Sampling Valves - Yarway Model 56 / Narvik Model 36 Installation and Maintenance Instructions

Similar documents
Standard Duty A.T.-Temp Desuperheater for cryogenic processes Installation and Maintenance Instructions

Yarway Que - Temp Desuperheater Standard-/heavy Duty Installation and maintenance Instructions

Installation and Maintenance Instructions

Installation and Maintenance Instructions

Standard Duty A.T.-Temp Desuperheater for cryogenic processes

Fig.01 Fig.02 Fig.03. Disassembly & Reassembly Instructions SBV-HP - Page 3

GT-200 GATE VALVES PN16, Screwed end

Serie 2003/2013. Three-way Control Valve, mixing/diverting. Wörth am Main. Service. Control Valve Division

Yarway Narvik Model 37 and 47 Cryogenic injector

Pneumatic actuator Assembly & maintenance procedures

QLM and QLD Series DN125 to DN200 Three Port Control Valves

KTM Hindle Series 300 Ultra-Seal two piece metal seated ball valves Installation and Maintenance Instructions

Double Acting and Spring Return Direct Gas Quarter-turn Actuators Output Torques to 6,500,000 lb.in.

Operation and Maintenance Instructions for Bettis GVO-C Series GVO-CLP-SR Pneumatic Actuators

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Guide

NAF-Duball ball valves Maintenance and installation instructions List of spare parts

Series Single seated top guided control valve. Preventive maintenance. Overhauling procedure. Wörth am Main SERVICE NOTE. Control Valve Division

DIFFERENTIAL PRESSURE RELIEF REGULATOR TYPE A4AL Port Size 3/4"- 4" (20-100mm) For Ammonia, R-22, R134a, R404a, R507 and other common refrigerants.

Welker Sampler. Installation, Operation, & Maintenance Manual. Model GSS-4HP

PNEUMATIC ACTUATORS ASSEMBLY & MAINTENANCE PROCEDURES. Ref. Doc. MMMACTREGDRE English Rev.2 January 2012 ADA & ASR SERIES DOUBLE ACTING ACTUATOR ADA

BUTTERFLY VALVE - WAFER FAF 3500

KAM E-IAS ELECTRIC ISOKINETIC AUTOMATIC SAMPLER

Standard Duty SLN - Temp Desuperheater Model: 50 / 60

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS D SERIES TABLE OF CONTENTS

NARVIK-YARWAY. Heavy Duty A.T. - Temp Desuperheater Model: 18/54 and 28/64

QLM and QLD Series DN15 to DN100 Three Port Control Valves

Newco / OIC / Cooper Forged Valves. Operation & Maintenance. Manual

EC4 SERIES CRYOGENIC VALVES 1/4 2 Sizes

2.- HANDLING OF VALVES BEFORE ASSEMBLY 3.- FITTING THE VALVE TO THE REST OF THE ASSEMBLY 5.- PERIODICAL INSPECTION OF THE VALVE AND MAINTENANCE

FRP Ball Valves INSTALLATION & MAINTENANCE MANUAL

MANUAL - PNEUMATIC ACTUATORS, SERIES DA & SR - 1 -

The GACHOT V501 gate valve offer the most possible reliability for process and critical applications

Standard Duty A.T.S.A. - Temp Desuperheater Model 24 / 34

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1-1/2-2 )

BIDIRECTIONAL WAFER Knife Gate Valve

I & M Mark 78 Series. Ideal Installation. Start-Up. Installation & Maintenance Instructions for Mark 78 Control Valves (1/2-1 )

FKB INDÚSTRIA DE EQUIPAMENTOS LTDA. KNIFE GATE VALVE VGU-01 (Rev. 02/2016)

I & M 8000 Series. Ideal Installation Schematic. Preferred Installation. Trouble Shooting

Fisher D2T FloPro Control Valve

Operation Instruction Manual Pneumatic Actuators

BUTTERFLY VALVE WITH WELDED ENDS INSTALLATION AND MAINTENANCE MANUAL

Val-Matic QuadroSphere Trunnion Mounted Ball Valve

Welker Gas Sampler Model MPS-2

NAF-Torex butterfly valves Maintenance and installation instructions List of spare parts

B Series 1/2" to 2" 2-Way and 3-Way Bronze Control Valves

Installation and maintenance instructions

for ½" thru 2" 800 lb. Piston Lift Check Valves with Resilient Seat Option

'C' Series Control Valves

Heavy Duty Que - Temp Desuperheater Model: 13 / 23

UNIDIRECTIONAL Round Guillotine Damper

YARWAY NARVIK STANDARD DUTY A.T.-TEMP DESUPERHEATER MODEL 38/48

KLINGER Piston Valves KVN DN PN 16 I/III with valve ring KX-GT Modul

BIDIRECTIONAL WAFER Knife Gate Valve

Installation and operating manual Quick closing valve (Bellow sealed) LK product no:

MOUNTING, OPERATING, TESTING & MAINTENANCE INSTRUCTIONS FOR ROTEX 3/2 DIRECT ACTING ON/OFF/REGULATING NAMUR SOLENOID VALVE MODEL 30318, 30318LW

CARBURETOR - HITACHI 2-BBL

USER INSTRUCTIONS. NAF Trunnball DL Ball Valves. Installation Operation Maintenance. Experience In Motion FCD NFENIM A4 01/15

½" to 4" (DN15 to DN100) LEA31 and LEA33 ANSI Control Valves Installation and Maintenance Instructions

UNIDIRECTIONAL Knife Gate Valve

Valveworks USA Operation and Maintenance Booklet Model FC

Baumann 24000C Carbon Steel Little Scotty Control Valve Instructions

LNG Screw Down Non-Return Valve Installation, Operation and Maintenance Manual

Danfoss Butterfly Valve

VALVEWORKS USA OPERATION AND SERVICE MANUAL FOR MODEL FC GATE VALVES MODEL FC PSI W.P FLOATING SLAB GATE VALVES

Baumann 24000F Wafer Control Valve

OPERATING INSTRUCTIONS & SERVICE MANUAL BLUE MAX II HYDROSTATIC TEST PUMP

ONYX VALVE CO MODEL DAO-PFO Installation & Maintenance

Sub Section Title Page No.

INSTALLATION, OPERATION, MAINTENANCE MANUAL FOR MANUALLY OPERATED STOP CHECK VALVE

XV en /5 XV Knife gate valve DN

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED

VELAN TRUNNION-MOUNTED

UNIDIRECTIONAL Knife Gate Valve

SCOTCH YOKE PART TURN PNEUMATIC ACTUATOR DAN 15 - DAN 1920 / SRN 15 - SRN 960

Instructions for installation, operation and maintenance of: GATE VALVE

KNIFE GATE VALVES -- MODEL D

ONYX VALVE CO MODEL DAO-PFC Installation & Maintenance

FLOWSERVE CORPORATION NOBLE ALLOY VALVE PISTON CHECK VALVE REPAIR INSTRUCTIONS

Installation, Operation, and Maintenance Manual

Control Valves Series "Q" DN15 - DN100 Installation and Maintenace Instructions

IMOI 2010 Rev 0

Bray/ VAAS Slurry Series Knife Gate Valve 760/762/765/766/767/768 Series Operation and Maintenance Manual

BCV30 DN20 - Blowdown Control Valve Installation and Maintenance Instructions

METERING VALVE 2" STEM GUIDED

BVA300 Series Pneumatic Actuators for Spirax Sarco Ball Valves

3. Installation and Commissioning 4. Maintenance 5. Spares

Operating Manual for. Dispenser. Read this manual thoroughly before operating the Labmax Bottle Top Dispenser!

Scope. Applicability. Caution. I & M CV3000 Series. Storage. Installation & Maintenance Instructions for Marwin CV3000 Series Three Piece Ball Valves

In-line sampling system for representative sampling without process interruption. Size mm.

Operating Instruction

Table of Contents Visual Inspection and Neutralizing... 3 Disassembly

ONYX VALVE CO MODEL DAO-ADA Installation & Maintenance

BIDIRECTIONAL Knife Gate Valve

Mounting and Operating Instructions EB 8039 EN. Type 3351 Pneumatic On/off Valve. Type 3351 Pneumatic On/off Valve. Type 3351 Pneumatic On/off Valve

FASANI ASSISTED SWING CHECK VALVE BOLTED BONNET INSTALLATION AND MAINTENANCE INSTRUCTIONS

Note: the numbers in parenthesis refer to the components in the exploded view of page 3 for UT-0 thru UT-6.5 and page 4 for UT-7 and UT-8.

Shut-off valves SVA-DH, SVA-DL

NAF-Triball ball valve

INSTRUCTION MANUAL. Anchor Darling 1878 Swing Check Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Installation, Operation and Maintenance Instructions

Transcription:

Unpacking The Yarway Sample Valve and the Narvik Sampler Valve are packed with the greatest of care in wooden boxes or cartons for protection during handling or transit to site. If it is found, however, that damage has occurred during shipment, then this should be reported immediately to your forwarder or Narvik/Yarway representative. Particular care should be taken with valves equipped with limit switches, air cylinder, glass bottle, etc. If the unit needs to be stored, please refer to the storage procedure as described at the end. Installation The Yarway Sample Valve and the Narvik Sampler Valve are supplied with either threaded or flanged connections. A suitable sealing compound as PTFE tape or equivalent should be used for sealing. Do not apply any force to the air cylinder when screwing-in the valve assembly. Dismantling instructions (see fig. 2 up to including fig. 5) Overhauling the Sample Valve / Sampler Valve is best carried out after removing it from the vessel, drip ring or pipeline to the workshop. Sample Valve Grind-off the tackweld between the stem bushing (12) and the valve bonnet (11). Untighten and remove the 4 cap screws. Remove the bonnet assembly, unscrew the stem bushing for the stem (10) and remove stem / coupling / plunger assembly. Disassemble the plunger (5) by removing the 2 half couplings (9) that hold it to the stem. Remove other valve internals, care should be taken not to lose the securing ball (). In special alloy valves, a key may be fitted in place of the securing ball. Sampler Valve Grind-off the tackweld between the stem bushing and the valve bonnet. Unscrew the stem bushing counter clockwise. Remove the stem bushing together with the stem, the coupling (9) and the plunger (5). Remove other valve internals, care should be taken not to lose the securing ball. In special alloy valves, a key may be fitted in place of the securing ball. Cleaning Clean all internals thoroughly using a suitable solvent. When necessary, use a find grade grinding cloth to repolish surfaces. The plunger should be free of longitudinal scratches or score marks. Plunger can not be remachined but may be ground with a fine grade of grinding cloth. Special are should be taken to clean the internal bore of the body where the upper/lower seal rings (2) (6) are located, as sealing integrity is very much dependent on the cleanness and smoothness of these surfaces. Reassembly Reassembly of the valve is the reverse of the procedure given above. Do not use old seal rings, otherwise sealing integrity may be impaired. Do not forget to tackweld the bushing to the body, using a 09 or similar type electrode. Note: Narvik can supply a special tool to facilitate the reassembly of the valve. Actuation (see fig. 1 and fig. 4) The Yarway Sample Valve and the Narvik Sampler Valve can be supplied with air cylinder actuators. These are specially adapted Festo type cylinders (other manufacturer type upon request) which are not commercially available through the normal Festo distribution network. The cylinder is a non-repairable item. Cylinders are made to individual order and this should be considered when deciding upon which spare parts should be retained at site. When ordering replacement cylinders, the valve plunger extension should be specified. Always use a clean dry instrument air supply with this equipment. The air supply pressure should have a minimum of.5 bar. www.tycovalves-eu.com Tyco reserves the right to change the contents without notice NRVSB-0050-EN-0710

Temperature limitations Sample Valve / Sampler Valve are supplied with various seal materials. Carefully check the original seal type before ordering spare parts. Maximum temperature seals are indicated in the product documentation. Maintenance The Yarway Sample Valve and the Narvik Sampler Valve require little maintenance. Regular greasing of the stem, however, is recommended using a high quality molybdenum grease. Inspection Sample Valve / Sampler Valve body, plunger, glands and seal rings should be smooth and free from scratches, indentations or any other physical damage, or damaged internal components will impair sealing capability and should be replaced if this is evident. Always renew sealing rings, as a matter of course, if the valve is dismantled for any reason. Valve testing the hydrostatic and leakage testing at the factory is performed based on the following parameters using water: - Hydrostatic test of the body (valve open) at 94.0 bar for 1 minute - Packing leakage testing (valve closed) at 40.0 bar for 1 minute Acceptance criteria: no visible leakage Notes - The maximum operating temperature is limited by the seal ring material. Check the identification plate for details. - If there is evidence of leakage, and the gland springs are adjusted correctly, then do not tighten further but dismantle the valve for inspection. Figure 1 - Pneumatic systems (examples) Pressurized air net Vent Air cylinder Solenoid valve Air cylinder with air failure to close system Optional Capacity tank Tyco reserves the right to change the contents without notice page 2

/4 1 2 4 5 6 7 8 9 10 11 12 1 /2 Table 1 - Standard materials 1 Body (16Nb) 1.4581 2 * Lower seal PTFE PTFE Securing ball St. Steel St. Steel 4 Lower gland A182 F16L 1.4404 5 Plunger A182 F16L 1.4404 6 * Upper seal PTFE PTFE 8 Belleville washers 50 CrV 4 50 CrV 4 9 Coupling AISI 410 1.4006 10 Stem AISI 410 1.4006 11 Bonnet A51 CF8 1.408 12 Stem bushing GGG60 zinc plated GGG60 zinc plated 1 Crank C.Steel zinc plated C.Steel zinc plated Washer St. Steel St. Steel 15 Cap nut St. Steel St. Steel 16 Handle C.Steel zinc plated C.Steel zinc plated Weight: 1.8 kg For other penetration lengths and/or materials, please consult Narvik-Yarway or your local Tyco representative 1 15 16 Figure 2 - Yarway 1/2 Sample Valve Tyco reserves the right to change the contents without notice page

25,4 1 1 /2 1 2 Table 2 - Standard materials 1 Body A51 CF8M 1.4408 2 * Lower seal PTFE PTFE Securing ball St. Steel St. Steel 4 Lower gland A182 F16L 1.4404 5 Plunger A182 F16L 1.4404 6 * Upper seal PTFE PTFE 8 Helical spring - 1.1200 9 ** Coupling AISI 60 1.4542 10 Stem AISI 420 1.4021 11 Bonnet A51 CF8M 1.4408 12 Stem bushing GGG60 zinc plated GGG60 zinc plated 1 Handwheel Aluminium Aluminium Washer St. Steel St. Steel 15 Cap nut St. Steel St. Steel ** For Copper-free environments, material 1.4005 Weight: 6.5 kg For other penetration lengths and/or materials, please consult Narvik-Yarway or your local Tyco representative 1 5 4 6 7 9 10 8 11 12 1 15 Figure - Narvik Sampler Valve 1 Tyco reserves the right to change the contents without notice page 4

/4 1 2 4 5 6 7 8 9 10 11 16 17 1 /2 Table - Standard materials 1 Body (16Nb) 1.4581 2 * Lower seal PTFE PTFE Securing ball St. Steel St. Steel 4 Lower gland A182 F16L 1.4404 5 Plunger A182 F16L 1.4404 6 * Upper seal PTFE PTFE 8 Belleville washers 50 CrV 4 50 CrV4 9 Coupling AISI 410 1.4008 10 Stem AISI 410 1.4008 11 Bonnet A51 CF8 1.408 16 Adaptor 17 ** Air cylinder. Sempress Double act 18 O-rings Rubber Rubber 19 Piston rod St. Steel 1.4104 20 Cylinder Aluminium Aluminium 21 Guiding Synthetic Synthetic ** Max. air supply: 10 bar Pneumatic connection: G/8 Spring return, upon request Weight: 5. kg For other penetration lengths and/or materials, please consult Narvik-Yarway or your local Tyco representative 18 19 20 21 18 Figure 4 - Yarway 1/2 Sample Valve with air cylinder Tyco reserves the right to change the contents without notice page 5

/4 - R - 1 2 4 5 6 7 8 9 - D - - C - 10 11 - A - 250 ml 12 1 15 16 - E - - B - Figure 5 - Yarway 1/2 Sample Valve with bottle holder Table 5 - Dimensions (mm) R A B C D E 0 271 60 45, 5 55 60 50 21 110 45, 5 55 60 Table 4 - Standard materials 1 Body (16Nb) 1.4581 2 * Lower seal PTFE PTFE Securing ball St. Steel St. Steel 4 Lower gland A182 F16L 1.4404 5 Plunger A182 F16L 1.4404 6 * Upper seal PTFE PTFE 8 Belleville washers 50 CrV 4 50 CrV4 9 Coupling AISI 410 1.4006 10 Stem AISI 410 1.4006 11 Bonnet A51 CF8 1.4008 12 Stem bushing GGG60 zinc plated GGG60 zinc plated 1 Crank C.Steel zinc plated C.Steel zinc plated Washer St. Steel St. Steel 15 Cap nut St. Steel St. Steel 16 Handle C.Steel zinc plated C.Steel zinc plated Weight:.2 kg Dimensions may be subject to change without prior notification Narvik will provide a certified dimensional drawing upon request For other penetration lengths and/or materials, please consult Narvik-Yarway or your local Tyco representative. Tyco reserves the right to change the contents without notice page 6

Storage procedure Upon receipt, check both the Sample Valve / Sampler Valve and the packing case for any transit damage. Any damage to the Sample Valve / Sampler Valve should be reported immediately to Narvik-Yarway or their local agent. Any damage to the packing container should be rectified to prevent the ingress of dust or water, prior to placing the equipment into storage. Check the information contained on the identification plate / tagplate and documentation and return the unit to the packing with protective covers in place. For short term storage, up to 6 months duration, no additional preservation measures are necessary. Retain the unit in the original packing in a clean, dry indoor location. If outdoor storage is unavoidable, then the packing case should be enclosed in a waterproof covering. For long term storage, use only a dry indoor location. Remove the stem packing and ensure that the Sample Valve / Sampler Valve are dry and free from moisture. Apply a Cosmo line type grease to machined faces, valve stem and stuffing box. Retain Sample Valve / Sampler Valve in the original packing and inspect at monthly intervals to ensure that no deterioration has occurred. Before placing the Sample Valve / Sampler Valve intoservice, replace stem packing and inspect other components, such as actuator seals, etc. to ensure correct functioning. Follow the procedure for installation as detailed in the Operating and Maintenance Instruction Manual. Note Materials and data of units supplied, may deviate from this Instruction Manual. Please consult order documents in case of doubt. Sample Valve / Sampler Valve are classified under European Directive 97/2/EC under Article, sub (SEP) / Note: Gases & Fluids Group 1). Tyco reserves the right to change the contents without notice page 7