AIR INTAKE EMERGENCY SHUT-OFF VALVE PH2 C50204 AIR INTAKE SHUT-OFF VALVE DODGE 6.7L CUMMINS.

Similar documents
PH2 AIR INTAKE EMERGENCY SHUT-OFF VALVES. APPLICATION C ½ DODGE 6.7L CUMMINS C DODGE 6.

AIR INTAKE EMERGENCY SHUT-OFF VALVE C50203 AIR INTAKE SHUT-OFF VALVES APPLICATION DODGE 5.9L CUMMINS.

AIR INTAKE EMERGENCY SHUT-OFF VALVE C50207 AIR INTAKE SHUT-OFF VALVES APPLICATION FORD 6.7L POWERSTROKE.

PH2 POWERHALT AIR INTAKE SHUT-OFF VALVE C50201A ½ DODGE 6.7L CUMMINS C50202A DODGE 6.

PH2 C50219A AIR INTAKE SHUT-OFF VALVE. T800 KENWORTH / ISX ENGINE WITH POWERGUARD SMART OVERSPEED LIMITER

C50254A PH3 AIR INTAKE SHUT-OFF VALVE DODGE 6.7L CUMMINS WITH POWERGUARD SMART OVERSPEED LIMITER

PH1 AIR INTAKE EMERGENCY SHUT-OFF VALVE PULL CABLE ACTUATION.

PH3 AIR INTAKE EMERGENCY SHUT-OFF VALVE WITH POWERGUARD SMART OVERSPEED LIMITER. Generic PH3 Truck Shut-Off Valve Kit.

C40008 & C40009 EXHAUST BRAKES

DirectMount EXHAUST BRAKES

C FORD F250 / F L POWERSTROKE DIESEL WITH AUTOMATIC TRANSMISSIONS ONLY

Installation Manual P / P / P A / P B / P C E N G I N E B R A K E S

Dodge Cummins Positive Air Shutoff

PRXB EXHAUST BRAKE MAXIMUM EXHAUST FLOW DESIGN

Dodge Cummins Positive Air Shutoff

3.5-4 GENERIC POSITIVE AIR SHUTOFF

CUMMINS 6.7L EXHAUST BRAKE PRXB EXHAUST BRAKE KIT FOR 2007½-2015 TRUCKS EQUIPPED WITH 6.7L CUMMINS ISB DIESEL ENGINES. C Kit C Kit

Dodge Cummins Positive Air Shutoff

Dodge Cummins Positive Air Shutoff

Getting Started. INLINE MOUNT Exhaust Brakes. Thank you and congratulations on your purchase of a Pacbrake Inline Mount exhaust brake kit.

-!.5!, P-80 And P-80A )NSTALLATION %. ' ). % 0 $ETROIT 0! $ETROIT

Dodge Cummins Positive Air Shutoff

Dodge Cummins Positive Air Shutoff

GM 6.6L (LML) Duramax Positive Air Shutoff 2.5 CAC TUBES

Ford 6.7L Powerstroke Positive Air Shutoff

Ford 7.3L Powerstroke Positive Air Shutoff

GM 6.6L (LLY, LZB, LMM) Duramax Positive Air Shutoff 2.5 CAC TUBES

PRXB EXHAUST BRAKE HIGH PERFORMANCE

Direct Mount EXHAUST BRAKES

C44090 HP325 PACBRAKE COMPRESSOR CONVERSION

Dodge 5.9L Cummins 24v ISBe

ELECTRONIC POSITIVE AIR SHUTOFF

HP10098 BASIC INDEPENDENT AIR SPRING ACTIVATION KIT

E X H A U S T B R A K E S. APPLICATION: International Trucks 2000 Model Year & Newer With Multi-Plex Wiring 4200/4300/4400/7300/7400/7500/8500/8600

Installation Manual. Model Chassis Code Engine Code Year

C WD 2 WHEEL LOW KIT FOR DODGE RAM 4WD VEHICLES

Diesel Engine Shutdown Valve

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

SVX-Series Solenoid Actuated Diesel Air Shut Down Valves

AIR SUSPENSION KIT HP UNIVERSAL AIR SUSPENSION KIT

LGT-306L / LB Club Car Precedent LED Light Bar Bumper Kit Installation Instructions

I N S T A L L A T I O N G U I D E

INSTALLATION INSTRUCTIONS FORD POWERSTROKE PICKUPS MODEL YEAR

Diesel Engine Shutdown Valves

Installation Manual. Model Chassis Code Engine Code Year

Installation Instructions Camaro ZL1 ( Z) ( ZB)

HP10134 & HP10135 KITS BASIC SIMULTANEOUS AIR SPRING ACTIVATION KIT

INTEGRATED ENGINE BRAKE. P55003 P67 LoadLeash Kit: 2007½-2013 Dodge Pickup Trucks & Sterling Chassis Cab Trucks w/ Cummins 6.

Installation Manual v1.0: Aurora Plus Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

MVX-Series Diesel Engine Air Shut Down Valves

Installation Manual v1.0: MST Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

3-5 Hours Professional installation recommended

Toyota Tacoma Double Cab up A Toyota Tacoma Access Cab* up A. 3-5 Hours INSTALLATION GUIDE INSTALLATION TIME SKILL LEVEL

High Idle Kit Dodge Cummins (24 valve) Dodge Cummins (with APPS on motor) PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

INSTALLATION INSTRUCTIONS

Ford F-150 Supercrew A (2004 Heritage) Ford F-150 Super Cab A

BD Dual Transmission Cooler Dodge (68RFE, 518, 47RH, 47RE & 48RE) Ford (5R110) & Chevy (Allison 1000) Transmissions

= Experienced

I N S T A L L A T I O N G U I D E

HP10033 KIT. * See application guide for proper fitment.

BD Transmission Cooler Dodge (68RFE, 518, 47RH, 47RE & 48RE) Ford (All) & Chevy (Allison) Transmissions

SVX-Series Solenoid Actuated Diesel Engine Air Shut Down Valves (Energised to Run Types for Non-Hazardous Areas)

*Modification required to running board assembly. See Item 1 on page 2.

FAX

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

I N S T A L L A T I O N G U I D E. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

I N S T A L L A T I O N G U I D E. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

Banks Brake. with installation instructions EXHAUST BRAKE SYSTEM Dodge 5.9L Cummins (12-valve) Turbo-Diesel Pickups with Manual Transmissions

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

INSTALLATION GUIDE. APPLICATION MODEL YR PART # Toyota Tundra Double Cab Toyota Tundra CrewMax

3-5 Hours Professional installation recommended

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

ONBOARD AIR SYSTEM FOR ALL VEHICLES APPLICATIONS

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

MPX-Series Diesel Engine Shut Down Valves (Manual Reset / Air Pressure and Manual Closure Options)

ME217PIB / ME503PIB SMART INTERLOCK TECHNOLOGY ACME ADAPTER INTERLOCK BRACKET INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

3-5 Hours Professional installation recommended

Jeep Wrangler Unlimited (JK) 2007 up A 2-Door

InstallationManual INTEGRATED ENGINE BRAKE

INSTALLATION GUIDE APPLICATION LENGTH MODEL YR PART #

SVX-Series Diesel Engine Shut Down Valves (Solenoid Latched Types with Manual Start Override/Emergency Stop)

Air Conditioner for M915 A0/A1 Truck

ACD-PRO Install in 2008 EvoX

INSTALLATION AND USER MANUAL

SVX-Series Solenoid Actuated Diesel Engine Air Shut Down Valves (Energised to Stop Types)

HP10220 KIT. See application guide for proper fitment.

INSTALLATION & OWNER S MANUAL

INSTALLATION AND PARTS MANUAL

INSTALLATION & OWNER S MANUAL

INSTALLATION MANUAL P2068. Level of Difficulty. Parts List. Product Image. Notes and Maintenance. Tools Required. Easy

HVX-Series Diesel Engine Shut Down Valves (Oil Pressure Latched Types with Manual Start Override/Emergency Stop)

I N S T A L L A T I O N G U I D E

INSTALLATION & OWNER S MANUAL

Installation Instructions

ENGINE BRAKE. Designed for Cummins N-14 Plus Engines with the following engine CPL # s

3-5 Hours Professional installation recommended

Transcription:

AIR INTAKE EMERGENCY SHUT-OFF VALVE PH2 C50204 AIR INTAKE SHUT-OFF VALVE 2013-2017 DODGE 6.7L CUMMINS www.powerhalt.com

Thank you for your purchase of a PowerHalt Air Intake Emergency Shut-Off Valve by Pacbrake. Please read the entire manual to ensure you can complete the installation once started. Should you have any issues during the installation, please call technical support. A PowerHalt Technical Representative can be reached Monday-Friday 6:00-4:30 (PST) at 800.663.0096 INSTALLATION REQUIREMENTS & RECOMMENDATIONS: A 1" clearance is required from the valve to any other components. Maximum air temperature at the valve should not exceed 120 C. All hoses, adapters, and fittings must be suitable for the vibration of the engine application, and of reinforced type. *If unsure of your vibration requirement, contact Pacbrake. Flexible hose gaps should be kept to a minimum and the overall pipe quality and integrity from the shut-off valve to the intake manifold should be confirmed. NOTE: - Failure to ensure this, may result in hose collapse during valve activation and possible system leaks, preventing engine shutdown If an air intake flame trap is used, the valve must be installed upstream of the trap. Crankcase breather connections in the intake system between the valve and engine (or in engine intake parts) must be sealed and replaced by an external breather. 2

Please ensure that you have all the parts listed in this kit before you start the installation. B J C A D K L M N O P Q F E G H I KIT CONTENTS A B C D E F G H I J K L M N O P Q Shut-Off Valve (1) Charge Air Cooler (CAC) Pipe (1) 2.75" Clamps (3) 3.5" Clamps (3) 2.75" - 3.5" Silicone Hose (1) 3.5" Silicone Hose 45 Elbow Silicone Hose (1) Self Tapping Screw (1) Tie Straps (8) Harness Spade Terminal (2) Washer Nut Switch Switch Identification Plate Switch Cover Relay REQUIRED TOOLS Drill 1/2 Unibit Ratchet with 7/16", 1/2" & 10mm Sockets (a 14" extension is ideal) Torque wrench capable of 0-80 in-lbs Wire Strippers & Crimpers Electrical Tape 3

1 2 Open the hood. Disconnect the batteries. RELAY INSTALLATION: Obtain the provided wiring harness (2A). Mount the relay receptacle (2B) in a convenient location on the driver s side of the engine compartment, using the self-tapping screw provided. 2A 3 SWITCH LOCATION: Locate the desired location for the activation switch in your cab. NOTE: Activation switch should be as close to driver s side door as possible to allow for shutdown when standing outside of the vehicle Consider the dash construction, as the switch requires a single dash wall for install unless the double wall is modified DO NOT ACTIVATE THE MANUAL SWITCH FOR MORE THAN 10 SECONDS. Damage to the solenoid may occur 2B 4 SWITCH INSTALLATION: Drill a ½" hole in the desired location. Then, install the PowerHalt switch, switch plate, and red switch guard as shown (4A). Tighten the nut to secure the switch in place. NOTE: If the dash cannot accept the switch nameplate, use the toggle sticker and install onto the switch cover as shown. Route the green and black wire to the switch, and cover the wires with the provided loom. Crimp one of the red spade terminals to each wire and connect the wires to the switch (4B), as per the wiring diagram on page 10. NOTE: Ensure the wiring harness routing is secured with provided tie straps and away from any moving parts or high heat sources. 4A 4B DASH 5 BATTERY CONNECTION: Route the two green and one red fused wire with ring terminals to the driver s side battery location. Connect the green wires to the negative terminal. Connect the red fused wire to the positive terminal. NOTE: Ensure the wiring harness routing is secured with provided tie straps and away from any moving parts or high heat sources. 4

6 Remove the driver s side inner fender well. - Release the ABS harness push pin from the inner shield - if applicable. - Remove the push pins (# 2, 3, and 4 from image 6A). 6A - Remove the inner screws (#3 and #4 from image 6B) - Remove the screws securing the shield to the fascia and the outer fender flange (#2 from image 6B) - Release the outboard edge of the shield (#1 from image 6B) from the fender flange and remove the inner shield (#1 from image 6B). 6B 7 Remove the driver s side charge air cooler (CAC) pipe and upper silicone hose using a 7/16" deep well socket with ratchet. NOTE: Factory clamps are not to be re-used. 7 8 Using a non-oily cleaner (such as iso-propyl alcohol) and a lint-free cloth, clean the outside of the intercooler and the outside of the intake plenum. 8 5

9 Attach the 3.5" silicone hose provided in the kit onto the end 9 of the valve in the direction of the arrow and install the clamp hand-tight. 10 Attach the 3.5"-2.75" silicone hose provided in the kit onto the opposite end of the valve and install the clamp hand-tight. 10 11 Install the longer leg of the provided stainless CAC pipe into the 2.75" end of the silicone hose, as seen in photo (image 11). 11 12 Attach the 45 degree elbow loosely onto the opposite end (short leg) of the stainless CAC pipe provided. 12 TO INTAKE PLENUM 6

13 Loosely install the remaining clamps and snug them up, but leaving them loose enough for the valve to be rotated into a proper position after assembly is in place. Place one clamp onto the intercooler outlet and the other remaining clamp onto the silicone hose that will be attached to the air intake plenum. Install the valve and CAC pipe assembly in between the intercooler and the intake plenum. Rotate the valve to provide adequate clearance, and torque all clamps to 75 in-lbs, 8 N m. 13 14 Reinstall the inner fender well, in opposite steps as described in step 6. 15 Connect the metri pack connector of the harness to the mating connector on the PowerHalt. NOTE: Ensure the wiring harness routing is secured with provided tie straps and away from any moving parts or high heat sources. 15 16 Reconnect the batteries. 7

WINDOW DECAL Install the window decal included in your kit to the lower corner of the inside of your windshield so that it is legible to those on the outside. POST INSTALLATION TESTING OF YOUR POWERHALT SHUT-OFF VALVE Once the installation is complete, ensuring all the steps, schematics and recommendations have been followed, it is time to test your system. 1. Activate the manual switch (no engine running). NOTE: DO NOT ACTIVATE THE MANUAL SWITCH FOR MORE THAN 10 SECONDS. Damage to the solenoid may occur 2. View valve and confirm valve has tripped. The reset knob should be in the tripped position. This will have the line direction on the reset knob facing 90 from air flow direction. VALVE CLOSED (TRIPPED) VALVE OPEN (RUN POSITION) 3. Reset the valve. 4. Start the engine and run at low RPM (preferably at idle). 5. Activate the PowerHalt shut-off valve by pushing the manual switch in an upward direction. The engine should stop within a few seconds. - If the engine does not shutdown in the specified time please check all intake piping and hoses for leaks between the valve and intake system. - If the system is leak-free and your valve still does not shut down the engine, please consult a PowerHalt Service Representative for support. 6. Once the engine stops, wait 30 seconds, then reset the valve by turning the red reset knob clockwise to the open Run position with knob arrow in line with air flow direction. 8

VALVE OPERATION Prior to running your system you must ensure that the valve is latched (clockwise) into its open position and that the above installation procedure was completed as described. It is recommended that the engine be shipped with the shut-off valve system in its active/open and ready-to-use state. To carry out the emergency shutdown procedure, the pull cable handle must be pulled as this will shut the valve and stop the engine. CAUTION: No attempt to restart the engine should happen until the activation information/details are understood and the valve is confi rmed to be returned back to the open Run position. NOTE: Please reference your specifi c operation procedures defi ned by your organization for additional operation specifi cs / details. If you require additional recommendations on the steps to operate your shut-off valve, please reference PowerHalt s operation manual based on your application. VALVE MAINTENANCE To ensure a trouble-free long life of your PowerHalt shut-off valve a scheduled maintenance procedure is mandatory. It is recommended that you follow the requirements & procedures stated below: MONTHLY REQUIREMENTS Inspect all clamps, pull cables and support brackets to ensure they are in good condition and to the required torque. Inspect all wiring & cable runs to ensure there is no corrosion or wear. Inspect all hoses to ensure there are no cracks or damage. Activate the valve to ensure it is exercised. See procedure below. 3 MONTH REQUIREMENT (or at oil change interval s whichever comes fi rst) Lubricate the PH2, fl ap O-ring, with Parker Super O-Lube, Part # SLUBE 884-2, or equivalent. VALVE ACTIVATION PROCEDURE: 1 Run engine at low RPM (preferably at idle). 2 Activate the PowerHalt shut-off valve by pulling the cable handle. The engine should stop within a few seconds. NOTE: If the engine does not shutdown in the specifi ed time, please check all intake piping and hoses for leaks between the valve and the intake system. If the system is leak free and your valve still does not shut down the engine, please consult PowerHalt s service representative for support. 3 Once the engine stops, wait 30 seconds, then reset the valve by turning the red reset knob clockwise to the open Run position with knob arrow in line with air fl ow direction. CAUTION: The #1 failure mode of any valve in the market is seizing due to lack of use. As this is a safety device, it is imperative that you employ safety activation testing at a minimum of once per month. 9

WIRING SCHEMATIC RED 87 30 RED 15 AMP FUSE RELAY PH2 POWERHALT SHUT-OFF VALVE METRI PACK CONNECTOR BLACK 85 86 + BATTERY GREEN GREEN SWITCH CUSTOMER SERVICE HOURS MONDAY TO FRIDAY FROM 6:00 AM TO 4:30 PM PST BUSINESS HOURS OF OPERATION MONDAY TO FRIDAY FROM 7:30 AM TO 4:00 PM PST CORPORATE HEADQUARTERS / R&D CENTER 19594 96TH AVENUE SURREY, BRITISH COLUMBIA 10 Patents pending. Pacbrake is a registered trademark of Pacbrake Company. Other trademarks used herein are property of their respective holders. Printed in Canada _rev10_22.06.2016