Overhead transmission lines Tension clamp

Similar documents
Overhead transmission lines Spacers

Overhead transmission lines Vibrationdampers

TEKNISK RIKTLINJE TR05-10E

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

026-2 : 1996 CEB STANDARD

Practice Note on the Sourcing of Threaded Rod Used for Foundation Bolts

SUSPENSION 04 CLAMPS

Standard Specification for Threaded Couplings, Steel, Black or Zinc-Coated (Galvanized) Welded or Seamless, for Use in Steel Pipe Joints 1

INTERNATIONAL STANDARD

SPECIFICATION FOR HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV/22KV LINE

UNITED STATES COAST GUARD OCEAN ENGINEERING DIVISION WASHINGTON, D.C. JANUARY 2011 SPECIFICATION FOR THE MANUFACTURE

High-strength structural bolting assemblies for preloading. Part 1: General requirements. Part 2: Suitability test for preloading

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

Volume 1 Series 2200 Specification for Road Works. Clause Title Page

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 *

TENSION CLAMPS AND JOINTS. General Wedge tension clamp without jumper guide, for aluminium based conductors... 79

E/ECE/324/Rev.2/Add.108/Rev.1/Amend.3 E/ECE/TRANS/505/Rev.2/Add.108/Rev.1/Amend.3

SFI SPECIFICATION 35.1 EFFECTIVE: AUGUST 26, 2008 *

12-SDMS-02 REV. 05 ( )

MATERIAL FOR FIBRE OPTIC LINES. General C-bracket HSU trunnion type, forged, for aluminium based OPGW conductors...

023 : 2006 CEB STANDARD. 12kV & 36kV LOAD BREAK SWITCHES CEYLON ELECTRICITY BOARD SRI LANKA

SECTION GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

TECHNICAL SPECIFICATIONS FOR HARDWARE & ACCESSORIES -ACSR DOG CONDUCTOR FOR TRANSMISSION LINE

EARTH WIRE FITTINGS 08

045 : 2000 CEB STANDARD

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

SPECIFICATION AND PERFORMANCE TABLE OF CONTENT. 1. Scope Reference Documents Material and Components... 2

PROCUREMENT SPECIFICATION FOR CNP19 CHERRY RIVETLESS NUT PLATE

Volume-III : Section-I 370 Technical Specifications

532: 2006 Bicycle tube valves and valve tubing Specification (third revision) 2414: 2005 Cycle and rickshaw pneumatic tyres (fourth revision)

TITLE: SPECIFICATION FOR BENCH VICE & BENCH GRINDER TABLE OF CONTENTS. 0.1 Circulation List. 0.2 Amendment Record

1ZSC AAA en, Rev. 6. Resin impregnated paper bushing, oil to SF 6., type GSBK Technical guide

1ZSC AAA EN, REV. 7. Transformer bushings type GSBK Technical guide

contents MALLEABLE PIPE FITTINGS BUsHEs NiPPlEs PlUgs caps BENds BackNUTs UNioNs TEEs 171 cross PN25 p socket PN25 p socket PN25 p.

INTER PLANT STANDARD STEEL INDUSTRY

SFI SPECIFICATION 15.4 EFFECTIVE: JULY 20, 2010 * PRODUCT: Top Fuel and Funny Car Drag Race Drive Beadlock Wheels

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-ACSR PANTHER CONDUCTOR FOR TRANSMISSION LINE

AS/NZS :2011. Gate valves for waterworks purposes AS/NZS :2011. Part 1: Metal seated. Australian/New Zealand Standard

1ZSE en, Rev. 3. Wall bushings, type GSA-AA Technical guide

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

Net +Plus Connection Code

SUSPENSION 04 CLAMPS

PRE-RELEASE VERSION (FDIS)

SERVICE LETTER No.: 0007/2012/R1

SPECIFICATION FOR BUTTON HEAD CEASE NIPPLES

SFI SPECIFICATION 4.2 EFFECTIVE: OCTOBER 26, 1994*

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

--> Buy True-PDF --> Auto-delivered in 0~10 minutes. HG/T Translated English of Chinese Standard: HG/T

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

MANUAL - PNEUMATIC ACTUATORS, SERIES DA & SR - 1 -

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

Reg Consolidated to Supplement 2 (Revision 3 Amendment 2)Replacement Brake Linings

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Compatibility Between Electric Trains and Electrification Systems

ASSEMBLY TOOLS FOR BOLTS & NUTS. Part 3: Insulated Wrenches

A. This Section includes the following types of sectional overhead doors:

Resin Impregnated Paper Bushing, Oil to Air, Type GSB Technical guide

E/ECE/324/Rev.1/Add.57/Rev.3 E/ECE/TRANS/505/Rev.1/Add.57/Rev.3

Economic and Social Council

1ZSE EN, REV. 4. Wall bushings type GSA-AA Technical guide

Doc:TED 11(794)W Dec Draft Standard Automotive Vehicles - Windscreen Wiping System for 3 Wheeler Vehicles - Specification

1ZSE en, Rev. 9. Transformer bushings, type GOB Technical guide

شركة كهرباء محافظة القدس المساهمة المحدودة

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES :

733:1983 Specification for Wrought aluminium and aluminium alloy Bars, rods and sections (for general engineering purposes) (third revision)

SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 *

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES TWIN AL59 CONDUCTOR FOR TRANSMISSION LINE

Construct Compressed Air Building Near Bldg SECTION OVERHEAD COILING DOORS 07/07

SFI SPECIFICATION 7.2 EFFECTIVE: DECEMBER 15, 2006 *

1ZSE EN, REV. 7. Oil SF 6. bushings type GOEK Technical guide

Branding of Wheels,Tyres and Axles

E/ECE/324/Rev.2/Add.104/Rev.2 E/ECE/TRANS/505/Rev.2/Add.104/Rev.2

Bolt-on Swivel Load Rings with Link - RUD VLBG with optional bolt lengths.

SPACERS AND SPACER DAMPERS

ISO INTERNATIONAL STANDARD

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

ISO 2320 INTERNATIONAL STANDARD. Prevailing torque type steel nuts Mechanical and performance properties

BUSWAY Low Voltage (Pow-R-Flex)

AT /2008 ITB TECHNICAL APPROVAL

Sterila injektionskanyler för engångsbruk (ISO 7864:1993)

FREE STANDING WORK STATION JIB CRANE

Grinnell Grooved Fire Protection Products Grooved Fittings

Doc:TED 11(794)W 1 September 2012 Draft Standard Automotive Vehicles - Windscreen Wiping System for 3 Wheeler Vehicles - Specification

DILLARD S TEST PROTOCOL FOR DILR US LUGGAGE (V26)

SFI SPECIFICATION 1.2 EFFECTIVE: FEBRUARY 9, 2006* PRODUCT: Multiple Disc Clutch Assemblies for Vehicles with Naturally Aspirated Engines

STATE OF NORTH CAROLINA E DEPARTMENT OF ADMINISTRATION AUGUST 28, 1995 PURCHASE AND CONTRACT DIVISION D MARCH 23, 1995

INTER PLANT STANDARD IN STEEL INDUSTRY SPECIFICATION OF HYDRAILIC HOSE ASSEMBLY & END FITTING FOR HYDRAULIC LINES

EU-Mexico Free Trade Agreement EU TEXTUAL PROPOSAL

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES ACSR MOOSE CONDUCTOR FOR TRANSMISSION LINE

SFI SPECIFICATION 1.3 EFFECTIVE: MAY 23, 2000 * PRODUCT: Nitro-Methane Drag Race Multiple Disc Clutch Assemblies

SERIES G100 / G110 SPECIFICATION 15KV & 25KV SUBMERSIBLE & VAULT MOUNTED SF 6 -INSULATED VACUUM LOAD INTERRUPTING SWITCHES

34-SDMS-01 SPECIFICATIONS FOR

TECHNICAL SPECIFICATIONS OF HARDWARE & ACCESSORIES-AL 59 CONDUCTOR FOR 220 KV TRANSMISSION LINE

SFI SPECIFICATION 27.1 EFFECTIVE: OCTOBER 11, 2006 *

Page 2 of 6. Summary of testing The clause 17 and clause 29 are considered and check on the appliance.

SFI SPECIFICATION 15.2 EFFECTIVE: MAY 1, 2008 *

E/ECE/324/Rev.1/Add.54/Rev.2/Amend.1 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2/Amend.1

GS-37 FLARE FLANGE SYSTEM

Transcription:

SVENSKA KRAFTNÄT T~ SWEDISH NATIONAL GRID UNIT, BUSINESS AREA AFL, Asset Management Lines OUR REFERENCE TR05-06E DATE 2016-06-09 CONSULTÅTIONS m /j(j TECHNICAL GUIDELINE REVISION 3 Td APPROVED Overhead transmission lines Tension clamp Introduction These guidelines describe the requirements on tension clamps for use on steel reinforced aluminium conductors and aluminium alloy conductors in accordance with TR05-04E for overhead transmission lines and cover design and inspection. The guidelines intend to guarantee satisfactory performance of tension clamps during the lifetime of the overhead line and shall be used at purchasing of tension clamps. This English text is to be regarded as a translation of the Swedish guideline. The Swedish text and the interpretation thereof shall govern the contract and the legal relations hetween parties. 1 (13)

Notes Change notes Date 1 (A) New template 09 / 07 / 2008 2 New template. Clause 6.5.3.1, 6.8.2.7 and 6.9. reviewed. Clause 6.8.3 added. 02 / 04 / 2012 3 New template new clause numbers. Clause 7.1 smple size revised. 09 / 06 / 2016 2 (13)

Content 1 References... 5 2 Scope... 6 3 Definitions... 6 4 Description... 6 4.1 Tension clamp... 6 5 Requirements... 6 5.1 General... 6 5.2 Material... 7 5.2.1 Wedge and clamp body... 7 5.2.2 Bolts and nuts... 7 5.2.3 Washers... 7 5.2.4 Threaded inserts... 7 5.2.5 Clamp connecting straps... 7 5.3 Design... 7 5.3.1 Tension clamp... 7 5.3.2 Conductor groove... 7 5.3.3 Fatigue damages... 7 5.3.4 Clamp connecting straps... 8 5.3.5 Bolts and nuts... 8 5.3.6 Washers... 8 5.3.7 Attachment... 8 5.4 Marking... 8 5.5 Mechanical requirements... 8 5.5.1 Tension clamp... 8 5.5.2 Tightening torque... 8 5.5.3 Bolts and threads... 9 5.6 Electrical requirements... 9 5.6.1 Short circuit current... 9 5.6.2 Corona... 9 3 (13)

5.6.3 Hysteresis losses... 9 6 Type test... 9 6.1 General... 9 6.2 Dimensions... 9 6.3 Thickness of zinc coating... 9 6.4 Hardness... 10 6.5 Tightening torque... 10 6.6 Mechanical strength... 10 6.7 Corona... 10 7 Sample test... 10 7.1 General... 10 7.2 Dimensions... 11 7.3 Thickness of zinc coating... 11 7.4 Hardness... 11 7.5 Tightening torque... 11 8 Delivery... 12 8.1 General... 12 8.2 Documentation... 12 8.2.1 Assembly drawing... 12 8.2.2 List of material... 12 8.2.3 Manufacturing process... 12 8.2.4 Quality system... 12 8.2.5 Installation instructions... 13 8.2.6 Short circuit current... 13 8.2.7 Reports... 13 8.3 Transport and storing... 13 9 Installation... 13 9.1 General... 13 4 (13)

1 References Note that standards, regulations etc. which are referred to in these guidelines are subject to continuous change and can be withdrawn, revised or replaced. The contractor shall immediately inform the client of such changes. ISO 272 EN ISO 898-1 EN ISO 898-2 Fasteners - Hexagon products - Widths across flats Mechanical properties of fasteners made of carbon steel and alloy steel - Part 1: Bolts, screws and studs Mechanical properties of fasteners - Part 2: Nuts with specified proof load values - Coarse thread. SS ISO 2178 Non-magnetic coatings on magnetic substrates - Measurement of coating thickness - Magnetic method EN ISO 3506-1 EN ISO 3506-2 ISO 5455 EN ISO 7091 EN ISO 9001 SS 2173 EN ISO 1461 EN ISO 6506-1 Mechanical properties of corrosion-resistant stainlesssteel fasteners - Part 1: Bolts, screws and studs Mechanical properties of corrosion-resistant stainlesssteel fasteners - Part 2: Nuts Technical drawings - Scales Plain washers - Normal series - Product grade C Quality management systems - Requirements Diameters of spot facings, counterbores and countersinks - Screws and nuts with ISO metric screw threads and tapping screws Hot dip galvanized coatings on fabricated iron and steel articles - Specifications and test methods Metallic materials - Brinell hardness test - Part 1: Test method (ISO 6506-1:1999) SS 424 12 53 Overhead line material - Tension clamps - Requirements SS-EN 50341 SvK TR 05-04E SvK TR 05-10E SvK TR 05-12E SvK TR 08E Overhead electrical lines exceeding AC 45 kv Technical guidelines - Conductors Technical guidelines - Insulator Sets Technical guidelines - Insulator Set Fittings Technical guidelines- Documentation 5 (13)

2 Scope These regulations are applicable to tension clamps for steel reinforced aluminium and aluminium alloy conductors according to SvK TR 05-04 for overhead lines and comprise design and testing. The intention of the specification is to guarantee satisfactory performance of the tension clamp during the lifetime of the overhead line. 3 Definitions Technical terms and definitions used in these regulations: Corona extinction voltage The voltage where no corona is visible when the voltage is reduced from a level with visible corona. 4 Description 4.1 Tension clamp Device, comprising one or several parts, for the termination of conductors according to SvK TR 05-04, providing a mechanical and electrical connection to an insulator string. 5 Requirements 5.1 General Tension clamps shall be able to withstand the mechanical stresses which can occur during transport, handling and installation at temperatures as low as 40 C, in addition to the mechanical stresses which can occur during the lifetime of the overhead line at temperatures from -50 C to +100 C. 6 (13)

5.2 Material 5.2.1 Wedge and clamp body The wedge and the clamp body shall be manufactured from aluminium alloy containing a maximum of 0.10 % Cu. The alloy shall be resistant to inter-crystalline, layer and stress corrosion. Further properties of the alloy shall be: Hardness min. 75 HBW Resistivity max. 60 n m at 20 *C 5.2.2 Bolts and nuts Bolts and nuts shall be made of stainless steel which shall fulfil the requirements of quality A2-80 according to EN ISO 3506. The mechanical properties shall conform to EN ISO 898. 5.2.3 Washers To provide sufficient resistance to corrosion washers shall be made from stainless steel with a minimum quality equivalent to A2 of EN ISO 3506. Washers shall have a minimum hardness of 240 HB. 5.2.4 Threaded inserts Threaded inserts shall be made from stainless steel with a minimum quality equivalent to A2 of EN ISO 3506. The required mechanical properties shall be equivalent to those given for bolts and nuts in clause 5.2.2. 5.2.5 Clamp connecting straps Clamp connecting straps shall be made of hot dip galvanised steel. The thickness of the zinc coating shall conform to EN ISO 1461. 5.3 Design 5.3.1 Tension clamp It shall be possible to install the tension clamp on a continuous length of conductor. The trunnion of the tension clamp shall be an integral part of the clamp 5.3.2 Conductor groove The conductor groove shall suit conductors according to SvK TR 05-04 and be free from irregularities and sharp edges. 5.3.3 Fatigue damages The tension clamp may not cause fatigue damage on the conductor. 7 (13)

5.3.4 Clamp connecting straps The hole in the clamp connecting straps for attaching to the tension clamp trunnion shall be of suitable size and shape in relation to its size. 5.3.5 Bolts and nuts Bolts and nuts shall have M10 or M12 metric threads with 16 mm or 18 mm width across flats respectively according to ISO 272. Bolts and nuts shall be attached to the tension clamp in such a way that they are impossible to drop accidentally. It shall also be possible to tighten them from the upper side of the clamp. Bolts shall be long enough to protrude outside the thread of the nut. Counterbores and countersinks shall be made in accordance with SS 2173. 5.3.6 Washers Washers shall be manufactured in accordance with EN ISO 7091. 5.3.7 Attachment Tension clamps shall, for the attachment to other details, have a clevis type coupling in accordance with SvK TR 05-12 5.4 Marking The tension clamp shall be marked with raised or indented / stamped characters with a minimum height of 3 mm as follows: Manufacturer s trademark Type or catalogue number Conductor diameter Bolts and nuts to be marked in accordance with EN ISO 3506. Year of manufacture. 5.5 Mechanical requirements 5.5.1 Tension clamp Tension clamps shall comply with the mechanical strength requirements of SS 424 12 53 and SS-EN 50341 5.5.2 Tightening torque Bolts and nuts shall be tightened to a torque of 44 Nm and 75 Nm for M10 and M12 respectively. 8 (13)

5.5.3 Bolts and threads Bolts and threads in tension clamps shall, without failure, be able to be tightened to a torque 50 % higher than that stated in clause 5.5.2 5.6 Electrical requirements 5.6.1 Short circuit current Tension clamps shall withstand the short circuit current given in SvK TR 05-04 maximum of 40 ka. The peak value of the short circuit current shall be 2,3 times its effective value. 5.6.2 Corona Tension clamps which are to be used for the termination of phase conductors shall, when fitted to a insulator string, conform to the requirements of SvK TR 05-10 clause 5.4.4. 5.6.3 Hysteresis losses Tension clamps which are to be used for the termination of phase conductors shall cause no hysteresis losses 6 Type test 6.1 General Unless otherwise agreed type test shall be performed in accordance with clauses 6.2-6.6 on three test samples. The tests shall be performed in such a way that the method and equipment do not affect the result. 6.2 Dimensions This test intends to check that the tension clamp fulfils the requirements in accordance with clause 5.3 and also that it is in accordance with the manufacturers drawing regarding measurements 6.3 Thickness of zinc coating This test is to be performed in accordance with SS ISO 2178. Each sample shall be subject to, depending on size, 3 to 10 measurements. The points of measurement shall be evenly and randomly distributed over the entire sample surface. The minimum and average layer thickness requirements in accordance with 5.2.5 shall be fulfilled. 9 (13)

6.4 Hardness Hardness tests on aluminium are to be performed in accordance with EN ISO 6506-1. Measured hardness values shall conform to the requirements of clause 5.2.1. 6.5 Tightening torque This test intends to verify that the bolts and threads conform to the requirements of clause 5.5. The test is to be performed in accordance with SS 424 12 53 clause 5.3. 6.6 Mechanical strength This test intends to verify that the tension clamp complies with the requirements of clause 5.5.1. The test is to be performed in accordance with clause 5.3 of SS 424 12 53 6.7 Corona This test intends to verify the corona extinction voltage in a fully assembled insulator string. The test is to be performed in accordance with SvK TR 05-10 clause 6.5. 7 Sample test 7.1 General Sample tests are to be carried out by the manufacturer on tension clamps selected at random from the lot to be supplied. Test samples shall be supplied by the manufacturer free of charge to the client and shall not be included in the lot to be supplied. The size of the test samples are indicated in the table below. Lot size Sample size N 300 1-3 subject to agreement 300 < N 2000 4 2000 < N 5000 8 5000 < N 10000 12 10 (13)

The samples shall be subject to testing in accordance with clauses 7.2-7.5. Tension clamps which have been submitted for test shall be discarded. The manufacturer shall inform the client when sample tests are to be performed. Records from the sample tests shall be filed by the manufacturer and be shown to the client on request. In the case where any component does not comply with the requirements, re-testing shall be performed as below. If only one tension clamp, or part thereof, fails to comply with the sample test requirement, a new sample equal to twice the quantity originally submitted for that test shall be subject to re-testing. The re-testing shall comprise the test or tests in which failure occurred. If two or more tension clamps, or parts thereof, fail to comply with any of the sample tests, or if any failure occurs during re-testing, the complete lot shall be considered not to comply with the requirements. Provided that the cause of the failure can be clearly identified, the manufacturer may sort the lot to eliminate all the tension clamps with this defect. The sorted lot shall then be resubmitted for sample testing. The number then selected shall be three times the first quantity chosen for the test. The re-testing shall comprise the test or tests in which failure occurred in the original test. If any tension clamp, or part thereof of the sorted lot, fails during this re-testing, the complete lot shall be considered as not complying with the requirements. 7.2 Dimensions The test is to be performed in accordance with clause 6.2. 7.3 Thickness of zinc coating The test is to be performed in accordance with clause 6.3. 7.4 Hardness The test is to be performed in accordance with clause 6.4. 7.5 Tightening torque The test is to be performed in accordance with clause 6.5. 11 (13)

8 Delivery 8.1 General The client shall, according to these guidelines, approve the tension clamp before delivery. For approval the manufacturer shall show that the tension clamp conforms to the guidelines. The manufacturer shall provide documentation in accordance with clauses 8.2.1-8.2.7 inclusive for approval. The approval of drawings by the client does not release the manufacturer from his obligations regarding the tension clamp complying with the guidelines. All documentation shall be written in Swedish or English. 8.2 Documentation A summary of documentation requirements in SvK TR 08E. 8.2.1 Assembly drawing The assembly drawing shall have a minimum of two views at an appropriate scale in accordance with SS ISO 5455. On the drawing shall be given: Type and/or catalogue number. Principal dimensions. The dimensions of the conductor groove with tolerances All marking. Weight. List of materials. 8.2.2 List of material Description of material in included parts. 8.2.3 Manufacturing process Description of the manufacturing process. 8.2.4 Quality system Quality system in accordance with EN ISO 9001. 12 (13)

8.2.5 Installation instructions Installation instructions shall be written in Swedish or English with the required figures 8.2.6 Short circuit current Test report verifying the compliance of the tension clamp regarding the short circuit current requirement as given in clause 5.6.1. 8.2.7 Reports Reports in accordance with clause 6 Type test report and 7 Sample test report. 8.3 Transport and storing The tension clamps shall be packed up in that way that they will not be damaged or fouled at transport, construction and storing. 9 Installation 9.1 General Installation on the conductor shall be performed in accordance with the manufacturer installation instructions. The conductor shall be free from dirt and not be damaged when the tension clamp is installed. Conductor adjacent to the tension clamp shall not have protruding wires. 13 (13)