INCOMING INSPECTION DELEGATION GUIDELINES FOR ALENIA SUPPLIERS PROGRAM: ALL

Similar documents
QUALITY REQUIREMENTS FOR JUST IN TIME SERVICE PROVIDER (JIT S.P.) PROGRAM: ALL

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Principle Decision by the Central Experience Exchange Circle of the Notified Bodies and the GS Bodies according to the Product Safety Act ZEK

Information for the Certification of Weld Shops in Rail Vehicle Construction According to DIN EN

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 *

Centerwide System Level Procedure

Guideline of the Railway Vehicles Coordination Committee (Draft Guideline DVS 1619)

SFI SPECIFICATION 35.1 EFFECTIVE: AUGUST 26, 2008 *

VOLUNTARY CODE OF PRACTICE FOR ELECTROMAGNETIC COMPATIBILITY (EMC) OF MOTOR VEHICLES (13 October 2014)

Microgeneration Installation Standard: MCS

REQUEST FOR PROPOSAL

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 *

Palabora Copper REQUEST FOR PROPOSAL SUPPLY AND DELIVERY OF BEARINGS AND ACCESSORIES RFP.PC.2017/18 PART 1 PROPOSAL INFORMATION AND CONDITIONS

68-253/Issue 1 (DERD 2491) 1 August 1997

13 th Military Airworthiness Conference 25 th September 2013 EASA Presentation. Pascal Medal Head Of Certification Experts Department EASA

Rule No. 1. Scope Definitions Periodicity of technical inspections Technical inspection Inspection requirements...

SFI SPECIFICATION 1.2 EFFECTIVE: FEBRUARY 9, 2006* PRODUCT: Multiple Disc Clutch Assemblies for Vehicles with Naturally Aspirated Engines

SFI SPECIFICATION 15.2 EFFECTIVE: MAY 1, 2008 *

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

SFI SPECIFICATION 1.3 EFFECTIVE: MAY 23, 2000 * PRODUCT: Nitro-Methane Drag Race Multiple Disc Clutch Assemblies

SFI SPECIFICATION 15.4 EFFECTIVE: JULY 20, 2010 * PRODUCT: Top Fuel and Funny Car Drag Race Drive Beadlock Wheels

Regulation of Commercial Waste Originators, Pumpers, Transporters, Processors, and Disposal Facilities

ECE/RCTE/CONF/4/Add.1/Rev.2

PROGRAM: C27J QUALITY REQUIREMENTS FOR ALENIA SUB-CONTRACTORS

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002

APPLICATION FOR PRODUCT / ECO-LABELLING CERTIFICATION. GPS Coordinates. GPS Coordinates. Fax No. H/P No.

Practice Note on the Sourcing of Threaded Rod Used for Foundation Bolts

SFI SPECIFICATION 4.2 EFFECTIVE: OCTOBER 26, 1994*

Certification Scheme

COMMISSION REGULATION (EU)

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

SFI SPECIFICATION 49.2 EFFECTIVE: MARCH 22, 2011 *

Offshore manufacturing and fabrication: guidelines for heavy trailers (class TC and TD)

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL

DNVGL-CP-0110 Edition March 2016

COMMISSION REGULATION (EU) / of XXX

Reg Consolidated to Supplement 2 (Revision 3 Amendment 2)Replacement Brake Linings

SFI SPECIFICATION 28.1 EFFECTIVE: AUGUST 25, 2017 *

ANNEXES. to the. Proposal for a Regulation of the European Parliament and of the Council

Lloyd s Register Type Approval System Test Specification Number GT04

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE TACHOGRAPH FORUM

Abu Dhabi Conformity Assessment Scheme for Electric Vehicle Supply Equipment

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:

CHAPTER 168. EVALUATE AN EASA SUPPLEMENT TO A REPAIR STATION S MANUAL/QUALITY CONTROL MANUAL

SFI SPECIFICATION 34.1 EFFECTIVE: January 13, 2017*

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS

SFI SPECIFICATION 18.1 EFFECTIVE: JUNE 17, 1999 *

TECHNICAL IMPLEMENTATION PROCEDURE FOR AIRWORTHINESS AND ENVIRONMENTAL CERTIFICATION

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

AGREEMENT. done at Vienna on 13 November Addendum 1: Rule No. 1. Revision 1

ANSI/BIFMA X Desk/Table Products - Tests. American National Standard for Office and Institutional Furnishings

SFI SPECIFICATION 32.1 EFFECTIVE: MARCH 24, 2009 *

Special Condition. Approval of Turbofan Engine Take-off Thrust at High Ambient Temperature (TOTHAT) rating.

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b)

MCS. Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors. Last Updated: 25 th September 2017

ANNEX MOTOR VEHICLES AND EQUIPMENT AND PARTS THEREOF. Article 1. Definitions

Diesel Exhaust Fluid Certification Program Overview FEBRUARY 2009 REVISION 01

BQ-9000 Quality Management System Testing Laboratory Requirements

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Section 12: Record Keeping Requirements. Minnesota Trucking Regulations

MAINE LEMON LAW SUMMARY

KBA Kraftfahrt-Bundesamt

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

ecognition of Prior Learning (RPL)

HYDRAULIC HOSES AND HOSE KITS

Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1

For Reference Only. Jett Pro Line Maintenance FAA REPAIR STATION NO. YUJR093Y EUROPEAN AVIATION SAFETY AGENCY (EASA) MANUAL SUPPLEMENT

NCC Leisure Battery Verification Scheme. Leisure Accommodation Vehicles

Guidelines for Applicants UG.FCTOA

RSPO Supply Chain Certification. OCTOBER 17-18, 2016

SKN_N0106AnnexJ_R2. Annex J - Specific requirements for PVT collector Certification. 1. Introduction and definition

Certificate of Acceptance

SFI SPECIFICATION 14.3 EFFECTIVE: AUGUST 25, 2017 *

Forensic Sciences Chapter ALABAMA DEPARTMENT OF FORENSIC SCIENCES ADMINISTRATIVE CODE CHAPTER IGNITION INTERLOCK RULES

ance Between the Union European and the Transport Canada

SFI SPECIFICATION 28.3 EFFECTIVE: APRIL 21, 2014 *

SFI SPECIFICATION 7.2 EFFECTIVE: DECEMBER 15, 2006 *

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

AGREEMENT. (Revision 2, including the amendments entered into force on 16 October 1995) Addendum 102: Regulation No. 103

MMP Investigation of Arthur Kill 2 and 3

Certification Scheme

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Compatibility Between Electric Trains and Electrification Systems

Written questions to UTAC CERAM - EMIS hearing of 11/10/2016

EU RO Mutual Recognition Technical Requirements

PTV TECHNICAL PRESCRIPTIONS. ELASTOMERIC SEALS: Part 1: Vulcanized Rubber FOR. Impartial institute for the monitoring of construction products

DEPARTMENT OF TRADE AND INDUSTRY NO APRIL 2016

Request for Assistance (RFA)

MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING, URBAN DEVELOPMENT AND PUBLIC WORKS

SFI SPECIFICATION 27.1 EFFECTIVE: OCTOBER 11, 2006 *

Recordkeeping Requirements of the Federal Motor Carrier Safety Regulations

FUNCTIONAL SAFETY CERTIFICATE

Article: Sulfur Testing VPS Quality Approach By Dr Sunil Kumar Laboratory Manager Fujairah, UAE

ST. VINCENT AND THE GRENADINES

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

RMS CONDITIONAL REGISTRATION SCHEME HISTORIC (CRS-H) RULES FOR MEMBERS. Mustang Owners Club Australia (N S W) Inc.

ST. VINCENT AND THE GRENADINES

Transcription:

INCOMING INSPECTION DELEGATION GUIDELINES FOR ALENIA SUPPLIERS PROGRAM: ALL THE CONTENT OF THIS DOCUMENT IS THE PROPERTY OF ALENIA AERONAUTICA S.p.A. THIS DOCUMENT IS SUPPLIED IN CONFIDENCE AND COMMERCIAL SECURITY ON ITS CONTENTS MUST BE MAINTAINED. IT MUST NOT BE USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SUPPLIED NOR THE INFORMATION CONTAINED IN IT MAY BE DISCLOSED TO UNAUTHORIZED PERSONS. IT MAY NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT PERMISSION IN WRITING FROM ALENIA AERONAUTICA S.p.A. 1 / 11

MODIFICATION DESCRIPTION Una Società Finmeccanica REVISION DATE MODIFIED PAGES VALIDATION - October 2002 First Release. See cover page Note: This document replace QPRA/97.512A5 Rev.2 and IAY G 08A procedure - September 2004 New revision according to IAY G05C. See cover page 2 / 11

INDEX Una Società Finmeccanica 1. APPLICABILITY 2. PURPOSE 3. REFERENCES 4. DEFINITIONS 5. PROCEDURE 3 / 11

1. APPLICABILITY The ALENIA Incoming Inspection Delegation (I.I.D.) procedure is applicable for the following suppliers category: - Subcontractors - Raw material and standard producers - Distributors/Stockists - Equipment suppliers The candidate supplier shall be authorised by Alenia as the opportunity and convenience to implement the Incoming Inspection Delegation for the relevant products. 2. PURPOSE The purpose of this document is to define the guideline to be implemented by Alenia Supplier in order to achieve the Incoming Inspection Delegation (IID) for products supplied to Alenia. The main activities are the following: 1. Selection of the products and related suppliers to which IID may be authorised. 2. Definition, in Delegated Quality Control Plan (DQCP), of the inspection tasks to be performed for each product. 3. Definition of additional quality requirements to be added in the contract. 4. Appointment of the Customer Co-ordinators and definition of their role and responsibilities. 5. Definition of the conditions for IID authorisation withdrawal/renewal. 6. Definition of the activities assigned to Alenia receiving personnel. 7. Alenia authorisation to act as customer co-ordinator to implement DQCP. 8. Activation of the IID. Details for these activities are given at par. 5.1 to 5.8. This document provides additional requirements to IAY G05 C and its subsequent revision. 3. REFERENCES - AS/EN 9100 Aerospace series Quality Management Systems - Requirements (based on ISO 9001:2000) - AS/EN 9120 Aerospace series - Quality Management Systems Requirements For Stockist Distributors. - AQAP 2110 NATO quality assurance requirements for design, development and production - AER.Q 110 D.G.C.A.A.A.S Quality assurance requirements concerning the design, the development and the production - IAY G 05 Alenia External Operative Procedure Quality Management System Requirements For Suppliers 4 / 11

4. DEFINITIONS 4.1 INCOMING INSPECTION DELEGATION (I.I.D.) For the purpose of this document, for Incoming Inspection Delegation is intended the authorization released by Alenia Aeronautica S.p.A. to a Supplier to provide specified products which will not be subjected to incoming inspection by Alenia Aeronautica S.p.A. This inspections, included in the Delegated Quality Control Plan are delegated to the supplier and are certified by an Alenia approved Customer Co-ordinator. 4.2 MAJOR DEFECT AND MINOR DEFECT Major Defect: Minor Defect: concern product significant technical characteristics and performance concern characteristics such as documentation, identification, packaging, etc. 4.3 CUSTOMER COORDINATOR Supplier Quality Control personnel approved by Alenia. He is the responsible of the inspections listed in the Delegated Quality Control Plan and he shall assure compliance with contractual quality requirements necessary to maintain I.I.D. 4.4 SOURCE INSPECTION Inspection activity performed by an Alenia source inspector at supplier facility. 4.5 SOURCE INSPECTOR Alenia personnel responsible to perform inspection activity at the supplier facility. 5 / 11

5.0 PROCEDURE 5.1 SUPPLIERS/PRODUCTS SELECTION FOR IID ACTIVATION Alenia Procurement and Quality Departments identify the suppliers and related products for which the Incoming Inspection Delegation (IID) may be authorised. Engineering Department participate to this activity for the equipments. Alenia Quality department evaluates the candidate supplier on the basis of its Quality System and of historical data for the furnished product quality level. Hence, IID cannot be authorised in case of products procurement where no sufficient data are available to assess the quality level. The following criteria are applied for this task to all products: a) No significant irregularities (lack of product certifications evidences, documents signed by not authorised personnel, etc.) must have been found within at least the previous 6 months also included anomalies not related to product quality such as availability/completeness of documentation, containers marking and labelling, etc. b) The Supplier Quality System has been evaluated and approved by Alenia. There must be not pending corrective actions. c) The production processes are performed in compliance with the applicable rules and requirements and are under control. All special processes must be qualified. d) No constraints are imposed by customers and/or airworthiness authority. Hereafter are defined specific product criteria: RAW MATERIAL AND STANDARD - Each candidate supplier/product couple have not been affected by significant rejects (i.e. special processes not performed or not qualified, laboratory test not performed, dimensional check failure, etc.) within the previous 20 batches supplied and in any case within the previous 2 years. - Supplier is included in the product QPL (when applicable) or equivalent Customer document SUBCONTRACTED PARTS/ASSY - Products have been submitted to first article inspection (FAI) with no action pending. 6 / 11

EQUIPMENTS - The equipment Declaration of Design and Performance (DDP) and/or Technical Standard Orders (TSO) shall be available before starting IID procedure. - The equipment is with high in service reliability. - Acceptance Test Procedure (ATP) has been approved by Alenia engineering. - Functional ground tests permit the verification of equipment operation - The equipment should not pass trough Alenia laboratory to undergo to software installation, settings, or acceptance incoming inspection. 5.2 DELEGATED QUALITY CONTROL PLAN (DQCP) For each product purchased from a supplier that is considered suitable for the Alenia IID project, the technical content of any additional specific inspection required to the supplier must be properly defined. Such additional specific inspection must be included in a Delegated Quality Control Plan (DQCP), agreed between Alenia and candidate supplier, and finally approved by Alenia. The specific inspections to be delegated to the supplier are defined, for each product, through an assessment of the current Alenia Receiving Control Plans identifying all those activities that can be delegated. The delegated activities, included in the Delegated Quality Control Plan (DQCP), must regard at least: 1. Checks related to the documentation (i.e.: Conformity Certificates, Test reports, etc.) 2. Dimensional checks 3. Laboratory tests 4. Other checks (i.e.: visual inspections, weight, NDI, special processes, etc.) Each performed inspection included in the DQCP, must be duly documented leaving no doubts or personnel interpretation. The approved DQCP s must be referenced in the additional Quality Requirements included in the Contract (see par. 5.3). 7 / 11

5.3 ADDITIONAL QUALITY REQUIREMENTS TO BE INCLUDED IN THE CONTRACT In order to get the IID authorisation; the supplier must accept any eventual contractual clause(s) identified jointly by Alenia Quality and Procurement Departments. These shall be recorded in the additional Quality Requirements within the Contract(s) for the part concerning incoming inspection delegation authorisation. The contracts must include at least the following clauses: a) Quality Rating agreement The Quality Rating value to be maintained by the supplier shall be included in the contract. b) Authorisation Withdrawal If supplier actual Quality Rating should be lower than the agreed value, the supplier within 30 days by the official Alenia request, shall refer about problem statement, immediate corrective action, immediate corrective action effectiveness, root cause and root cause corrective action/effectiveness, corrective action verification plan and follow up. When requested by Alenia, First Article Inspection may be repeated. Alenia source inspection and/or Alenia unscheduled audit may be necessary. In case Alenia is forced to revoke/suspend IID authorisation for the particular seriousness of the events, the whole agreement for incoming inspection delegation and just in time supplies shall be revised as defined by Alenia Purchasing Department. c) Alenia Quality Control Rejection In case of rejection for which responsibility is agreed to be on the supplier, the materials costs and the costs incurred to by Alenia (i.e.: man-hours, etc.), up to rejecting the item on the assy, will be defined by Alenia Purchasing Department. d) Customer Co-ordinators (Supplier) It is the supplier duty to comply with this document concerning selection, training, roles and responsibilities of the Customer Co-ordinators (see par. 5.4). Such activity must be regulated by supplier s internal procedures approved by Alenia. If these procedures are to be modified, Alenia shall be immediately notified for review and approval. 8 / 11

e) Delegated Quality Control Plan (DQCP) It is the supplier s duty to validate, for each delivered item, the approved DQCP included in the contracts and maintain objective evidence. f) Laboratory Tests Where applicable, is supplier responsibility to assure that every laboratory test included in the approved DQCP (for any specific item before delivery), is performed using agreed method and frequency. The Laboratory facility used to perform DQCP tests (according to agreed method and frequency) shall be accepted or approved by Alenia and indicated in the Supplier internal IID management procedure. For Distributor/Stockist, laboratory tests shall be performed with a sampling plan and an inspection plan approved by Alenia. g) Surveillance Right Supplier shall allow Alenia and its customers/authorities the right of access in its Plants and used Laboratory to perform scheduled/unscheduled audit. h) Documentation Filing and Availability It is supplier s responsibility to keep a file reserved to the Alenia IID documentation, for at least 10 years. After this period the supplier must ask for Alenia authorisation before disposal. Documents will be provided to Alenia on call, within 24 hours but not later than two working days from receipt of request. Such clause is particularly important when the product s documentation filing and management is one of the specific inspections required to the supplier (i.e.: products shipped without certification documentation). In particular supplier will keep a file of all certification documents such as Certificate of Conformity, Test Reports, Delegated Quality Control Plan validated by the approved customer s coordinator, Source Certificate, Source Test Reports (as applicable). i) Product/Documentation Traceability It is supplier s responsibility to enforce a system to ensure correlation among each item shipped and its own documentation, even for not serialised items. j) Configuration Control Any change in the required configuration shall be submitted to Alenia engineering for approval before product delivery. 9 / 11

k) Delivery Documentation Supplier shall assure that every delivered product is adequately packed, labelled and marked with the stamp of approved customer s coordinator as defined in the Supplier s IID management internal procedure approved by Alenia. Traceability between DQCP validated by the approved customer s coordinator and relevant shipping documents shall be assured. l) Double Check Alenia delegated Supplier s laboratory tests validity must be verified periodically. Hence it s supplier responsibility to sample production destined to Alenia every 12 months in order to perform Chemical and Physical/Mechanical tests at Alenia laboratory. 5.4 CUSTOMER S COORDINATOR Alenia approves the candidate Customer Co-ordinator appointed by the supplier in accordance with its procedure under the following guidelines: a) Candidate s curriculum assessment. The candidate must demonstrate four years Quality Control experience of which at least two for the particular product or as otherwise agreed with Alenia. b) Contract s Quality requirements, Roles and Responsibilities knowledge, including: all inspections contained within the DQCP applicable to the contract. authorisation withdrawal procedure supplementary laboratory test requirements. documentation filing and retrieval requirements. product/documentation traceability requirements. c) Evidence that the candidate holds a controlled inspection stamp. d) Provide Alenia with supplier s quality indicators for the specific delivered product. 10 / 11

5.5 SURVEILLANCE The surveillance will be established on the basis of the following two aspects: a) Periodical adequacy assessment of the Customer Co-ordinator activities through data collection of all eventual minor defects of the material received at Alenia (such as scratch, etc.) and/or dedicated on site audit. b) Product quality assessment via the monitoring of specific quality rating based on Supplier performance. c) The supplier must maintain a product s quality rating not below the one agreed with Alenia. d) Double Checks. 5.6 ACTIVITIES DELEGATED TO THE ALENIA RECEIVING UNIT The activities required for the products acceptance are limited to the verification that both the product and the related shipping documentation are duly stamped by the customer coordinator s. A list of approved Alenia Customer s Co-ordinator with relevant stamps must be available on site. Alenia Quality Control will maintain responsibility for the management of non conforming materials (including non conformities discovered after incoming inspection). 5.7 AUTHORISATION TO PERFORM DELEGATED QUALITY CONTROL PLAN Once completed the activities listed under par. 5.1 to 5.5, Alenia Purchasing Department with the support of Quality Control and Suppliers Quality Unit will authorise the Customer Co-ordinator to perform the specific inspections (DQCP) required by contract and to certify them with the inspection stamp. 5.8 IID ACTIVATION Once completed the activities listed in par. 5.1 to 5.7 the IID process can be started. However it is always Alenia Quality Control s duty to formalise any product rejection. 11 / 11