Operating and Installation Instructions

Similar documents
Assembly and Operating Instructions

Operating and Installation Instructions

Glazed Screens. Handling and care manual (Construction Phase) January Performance Door, Window & Panel Manufacturers

Instructions for Fitting, Operating and Maintenance Canopy Door RE / (St.: )

Installation, Operating and Maintenance Instructions Retractable Door / Art.-Nr.:

Cleaning, Maintenance and Repair

Instructions for Fitting, Operating and Maintenance

LANCER SIDE WIND DEFLECTOR MZ562863EX INSTALLATION AND HANDLING INSTRUCTIONS

Cleaning & Maintenance. For Aluminium Products

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

AIRWORTHINESS BULLETIN

INSTALLATION INSTRUCTIONS

Product card User manual. Koliber Safes Koliber Deposit Drop Safes KSN Wall Safes Grade S1

SECTION 6 5 SERVICE PROCEDURES AND SPECIFICATIONS. Body


INSTALLATION INSTRUCTIONS PARTS LIST. SUPPLIES REQUIRED Isopropyl alcohol Shop towel Masking tape Tape measure. Door visor (front left) INSTALLATION

GV Chain Actuated VisionVent Patent GB

HYDRAULIC TROLLEY JACK K Distributed by Kincrome Tools and Equipment:

SECTION 6 5 SERVICE PROCEDURES AND SPECIFICATIONS. Body

June14. Type

IMPORTANT: Read this manual fully before assembly and use and observe all safety rules and operating instructions

2-DOOR LAUNDRY CABINET KIT

ELECTRIC CAR POLISHER

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Installation Instructions. Ultimate Screen. English Version 2.3

Vehicle Care ! WARNING: CLEANING PRODUCTS CLEANING THE EXTERIOR

XM8100F/CP. Satellite Radio Antenna. antenna specialists. Patents Pending

Air Operated Double Diaphragm Pump. M-Pump ½ Metallic Non Metallic Pump INSTALLATION, OPERATION & MAINTENANCE MANUAL

Typical Installation Schematic

Mod: KLD6-12/35XLAS-N

GENUINE ILLUMINATED SCUFF PLATE

HOME CHARGER MODE 2. Series to /32A single phase CONTENTS. Manual IMPORTANT SAFETY INSTRUCTIONS 3 SAFETY INFORMATION 4 INSTALLATION 5

Pressure relief valve

Porte 150 Users Manual Swing Gate Opener 24V DC

Installation and Operating Manual for Tank and Equipment Cleaning Nozzles Series 5TM

INSTALLATION INSTRUCTIONS UNDERMOUNT SINKS

GENUINE REAR SPOILER

Sales Parts Service Installation Rigging RAMCO SWE T Washer/Extractor Series MAINTENANCE & TROUBLESHOOTING

Distributed by Kincrome Group

Product card User manual. KP Strong Safe

HIGH LIFT HYDRAULIC TRANSMISSION JACK K12110

PACIFICA Shower Cabin Installation Instructions

2-DOOR LAUNDRY CABINET KIT

QA4 Surgery Trolley System Manual Function Operating Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Analog Resistive Touchscreen QST Series Product Specifications

INSTALLATION INSTRUCTIONS

TONNEAU COVER INSTALLATION INSTRUCTION. Toyota Hilux 407L

Installation and Service Manual for SRC25, SRC252, SRC50, SRC502, SRC75, SRC752

Maintenance Adjustments

CARE & PREVENTIVE MAINTENANCE GUIDE

QUICK START GUIDE OWNER S MANUAL AL50 SERIES SAND FILTRATION TECHNOLOGY PLEASE CALL DO NOT RETURN TO STORE

Distributed by Kincrome Group

60 Watt Industrial LED Low Bay Light

GENERAL SAFETY... 3 PARTS LIST...

INSTRUCTIONS FOR OUTDOOR WALL LANTERN, MODEL LPT-1107

PORTABLE Q-CATCH 86 SERIES CHUTE & ALLEY PRODUCT MANUAL arrowquip.com

B 3000 Instant Chilled Filtered Water System. User guide

OWNER'S MANUAL. Royal Sovereign International Inc. RET Desk Series

1PC TONNEAU COVER INSTALLATION INSTRUCTIONS. Ford Ranger (with bedliner)

manual magnetic linear measurement system MW10

SECTION 6 CORROSION PREVENTION AND APPEARANCE CARE. Corrosion prevention and appearance care

RUSH SHOWER/BATH DIVERTER MIXER PRODUCT CODE: FINISH: RU791 CHR CHROME CONTEMPORARY DESIGN PHOENIX WARRANTY STYLISH PREMIUM CHROME FINISH

3 Ton Trolley Jack. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference.

Chemical Price List Effective

VIVID SLIMLINE FLOOR MOUNTED BATH MIXER PRODUCT CODE: FINISH: VS745 CHR CHROME STYLISH PREMIUM FINISH CONTEMPORARY DESIGN PHOENIX WARRANTY

Porte 300 Users Manual Swing Gate Opener 24V DC for residential use only

INSTRUCTIONS AND SPARE PARTS READ CAREFULLY BEFORE OPERATING MACHINE

Product card User manual. KP Strong Safe

Rosemount 402 and 402VP

Water Broom. Instruction manual ESPAÑOL: PÁGINA 7 FRANÇAIS : PAGE 13 MODEL PCA270

GLOSS WALL BATH SET PRODUCT CODE: FINISH: GS783 CHR CHROME CONTEMPORARY DESIGN PHOENIX WARRANTY STYLISH PREMIUM CHROME FINISH MATCH WITH...

Roof access hatch installation instructions

4V LITHIUM-ION SCREWDRIVER OWNER S OPERATING MANUAL

NEOGARD. Preventive Maintenance Manual

Operating Instructions

User's Guide. Magnetic Tape Magnet Rings

DEFOGGER SYSTEM PARTS LOCATION

Caring for your Steel Windows & Doors

MEKO OPENER FOR RACK-DRIVEN SLIDING MOTOR

AIRWORTHINESS NOTICE

February 26, ch.12.notebook. Ch. 12. Preventative Maintenance and Troubleshooting. Feb 23 5:03 PM

Viking Use/Installation Guide

EXHAUST HOODS HNPD, HNPA, HPPD, HFPD, HNCD, HNCA, HPCD, HFCD, HKCD, HNPDC. Installation, Operation and Maintenance Manual

3PC TONNEAU COVER INSTALLATION INSTRUCTIONS. Ford Ranger/Mazda BT-50 (without bedliner)

INSTALLATION INSTRUCTIONS TOP MOUNT SINK CH366

Requests for Daily Care and Maintenance

ASSEMBLY INSTRUCTIONS. Toll-free: MODEL N

! WARNING! WARNING. Dock Boxes Unlimited, Inc. strongly recommends that these products be installed by a qualified electrician.

HEAVY DUTY TROLLEY JACK. Operation Manual

Owners Manual: - Pumps

Installation Guide The RSi brief overview:

Operating Manual for FINE-SPRAY gun W 3/FZ-Duo

Soap/Sanitizer Dispensers

Type S030. Operating Instructions. Symbols used. INLINE fitting. Bedienungsanleitung Manuel d'utilisation

Flight Compartment. 1. General

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700

INSTALLATION, SERVICE AND MAINTENANCE INSTRUCTIONS Y-FILTER 83700

Transcription:

Operating and Installation Instructions Industrial two-leaf fence gate Operating and Maintenance Manual Last Update - 20th October, 2003 GB

1. IMPORTANT INFORMATION The gate can be installed only by a QUALIFIED person. Before starting installation please read the complete instructions. Please read these instructions carefully and follow the guidelines. You will find here essential information, which guarantees safe installation and use as well as proper maintenance of the fence gate. Please store these instructions with care. 2. PURPOSE OF USE The gate is designed for fencing factories, manufacturing plants, public utility buildings, embassy premises, governmental buildings, State Office Buildings and other of similar character. 3. CONDITIONS OF USING THE GATE AND SAFETY NOTE: During installation safety and health requirements must be observed regarding: assembling, metal-working, work carried out using motor -operated electrical tools, depending on applied assembling technology. ELECTRICAL INSTALLATION MUST BE PERFORMED ACCORDING TO THE PROVISIONS BINDING IN THE PARTICULAR COUNTRY. ALL TYPES OF ELECTRICAL WORK MUST BE CARRIED OUT ONLY BY A QUALIFIED ELECTRICIAN. 4. PREPARATORY WORKS 5. INSTALLATION 6. OPERATION No obstacles should be left in the way of leaf. Make sure that when opening the gate leaf, no one, especially children or things stay in its way. NOTE! Danger of accident. The gate can be opened and closed with a control unit, only if the gate is within the sight of the operator. NOTE! Danger of accident. Gates with clearance between the filling <20% should not be used if wind velocity exceeds 15m/s. 4.1. Foundations Foundations must be "W" deeper than the frost penetration zone specified for the particular area. For Poland according to PN-81/B-03200. Width of foundations for gate pillars should be min. 800 [mm]. For embedding pillars in concrete B15 concrete should be used. 4.2. Fixing the central stop In the case of stable base, the stop can be screwed down. For concrete sett base, a foundation should be made to which the central stop is fixed according to fig. 6. The foundation must be deeper than the frost penetration zone specified for the particular area. If there is no stable base, a foundation should be made to which the central stop is fixed. The foundation must be deeper than the frost penetration zone specified for the particular area. 4.3. Power cords Backfill control wires YLY 2x1mm 2 (for one pair of photocells) below driveway level and leave assembling outlet of approx. 1 m, or PVC pipe ensuring feature fishing. If you want to buy a control unit for the gate, run the power cords and control wires to the photocells as shown in fig. 0. Correct functioning of the gate depends to a great extent on its proper installation. The manufacturer may, if optionally ordered by the Client, install the gate or recommends authorized installation performers. Should the user choose to install the gate by himself, he must ensure that the guidelines contained in this manual are observed, to avoid incorrect functioning of the gate, its premature wear and voiding guarantee claims. After installing the gate leaves tighten the locking nuts on the hinges. In the case of installation of the control unit follow the instructions of the equipment manufacturer. OPERATIONS CARRIED OUT AFTER INSTALLATION OF THE GATE Do not put any objects in the door leaf way! When opening and closing the gate leaf make sure that there are no people, especially children or objects in its way. Prior to first opening the gate check it according to section 10 "Inspection and maintenance". The gate is mounted correctly if its leaf opens and closes smoothly and the gate can be operated with ease. 7. OPENING AND CLOSING When closing MANUAL gate make sure the locking dead bolt is in open position. Closing the gate with the bolt in closed position may damage the gate. 8. TROUBLESHOOTING If the gate leaf offers a resistance or other defects are found, follow the guidelines specified in sections "Inspection and maintenance" and "Cleaning and fine look". In case of any doubt please contact the installer or the authorized service center. 9. PAINTING (does not apply to painted gates) After installation of the gate, touch up any paint coat losses with anticorrosive priming paint, where necessary. The galvanized gate can be painted by applying two coats of topcoat paint, preferably synthetic resins based paints, following the paint manufacturer's instructions. 10. INSPECTION AND MAINTENANCE Inspection and maintenance activities should be carried out at least every six months, following the guidelines specified in this manual! Failure to do this may present danger of improper operation of the gate. 10.1. Fitting the elements Check the condition of all fittings (done during installation of the gate), particularly fitting to fencing pillars, adjust if necessary. 10.2. Greasing Periodically every 6 months grease gate hinges (with e.g. ŁT-43 grease), using a grease nipple put on a hinge, and bolts. 10.3. Lock cylinder element Do not lubricate! 11. CLEANING AND FINE LOOK Periodically (after winter season) clean the gate from dirt deposited inside. 11.1. External surface of the gate painted with powdered paints. Protect the gate from contact with caustic agents such as: lye, acids, etc. Follow proper PRODUCT maintenance instructions. Powder-painted elements should be cleaned at least once a year, and for heavily contaminated environment, more frequently. When cleaning adhere to the following rules: For washing use clean water with small addition of neutral or weak alkaline detergent using soft non-abrasive cloth or rag. During cleaning painted surfaces must be cold - max temperature 25 o C. Cleaning agents may only be used in cold condition - max temperature o 25 C. Do not use any acidic or heavily alkaline cleaning and abrasive agents, which can attack steel sub-structure. Do not use any cleaning and abrasive agents causing loss of paint and surface scratching. Do not use any organic solvents, containing esters, ketones, alcohols, flavors, glycol ether or chlorinated hydrocarbon substances, etc. Do not use any cleaners of unknown chemical composition. Removing greasy, oily or sooty substances can be done using aroma-free gasoline hydrocarbons. Residues of glues, silicon caoutchouc or self-adhesive tapes, etc. can be removed using aroma-free gasoline hydrocarbons Maximum interaction time of the cleaning agent may not exceed 1 hour. If necessary, cleaning can be repeated after minimum 24 hours. Glues, priming grounds, putty compounds, putties, masking and gluing tapes may can contain aggressive substances, therefore before using them please check their influence on paint coatings and base. 11.2. External surface of galvanized gates. Follow the rules specified for powder-painted gates. Design and specification are subject to change (resulting from technological progress) without notice, which do not alter the functionality of the product. This documentation belongs to FPHU WIŒNIOWSKI. Copying, duplicating and using the document in whole or any part of it without owner's written permission is allowed. 2 PL 20.10.2003/GB 05.07.2006 Operating and Maintenance Manual

36 max.26 51166 0 1 2 3 4 RG58 2x1 YLY 4x0,25 YLY 6 4x1,5 YLY 8 A B 8 4x1,5 YLY 2x0,25 YLY 7 1. Control panel 2. Antenna 3. Signal light - optional 4. Photocell 5. Servomotor 6. Opening stop 7. Current-differential protection 8. Protection from automatic closing (manual gate) 5 A - Manual control - wires: 2x0,25 YLY B - Supply - wires: 3x1,5 YLY 5 NOTE! Do not alter the size of power supply and control wires, since this may make installation more difficult or impossible. Operating and Maintenance Manual PL 20.10.2003/GB 05.07.2006 3

1 1.1 So - inside measurement of the installation opening W 800 1.1.a 4 PL 20.10.2003/GB 05.07.2006 Operating and Maintenance Manual

5 5.1 5.1a 5.1b Operating and Maintenance Manual PL 20.10.2003/GB 05.07.2006 5

6 6.1a 7 6.1 W 250 250 7.1a 7.1b 7.1 6 PL 20.10.2003/GB 05.07.2006 Operating and Maintenance Manual

8 8.1a 8.1 8.1 I I.1 W 250 250 I. 1a Operating and Maintenance Manual PL 20.10.2003/GB 05.07.2006 7

Installer: WIŚNIOWSKI Ltd. 33-311 Wielogłowy 153, Poland Tel. (+48 18) 44 77 270 Fax (+48 18) 44 77 277 www.wisniowski.pl OaII/ ITLFG /07/2006