Production Analysis Report

Similar documents
Use of Exhaust Gas Testing to Reduce Engine Emissions, Fuel Consumption and Improve Equipment Management

TSP-308 MPK Ferdinand Fassa

Hydraulic power is the key to the utility of many excavators.

**Equipment production**

WHEEL DOZERS SOIL COMPACTORS WHEEL DOZERS CONTENTS WHEEL DOZERS

300.9D. Mini Hydraulic Excavator

Appendix E3. Open Pit Pioneering and Pre-production

301.7D CR. Mini Hydraulic Excavator

An innovative solution for water and sewer installation AXIS. Guided Boring System

CITY OF MINNEAPOLIS GREEN FLEET POLICY

Product Marketing Bulletin

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT

PATENTED TECHNOLOGY» PROVEN RESULTS» PAYBACK

Teacher Assessment Blueprint. Heavy Equipment. Test Code: 5913 / Version: 01. Copyright 2007 NOCTI. All Rights Reserved.

Cat Land Management Equipment. The widest selection of specialized machines in the industry.

Diesel Fleet Fuel Economy Study

Vehicle Application: Part Numbers

SAN PEDRO BAY PORTS YARD TRACTOR LOAD FACTOR STUDY Addendum

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer.

ROCK EXCAVATION. Taking Care. of Customers. Worldwide. with Better. Solutions

This appendix describes various types of equipment that can

Type Flexair Pneumatic Pressure Control Valves

BEACH CLEANING EQUIPMENT. Lifts the debris, not the sand. SURF RAKE

Hydrogen Power Systems, Inc.

Yard Hostler Duty Cycle Summary Brad Rutledge Nov. 27, Introduction

Better Than Perfect When your ILI is too good. City of Olathe, Kansas

MODELS 108 and 138 CRAWL SPACE PUMPING SYSTEM PREINSTALLATION CHECKLIST

The FASS Fuel System is a positive flow, fuel delivery system for diesel engines.

City of Richmond DPW CNG Project James A Jackson Ransford O. Ellis Director, DPW Oper. Manager, DPU

FUEL PROVISIONS FOR DREDGING PROJECTS

FM MCRP I

Converting Oil Hydraulics to Electric Drives with Valley. Components

DD13 Engine Fire and Emergency Model

StormPro BA Series Sump Pump

Chapter 2: Approaches to Problem Solving Lecture notes Math 1030 Section A

STRYKER VEHICLE ADVANCED PROPULSION WITH ONBOARD POWER

A division ofolson Engineering, Inc. FINAL REPORT

FUELTRAX SET THE STANDARD. March 2018

MINI SKID STEERS MINI SKID STEERS FEATURING THE S800TX / S650TX / S600 / S450TX

L SERIES CRAWLER DOZERS 1650L XLT I 1650L WT I 1650L LGP

2017 FINANCIAL ANALYSIS

System Flow Diagram. Starting the engine. Filter Maintenance

Diesel Fleet Fuel Economy Study

Service Guide JATCO Environmental Protection Tank Model J-7000

OPS Fluid Cleaning Technology

BUILDING A ROBUST INDUSTRY INDEX BASED ON LONGITUDINAL DATA

Agenda Introduction Objective of Meeting Fact Sheet on Efficiency Matrix... On highway vs Rail vs Marine Savings Action plan... Customer Evaluation

Fair Oaks Farms. Sustainability Through Poo Power

4.4.2 FRONT-END LOADERS

Copyright Statement FPC International, Inc

Neptune X6 12/24V SAE 316L Stainless Steel Low Profile Through-Hull Mounted Underwater LED Light Manual

KX KX161-3 SUPER SERIES

Traffic Logix SafePace 100 Radar Speed Sign Product Specifications Version 2.7

AccuGrade Grade Control System for

TANK RISER SUSPENSION SYSTEM CONCEPTUAL DESIGN (U)

PORTABLE POWER PRIMER

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

Beechcraft Bonanza. 550 Tuned Induction Conversion. STC for Teledyne Continental IO-550-R for the Beechcraft Bonanza

APPLICATION guide book

Traffic Logix SafePace 100 Radar Speed Sign Product Specifications Version 2.7

TABLE OF CONTENTS. OBJECTIVE TWO Measure the Contribution of Each Management Practice to Ratoon Crop Yield Using Cocodrie as the Test Variety.

Operator s Manual COULTER GANG

FUEL EFFICIENCY CASE STUDY

vulcanhammer.net Visit our companion site

Facts and Figures. October 2006 List Release Special Edition BWC National Benefits and Related Facts October, 2006 (Previous Versions Obsolete)

52.1 SNOW REMOVAL AND ICE CONTROL (TRUCK)

TE-II (10CV63) Ballast

MINI SKID STEERS MINI SKID STEERS FEATURING THE S800TX / S650TX / S450TX

Copyright Statement FPC International, Inc

Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation

The BEGi MazdaSpeed Miata Downpipe Upgrade. Installation and operations manual Applicable to all 2004 to 2005 MazdaSpeed Miatas

Liquefied Natural Gas (LNG) Yard Hostler Demonstration and Commercialization Project

Balancing Paving & Compaction Operations. Presented by Todd Mansell, CAT Paving

305C CR. Mini Hydraulic Excavator. Diesel Engine Net Power (ISO 9249) at 2400 rpm Operating Weight (without extra counterweight)

U17-3 KUBOTA ZERO TAIL SWING COMPACT EXCAVATOR

STUDENTS DO NOT OPEN THIS TEST OR BEGIN UNTIL INSTRUCTED TO Examination for the. Read the following instructions:

APPENDIX E SCOPE OF WORK EXAMPLE EQUIPMENT LEASING FOR CLEARING OF DEBRIS

Transfer. CE 431: Solid Waste Management

COMPANY CAR TAX. OCTOBER A GUIDE TO THE OCTOBER 2018 BUDGET FOR FLEET DECISION MAKERS. Home. October 2018 Budget. Vehicle excise duty.

303E CR. Mini Hydraulic Excavator. Engine Gross Power 18.5 kw 24.8 hp Net Power 17.5 kw 23.5 hp

Additional Transit Bus Life Cycle Cost Scenarios Based on Current and Future Fuel Prices

SHIFT INTO WORK MODE. CAT CX31 AUTOMATIC TRANSMISSION FOR CAT VOCATIONAL TRUCKS

Engine Power and Fueling Comparison Between Vessels with Conventional Transmissions and Controllable Speed Propeller Transmissions During Dynamic

Request For Bids. Sewer Cleaning Truck

SVL. KUBOTA COMPACT TRACK LOADER SVL75-2 / SVL95-2s

303E CR. Mini Hydraulic Excavator

Minto North Access Design

Appendix 4-2-C Project Air Emissions Inventory

REQUEST FOR QUOTES Invitation to Bid. Purchase of Two (2) Class 8A Tandem Axle Tractors

OPERATION MANUAL Variable Speed Pump Controller Dated: 06/04/2013 Pump Down Application. Document No.: LMSII_V100_OM Page 1 of 8 Model-V100 LMS II

LESSON PLAN. Production Estimations LESSON ID: EEC/EEO-B07 ENGINEER EQUIPMENT WARRANT OFFICER/CHIEF COURSE CID: A16ACN1/A1613E1 REVISED 09/08/2014

AIRCRAFT DESIGN SUBSONIC JET TRANSPORT

SVL SVL75-2 / SVL90-2 KUBOTA COMPACT TRACK LOADER

COMPANY CAR TAX. OCTOBER 2018.

More power at altitude Faster cruise speed at altitude Potential for enhanced resale value

(lb/day) Excavation and Installation. NO NO NO NO NO Emission calculations assume that all construction phases overlap.

311C Utility. Hydraulic Excavator. Engine

CITY OF REDLANDS EQUIPMENT OPERATOR IN TRAINING (OIT) EQUIPMENT OPERATOR I/II

Copyright Statement FPC International, Inc

Traffic Logix SafePace 450 Radar Speed Sign

Transcription:

Production Analysis Report March 2010 Cat D9R Mirenco C-Max On vs. Off

Study Purpose Study Date The purpose of the study was to conduct economic analysis of dozer production capability, as well as determine the performance differences and fuel savings between a Cat D9R with Mirenco s C-Max turned on and a Cat D9R with Mirenco s C-Max turned off. March 16th, 2010 March 19th, 2010 Field Data by Location Braden Weisheit Whayne Supply Edwin Downer Whayne Supply Dale Hikes Whayne Supply KJ Jones Whayne Supply Andrew Gallusser Whayne Supply (Operator) Whayne Supply Corporate Proving Grounds Louisville, Ky Written by Braden Weisheit Whayne Supply Weather Conditions Temperatures ranged from 40 F to 70 F. At the time of study month to date rainfall was.31 inches. Tested Units Material Caterpillar D9R (Whayne Owned) Mirenco C-Max (Whayne Owned) Loam - 60% Silt 30% Clay 10% Sand Surveying Tools Trimble TSC2 with Survey Controller SCS900 Trimble SPS-851 Base Station Business Unit This study was completed by Whayne Supply Company s Technology Division and Production Analysis Team.

No noticeable difference in D9R responsiveness was reported by operator with Mirenco C-Max turned on. C-Max visibly reduced the amount diesel particulate matter (DPM) during initial cut, blade load and carry, and blade dump and return. Mirenco s C-Max unit resulted in a 8% fuel savings advantage or a 11.12% fuel efficiency advantage (bcy/hr gal/hr) Key Findings 6. Fuel Savings Annual Dozer Operating Hours 4000 4000 Average Production Rate (bcy/hr) 300 300 Total Volume per year (bcy) 1,200,000 1,200,000 Fuel Efficiency (bcy/gal) 24.75 22.28 Gallons consumed per year 48,479 53,871 Fuel cost per gallon ($/gal) 2.20 2.20 Total Fuel Expense per year ($) $ 106,653 $ 118,516 Mirenco C-Max Savings $ 11,863 Tractor Ownership (year) 10 $ 118,634 During the course of the study two different production dozing slots were studied. The study was composed of one test in which data was recorded for the following parameters: Fuel Consumption Cycle Times Pit Dimensions Blade Load Bank Cubic Yards (BCY) Moved For this study fuel consumption data has been reported in BCY of material moved per gallon of fuel burned. The dozer production was captured in identical material located within feet of each other. The final data analysis showed a 11.21% BCY/Gal advantage for the Cat D9R with the Mirenco C-Max turned On. The D9R was operated by the same individual during the entire study. Executive Summary

The study was conducted using a production slot dozing technique. The pits were set up to ensure that neither Mirenco On nor Mirenco Off had an advantage due to soil conditions. A total of two pits were measured and laid out as shown in figures below. Study Procedures

The D9R was filled with fuel to a predetermined point on the neck of the fuel tank. Fuel was added at the beginning of each pit study to ensure the D9R was completely full. The D9R was driven approx ¼ mile from the fueling station to the testing area in second gear. The D9R then performed the slot production study 1 st gear forward 2 nd gear reverse. Post study the D9R was driven back ¼ mile to the fueling station. The machine was allowed to cool to avoid thermal error in fuel data. Post study the D9R was fueled to the predetermined point on the neck of the fuel tank.

Each pit was laid out to be 17 ft in width and 200 ft in length. The pits were dug to a depth of one blade height and a width of one blade. Each pit was limited to 1 st gear forward and 2 nd gear reverse. Upon leaving the in-pit area the material was carried into a stockpile. The dump portion of the test was recorded, but deducted in the results to provide an in-pit study time and to eliminate any differences in push distances beyond the designated test area. The return portion of the test was conducted in 2nd gear as well. Times for doze, carry and return were recorded and are provided in the results. After completion of the study, the pits were surveyed using Trimble Survey Controller to calculate the volume moved. Slot Dozing

Mirenco C-Max Product Description The Mirenco C-Max system increases fuel efficiency, reduces emissions, and extends the engine life of diesel vehicles. The C-Max system prevents excess, unburned diesel fuel from spewing out the tailpipe as soot, by delivering only as much fuel as the engine needs. C-Max accomplishes this through a solid state, electronic throttle delay and throttle stop that can easily be programmed with a hand-held computer. Installation Versatility: Majority of equipment types, manufacturers, and models Universal to all grades of diesel fuel Supports new and old equipment No loss of horsepower http://mirenco.whayne.com

Test Results Mirenco On Mirenco Off 1. Cycle Times Doze Time (min.) 20.62 23.31 Return Time (min.) 15.62 15.38 In-Pit Time (min.) 36.24 38.69 Out of Pit Time (min.) 32.70 23.37 Tram to Study Area (min.) 4.00 4.00 Total Study Time (including Tram) 72.94 66.06 Total # of Cycles 36.00 37.00 Avg. Doze Time (min.) 0.57 0.63 Avg. Return Time (min.) 0.43 0.42 Avg. Cycle Time 1.01 1.05 2. Pit Volume (bcy) Pit Volume (bcy) 252.49 267.05 Total # of Cycles 36.00 37.00 Avg. Blade Load (bcy) 7.01 7.22 3. Dozer Production (bcy) Pit Volume (bcy) 252.49 267.05 Total In Pit Time (min) 36.24 38.69 Dozer Production (bcy/hr) 418 414 or. Avg. Blade Load (bcy) 7.01 7.22 Cycles / Hour 59.60 57.38 Dozer Production (bcy/hr) 418 414 Dozer Production (bcy/hr) 418 414 Distance leave pit line to Centroid (ft) 60.9 59.9 Reference Centroid 60.4 60.4 Adjusted Production (bcy/hr) 421 411 Production Difference 3%

4. Fuel Consumption Total Fuel Consumed (gallons) 20.70 20.30 Running Time of Dozer (min) 72.94 66.06 Fuel Consumption (gallons/hr) 17.03 18.44 Fuel Difference 8% or.. D9R ECM gallons before study 162,958 162,999 D9R ECM gallons after study 162,977 163,018 Gallons consumed 19 19 Hour Meter reading before study 7.9 10.80 Hour Meter reading after study 9.2 12.00 Running Time of Dozer (min) 1.3 1.20 Fuel Consumption (gallons/hr) 14.62 15.83 Fuel Difference 8% 5. Fuel Efficiency Dozer Production (bcy/hr) 421 411 Fuel Consumption (gallons/hr) 17.03 18.44 Fuel Effciency (bcy/gallon) 24.75 22.28 Fuel Efficiency difference 11% 6. Fuel Savings Annual Dozer Operating Hours 4000 4000 Average Production Rate (bcy/hr) 300 300 Total Volume per year (bcy) 1,200,000 1,200,000 Fuel Efficiency (bcy/gal) 24.75 22.28 Gallons consumed per year 48,479 53,871 Fuel cost per gallon ($/gal) 2.20 2.20 Total Fuel Expense per year ($) $ 106,653 $ 118,516 Mirenco C-Max Savings $ 11,863 Tractor Ownership (year) 10 $ 118,634

Production Comparison 70.00 424 60.00 59.60 57.38 422 420 50.00 418 40.00 30.00 416 414 412 20.00 410 10.00 7.01 7.22 408 406 0.00 Mirenco On Mirenco Off 404 Avg. Blade Load (bcy) Cycles / Hour Adjusted Production (bcy/hr) 35 Dozer Cycle Breakdown 30 25 20 15 10 5 0 Mirenco On Doze Time (min.) Out of Pit Time (min.) Return Time (min.) Mirenco Off Tram to Study Area (min.)

30 25 20 15 10 5 0 Production vs. Fuel Consumption 24.75 22.28 15.83 14.62 Mirenco On Mirenco Off 424 422 420 418 416 414 412 410 408 406 404 Fuel Effciency (bcy/gallon) Adjusted Production (bcy/hr) Fuel Consumption (gallons/hr) Pit Volume Comparison 40 270 35 30 36.00 37.00 265 25 260 20 15 255 10 5 7.01 7.22 250 0 Mirenco On Mirenco Off 245 Total # of Cycles Avg. Blade Load (bcy) Pit Volume (bcy)

MIRENCO MDEP BASELINE

MIRENCO MDEP C-MAX INSTALL

DISCLAIMER THE ATTACHED INFORMATION HAS BEEN GATHERED TO PROVIDE DATA ON THE PERFORMANCE OF CATERPILLAR MACHINES UNDER ACTUAL JOB CONDITIONS. EVERY EFFORT WAS MADE TO ENSURE RELIABLE RESULTS. HOWEVER, BECAUSE OF MANY VARIABLES PECULIAR TO EACH JOB (INCLUDING MATERIAL CHARACTERISTICS, OPERATOR EFFICIENCY, LABOR AND OTHER COSTS, HAUL ROAD CONDITIONS AND ALTITUDE), NEITHER CATERPILLAR NOR WHAYNE SUPPLY CO. WARRANT EXPRESSLY OR IMPLICITLY THAT CATERPILLAR EQUIPMENT REFERRED TO WILL ACHIEVE THE PERFORMANCE OR INCUR THE COSTS INDICATED UNDER OTHER CIRCUMSTANCES EVEN THOUGH SIMILAR. COSTS ARE STATED IN UNITED STATES DOLLARS AND CENTS.