ALL MERCEDES-BENZ PASSENGER CAR DEALERS DATE: November 1996 REF. NO. MBNA 58/92 NEW TIMING CHAIN TOOLS FOR DIESEL AND GASOLINE ENGINES

Similar documents
Zoom and Print Options

CAMSHAFT TIMING CHAIN, SPROCKET, AND TENSIONER REPLACEMENT

Timing Chain Replacement and Riveting. Numbers in parentheses ( ) indicate a component or tool in the associated illustration.

Camshaft Timing Chain, Sprocket, And Tensioner Replacement

CAMSHAFT TIMING CHAIN, SPROCK... CAMSHAFT TIMING CHAIN, SPROCKET, AND TENSIONER REPLACEMENT (LE5 OR LE9) (ENGINE MECHANICAL - 2.2L OR 2.


SECTION C Engine 5.4L (4V)

GM V8 Cam Tools Set Operating Instructions

The following tools will be required to perform this new service procedure outlined in this bulletin:

Upon investigation, the technician may find one or more of the following DTCs stored: 2015 General Motors. All rights reserved.

11/29/2017 Engine Cooling - Coolant Pump - Removal and Installation 2010 Ford Edge MotoLogic Engine Cooling 2010 Edge, MKX

A: Removing/Installing Camshaft

Timing Chain: Service and Repair With 2 Piece Tensioner (TSB A) Precaution. Removal This article has been updated with bulletin No A.

AR05.20-P-6020AU Set the Basic Position of Camshafts

N63 Valve Stem Seal Tool Kit Part #: AGA-N63-VSK-K

GM 6-Cylinder Cam Tool Set 3.0L and 3.2L Operating Instructions

2001 Dodge Dakota ENGINES 4.7L V8

2003 Saturn Vue. SATURN 3.0L V6 DOHC - L-Series After VIN & Vue

CAMSHAFT INSTALLATION INSTRUCTIONS FOR NISSAN KA24DE ENGINES W/DOUBLE ROW CHAIN (SEE LAST PAGE FOR USING JWT CAMS IN KA24DE W/SINGLE ROW CHAIN)

15.Timing Chain Assembly

2005 Saturn L ENGINE Engine Mechanical - 3.0L (L81) - L300

6.0 Liter Timing Chain, Crankshaft Sprocket, Camshaft Position Actuator, and Solenoid Valve Replacement

TOYOTA 4-RUNNER TOWING HITCH Preparation

Engine Cylinder Head Installation

Servicing the APU Generator Belt. Determining if a belt adjustment or replacement is required

2001 Mitsubishi Truck Montero LTD 4WD V6-3.5L SOHC Copyright 2006, ALLDATA 8.80 Page 1. Timing Belt: Service and Repair

1 Cable harness for trailer hitch 3 Supporting plate, detachable ball neck 4 Bolts 12 Detachable ball neck 12a Mount X52 Trailer hitch connector

Removing and installing timing case cover. A. Engine

Fig. 195: Positioning Timing Chain On Exhaust Camshaft Courtesy of BMW OF NORTH AMERICA, INC.

Document ID# Cadillac CTS

Zoom and Print Options

NUMBER: S.M. REF.: 8.5 ENGINE: EPA07 Series 60 DATE: November 2008

REMOVAL. Cylinder Head. All cylinder heads. 1. Remove the engine. For additional information, refer to Engine in this section.

2002 Escape Workshop Manual

Trim panels on model 124 as of 07/

TOYOTA LAND CRUISER 2003 DVD VES

GENUINE PARTS INSTALLATION INSTRUCTIONS

Timing Drive Components ( )

1992 Mitsubishi 3000GT VR-4

WARNING. Indicates a hazardous situation which, if not avoided, could result in death or serious injury. WARNING

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: August 2013 SUBJECT: VALVE LASH ADJUSTMENTS ADDITIONS, REVISIONS, OR UPDATES

Cylinder Head. Special Tool(s) 3-Jaw Puller 303-D121 or equivalent. Compressor, Valve Spring

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

2005 Chrysler 300 C ENGINE Mechanical - 3.5L - Service Information & Magnum

REMOVAL AND REPLACEMENT

1991 Nissan 240SX. 2.4L 4-CYL - VINS [F,M,S] 1991 ENGINES Nissan 2.4L 4-Cylinder

Engine, disassembly and

All models. Make airbag units unusable.

Removal Procedure. Remove the timing chain tensioner. 1 of 32 12/17/ :42 AM

Power Transmission Group Automotive Aftermarket

90 Utility Model Number A2013KUB2BUSZ SHARE OUR PASSION.

LA1, LNJ, LG8, LL1, LX9, L82, LL2, LB8, LHO, LG5, LB6, LE2, LQ1, LH7, LC1, L44, LZ4, LZE, LZ9, LGD, LZ8, LZG)

Fog Lamp Instructions

INSTALLATION INSTRUCTIONS

Timing Belt: Service and Repair Timing Belt Replacement

Models Affected: Visions with Propane Engines CORRECTIVE ACTION ---- PROCEDURE

Models Affected: Certain 2015 & 2016 All American Front Engine and Vision Buses Equipped with Hydraulic Brakes ISSUE _ CORRECTIVE ACTION _

SCION xb 2004 SATELLITE RADIO TUNER Section I Installation Preparation


Max IV Rear Axle Replacement For models after Serial Number and all rear splined axle replacements.

11/30/2017 # F: Engine Oil Leak at Crankshaft Rear Main Oil Seal (Install Revised Crankshaft Rear Main Oil Seal Using Revised Rear Main S

& MX Loosen the righthand front wheel lug nuts, then raise and support the vehicle with jack stands.

IN-VEHICLE REPAIR. Timing Drive Components. Removal. 3. Disconnect the eight ignition coil electrical connectors.

15.Timing Belt Assembly

SCION xa 2004 SATELLITE RADIO TUNER Section I Installation Preparation

(g)honda Service Bulletin

INSTALLATION INSTRUCTIONS

Master Engine Timing Tool Set

Timing Chain, Balancer Shaft, Replace (Z 22 SE)

1995 Mitsubishi Montero LS. Ensure timing marks are aligned. Mark timing belt direction of rotation.

DISASSEMBLY. Engine. Special Tool(s) Locking Tool, Camshaft Phaser Sprocket Special Tool(s)

N63TU Valve Stem Seal Tool Kit Part #: AGA-N63TU-VSK-K BMW Part #:

9/24/2017 Camshaft Timing Chain Removal and Installation Engine Mechanical 2002 Audi A6/S6/Quattro/Allroad MotoLogic

Valve Timing, Adjust (Z 22 SE)

Engine Oil Leak at Crankshaft Rear Main Oil Seal (Replace with Revised Crankshaft Rear Main Oil

15.Timing Belt Assembly

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07/10 DD Platform DATE: September 2010

INSTALLATION INSTRUCTIONS

2. Timing Belt. 2-3b [W2A1] SERVICE PROCEDURE A: REMOVAL 1. CRANKSHAFT PULLEY AND BELT COVER

Copyright DaimlerChrysler AG CD-Ausgabe G/11/05. This WIS print-out will not be recorded by Modification services.

INSTALLATION INSTRUCTIONS

15.Timing Belt. Timing Belt A: REMOVAL ME(H4DOTC) TIMING BELT

Zoom and Print Options

5. Keep rotating the water pump housing to release the belt tension and remove the belt once it becomes loose.

2002 Dodge Pickup R1500

INSTALLATION LX - CHRYSLER L V6 V.V.T Engine, 3.6L/Valve Timing/CHAIN and SPROCKETS, Timing/Installation

INSTALLATION INSTRUCTIONS

Timing Belt: Service and Repair Timing Belt Replacement

SPECIFICATIONS TEST AND ADJUSTMENT SPECIFICATIONS SPECIFICATIONS ENGINE FD620D, K SERIES

SIDI Camshaft Position Actuator Replacement

NEW CRITICAL INSTRUCTIONS. MUST READ!

Toyota Truck Pickup 2WD L4-2.4L SOHC (22R) 1987

CBEA/CJAA Timing belt procedure. Written by: greengeeker Photos by: DanG144, Kriesel, coalminer16. Required tools:

INSTALLATION INSTRUCTIONS

TIMING BELT AND SPROCKET(S) REMOVAL - TIMING BELT

Excluding vehicles with special bodywork, 4MATIC, sedan with long wheelbase and all types without level control system on the rear axle and

97 00 dodge trucks CKP CPS

INSTALLATION INSTRUCTIONS

Engine Timing Tools. Volkswagen Audi Group. K 10543

Transcription:

amb service information TO: ALL MERCEDES-BENZ PASSENGER CAR DEALERS DATE: November 1996 REF. NO. MBNA 58/92 SUBJECT: NEW TIMING CHAIN TOOLS FOR DIESEL AND GASOLINE ENGINES A new timing chain with a pressed on center link plate as part of the connecting link has been phased into production on the diesel engines. See S.I. MBNA 05/95, for additional information regarding the new timing chain. Only the new modified timing chain is available as a spare part for diesel engines 601, 602, 603 and 606. Prior to replacing the timing chain, review the timing chain replacement procedure as described in: SMS, Engine 601, 602, 603; Mechanical III, Job No. 05-320. SMS, Engine 604, 605, 606; Mechanical II, Job No. AR05.10-7601HA. It is important that the center link plate of the connecting link be properly positioned when pressing the connecting link together during its final installation on the timing chain. For that reason, it is critical that the Special Tools described in this Service Information are used. Additionally, the following Special Tools are considered temporary assembly aids and must be removed after use: Threading link (temporary), Special Tool 602 589 02 40 00 Assembly link (temporary), Special Tool 602 589 02 63 00 For gasoline engines, when replacing the single and double row timing chains, the following special tools are required: Link removal tool, Special Tool 602 589 02 33 00 Mandrel, link remover, Special Tool 602 589 05 63 00 Link removal pins, Special Tool 602 589 05 63 01 Swaging jaws, Special Tool 103 589 01 63 00 Note: The following installation and riveting of timing chain procedure refers specifically to diesel engines 601, 602, 603, 604, 605 and 606. The procedure for gasoline engines is similar, please refer to the appropriate SMS Job No. before beginning the replacement of the timing chain. Copyright DaimlerChrysler AG 09.08.2002 CD-Ausgabe G/05/02 Will not be recorded by Modification services Page 1

INSTALLATION AND RIVETING OF TIMING CHAIN Procedure 1. Remove Visco fan. (see SMS, models 201, 124 and 140: Engines 601, 602, 603, Mechanical IV, Job No. 20-312). (see SMS, models 124, 210: Engines 604, 605, 606, Mechanical II, Job No. AR20.40-5660HB). 2. Remove timing chain tensioner. (see SMS, models 201, 124 and 140: Engines 601, 602, 603, Mechanical III, Job No. 05-310). (see SMS, models 124, 210: Engines 604, 605, 606, Mechanical II, Job No. AR05.10-7800HA). 3. Disconnect and partially unscrew all glow plugs. 4. Remove valve cover. Separating timing chain 5. Attach retainer (01, Figure 1) Special Tool 602 589 01 40 00 on engines 601-603 or Special Tool 602 589 00 40 00 on engines 604-606, to cylinder head with bolts as shown (arrows, Figure 1). 6. Cover exposed timing chain case with a clean shop towel. As shown on engines 601 to 603 Figure 1 P05.10-0262-01 Copyright DaimlerChrysler AG 09.08.2002 CD-Ausgabe G/05/02 Will not be recorded by Modification services Page 2

7. Install link remover mandrel (02, Figure 2) Special Tool 602 589 04 63 00 along with link removal pin, Special Tool 602 589 04 63 01 into link removal tool (03, Figure 2) Special Tool 602 589 02 33 00. 8. Lay above assembled link removal tool (03) onto the timing chain (Figure 2) and contact the leading link pin (Figure 3) 9. Using a wrench, turn link remover mandrel (02) in towards the timing chain until contact is made with the timing chain link plate (Figure 2). 10. Continue by turning mandrel (02a) (with link removal pin) (Figure 2) to press out the timing chain leading link pin from the old timing chain (Figure 3). Figure 2 U05.10-0263-01 Figure 3 U05.10-0213-01 11. Unscrew link remover mandrel (02) and then remove link removal tool (03) from old timing chain (Figure 4). The timing chain is now separated. 12. Remove pressed out timing chain link pin (1) from link removal tool (03) (Figure 4). Figure 4 P05.10-0271-01 Installing new timing chain Copyright DaimlerChrysler AG 09.08.2002 CD-Ausgabe G/05/02 Will not be recorded by Modification services Page 3

13. Connect new timing chain (5, Figure 5) to the old timing chain (4, Figure 5) using the suitable threading link (04) from Special Tool 602 589 02 40 00. 14. Using a ratchet and socket on the crankshaft, carefully turn engine in direction of rotation, thereby rolling in the new chain (5, Figure 5) onto all the sprockets (in place of the old timing chain) while removing the old chain at the same time. Do not rotate engine backwards. Apply pulling tension on old timing chain while feeding in new timing chain to ensure new timing chain properly engages all sprockets. Retainers (602 589 01 40 00 and 604 589 00 40 00) prevent the timing chain from jumping from cam sprocket, thus eliminating the assistance of a second technician when feeding in the timing chain. Figure 5 U05.10-0268-01 15. Disconnect old timing chain (4) from new timing chain (5) when the threading link (04) has reached the top of the camshaft sprocket (Figure 6). Remove and discard old timing chain. Threading link (04), Special Tool 602 589 02 40 00 is considered a temporary assembly aid only and must be removed after use. Figure 6 U05.10-0268-02 Riveting new timing chain connecting link 16. Connect the two timing chain ends (5, Figure 7) using the assembly link, Special Tool 602 589 02 63 00 (05, Figure 7) and also from the new timing chain insert the new connecting link center link plate (2, Figure 7). Insert assembly link (05) as shown, since it will be pushed back out by the link assembly tool when new timing chain connecting link is installed in step 20. The assembly link (05), Special Tool 602 589 02 63 00 is considered a temporary assembly aid only and must be removed after use. Figure 7 P05.10-0266-01 Copyright DaimlerChrysler AG 09.08.2002 CD-Ausgabe G/05/02 Will not be recorded by Modification services Page 4

17. Attach swaging jaws (F5 and D9, Figure 8), Special Tool 602 589 02 63 00 into link assembly tool (06). 18. Insert new timing chain connecting link (3, Figure 8) into timing chain ends (5). Observe direction of installation. 19. Lay link assembly tool (06) onto timing chain (5, Figure 8). 20. Press in new timing chain connecting link (3, Figure 8) by turning link assembly tool mandrel (07, Figure 8). NOTE: Assembly link (05) will be pushed out in forward direction (arrow, Figure 8), when pressing in new timing chain connecting link (3, Figure 8). Figure 8 U05.10-0267-01 The assembly link (05) is considered a temporary assembly aid only and must be removed after use. 21. Remove link assembly tool from timing chain. 22. Attach riveting inserts (D8 and F1) into link assembly tool (06, Figure 9). 23. Insert outer connecting link plate into link assembly tool (06). Outer connecting link plate will be held in place magnetically by link assembly tool. Press outer connecting link plate onto timing chain using mandrel. 24. In order to rivet the timing chain connecting link pins, rotate swaging jaw (D8, Figure 9). Then by turning mandrel carefully rivet the timing chain connecting link pins. Figure 9 P05.10-0265-01 Copyright DaimlerChrysler AG 09.08.2002 CD-Ausgabe G/05/02 Will not be recorded by Modification services Page 5

25. Carefully inspect riveted connecting link pins (arrows, Figure 10). If necessary re-rivet pins by repeating step 24 again. 26. Carefully rotate engine by hand to verify camshaft timing. If necessary adjust camshaft timing and injection pump timing. 27. Reinstall timing chain tensioner. 28. Reinstall visco fan. 29. Tighten all glow plugs and reconnect wire harness. 30. Reinstall valve cover. Figure 10 P05.10-0213-01 Special Tools 602 589 00 98 00 602 589 02 33 00 602 589 04 63 00 Case (without tools) Link Removal Tool for Diesel/Gasoline Engines Mandrel, Link Remover for Diesel Engines 602 589 04 63 01 602 589 00 39 00 602 589 02 63 00 Link Removal Pins for Diesel Engines (wear item-replaceable set) Link Assembly Tool for Diesel/Gasoline Engines Assembly Link (temporary) for Diesel/Gasoline Engines and Swaging Jaws for Diesel Engines Copyright DaimlerChrysler AG 09.08.2002 CD-Ausgabe G/05/02 Will not be recorded by Modification services Page 6

602 589 02 40 00 602 589 01 40 00 604 589 00 40 00 Threading Link Set (temporary) for Diesel/Gasoline Engines Retainer Retainer Special Tools (continued) 602 589 03 63 00 Swaging jaw for Diesel Engines Swaging jaws for Gasoline Engines 602 589 05 63 00 Mandrel, Link Remover for Gasoline Engines 602 589 05 63 01 Link Removal Pins for Gasoline Engines (wear item-replaceable set) Special Tools Description Part Number Dealer price 4) ($) Case 602 589 00 98 00 24.00 Link removal tool 2) 602 589 02 33 00 186.00 Mandrel, link remover 1) 602 589 04 63 00 98.00 Link removal pins 1) 602 589 04 63 01 40.00 Link assembly tool (basic) 2) 602 589 00 39 00 123.00 Assembly link (temporary) 2) and swaging jaws 1) 602 589 02 63 00 69.00 Threading link (temporary) 2) 602 589 02 40 00 29.50 Retainer 602 589 01 40 00 18.50 Retainer 604 589 00 40 00 18.50 Swaging jaw 1) 602 589 03 63 00 100.00 Mandrel, link remover 3) 602 589 05 63 00 98.00 Copyright DaimlerChrysler AG 09.08.2002 CD-Ausgabe G/05/02 Will not be recorded by Modification services Page 7

Link removal pins 3) 602 589 05 63 01 32.50 Swaging jaws 3) 103 589 01 63 00 91.00 1) Applicable to diesel engine only. 2) Applicable to both diesel and gasoline engines. 3) Applicable to gasoline engines only. 4) Price at time of publishing of S.I., subject to change without notice. Copyright DaimlerChrysler AG 09.08.2002 CD-Ausgabe G/05/02 Will not be recorded by Modification services Page 8