Winters Instruments: Corporate Engineering White Paper: Waste Water Treatment Application: Isolation Ring Assembly. Principle of Operation

Similar documents
ONYX VALVE CO ISOLATOR RING Installation & Maintenance

ONYX VALVE CO QUICK START INSTRUCTION. Changing Instruments on an Onyx Isolator Ring

ONYX VALVE CO MODEL CAR, CAP-PFO Installation & Maintenance

ONYX VALVE CO MODEL CER with JORDAN ACTUATOR Installation & Maintenance

ONYX VALVE CO MODEL CER and CEP Installation & Maintenance

ONYX VALVE CO MODEL CHR & CHP Installation & Maintenance

ONYX VALVE CO MODEL DAO-PFO Installation & Maintenance

ONYX VALVE CO MODEL DAC-PFO Installation & Maintenance

ONYX VALVE CO MODEL DBC Installation & Maintenance

ONYX VALVE CO MODEL DAO-ADA Installation & Maintenance

ONYX VALVE CO MODEL DAC-ADA Installation & Maintenance

ONYX VALVE CO MODEL DEC Installation & Maintenance

ONYX VALVE CO MODEL DAO-PFC Installation & Maintenance

ONYX VALVE CO MODEL GSF AND GSD Installation & Maintenance

Keystone Series GR resilient seated butterfly valves GRW/GRL Installation and operation manual

CPF INSTALLATION, OPERATION, AND MAINTENANCE MANUAL FLANGED SERIES CHECK VALVE *

INSTALLATION, OPERATION AND MAINTENANCE FOR SERIES 500 K-FLO BUTTERFLY VALVES

KEYSTONE OPTISEAL F14/16-15/17 AND BREWSEAL BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

KEYSTONE SERIES GRF RESILIENT SEATED BUTTERFLY VALVES INSTALLATION AND OPERATION MANUAL

COMMERCIAL. BV & BVM Series Installation Instructions 06/29/15

PFA LINED BALL VALVES Installation, Operation and Maintenance Manual

PO Box 411 Berwick PA VALV

KEYSTONE. Butterfly valves Figure 9 Installation & Maintenance Instructions. Please read these instructions carefully

CompoSeal butterfly valves, wafer style Installation & Maintenance Instructions

Operating & Maintenance Manual For Steam Conditioning Valve

Series 820 AWWA Butterfly Valves

Operation and Maintenance Instructions

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2012 SUBJECT: REFERENCES TO THE TURBOCHARGER PURGE ROUTINE

IOM Manual. IOM Manual. Series 76/77.

Mounting and Operating Instructions EB 8135/8136 EN. Series V2001 Valves Type 3535 Three-way Valve for Heat Transfer Oil

Installation Operation Maintenance. LSSN Butterfly Valve AGA Approved 50MM - 150MM. QAD#IM6055.REVA

Actuator Maintenance Manual, E-Type size 8 to 150

1/2" AIR DRIVEN DIAPHRAGM PUMP

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

INSTALLATION - MAINTENANCE MANUAL Severe Service Series M4 Ball Valve

Fisher TBX Hydro Plug Fixture

Fisher CVX Hydro Plug Fixture

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

INSTRUCTION MANUAL. Anchor Darling 1878 Swing Check Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Installation Operation Maintenance

Type 644 and 645 Differential Pressure Pump Governors

INSTALLATION INSTRUCTIONS

KEYSTONE SERIES GR RESILIENT SEATED BUTTERFLY VALVES GRW/GRL INSTALLATION AND OPERATION MANUAL

Backpack Sprayer. Use and Care Manual

WARNING Carefully Read These Instructions Before Use

5000/6000 SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

Operation and Maintenance Instructions

POWER STEERING TO INDEX POWER STEERING SYSTEM PRECAUTIONS... OPERATION CHECK... PROBLEM SYMPTOMS TABLE... VANE PUMP ASSEMBLY COMPONENTS...

Diaphragm Valve Type 16 (Pneumatic Model Type AD)

CV Control Valves Installation and Operation Manual

KEYSTONE SERIES 320 BUTTERFLY VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Delivering Peak Performance. High-pressure liquid and gas flow control solutions for the oil and gas industry s harshest environments

Industrial Turbo Meters, Sizes 2" through 6"

GATE VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

Fisher V250 Ball Valve

DISASSEMBLY AND ASSEMBLY

Butterfly valves Figure 56 Installation & Maintenance Instructions

SM64052 Maintenance & Repair Manual Commercial 2" Unisex Coupling - Valved Model 64052

Calibration and Switching Module. User s Manual. A Swagelok Pre-Engineered. Subsystem. Pre-engineered subsystems available in weeks, not months.

1004D2/1005E API Bottom Loading Coupler. 1005E Small handles used throughout Europe 1004D

V-SEGMENT SERIES V-Port Segment Control Valves (VS/VV/VM) Installation & Maintenance Manual

Diaphragm Valve Type 14 Pneumatic Actuated Type AP. User s Manual. Contents H-A065-E. Serial No.

Butterfly Valve Type 58 (PDCPD)

M-8100EP. Installation Guide ENGINEERED PLASTIC MANIFOLD SERIES. Introduction. A. Assemble Manifold Components

GH-BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODELS HD521-M4, HD721-M4 AND HD731-M4 DOUBLE ACTING SERIES PNEUMATIC ACTUATORS

Installation, Operation and Maintenance Instructions Series 608 Ball Valve

WARNING CAUTION. CAUTION Do not exceed 120 psig (8.3 bar) air-inlet pressure.

MK Series - High Performance Butterfly Valves Operation and Maintenance Instructions

1004D3/1005E3 API Bottom Loading Coupler. 1005E3 Small handles used throughout Europe 1004D

Non-Valved Unisex Coupling

Power-Seal High Performance Butterfly Valve: Series P1 Installation & Maintenance Manual

Steam/Water Washdown Units Safety and Operation Installation and Maintenance Instructions

Series Roll Seal

Constant Flow Valves ASAHI AV VALVES H-V019-E-6. Contents. Serial No. User s Manual

CIRCLE SEAL CONTROLS

AIR CLEANER GENERAL REMOVAL. 1CAUTION Do not run engine without filter element in place. Debris could be drawn into the engine causing damage.

ONYX VALVE. Pressure Isolator Ring. New Patented Design Assures Accuracy and Maintenance-Free Operation Patent #5,708,201

1004D3/1005E3 API Bottom Loading Coupler

MUELLER GAS. Shur StopTM Unit 812 PE Line Stopping. System 8" 12" SDR Reliable Connections. General Information 2

Butterfly Valve Type 57P

SERIES. The Ultraflo Transport Line Resilient Seated Butterfly Valves: Specifically Designed for use in the Bulk Trailer Industry.

Bettis M11 Manual Hydraulic Override System Operating Instructions for HD, T, and G Series Pneumatic and Hydraulic Actuators

Recommended BFV Installation, Maintenance & Repair Procedures Ultraflo 300 & 400 Series Valves

Crispin Valves Operating Guide. Crispin

Valtek Auxiliary Handwheels and Limit Stops

EZH and EZHSO Series. Pressure Reducing Regulators. EZH and EZHSO Series. Introduction. Scope of the Manual. Product Description !

MERIDIAN, 2 or 3 PIECE, TRUNNION MOUNTED BALL VALVES

MEMORY SEAL BALL VALVES MAINTENANCE MANUAL 2 12, Class 150 & 300, Regular Port, Flanged Unibody

MP and MP Diaphragm and Seal Kits for MP8000 Series Actuators

1999 F-150/250 Workshop Manual

SPEED CONTROLLERS WITH QUICK FITTINGS

USER INSTRUCTIONS. Serck Audco Slimseal Wafer-Type Butterfly Valves. Installation Operation Maintenance. Experience In Motion SREEIM /13

Fuel Gas/ Starting Air Valve Series

Powers Controls 656 Powermite Valve with 3-inch Top Rebuilding

Welker Jet Top Entry Control Valve

Diaphragm Valves Type 15

PV4 - Compact Shut Off Style Pig Valve IOM - Installation, Operation & Maintenance

aero 2 -IOM aero 2 ACTUATOR - INSTALLATION, OPERATION & MAINTENANCE MANUAL

SERIES RSR PRESSURE RELIEF VALVE

Transcription:

Winters Instruments: Corporate Engineering White Paper: Waste Water Treatment Application: Isolation Ring Assembly Principle of Operation Obtaining accurate pressure readings on waste water treatment and slurry lines is difficult because the solids present in the process media block pressure elements such as gauges, switches and transmitters. Isolation rings consist of an inner rubber elastomer nestled inside two end plates and center section. The assembly is installed between flanges in the process pipe. The space between this rubber membrane, housing ring and pressure instrument is filled with silicone (or other fill fluids as per options). As the process media flows through the isolation ring and passes through, it presses against the rubber membrane causing it to expand or contract. The pressure which is exerted by the media is subsequently transferred via the fill fluid to the pressure instrument (gauge, switch or transmitter). The inside diameter of the ring assembly is based on ASME B36.10 pipe specifications and is sized so that it matches the adjacent pipe. This enables the isolation ring to be continually cleaned by the motion of the process fluid without any resultant build-up caused by step changes in the pipe s inner diameter. Note: The isolation ring is rated up to 1000psi input pressure. A GLOBAL MANUFACTURER OF INDUSTRIAL INSTRUMENTATION P a g e 1

Maintenance The isolation ring is fitted with pressure instruments such as gauges, transmitters and switches. Please refer to Winters specification literature and pressure instruments Installation, Operation and Maintenance guide found on www.winters.com for these products and accessories. The isolation ring also has a modular male-female WinCONNECT fitting which allows removal of the instrument assembly whilst preventing subsequent fill fluid leakage from the isolator ring. The pressure instrument assembly is fitted with the male adaptor of the WinCONNECT fitting which is secured by hand tightening to the female lock nut on the other part of WinCONNECT (which is fitted to the isolation ring). Refer to picture below. If removing the entire assembly of isolation ring and instrument(s), first turn off the process media supply into the pipe where the isolation ring is fitted. Once the system has been depressurized, the instrument(s) may be safety removed. If the isolation ring is to remain fitted, then it is possible to remove only the instruments through disconnecting the WinCONNECT, without having to turn off the process. Loosen the lock nut and in quick fashion, lift and place the WinCONNECT and the instrument in an inverted and upright position. The male WinCONNECT fitting should then be sealed by screwing on the red plastic cap protector (it is now safe to store it or to send it your nearest Winters facility). The female WinCONNECT fitting is equipped with an Automatic pinion-actuated shut-off which allows the isolation ring to remain inline and not interrupt the operation of the process. There is also a red plug that can be screwed into the female thread to provide added protection against dust & dirt. The system may now be turned on. Note: Repeat the above process when installing a new instrument with a WinCONNECT fitting. A GLOBAL MANUFACTURER OF INDUSTRIAL INSTRUMENTATION P a g e 2

Storage Correct storage of the isolation ring extends the service life. Rubber membranes are perishable if the following precautions are not taken prior to installation. 1. Keep isolation rings cool. They can be stored in an unheated area, but allow maximum ventilation in storage areas subject to high ambient temperatures. Trailers and storage sheds can become very hot during summer months. Avoid these locations where possible. 2. Avoid direct sunlight. UV light deteriorates rubber. Leave the isolation ring in its box. 3. Avoid ozone. DO NOT STORE isolation rings near electrical equipment. 4. If the isolation ring already has instruments installed, then be careful where the assembly is stored so these external devices are not physically damaged. 5. These separate instruments may be fitted with a WinCONNECT fitting. DO NOT REMOVE THE RED PLASTIC CAP PROTECTOR FROM THE WinCONNECT FITTING UNTIL ATTACHING IT TO THE ISOLATION RING. DO NOT REMOVE THE RED PLASTIC PLUG FROM ISOLATION RING COUPLER UNTIL READY TO FIT INSTRUMENT ASSEMBLY A GLOBAL MANUFACTURER OF INDUSTRIAL INSTRUMENTATION P a g e 3

Installation 1. Safety Considerations: a. Pressure isolation rings often handle chemically reactive (eg chlorine) and abrasive fluids. Applications such as these can result in the elastomer sleeve wearing out over time. b. Make sure that the fitted pressure instruments (gauges, switches, transmitters) have pressure & temperature ratings suitable for actual operating conditions. Note that isolation ring s maximum pressure rating is 1000 psi, so the pressure instruments can only be used up to this maximum rating. Process fluid that exceeds these design pressures may result in equipment damage or personal injury. c. The rubber sleeve elastomer must be chemically compatible and temperature compatible with the process fluid. 2. Inspect the isolation ring prior to installation. Do not install if it is damaged. The isolation ring should not show any indication of leakage and the elastomer should be free from cuts or puncture holes. 3. The isolation ring can be installed at any altitude with liquid flow in either direction. Install in a straight pipe run at least 5 pipe diameters from tees and elbows where possible. 4. To install, sandwich the isolation ring between two flanges in the process pipe line. Center as carefully as possible. Install gaskets on both sides of the isolation ring. Insert the flange bolts. Tighten these bolts in a criss-cross pattern. Operating Instructions 1. Isolation rings are vacuum filled at the factory. a. Do not disassemble the isolation ring without Factory Authorized Approval. b. Do not remove the female portion of the WinCONNECT fitting from the isolation ring stem. Do not remove the red plastic plug. c. Do not remove the red plastic cap protector from the WinCONNECT fitting until ready to attach the pressure instrument(s) to the isolation ring. 2. To attach a pressure instrument with the WinCONNECT fitting to the Isolation ring, the isolation ring and instrument assembly must be pre-assembled and vacuum filled prior to attaching it to the isolation ring. A GLOBAL MANUFACTURER OF INDUSTRIAL INSTRUMENTATION P a g e 4

a. Instruments should not be attached to an isolation ring installed in a process pipe while the system is pressurised. b. Hold the pressure instrument and WinCONNECT fitting assembly upside down, until the installer is ready to mate the WinCONNECT fittings. c. Unscrew and remove the red plastic plug from the female coupler attached to the isolation ring. d. Unscrew and Remove the red plastic protective cap from the WinCONNECT fitting (save the protector for future use). e. Quickly install the male and female connections of the WinCONNECT fitting. f. Hand tighten the lock nut. g. The instrument assembly may be rotated 360 degrees to face any direction by loosening the lock nut and turning the pressure gauge and then re-tightening the ring. 3. To remove pressure instruments from the isolation ring: a. It is not necessary to remove the isolation ring from the process pipe. b. In order to minimize any slight fill fluid loss, stop the upstream process altogether by turning the system off. The interruption will be brief as the WinCONNECT and instrument removal is a very quick and straight forward procedure. c. Loosen the lock nut on the WinCONNECT fitting (item 2). d. Quickly lift the male WinCONNECT fitting along with the pressure gauge out of the female WinCONNECT and place the WinCONNECT fitting and the instrument in an inverted and upright position. e. It is necessary for the male WinCONNECT fitting to be sealed with the red plastic cap protector (it is now safe to store it or to send it your nearest Winters facility). f. The female WinCONNECT fitting is equipped with an Automatic pinion-actuated shut-off which allows the isolation ring to remain in-line and not interrupt the operation of the process. g. Screw in the red plug into the female coupler of the isolation ring, to protect it from dust and dirt. h. The system may now be turned back on. 4. Elastomer Sleeve and module seal replacement: a. Shut down the upstream process. b. Remove isolation ring from the process line. c. Remove WinCONNECT and pressure gauge (item 1 and 2). d. Remove screws from end plate (item 8). e. Remove end plate (item 4). f. Remove old elastomer (item 7). g. Use ¼ hex (Allen) key to remove the seal screw. A GLOBAL MANUFACTURER OF INDUSTRIAL INSTRUMENTATION P a g e 5

h. Use a packing extractor to remove the old rubber seal. i. Clean all components thoroughly. j. Press new rubber seal into the stem (item 3). Drive all the way to bottom of bore. Replace seal screw. Do not over tighten. k. Collapse new elastomer (item 7), push through the centre section (item 6) and work seal lips into housing grooves. l. Reinstall end plates (item 4). m. Replace end plate screws (item 8). n. Connect the fill fluid connector located on the stem (item 3) to the vacuum filling system, evacuate air from the isolation ring assembly and refill it with the new fill fluid. o. The isolation ring can now be reinstalled into the pipe for service. 5. To attach the WinCONNECT fitting to pressure instruments: a. Attach the pressure gauge or other instrument to the WinCONNECT fitting (item 1 and 2). b. Connect the instrument assembly to the vacuum filling system. c. Evacuate all the air from the instrument assembly and fill with fill fluid. d. Detach the instrument assembly from the filling system. Protect the WinCONNECT with the plastic cap protector. e. The instrument assembly can now be attached to an isolation ring or stored for future use. A GLOBAL MANUFACTURER OF INDUSTRIAL INSTRUMENTATION P a g e 6

David Reay Corporate Engineering Manager Winters Instruments, June 2017 A GLOBAL MANUFACTURER OF INDUSTRIAL INSTRUMENTATION P a g e 7