Eurailspeed Parallel Session D.3. Julen Barrutia Commercial Director for Europe, CAF

Similar documents
Double gauge High-Speed. interoperability and scope

Traction Systems GC01DTR01_C 08/2013. Ingeteam Traction

Vicenza. Verona. Torino. Florence. Head office in Signa Florence. Production Branch in Sona Verona. Elpower in Noventa Vicentina Vicenza

New generation of gauge changeover Facilities: The UNICHANGER Project

Manufacturing operating and maintaining different rolling stock

Electrification and Power Supply. Andrea Nardinocchi Technological Design Department Italferr S.p.A., Rome, Italy

High speed diesel powered trains: An efficient approach to existing and future diesel freight lines

Simulation of a Narrow Gauge Vehicle using SIMPACK, Model Validation using Scaled Prototypes on Roller-Rig

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS

Track friendly vehicles - principles, advantages. Sebastian Stichel August 8, 2007

LESJÖFORS. Spring manufacturing since 1852.

Vossloh Rail Vehicles

AŽD Praha. ATO system type AVV. in everyday operation at Czech railway network. Vladimír Kampík. European Affairs Director, AŽD Praha

Eurailspeed Parallel Session C.1. Jean-Paul Balensi Vice president of Operation and Safety Division SNCF

Eurailspeed Parallel Session D.3. Imrich Korpanec Deputy Director Research & Development, UIC

ALSTOM High Speed Trains: State of the art & perspectives

Power Supply Systems in Spain

POSITION PAPER Version 3.0

SPANISH POLICY WITH REGARD TO ELECTRIC VEHICLES

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS

Regional and Suburban Transport

SPAIN Valentin Huerta Industrias Huerta S.A., Madrid

ELECTRO MECHANICAL INNOVATION IN Rail

Product presentation RAILWAY

High speed innovation in Adif. Antonio Berrios Villalba ADIF (Spain)

UITP THE INTERNATIONAL ASSOCIATION OF PUBLIC TRANSPORT Umberto Guida UITP Research & Innovation Director Eindhoven, 21st March 2017 UITP

Gröna Tåget. (Eng: Green Train) Overview and Technical Aspects

TOD S S.p.A. Group s sales totalled million Euros in FY 2018 (958.2 million at constant rates)

siemens.com/mobility Trainguard Full interoperability for rail traffic

RAMS of train and infrastructure using the TELE-DIAGNOSTIC SYSTEM of the NEW ETR 1000

RUBBER & PLASTIC PARTS FOR AUTOMOTIVE & INDUSTRIAL APPLICATIONS. Company profile

Continuity in internationalization: BOGE Rubber & Plastics on track for further growth

Operations and Innovations in the Railway Industry. Raúl Coleto Sierra Idom Infrastructures. Responsible for Middle East

Deliverable 2.3: Identification of samples and available rolling stock for testing

Reliable rail traffic from the very first day

siemens.com/mobility-services Published by Siemens AG 2016 Mobility Division Siemens Mobility Services Otto-Hahn-Ring Munich Germany

SIMPACK User Meeting May 2011 in Salzburg

High Speed Rail November Cannongate House, Cannon Street, London, EC4N 6AE, EC4N London 6AE

New Generation of SKODA Trams in European Cities

Ingeteam. Pág.. n.

BOGE Rubber & Plastics achieves record sales and extends its product portfolio with Fiberreinforced rubber-elastic coupling

Connecting Europe Facility. Regulation Study for Interoperability in the Adoption of Autonomous Driving in European Urban Nodes

Introduction to PrimoveCity. Gaëtan Bilodeau, P.Eng. Business Development - PRIMOVE December 2011

PALLET TRANSPORTERS PLL, PLP, ALL & XLL. CEN-PT-NFE/ Printed in the Netherlands

RZD Talgo Moscow Berlin service. Press kit

About us. OUR VISION We shape tomorrow s customers mobility.

students (mostly MS level, partially BS and PhD) academic staff

Ford Delivers Power of Choice to Mondeo Customers; 14 Petrol, Diesel and Hybrid Models Now Available to Order

EDF Research & Development Bernard Salha

The Global Evolution of HSR. Lessons from the Spanish Experience. Application to U.S. High Speed Rail Acknowledgements CONTENT

Irizar Group electric bus. Zero emissions Irizar Group Technology

GENERAL OVERVIEW OF HIGH-SPEED IN EUROPE

Freight Wagon Development in China, Review and Prospect

NATIONAL REPORT: SPAIN. At 31/12/2015

VEDECOM. Institute for Energy Transition. Presentation

The criteria of choice for new High Speed fleet

voith.com Your ticket to ride Gear units for rail vehicles

Europe - China freight trains: traffic volumes and infrastructure development. Péter Bucsky University of Pécs Doctoral School of Earth Sciences

EU Interregional Cooperation

ALS (Active Lateral Suspension) By Bernard GAUTIER SNCF

CHOOSE A COST EFFECTIVE ALTERNATIVE FOR MOBILITY, A WINNING STRATEGY

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

The DLR Project Next Generation Train (NGT)

High Speed Trains. General overview. Dr. Eng.&MBA José A. Jiménez Rolling Stock Director Renfe - Alta Velocidad. Paris, 19 th 23 th June 2006

Evonik Corporate Venturing. Dr. Jürgen Finke Ecosummit 2012, Neuss November 14, 2012

Satellite and mobile communications HGV tolls in Germany: innovative, environmentally friendly and fair

Faculty of Engineering Technology

Division Locomotives. Borderless locomotives

Doc-8Pages-DER-2:Application Internal 9/09/08 16:28 Page 1 HIGH RELIABILITY CONNECTORS FOR RAILWAY APPLICATIONS

GROUP PRESENTATION. Milan, March 27 th &28 th 2012 SOGEFI GROUP

Sensor-Bearing Units Steer-By-Wire Modules Mast Height Control units Other sensorized units

Eurailspeed Parallel Session E.1

Residential power RSPW/GB-2008/1

How our experience could serve your ambitions Lessons learnt

Toyota Order Picker Trucks

VII THE EXPANSION OF ITALIAN COMPANIES IN THE EMERGING MARKETS FOR PV. TURNOVER & MARGINS CONSIDERATIONS

Promoting environmental related innovation in global markets. Workshop on Environmental Innovation and Global Markets

2. Test Centre VUZ Velim Cerhenice

Application of the SuperGen Electro-Mechanical Supercharger to Miller-Cycle Gasoline Turbocharged Engines

SAFT approach to on-grid Energy Storage Intensium Max and ESS experiences Javier Sánchez

(Non-legislative acts) DECISIONS

technology with n ature

SNCF ERTMS RETURN ON EXPERIENCE THOMAS JOINDOT RAILWAY STRATEGY AND REGULATION DEPARTMENT UIC ERTMS CONFERENCE STOCKHOLM

1.5 to 3.5 ton. Electric Powered Forklift. Series 7FB

AT A GLANCE GRID /2014

Electric motors, generators and gears for rail cars.

Preventing Road Accidents and Injuries for the Safety of Employees Case Study: ALSA FACTFILE. Company: ALSA

Council of the European Union Brussels, 18 July 2014 (OR. en)

SP2 Requirements toward the freight system of FFE (Madrid Spain) 21 September 2017

Spanish Initiatives in the Electromobility Sector

Railway Dynamics Studies at CITEF with SIMPACK

The SHIFT2RAIL Joint Technology Initiative Presentation to the Rail Forum Europe 15 November 2011

Electric mobility: Type 2 charging plug proposed as the common standard for Europe

UIC/ UNIFE Technical Recommendations (TecRec)

Room, packaged & close control air conditioning United Kingdom

Your Ticket to Ride. Gear Units and Complete Wheelsets for Rail Vehicles

Very Light Rail Development

Low-voltage drives. Pekka Tiitinen October 3, :09 PM. ABB Oy -1- RT/EOO/ 10/6/2003

Ultra Terminal. March 28, Building a New Electric World

Eurotrans General Information YEAR 2015

Transcription:

Eurailspeed Parallel Session D.3 Julen Barrutia Commercial Director for Europe, CAF

High Speed in the technological development of CAF CONSTRUCCIONES Y AUXILIAR DE FERROCARRILES, S.A. EurailSpeed 2005 MILANO 8 th November 2005

GENERAL INFORMATION ABOUT CAF A SPANISH-OWNED COMPANY (24% SHARE HELD BY EMPLOYEES), WHICH IS LISTED ON THE STOCK MARKET. WITH 3800 EMPLOYEESS, 250 OF WHICH ARE R+D TECHNICAL STAFF. AN ANNUAL TURNOVER OF 650 MILLION EUROS. AN ORDER BOOK (AT 30/06/05) OF 2400 MILLION EUROS. 60% OF ITS PRODUCTION FOR EXPORTS. WORLDWIDE PRESENCE OF CAF.

MEDIUM TERM STRATEGY Yesterday Tomorrow 3000V d.c. RENFE Gauge 120-200 km./h. RENFE Gauge 120-160 Km./h. 3000Vdc. UIC Gauge 250 Km./h. 25.000V.a.c. MANUFACTURE AVE Madrid-Sevilla Shuttles S-104 EUROPEAN INTEROPERABLE TRAIIN COMPETITIVENESS REDUCED TRAVELLING TIME Greater international presence R +D INVESTMENT TILTING-SIBI VARIABLE GAUGE NEW DEVELOPMENTS VERY HIGH PERFORMANCE SYSTEMS

i Yesterday Tomorrow Technological Centres R + D INVESTMENT TILTING-SIBI VARIABLE GAUGE TCN COSMOS NEW DEVELOPMENTS GREATER FOREIGN PRESENCE Two technological centres in Spain. More than 6000m 2 in R+D installations. 320 R+D professionals.

i Yesterday Tomorrow R+D R + D INVESTMENT TILTING-SIBI VARIABLE GAUGE TCN COSMOS NEW DEVELOPMENTS GREATER FOREIGN PRESENCE Advanced computer systems and tools. CAD -CAM. Static test installations. Dynamic test installations. Lineside conditions simulation. Dynamic simulation programmes. Collaboration with Technological Centres and Universities.

i Yesterday Tomorrow R+D Investment R + D INVESTMENT TILTING-SIBI VARIABLE GAUGE TCN COSMOS NEW DEVELOPMENTS GREATER FOREIGN PRESENCE Investment directed at technologies and systems offering competitive advantages. Well defined aims with special attention to: Continuous improvement of products and processes. Adaptation to Customer needs. Product-price optimization.

i Yesterday Tomorrow R + D INVESTMENT GREATER INTERNATIONAL PRESENCE TILTING-SIBI VARIABLE GAUGE TCN COSMOS NEW DEVELOPMENTS

i Yesterday Tomorrow R + D INVESTMENT TILTING-SIBI VARIABLE GAUGE NEW DEVELOPMENTS GREATER FOREIGN PRESENCE INTELLIGENT TILTING SYSTEM (SIBI) (In operation) First tilting system in the world that acts at the required moment. Detects the exact train position at any time. Makes maximum use of gauge. Achieves optimum train body tilting. Clean and silent. For electric and diesel trains. Reduces track maintenance needs.

i Yesterday Tomorrow VARIABLE GAUGE WHEELSET- BRAVA R + D INVESTMENT TILTING-SIBI VARIABLE GAUGE NEW DEVELOPMENTS GREATER FOREIGN PRESENCE The Variable Gauge Self-Propelled Bogie (BRAVA) allows vehicles to be adapted in running to any track gauge, in only three seconds. It is a fast and safe bogie. It has successfully reached speeds of 275 km/h on the La Sagra -Ciudad Real section. Reliable, available and maintainable in accordance with the most demanding railway standards. Applicable to concentrated or distributed traction systems, diesel or electric. Compatible with different existing vehicles and technology.

i Yesterday Tomorrow Under Development R + D INVESTMENT TILTING-SIBI VARIABLE GAUGE GREATER FOREIGN PRESENCE Full or partial integration of the different systems: SIBI Active Tilting System BRAVA Variable Gauge Wheelset COSMOS Control, Command and Diagnostics ERTMS Signalling GSM-R Communications VERY HIGH SPEED EUROPEAN INTEROPERABLE TRAIN NEW DEVELOPMENTS

i Yesterday Tomorrow BRAVA SYSTEM TRAIN PLATFORM R + D INVESTMENT TILTING-SIBI VARIABLE GAUGE TCN COSMOS NEW DEVELOPMENTS GREATER FOREIGN PRESENCE High speed Motor or towed vehicles Concentrated or distributed traction Bivoltage Gauge change without stopping

12 250 KM/H SELF-PROPELLED TRAINS WITH VARIABLE GAUGE WHEELSETS. ATPRD RENFE - GRANDES LINEAS

GENERAL CHARACTERISTICS Train performance features Composition: Distributed traction-4 motor cars 2 preferential class cars (MCP, MIP) 2 tourist class cars (MCT, MIT) Maximum speed: 275 km/h Commercial speed: 250 km/h Acceleration: 0,60 m/s2 Residual acceleration at 250 km/h: 0.05 m/s2 Power: 4.000 Kw Bivoltage: 3000 Vdc/ 25000 Vac Coupling: 2 trains. BRAVA automatic track gauge changing.

GENERAL CHARACTERISTICS Seats 3 seats per row in preferential class. 4 seats per row in tourist class. Reversible seats, coinciding windows. High level of comfort and services. NUMBER OF SEATS : Preferential: 81 Tourist: 156 PRMs: 1 TOTAL: 238

New orders Renfe/ ATPRD s-120/ s 250 Km/h 19 trains Long Distance 26 trains Regional Services

ATPRD