Operating and Installation Instructions

Similar documents
Operating and Installation Instructions

Assembly and Operating Instructions

Instructions for Fitting, Operating and Maintenance

Instructions for Fitting, Operating and Maintenance Canopy Door RE / (St.: )

Porte 150 Users Manual Swing Gate Opener 24V DC

GARAGE DOOR OPENER OWNER S MANUAL S3/S4

User s Manual. Automatic Switch-Mode Battery Charger

HYDRAULIC TROLLEY JACK K Distributed by Kincrome Tools and Equipment:

Installation, Operating and Maintenance Instructions Retractable Door / Art.-Nr.:

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Installation Instructions. Ultimate Screen. English Version 2.3

HOME CHARGER MODE 2. Series to /32A single phase CONTENTS. Manual IMPORTANT SAFETY INSTRUCTIONS 3 SAFETY INFORMATION 4 INSTALLATION 5

insulated sectional 2180mm (h) x 2550mm (w) Opening Size: 2140mm (h) x 2500mm (w) suits single car garage

Northern Sales & Distribution Centre

Sectional and Tilting Door Opener Installation Instructions and User Guide

Product card User manual. KP Strong Safe

Distributed by Kincrome Group

START HERE GRILLE REMOVAL. 1) Turn off engine and chalk tires with stop block. Open Hood. 1. Disconnect negative battery terminal.

Porte 300 Users Manual Swing Gate Opener 24V DC for residential use only

Product card User manual. KP Strong Safe

Safety, Operation and Maintenance Instructions For Long & Short Nose Upholstery Air Stapler (NS10 & NS11)

Instruction Manual LA-SDO1 Sectional garage door opener

WARNING. Electric Recovery Winch. General Safety Precautions

PW150/PW200 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR

Sectional and Tilting Door Opener

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

Laser BILLET Main Grille

START HERE GRILLE REMOVAL. 1) Turn off engine and chalk tires with stop block. Open Hood. 1. Disconnect negative battery terminal.

Product card User manual. Koliber Safes Koliber Deposit Drop Safes KSN Wall Safes Grade S1

OPERATIONS MANUAL LEVER CHAIN HOIST

SWING GATE OPENERS 24V DC GEAR MOTOR

3PC TONNEAU COVER WITH SPORTS BAR INSTALLATION INSTRUCTIONS

WWWAUTO-ROLLER.CO.ZA INSTALLATION MANUAL AUTO- ROLLER

R3 Roller Garage Door Opener

Compensation unit AGE-XY 50-80

INSTALLATION INSTRUCTIONS SERVICE MANUAL

Embedded Rack Slide-out System

Upper Class Grille Main grille INSERT - #54127 / #54131 / #54133 / #51127 / #51131 / 51133

SB106WG. LIGHTING SYSTEM (balloon type) SISTEMA DE ILUMINACIÓN (tipo de balón) ISSUE EMD-TU2343 9ZZ PRINTED IN JAPAN March 2007

Assembly and Maintenance Manual Type AS

Consists of. Date:17/02/2011 Page 1/8

TORCH Main Grille Main grille INSERT - # / # Chevrolet Silverado

DEMOUNTABLE BODY INSPECTION PROCEDURE Follow Detailed Instructions Inside for Each Step

START HERE FRONT BUMPER REMOVAL. 1) Turn off engine and chalk tires with stop block. Open Hood. Disconnect Battery.

Original Operating Manual

I. Safety Requirement WARNING. ATV/UTV Winch

PW320/PW330 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR FOR RESIDENTIAL. Flashing Light. Push Button. Control box. Gate 2.

USE AND MAINTENANCE MANUAL. J-Giotto-Top GB-IST-JGIOT-0112

Trailer Assembly Guide Model MMT5X GVWR All Steel Trailer

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

Assembly and Maintenance Manual Type ASNU

Distributed by Kincrome Group

Technical Support (707)

SL-6 & SL-6A. I UNION SWITCH & SIGNAL l[ml 645 Russell Street Batesburg, SC Service Manual Field and Shop Maintenance

3PC TONNEAU COVER INSTALLATION INSTRUCTIONS. Ford Ranger/Mazda BT-50 (without bedliner)

Printed: Doc-Nr: PUB / / 000 / 00

Instruction Manual MB4 Rolling garage door opener

Opening Quality Doors Around The World. Installation Instructions Bi-Parting Freight Doors - Q Style (Power and Manual)

TONNEAU COVER INSTALLATION INSTRUCTION. Toyota Hilux 407L

Installation, Operation and Maintenance Manual

Sectional And Tilting Door Opener

Albany RR1000. Mechanical Installation Manual. PN: 6410T0029 Version - Rev: 04/23/2014. ASSA ABLOY Entrance Systems

OPERATING MANUAL INDUSTRIAL SECTIONAL DOORS. Series ProPlus and ProTrend. English.

Instruction Manual AVTM for. Strip Chart Recorder Catalog Nos and

Installation Instructions Pro Stick Shifter

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

* APPLICATION MODELS VARY. WE RECOMMEND TO VERIFY FITMENT BEFORE BEGINNING INSTALLATION PROCESS.

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

Read the owner s manual completely before you use the trailer.

RH722 Instruction Manual

GENERAL SAFETY... 3 PARTS LIST...

Safe-T-Glide Installation Instructions

SLIDING DOOR OPERATOR INSTRUCTION MANUAL

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

Installation, Operating & Maintenance Instructions. HV gate valve with pneumatic actuator. Series 110 DN mm (I. D.

Typical Installation Schematic

ValveSentry USER S MANUAL REVISED 8/6/16 IMPORTANT! PLEASE READ CAREFULLY AND SAVE

START HERE GRILLE REMOVAL. 1) Turn off engine and chalk tires with stop block. Open Hood. 1. Disconnect negative battery terminal.

Hydraulic Wheel Dolly

Power Transmission. Installation and Operating Instructions for Brake Caliper DV / DH 020 FKM. E e.

When the ACB is CLOSED and in the connected position the draw-out handle cannot be inserted.

TRAILER WINCH MODELS ST315 AND ST712. General Safety (Continued) Description. Unpacking. General Safety Information.

Instruction Manual LA-SDO1 Sectional garage door opener

HEAVY DUTY TROLLEY JACK. Operation Manual

Giant Hydraulic Disc Brake System

Distributed by Kincrome Group

Original operating manual

Operating instructions ErgoPack 600 E

STAND MODEL FOR MACH M2

TOYOTA COROLLA ILLUMINATED DOOR SILLS Preparation

Installing the gate post bracket with the cardboard arm template

TUB DOORS SHOWER DOORS

INSTRUCTION MANUAL. I/P Converter DSG BXXY3Z DSG BXXY4Z

Self-Recovery Winch WARNING. General Safety Precautions

I. General Safety Precautions

Mechanical Operating Instructions

Installation instructions

Instruction manual Electric glass door lock Touch-to-open

. Tighten loose screws and bolts; replace if

Transcription:

Operating and Installation Instructions Sectional gate MakroPro 100 MakroPro Alu 100 installation type STL HL Catalog no. AW.03.40 Last Update - 10th May, 2006

IMPORTANT INFORMATION Please read these instructions carefully and follow the guidelines. You will find here essential information, which guarantees safe installation and use as well as proper maintenance of the sectional gate MAKROPRO 100. Please protect these instructions from damage and store them carefully. EXPLANATIONS OF SYMBOLS Numbers shown in fig. 1 correspond directly to numbers of drawings included in these instructions. A1 - gate leaf A2 - vertical guide assembly L A3 - vertical guide assembly P A4 - guide coupler A5 - console A6 - line drum A7 - drive shaft A8 - carrier A9 - side gasket A10 - upper hinge A11 - side hinge A12 - protection from cable breaking A13 - lock/bolt A14 - bottom gasket A15 - middle hinge Ho - opening height So - opening width Sz - custom order width N - lintel E - garage depth W1 - side space L W2 - side space P L - cable length (specified in the guarantee certificate) (drawing number) a - refers to installation of the gate with bolt (drawing number) b - refers to installation of the gate with lock 1. DESIGN CHARACTERISTICS & TECHNICAL SPECIFICATION We offer as a standard MAKROPRO 100 series sectional gates designed for mounting in door-way dimensions as indicated by the hatched area on fig 2. Gates outside of the dimensional range specified below can be made after prior arrangement made with WIŚNIOWSKI. As a standard MakroPro 100 gates are made as industrial type gates. Gates higher than 2100 [mm] and up to 5000 [mm] in width can be equipped with pass door opening to the outside. Gates with a width up to 5500 [mm] can be provided with glazed sections, maximum number of windows is given in the price list. Sectional gates MAKROPRO 100 are made from steel panels filled with polyurethane foam. As a standard the gates are provided with devices protecting the gate leaf from falling down in case of breaking of the cables, holding the gate leaf. In case of failure this device blocks the leaf in safe position. 2. APPLICATION AND FUNCTION Sectional gates MakroPro 100 are external building partition used for closing garage and technical rooms, industrial facilities, in halls and storage houses. When in closed position they make a tight vertical partition of rooms, and when being opened allow taking in or out vehicles or industrial equipment. Due to corrosion protection applied the gates may be used for their intended purpose, in environments with corrosion category C1, C2 and C3 according to PN-EN ISO 12944-2 and PN-EN ISO 14713. 3. SAFETY RECOMMENDATIONS Before attempting to install and operate the door you must carefully read and understand the guidelines provided in these instructions. Following the gate installation and operation guidelines will ensure its correct installation and provide long and trouble-free service. All operations connected with installation of the gate should be carried out following the steps described. 2 Design and specification are subject to change (resulting from technological progress) without notice. 4. REQUIRED INSTALLATION CONDITIONS The gate should be used and operated according to its design purpose. Selection and use of gates in building applications should be based on the technical documentation of the building, drawn according to the Building Law, binding standards ad other provisions - in particular according with the decree of the Minister of Infrastructure dated 12th of April 2002 regarding technical criteria for buildings and building locations (Journal of Law, No. 75, pos. 690 with later amendments). Sectional gates MakroPro 100 can be mounted into reinforced concrete walls, walls made of bricks or steel frameworks. The room intended for gate installation should be fully finished (plastered walls, finished flooring), the walls must not show flaws in completion of the job (fig. 4). The room should be free from any chemical substances harmful to varnish coating. The floor around the bottom washer should be leveled and made in such a way to ensure free water removal. For proper installation of the gate you need lintel N to mount the guides and drive, and side space W1 and W2, with the minimal width required to install the gate shown on fig 5.1 and 5.2. Correct measurement of lintel height and width of side space is shown on fig 5. 5. INSTALLATION Correct functioning of the gate depends to a great extent on its proper installation. The manufacturer may, if optionally ordered by the Client, install the gate or recommends authorized installation performers. Should the user choose to install the gate by himself, he must ensure that the guidelines contained in this manual are observed, to avoid incorrect functioning of the gate, its premature wear and voiding guarantee claims. Installation must be performed in accordance with binding standards and provisions and relevant design documentation. 5.1. Installation sequence 1. Screw down consoles to vertical guides (fig. 8). 2. Push the guides against the wall and face them with the opening and set precise spacing of the consoles by means of clamping channel fixing it temporarily to consoles (fig. 9). 3. Check spacing of consoles as shown on fig. 7. 4. Move the guides and consoles aside, mark off mounting holes in the wall (fig. 10) and fit the plugs of wall fixing into drilled holes (fig. 10-13). 5. Fix the vertical guides to the wall (fig. 12-13), optionally bracing L section can be used (fig. 14). 6. Unscrew clamping channel from the consoles (fig. 15). 7. Remove the consoles from the vertical guides (fig. 15.3) and fix them (movably) by means of assembly tacks to horizontal guides (fig. 16). 8. Put the horizontal guide with the console to the opening, face it with the vertical guide and tighten with screws (fig. 16.5-16.7). 9. Push the consoles against the wall and screw down permanently to the horizontal guides and to the wall (fig. 16.9-16.11). 10. Check the diagonals of the mounted guides (fig. 17). 11. Fix the horizontal guides to the ceiling using assembly hangers (fig. 18). 12. Install the bumper to the horizontal guides (fig. 23). 13. Fit the clamping cross-bar to the horizontal guides (fig. 24). 14. Mount the drive shaft and lubricate the bearings with grease (servomotor SI 55 - fig. 27-29, servomotor SI 17, SI 25, SI 40 - fig. 34). 15. Mount the gate drive - slide the key on the shaft, slide over the servomotor (SI 55 - fig. 30, SI 17, SI 25, SI 40 - fig. 35) and secure it with a ring (SI 55 - fig. 33, SI 17, SI 25, SI 40 - fig. 37). 16. Mount the cable (fig. 41). 17. Wind the cable on the drum (after winding three turns cut-off the remaining cable, and protect its end from unwinding) (fig. 38) - tighten firmly the plates securing the cable. 18. Mount the gate leaf (fig. 39-48). 19. In order to ensure proper gap between the panels during installation of the panels use cardboard templates with a thickness of approx. 2 [mm], which should be placed between the panels near each hinge. (fig. 42). The cardboards should be removed during opening of the gate, when the panels are bent to each other (fig. 51.1). To avoid damage and facilitate inspection (if brake is activated) do not remove tape from the knife when protecting from cable break. 20. Install the bolt/lock (fig. 49).

When using the lock - use distance sleeves in the side hinge between the first and second panel. In gates equipped with lock or bolt it is recommended to install a lock or bolt sensor. 21. Adjust initially the roller of the first section (fig. 50). 22. Adjust initially the roller of other sections (fig. 50.1). 23. Gate lifting/lowering test (fig. 51). 24. Check correct operation of the electrical protection devices (if used): photocells - by simulating the operating conditions - after cutting the light flux the gate should stop and move back, optical strip - the gate should stop and move back, when the leaf touches 40 [mm] high object, placed on the floor. If necessary, adjust and check again, since bad adjustment can result in accident, lock sensor - when the lock is in locked position the gate should not start, pass door sensor - when the door is open the gate should not start. 6. GATE INSTALLATION ERRORS There is a risk that during installation of the gate some errors can be made, which can be easily avoided by paying attention that: vertical guides are properly installed, according to the specification provided in these instructions, the closed gate leaf creates equal plane, sections must not show any deformations - any displacements of the sections should be corrected on the hinges, side hinges are adjusted according to the instructions, end stop are pressed when the gate is open (fig. 26), all fasteners must be properly tightened. Failure to follow the above mentioned basic guidelines may cause problems in correct functioning of the gate, damage to the gate or in consequence can void the guarantee. 7. DISASSEMBLY OF THE GATE Disassemble the gate in the reverse order as when assembling it. Removing the keys connecting the shaft with the servomotor and disassembling the servomotor is only possible with the gate fully closed. 8. MAINTENANCE INFORMATION General proper maintenance conditions for the gate, assuring its long, trouble-free service: should you find any malfunctioning of the gate stop using the gate and contact the authorized service, do not block the area of the gate leaf movement. When opening and closing the door leaf make sure that there are no people, especially children or objects in its way, do not pass, run or drive under the moving gate, avoid excessive contamination of the gate leaf, particularly protect the leaf from harmful elements which could scratch the surface e.g. with sand, the floor around the bottom washer should ensure free water draining, protect the gate from contact with any substances harmful to varnish coatings and metals, ex. caustic substances (acid, lye, salt), when finishing the room or when renovating it protect the gate from contact with plaster chips, paints and solvents, the gate operated electrically should be opened following the instructions supplied with the electrical equipment, if during lifting of the gate some excessive resistance is encountered check correct adjustment of the hinges, if necessary, adjust the hinges according to the installation instructions, if pass door are installed in the gate do not lift the gate if the door is not locked, It is not allowed to operate the gate if there is visible damage to the drive lines. after installation (at the latest up to two weeks) remove the protective foil from the panel surface, starting the gate when the gate is locked is not allowed. 8.1. Running maintenance instructions: Operations that can be performed by the client after getting thoroughly acquainted with the Operating and Maintenance Instructions supplied with the gate: for cleaning the gate sections use mild cleansers, safe for varnish coatings ex. water and soft sponge or cleaning agents intended for use with varnish coatings available on the market, for cleaning glazed sections do not use agents containing alcohol or solvents (may cause dulling of acrylic glass), you can use mild cleaning agents but we recommend to do some testing first on small glazing surface, minimum once per three months and in the case of industrial gates once a month perform by your own running inspections of the gate to check the following: check if the cables are not loose or damaged (broken wires, corrosion), check tightening and correct mounting of all fasteners, particularly screws securing guides, screws securing hinges, in case of any faults they must be completely removed, it is not allowed to operate the gate if there is visible damage to the drive lines, lubricate the running rollers and hinges at least once every six months using white mineral oil, replace the supply batteries at least once every 12 months, for electrically driven gates check correct adjustment of the limit switches (check by pressing the corresponding up/down button on the control panel, observing where the gate stops) - after the gate stops in closed position the cables should remain stretched, after the gate stops in open position the bottom gasket should not protrude above the gate opening, for electrically driven gates once every month check correct operation of electrical safety devices (if used): photocells - by simulating the operating conditions - after cutting the light flux the gate should stop and move back, optical strip - the gate should stop and move back, when the leaf touches 40 [mm] high object, placed on the floor. If necessary, adjust and check again, since bad adjustment can result in accident, lock sensor - when the lock is in locked position the gate should not start, pass door sensor - when the door is open the gate should not start, check operation of the emergency opening facility supplied with the servomotor. 8.2. Operations that can be performed by the authorized, trained personnel having proper qualifications: minimum once per six months and in the case of industrial gates once per three months perform inspections of the gate to check the following: check cables on the entire length, for damage (broken wires, corrosion), check cable fitting on cable drums, check tightening and correct mounting of all fasteners, particularly screws securing guides, screws securing hinges, and keys, fastening of the servomotor, check proper functionality of devices protecting from cable breaking, in the case of errors in work of electrical drives disconnect the drive from power supply for 2, 3 min and reconnect, check adjustment of the rollers, adjust if necessary, check condition of pass doors - adjust if necessary, in case of any faults they must be completely removed, all activities should be carried out following the gate operating and maintenance instructions. 8.3. Operations that can be performed exclusively by authorized service FPHU WIŒNIOWSKI: any modifications of the gates, replacement of the protection from cable breaking, replacement of cables, cable drums, repairs of electrical components. 9. GATE OPERATING INSTRUCTIONS Do not block the area of the gate leaf movement. When opening and closing the gate leaf make sure that there are no people, especially children or objects in its way. Do not allow children to play with the equipment. Gate control transmitters should be kept out of the reach of children. 3

Prior to first opening the gate check its correct installation. The gate is mounted correctly if its leaf opens and closes smoothly and the door can be operated with ease. Electrically driven gate: I. Operating the gate under normal conditions (without power loss) without self-support: 1. Opening: press the button and hold it until the gate is completely open. 2. Closing: press the button and hold it until the gate is completely closed. 3. The gate is stopped in each intermediate position when the button is released. II. Operating the gate under normal conditions (without power loss) with self-support: 1. Opening: press the button once and wait until the gate completely opens. 2. Closing: press the button once and wait until the gate completely closes. 3. The gate is stopped in each intermediate position with the STOP button. III. Operating the remotely controlled gate under normal conditions (without power loss): 1. Opening: press the control button once on the remote controller and wait until the gate completely opens. 2. Closing: press the control button once on the remote controller and wait until the gate completely closes. 3. The gate is stopped in each position with the control button on the remote controller. Slight pulling the green holder of the activating chain home (maximum activation force 50 N) turns the control voltage on, the gate can be now electrically controlled. Design and specification are subject to change (resulting from technological progress) without notice, which do not alter the functionality of the product. This documentation belongs to FPHU WIŒNIOWSKI. Copying, duplicating and using the document in whole or any part of it without owner's written permission is not allowed. Fig. I IV. Emergency opening of the gate - manual operation (in case of supply voltage loss). Please disconnect power supply before using emergency opening. Manual emergency start is intended for opening or closing of the gate without electrical power supply. Warning! Risk of injury in case of improper use! Fig. II Before manual emergency start make sure to turn off the main switch of the drive. Manual emergency start is only allowed with the stopped motor. With the manual start of the drive position yourself in a safe position. In the case of servomotors with spring-loaded brake, opening and closing of the gate must take place by overcoming the brake resistance. For safety reasons with gates without weight compensation you may only release the brake for control purposes when the gate is in its lower position. When using the manual emergency start facility do not set the gate outside its extremities, since this will activate emergency limit switches. Electrical actuation of the gate is not possible then. Manual emergency start "QUICK CHAIN" or "Emergency manual chain" S1K version: "Quick two chains". KNH version: "Emergency manual chain". Actuation of the manual emergency unit is possible with the horizontal and vertical installation position of the actuator. For other non-standard installation positions, the actuator must be located within the area, shown on fig. I. If necessary, fit the element of the manual emergency start in a position reversed by 180. Fig. III Changing the length of the catch chain The catch chain can be open in the linking point and shorten or elongate it using extra chain links. Make sure to carefully overbend the chain links. When changing the length of the catch chain pay attention not to twist the chain during installation - fig. II. S2K/KNH version "Quick two chains" - fig. III. "Emergency manual chain" First, pull slightly the red holder of the activating chain (1) home (maximum activation force 50 N). Control voltage is off and the gate can be opened or closed using the catch chain (2) (maximum activation force - see technical data in the servomotor documentation). 4 (2) (1)

n Operating and Installation Instructions - MakroPro 100, MakroPro Alu 100 - installation type STL HL 1 18-22 37 40 16 7-14 39 42 34 32 1.2 25 24 5

2 5000 4000 Ho [mm] 3000 2100 2000 1000 1000 2000 3000 4000 5000 6000 7000 8000 2400 So [mm] 3 A6 A7 A8 A5 A4 A9 A10 A11 A2 A3 A13 A12 A1 A15 A14 6

4 4.1 O.K. 4.2 5 N W1 W2 E 5.1 Ho N E 5.2 [mm] 250 So 600 7

6 6.1 12 A 8.4 B 12 12 10.5 C M10 D M10x25 J M8x25 G M10x30 K M8x20 H M8x16 I 6.3x38 F M8 E 8

7 So Sz + 300 Console spacing 8 8.1 9 9.1 9.2 9.3 9

10 10.1 10.2 10.3 10.4 10.5 11 11.1 11.2 A 10

11.3 12 12.1 12.2 14 option A B 13 13.1 A A B B 13.2 A B 14.1 A B 11

15 15.1 15.2 15.3 16 16.1 16.2 16.3 12

16.4 16.5 16.6 16.7 16.8 B E I 16.9 16.10 A 16.11 17 A A=B B 13

18 18.1 18.2 19 19.1 A 20.1 20 21 B E G B A 14

22 23 H 24 24.1 B E G 25 15

25.1 B E H 25.2 25.3 25.4 26 Automatic drive 16

Servomotor version SI 55 27 28 29 30.1 30 32 33 17

34 Servomotor version SI 17, SI 25, SI 40 35 1 SI 40 2 36 36.1 37 38 18

38.1 min. 3 turns 39 40 40.1 F 41 41.1 41.2 41.3 41.4 After installing the cable on the safety brake fit the cotter pin! 19

42 Operating and Installation Instructions - MakroPro 100, MakroPro Alu 100 - installation type STL HL F 43 43.1 44 44.1 45 46 46.1 47 20

48 48.1 49a F F 49b 50 50.1 51 51.1 21

Installation of the limit switch for the pass door 52 52.1 external limit switch 52.2 internal limit switch 52.3 52.4 Installation of the lock limit switch 53 22

Servomotor version AUTOMATIK - control 961 54 limit switch wires brown 1 green white 2 1 3 4 1 2 1 3 4 ST+ ST SK/b - brown SK/g - green SK/w - white Connecting the limit switch of the pass door or lock: External and internal limit switch of the pass door can be used alternatively - as a standard internal switch is installed. 1. Fit the limit switch to the gate, connect wires to switch terminals 23 and 24 (fig. 52.1).* 2. Run the wires over the gate leaf to the connection box (fig. 52.1-52.4).* 3. Open the connection box of the optical strip mounted on the gate leaf (fig. 54). 4. Remove the jumper from the terminals in the box as shown on fig. 54. 5. Hook up the wires in place of the removed jumper and connect the wires of the optical strip, if installed. 6. After correct connection, the servomotor will only work with the pass door closed. *) - applies to external limit switch of the pass door 54.1 54.2 brown 1 green 2 1 3 4 white 1 2 1 3 4 ST+ ST SK/b - brown SK/g - green SK/w - white Connecting the limit switch of the lock or pass door: 1. Fit the limit switch to the gate (screw down beneath the lock rod), connect wires to limit switch terminals 21 and 22 (fig. 54.1). 2. Run the wires over the gate leaf to the connection box (fig. 53). 3. Open the connection box of the optical strip mounted on the gate leaf (fig. 54.2). 4. Remove the jumper from the terminals in the box as shown on fig. 54.2. 5. Hook up the limit switch wires of the lock and/or pass door (in case of simultaneous use of the limit switches of the pass door and lock connect them in series) in place of removed jumper and connect the wires of the optical strip, if installed. 6. After correct connection, the servomotor will only work with the lock in unlocked position. 23

Servomotor version TOTMANN - universal control 55 Limit switch wires 1 2 3 1 2 3 brown green white Connecting the limit switch of the pass door or lock: 1. Remove the jumper E from the strip X4, replace it with yellow and black (grey) wire. 2. Remove the jumper from the terminals in the box as per fig. 55, replace it with yellow and black (grey) wire. 3. After correct connection, the servomotor will only work with the pass door closed. 55.1 55.2 1 2 3 1 2 3 brown green white Connecting the limit switch of the lock or pass door: 1. Fit the limit switch to the gate (screw down beneath the lock rod), connect wires to limit switch terminals 21 and 22 (fig. 55.1). 2. Run the wires over the gate leaf to the connection box (fig. 53). 3. Open the connection box of the optical strip mounted on the gate leaf (fig. 55.2). 4. Remove the jumper from the terminals in the box as shown on fig. 55.2. 5. Remove the jumper E from the strip X4, replace it with black (grey) and yellow wire. 6. Hook up the limit switch wires of the lock and pass door (in case of simultaneous use of the limit switches of the pass door and lock connect them in series) in place of removed jumper. 7. After correct connection, the servomotor will only work with the lock in unlocked position and pass door closed. 24

56 Indicator connection diagram Indicator Red Green Connection of the indicators to servomotor GfA with control TS 96: should be made according to diagram - fig. 56. With the gate closed and during its movement red light should be lit. With the gate opened green light should be lit. Position the additional extremity S6 (yellow) in the same way as the main opening extremity S3 (green). 57 MakroPro 100 installation type HL 25

26

Installer: WIŚNIOWSKI Ltd. 33-311 Wielogłowy 153, Poland Tel. (+48 18) 44 77 270 Fax (+48 18) 44 77 277 www.wisniowski.pl OaII/MakroPro100-STL-HL/06/2006