model Tests for the DP System of a Drilling Semi-Submersible

Power Solutions Manager Generac Power Systems, Inc.

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012

Dynamic Study of Bonaire Island Power System: Model Validation and Project Experience

Low Loss Concept Comparison Study

SPIDER Modeling Sub-Group DER Modeling, CAISO Experience

Philip Padfield, CEO. Sustainable shipping. 22nd October

ABB Power Cables Service Turnkey Cable Repairs Three Reference Cases

SHIP ENERGY EFFICIENCY MANAGEMENT PLAN SEEMP. Edilberto Peralta Operations Manager Central and South America

All Dealer Principals, General Managers, Service Managers, and Parts Managers

NATIONAL TRANSPORTATION SAFETY BOARD Public Meeting of February 9, 2016 (Information subject to editing)

NC PV DG Program SEPA Presentation. December 15, 2011

Power Quality and Energy Management

Understanding the benefits of using a digital valve controller. Mark Buzzell Business Manager, Metso Flow Control

Potential of operational saving measures Orka 2015 Summit Jacob W. Clausen, Head of Advisory

ELECTROMECHANICAL OPTIMIZATION AGAINST TORSIONAL VIBRATIONS IN O&G ELECTRIFIED TRAINS MICHELE GUIDI [GE O&G] ALESSANDRO PESCIONI [GE O&G]

Fire pumper brake work was put off

Feasibility of Electric Propulsion for Semi-submersible Heavy Lift Vessels

MAN Diesel's First VTA Application Achieves 10,000 Operating Hours

Large Air Cooled Generator Failure

Ballast Water Management Surveyor checklist

BOURBON LIBERTY 150 SERIES. Platform Supply vessels. DP2-1,701 t DWT

ST315B. User Handbook STAFFOR. ST315B Temperature Programmer. See separate handbook for Installation Instructions Issue: 2.00

ABB's Energy Efficiency and Advisory Systems

Fuel Efficient Power Plant Featuring Variable Speed Generation Systems for DP Drilling Units

Towards Safer, Smarter and Greener Ships Using Hybrid Marine Power Plants. Introduction. Authors:

WIND ENERGY DENMARK

A numerical DP module For design and operations

Vehicle Management: Asset Information Basics

Grid Stability Analysis for High Penetration Solar Photovoltaics

Technology Update May Mark Hamilton - CTO

Jemena Electricity Networks (Vic) Ltd

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Kongsberg Maritime Simulation and Training. The power to excel in Dynamic Positioning training

MEPC 71. The Impact on Ballast Water Management Compliance Plans

Power Generation Stability and Response in DP Applications An Overview of Modern Diesel Engine Performance

Variable frequency transformer for asynchronous power transfer

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

MORE EFFICIENT DIESEL ELECTRIC POWER PLANT FOR DREDGES

YOUR PROPULSION EXPERTS

Specification for 1500V DC Traction Supply WOS 01.E

Coriolis Density Error Compensating for Ambient Temperature Effects

IHC Holland BV IHC WFSV Brief Specifications

MARINE PROPULSION CONTROL

Transmitted by the expert from Germany

SeaGen-S 2MW. Proven and commercially viable tidal energy generation

EI HMC Report Spring API Committee on Petroleum Measurement Standards Meeting

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Gear Failures: Lessons Learned

Guideline No.: E-07(201610) E-07 TRANSFORMERS. Issued date: October 28,2016. China Classification Society

This qualification has been reviewed. The last date to meet the requirements is 31 December 2020.

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society

A Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

Transcription:

DYNAMIC POSITIONING CONFERENCE October 11-12, 2016 RISK DP Undesired Events - Investigation and Methodology Kevin Duffin - Martime Assurance & Consulting John Flynn- Stena Drilling

DP Undesired Events Investigation and Methodology 11 October 2016

Summary Stena IceMAX - undesired events offshore Nova Scotia, Canada, 4 th December, 2015 Effective investigation strategy Root cause identified Remedial actions verified through proving trials Lessons learned

Stena IceMAX. Length ~ 750ft Breadth ~ 138ft Depth ~ 62ft Gross tonnage ~ 58, 295t World s 1 st DP, dual mast, ice class drillship Delivered 2012 from SHI, Korea Water depth ~ 9,800ft Drilling depth ~ 35,000ft DP 3 (DYNPOS AUTRO) notation Winterised Cold ( 30 C, 20 C) notation

Commissioning and Assurance. UK Flag State Registration Stena IceMAX Commissioned 2012 SHI Korea Stena Technical Commissioning Team Attendance IMCA standard, DNV approved FMEA DNV witnessed Proving Trials Annual DP Trials in accordance with IMCA M 191 Accepted by the Shell Assurance Team In line with Industry Best Practice

Stena IceMAX Worst Case Failure Design Intent (WCFDI) Port Redundancy Group DG 1 DG 2 Centre Redundancy Group DG 3 DG 4 Starboard Redundancy Group DG 5 DG 6 No single failure, as defined for DYNPOS AUTRO notation, will have a greater effect on the vessel s ability to maintain position and heading than the loss of one of the three power system redundancy groups (port, centre or starboard engine rooms / switchboard rooms) with the resulting loss of the associated 11kV switchboard, two diesel generators and two thrusters. Thruster 1 (centre bow) Thruster 3 (starboard bow) Thruster 2 (port bow) Thruster 4 (port stern) Thruster 6 (centre stern) Thruster 5 (starboard stern)

Location Cheshire Well, Offshore Nova Scotia, Canada

December 4 th, 2015 Wind speed 46kts 1.15am Several small vessel excursions (<5m) Vessel reverts to Blue (Advisory) status, as per WSOG G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Wind speed 46kts 2.15am Five power limitation alarms on centre switchboard (ECR alarms) Drilling rate reduced to slow G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Wind speed 46kts 3.40am Average power consumption ~ 40% G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Large Wave ~ 10 mtr Wind speed 46kts 3.46am Vessel hit by rogue wave moves 13m astern Thrusters ramp up and load on each swbd increases (80 90%) G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Wind speed 46kts 3.48am As vessel approaches original set point, thruster and bus load decreases rapidly Approaching set point, CBs for DGs 1 & 2 trip, blacking out swbd 1 DGs 1 & 2 remain running Vessel goes to Yellow status and prepares for disconnection G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Wind speed 46kts 3.50am DG 4 also trips All thrusters operating at max and swbd load at 90 95% G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Wind speed 46kts 3.55am High temps on DGs 1 & 2 so have to be stopped. DG 4 was still running after trip and was successfully reconnected to swbd G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Wind speed 58kts 4.05am Wind increases to 58kts Vessel moves 35m from set point Thrusters ramp up and swbd load increases G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Wind speed 58kts 4.05am When 1m away from set point, reduced power demand results in DG3 trip Power limitation alarms DG 3 reconnected Vessel regains position G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

December 4 th, 2015 Wind speed 46kts 6.00am DG 2 reconnected (05:36) DG 1 reconnected (05:43) Swbd 1 recovered and thrusters 1 and 4 back in DP G1 G2 G3 G4 G5 G6 Thruster Load 50% 75% 100%

Immediate Response Stena DP Marine / Technical Team Notified Canadian authorities Initiated investigation Mobilised multi-disciplined investigation team (OEM vendors, third party consultancies) Organised and led Bi-Daily technical meetings with Client Engaged MAC as independent for investigation in line with MTS TECHOP_GEN_03

Investigation MTS TECHOP_GEN_03, Conducting Effective and Comprehensive DP Incident Investigations 2AA 3AA 4AA 5AA Incident DATA 1 LFI PATHWAY SHORT TERM ACTIONS 6A 2BB 3BB 4BB 5BB

Investigation DESIGN OPERATIONS PROCESS PEOPLE DP PMS AVRs Protection relays Governors Environment DP FMEA Proving Trials Annual Trials DP Checklists WSOG Crew Response

Design - DP Control System DP system dynamically allocates thrust in response to weather Faults with system may result in thrust demand issues DP vendor technician mobilised to vessel to inspect DP control system configuration WIND POSITION REFs & SENSORS DP Control System and monitor trends Trends, event lists and alarm lists concluded DP system was operating as designed. Did not contribute to undesired events ALLOCATION OF THRUST

Design - Power Management System PMS interacts with DGs, thruster and drilling loads for a stable, balanced power system Configuration issues may result in mismanagement of the generators. PMS/VMS vendor technician mobilised to inspect PMS G1 Power Management System G2 G3 G4 G5 G6 Trends, event lists and alarm lists concluded that PMS did not contribute to undesired events

Design AVRs Reactive load sharing issues may lead to spurious tripping of generators OEM vendor technician mobilised to vessel to collect data from AVRs for off-site analysis On site inspection confirmed AVRs were configured correctly Did not contribute to undesired events

Design Protection Relays Incorrectly configured protection relays could lead to premature tripping of DGs OEM vendor technician collected data from protection relays Relays were reset and cleared while recovering DGs resulting in the loss of trip flags and data. Configuration files confirmed relays were set according to coordination study. Reverse power trip setting: -4% for 5s Reverse power trip reset: positive power for 1s Did not contribute to undesired events

Design - Engine Governors (Mechanical) Technicians from a local vendor investigated governor performance - simulated loads Hz and kw trends monitored during step load testing at 20% increments from 0% to 100% Mechanical calibration of actuator and fuel rack checked Performance stable across all loads and within tolerances Did not identify cause of undesired events Load Fuel rack position Set point actual DG 1 DG 2 DG 3 Time DG 4 DG 5 DG 6 Actuator Index

Design Engine Governors (Electrical) Technicians from OEM vendor investigated governor performance. Increased weather during investigation induced oscillation within power system identifying root cause of undesired event. Trending during this weather event indicated that paralleled generators were hunting between zero and 70-90%.

Generator Hunting Contributory Factors 1. Proportional gain set low resulting in speed deviations between reference and actual for minor load changes 2. Gain multiplier set for a narrow band (from 3 4rpm) resulting in small deviations in speed being significantly amplified High gain Medium gain Low gain Amplified load fluctuations may take longer to reach equilibrium Under significant load changes, generator response is amplified resulting in increased hunting across the set point reference

Design - Potential Root Cause Example plot of DG3 Over Power and References Heavy weather gives rise to rapid load changes 100 Power (%) Frequency of oscillation greater than the sample rate of the protection relay Hunting on parallel DGs oscillating in and out of reverse power Each trip relay sees 4 threshold 5s reverse power condition and trips DG 0 Time (s)

Operations - Environment Increased weather resulted in large and significant load changes on the vessel power plant as the DP System responded to maintain position Operated in harsh environments previously without incident The significant load changes highlighted governor tuning issues Cannot be considered a root cause

Process Key DP Documents Industry standard FMEA. Industry standard Proving Trials Industry standard Annual Trials. Industry standard DP Checklists... WSOG... All vessel documentation in compliance with rules, guidelines and industry best practice Industry standard documentation does not require that a vessel be tested / verified under extreme dynamic load conditions

People Crew Actions Experienced drilling and marine crew no previous incidents onboard the IceMAX The following can be concluded from review of crew witness statements: Post failure recovery of switchboards could have been better Vessel Master/OIM could have been alerted earlier to enable a faster response No human element contributed to the undesired events

Investigation Actions MTS TECHOP_GEN_03, Conducting Effective and Comprehensive DP Incident Investigations 2AA 3AA 4AA 5AA Incident DATA 1 LFI PATHWAY Root Cause governor tuning SHORT TERM ACTIONS 6A 2BB 3BB 4BB 5BB

Short Term Actions Investigation completed Governor tuning to dynamic load conditions Verifying trials created Interaction with Regulator and Client Amendment of WSOG (while Investigation in process) Incident reporting (IMCA)

Short Term Actions - Verifying Trials Proving trials offshore Nova Scotia 1 st and 2 nd January, 2016 Objective - demonstrate power plant stability under rapid and severe load changes: 1. Active (kw) load sharing.. 2. Reactive (kvar) load sharing.. 3. Verify reverse power protection.. 4. Verify PMS functionality... Governor tuning improved stability of power plant in response to dynamic load changes

Medium and Long Term Actions Lessons learned recorded in Stena Drilling HSE recording system Included in Stena Drilling Processes for the future: Governor tuning to be optimised during commissioning of new vessels OEM vendor approved training on specialist equipment Advanced drills for simulated DP failures and response

Conclusions Governor tuning issues hidden until significant load changes highlighted power system instability Stena Drilling initiated a thorough Incident Investigation, based on MTS TECHOP and identified root cause Remedial action was verified through proving trials

Conclusions (cont.) Stena Fleet DP trials updated to include significant step change testing. Regulator requesting step change testing for all DP vessel entry. Client adopted testing for on-hire DP Vessels. Open dialogue with Industry bodies for improvement.