For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:

Similar documents
For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein:

Tariffs Charges 2017/2018

MYPD3 tariff restructuring plan use-of-system charges. Brochure

2008/9 Tariffs and Charges

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. LARGE MANUFACTURING SERVICE RATE SCHEDULES (November 2018)

FLORENCE ELECTRICITY DEPARTMENT. MANUFACTURING SERVICE RATE--SCHEDULE TDMSA (October 2015) Availability

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

FLORENCE ELECTRICITY DEPARTMENT. GENERAL POWER RATE--SCHEDULE GSC (October 2015) Availability

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Cost Reflective Tariffs

APRIL 2011 FINAL RATES

Electricity Network pricing schedule. Module 15 Effective April 1, 2011 for Electricity line charges. Version

Consolidated Edison Company of New York, Inc.

Introduction. This paper sets out the Eskom approach

11. Electrical energy tariff rating

City of Lethbridge ELECTRIC UTILITY. Electric Distribution Tariff Rate Schedule

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

Large Power Service Time-of-Use (LPS-TOU)

ACTEWAGL DISTRIBUTION SCHEDULE OF ELECTRICITY NETWORK CHARGES

United Energy Tariff Criteria (effective 1 January 2019)

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

RATE APPLICATION MANUAL. Kansas City Board of Public Utilities

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Rate Schedules. Effective 1/1/2019

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

SERVICE CLASSIFICATION NO. 7. Also optional for: This option is not available to Service Classification No. 2 customers, effective December 3, 2002.

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

Residential PV-the City of Cape Town s experience Brian Jones Head: Green Energy/Electricity Services City of Cape Town South Africa

RESIDENTIAL SERVICE SCHEDULE R

N.H.P.U.C. No ELECTRICITY GRANITE STATE ELECTRIC COMPANY DBA LIBERTY UTILITIES. SUPERSEDING N.H.P.U.C. No. 17 TEMPORARY RATES

NSTAR ELECTRIC COMPANY M.D.P.U. No. 28 EASTERN MASSACHUSETTS CAMBRIDGE SERVICE AREA GENERAL SERVICE

BrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule)

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Methodology of Cost Allocation

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

ELECTRIC SERVICE RATES UPDATED NOVEMBER 2016

CITY OF SANTA CLARA. RATE OPTIONS: Non Time of Use Time of Use CUSTOMER CHARGE For Each Service Address per meter per month $ $306.

JERSEY CENTRAL POWER & LIGHT COMPANY. TARIFF for SERVICE. Part III. Service Classifications and Riders

ELECTRIC WATER SEWER STORMWATER 3 Industrial Loop Drive PO Box 1589 Hannibal, MO (573)

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC.

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE

EC Forum on Model Approaches to Distribution Pricing. June 2009

energy price fact sheet - electricity

of New York, Inc. Original Leaf No. 216 SERVICE CLASSIFICATION NO. 3 BACK-UP SERVICE

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

STANDBY SERVICE. Transmission Service Primary Service Secondary Service

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

EXHIBIT A ORDINANCE NO. O CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE

Docket 50-ER-108 Algoma Utilities. Final Form Rate and Rule Tariff Sheets Amendment 78. Filed By: Public Service Commission of Wisconsin

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

STANDBY SERVICE. RULES AND REGULATIONS: Terms and conditions of this schedule and the General Rules and Regulations govern use of this schedule.

-and- Peter W. Gurnham, Q.C., Chair. ("Utility"), made application on January 14, 2015, to the Nova Scotia Utility and Review

Large Power Service Time of Use

Power Supply Cost Recovery

RATE DS-2 SMALL GENERAL DELIVERY SERVICE

TARIFFS & CHARGES 2016/2017

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004

Schedule DP-1 SMALL GENERAL SERVICE (EXPERIMENTAL)

Net Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014

Norris Public Power District

Smarter Network Storage UK first multi-purpose application of grid scale storage. Dr. Panos Papadopoulos, PhD, CEng

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE ("MSC")

Wegmans Fairfax Joseph B. Lookup Electrical System Existing Conditions Report & Building Load Summary Report. Appendix Tech Assignment # 2

Marlborough Lines Limited Electricity Line Charges from 1 April 2014

The benchmarks recently proposed by NERSA (18 November 2014) are the following:

Delaware Electric Cooperative

ENERGY MANAGEMENT 4/22/2014. What are your approximate yearly energy costs? (Electricity, natural gas, etc.)

RESIDENTIAL SERVICE. CHARACTER OF SERVICE: This Schedule is for single phase, alternating current at standard voltage as designated by the Utility.

THE NELSON MANDELA BAY MUNICIPALITY ELECTRICITY TARIFF FOR THE 2016/17 FINANCIAL YEAR (ALL PRICES ARE VAT EXCLUSIVE)

Street Address. City-Village-Township

UK Power Networks Use of System Charging Methodology

MISSOURI SERVICE AREA

Indianapolis Power & Light Company I.U.R.C. No. E-18 Original No. 17 One Monument Circle Indianapolis, Indiana

JERSEY CENTRAL POWER & LIGHT COMPANY. TARIFF for SERVICE. Part III. Service Classifications and Riders

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Small General Service Time-of-Use Rate Schedule GS-TOU3

Street Address. City-Village-Township

Queensland Government Gazette

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

Resolution 12- introduced and read the following resolution

Edmond Electric Standard Pricing Schedules

Electric Rates. For Michigan customers

Net Metering & Compensation Seminar

Group 3: Pricing from 1 April 2018 and load management

Transcription:

SCHEDULE OF STANDARD PRICES FOR ESKOM TARIFFS 1 APRIL 2015 TO 31 MARCH 2016 FOR NON-LOCAL AUTHORITY SUPPLIES, AND 1 JULY 2015 TO 30 JUNE 2016 FOR LOCAL AUTHORITY SUPPLIES 1. Standard prices The standard prices contained in this schedule to be charged by Eskom for electricity supplied or made available by Eskom to customers, shall, subject to the provisions of the Electricity Regulation Act (Act No 4 of 2006), or its successor-in-title, be as set out hereunder. These terms, conditions and prices contained in this schedule are approved by NERSA and are valid until Eskom s next price increase or tariff changes as approved by NERSA from time to time. 2. Definitions and abbreviations 2.1. Definitions For the purpose of this Schedule the following words and phrases shall have the same meanings as assigned to them herein: Account means the invoice received by a customer for a single point of delivery (POD) or if consolidated, multiple points of delivery for electricity supplied and/or use of the System. Active energy charge or energy charge means the charge for each unit of energy consumed, typically charged for as c/kwh. Administration charge means the daily fixed charge payable per POD to recover administration-related costs such as meter reading, billing and meter capital. It is based on the monthly utilised capacity or maximum export capacity of each POD. Affordability subsidy charge means the transparent charge indicating socio-economic subsidies related to the supply of electricity to residential tariffs and is payable on Eskom related active energy sales to non-local authority tariffs. Ancillary Service charge (previously known as the reliability service charge) means the charge that recovers the cost of providing ancillary services by the System Operator. Annual utilised capacity means the higher of the notified maximum demand (NMD) or maximum demand, per POD/point of supply measured in kva, and registered during a rolling 12-month period. Chargeable demand means the highest average demand measured in kva in a billing month during the chargeable time periods specified for each tariff. For WEPS and Megaflex, the chargeable period is during WEPS and Megaflex s peak and standard periods and for Nightsave Urban (Large and Small) and Nightsave Rural during Nightsave s peak periods. Code means the Distribution Code, the South African Grid Code, the Grid Connection Code for Renewable Power Plants or any other code, published by NERSA, as applicable, and as amended, modified, extended, replaced or reenacted from time to time. Distribution means the regulated business unit through which Eskom constructs, owns, operates and maintains the Distribution System in accordance with its licence and the Code. Distribution losses charge (previously known as the network charge rebate) means the production-based (energy) incentive to generators. The rebate is based on the approved loss (load) factors, the amount of energy produced on a TOU and seasonally basis and the WEPS energy rate. Distribution network access charge see the Distribution network capacity charge. Distribution network capacity charge (previously known as the Distribution network access charge) means the R/kVA or R/POD fixed network charge raised to recover Distribution network costs and depending on the tariff is charged on the annual utilised capacity or maximum export capacity where maximum demand is measured or the NMD where maximum demand is not measured. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 1 of 43

Distribution network demand charge means the R/kVA or c/kwh variable network charge raised to recover Distribution network costs and depending on the tariff may be charged on the chargeable demand or the active energy. Distribution System means Eskom s network infrastructure consisting of assets operated at a nominal voltage of 132 kv or less, not classified as transmission transformation equipment. Distribution use-of-system (DUoS) charges means the network tariffs charged for making capacity available, connecting to and for the use of the Distribution System. The DUoS charges are the source of the Distribution network charge components in the retail tariff structures. DUoS charge (generators) means the DUoS charges payable by generators. These DUoS charges for generators comprise the network capacity charge based on maximum export capacity, the distribution losses charge, the ancillary service charge, the service charge and the administration charge. DUoS charge (loads) means the DUoS charges payable by loads. These DUoS charges comprise the network capacity charge, the network demand charge, the urban low voltage subsidy charge, the ancillary service charge, the service charge, the administration charge and the electrification and rural network subsidy charge. Electrification and rural network subsidy charge means the DUoS charge transparently indicating the contribution towards socio-economic network-related subsidies for Residential and Ruralp tariffs and is payable by loads that use the Distribution or Transmission System for the delivery of energy. Energy demand charge means the seasonally differentiated charge per POD that recovers peak energy costs, and based on the chargeable demand. Embedded Transmission use-of-system (ETUoS) charge means the TUoS charges payable by customers connected to the Distribution network. Excess network access charge see the excess network capacity charge. Excess network capacity charge (previously known as the excess network access charge) means the charge payable with reference to the NMD rules and is based on the demand exceeding the NMD multiplied by the event number (recorded every time the NMD is exceeded) multiplied by the applicable network capacity charges for the tariff (refer also to paragraph 5). High-demand season means the TOU Period from 1 June to 31 August of each year. High voltage networks usually consist of equipment supplied at a voltage greater than 22kV and consist of the distribution substations and networks. A substation is considered an HV substation when the primary side of the substation is supplied at a voltage > 22 kv. Key customer means a customer identified by Eskom as requiring special services, or a customer that consumes more than 100 GWh on a contiguous site. Local authority tariffs means tariffs applicable to municipal bulk points of supply. Loss factors mean the factor indicating the cost or benefit of technical energy losses on the Transmission and the Distribution System. The Distribution loss factors differ per voltage category and per Ruralp and Urbanp categories. The Transmission loss factors differ for generators and loads and are based on Transmission zone. Low-demand season means the TOU Period from 1 September to 31 May of each year. Maximum demand means the highest average demand measured in kva or kw at the POD/point of supply during a 30 minute integrating period in a billing month. Maximum export capacity (MEC) means the maximum capacity at the point(s) of supply notified by the customer and accepted by Eskom for the transmission of electrical energy between a generator and the Transmission or Distribution System. Medium voltage networks consist of the networks above 1 kv up to 22 kv. Some rural networks with a voltage of 33 kv have been specifically designated by Eskom as rural reticulation networks. A substation is considered a MV substation when the primary side of the substation is supplied at a voltage 22 kv. Monthly utilised capacity means the higher of the notified maximum demand (NMD) or maximum demand, measured in kva or kw, registered during the billing month. Network capacity charge (previously known as the network access charge) means the R/kVA or R/POD fixed network charge raised to recover network costs and depending on the tariff is charged on the annual utilised capacity or maximum export capacity where maximum demand is measured or the NMD where maximum demand is not measured. Network charge rebate see Distribution losses charge. Network demand charge means the R/kVA or c/kwh variable network charge raised to recover network costs and depending on the tariff may be charged on the chargeable demand or the active energy. Non-local authority tariffs means the tariffs applicable to Eskom s direct customers and exclude the non-local authority tariffs. Notified maximum demand (NMD) means the contracted maximum demand notified in writing by the customer and accepted by Eskom per POD/point of supply. Note: The notification of demand is governed by the NMD rules. NMD rules means the rules approved by NERSA and as amended from time to time for the notification of demand or changes to or exceedances of the NMD (refer also to paragraph 5). SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 2 of 43

Off-peak period means the TOU periods of relatively low system demand. Peak period means the TOU periods of relatively high system demand. Point of delivery (POD)/point of supply, means either a single point of supply or a specific group of points of supply on Eskom s System from where electricity is supplied to the customer by Eskom or from where the customer supplies electricity to Eskom s System located within a single substation, at which electricity is supplied to the customer at the same declared voltage and tariff. Note: This can be a metering or summation point. Public holidays means the treatment of charges on public holidays as specified by Eskom and as set out in paragraph 6. Reactive energy charge means a c/kvarh charge based on the power factor and tariff of the POD. Reliability service charge see ancillary service charge. Residential tariffs means the Homelight and Homepower suite of tariffs. Ruralp means areas classified as rural by Eskom for the purposes of tariff design and classification. Service and Administration charge means the monthly charge payable per account for service and administration related costs. (Also see service charge and administration charge). Service charge means the daily fixed charge payable per account to recover service-related costs and is based on the sum of the monthly utilised capacity or maximum export capacity of all PODs linked to an account. Standard period means the TOU periods of relatively mid system demand. System means the Transmission and Distribution network infrastructure consisting of all lines and substation equipment. Time-of-use (TOU) tariff means a tariff with energy charges that change during different TOU periods and seasons. TOU periods means time blocks based on the volume of electricity demand during high, mid and low demand periods and may differ per tariff. The TOU periods typically are peak, standard and off-peak periods and differ during in high and low demand seasons and are further described in paragraph 4. Transmission means the regulated business unit through which Eskom constructs, owns, operates and maintains the Transmission System in accordance with its licence and the Code. Transmission System means Eskom s electricity System consisting of all lines and substation equipment where the nominal voltage is above 132 kv or where the nominal voltage is lower than or equal to 132 kv and there are no Distribution System assets. Transmission use-of-system (TUoS) charges means the network tariffs charged for making capacity available, connecting to and for the use of the Transmission System. The TUoS charges are the source of the ETUoS and the Transmission network charge components in the retail tariff structures. Transmission network access charge means the same as Transmission network charge. Transmission network charge means the network related TUoS charge. Transmission zone means the geographic differentiation applicable to Transmission network charges and loss factors as indicated in paragraph 4, to indicate the costs associated with the delivery and transmission of energy. Urbanp areas means areas classified by Eskom as for the purposes of tariff design and classification. Urban low voltage subsidy charge means the charge transparently indicating the network-related cross subsidy payable by 66 kv Urbanp connected supplies for the benefit of < 66 kv connected Urbanp supplies. Utilised capacity means the same as annual utilised capacity. 2.2. Abbreviations DUoS ETUoS kv kva kwh MEC NERSA NMD POD TOU TUoS UoS Distribution use-of-system Embedded Transmission use-of-system charges Kilovolt Kilovolt-ampere Kilowatt-hour Maximum export capacity National Energy Regulator of South Africa Notified maximum demand Point of delivery Time-of-use Transmission use-of-system Use-of-system SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 3 of 43

Index Page No 1. Standard prices... 1 2. Definitions and abbreviations... 1 2.1. Definitions... 1 2.2. Abbreviations... 3 3. Time-of-use periods... 6 3.1. Nightsave Urban Large, Nightsave Urban Small and Nightsave Rural TOU periods... 6 3.2. WEPS, Megaflex, Genflex Urban, Genflex Rural, Transflex 1, Transflex 2, Miniflex and Ruraflex: low and high demand seasons TOU periods... 6 4. Transmission zones... 7 4.1. Transmission zones for loads... 7 4.2. Transmission zones for generators... 7 5. NMD rules and charges payable in the event of an NMD exceedance... 8 6. Public holidays... 8 USE-OF-SYSTEM CHARGES... 9 7. Loss factors... 9 7.1. Loss factors (Distribution loads and generators)... 9 7.2. Loss factors (Transmission loads)... 9 7.3. Transmission loss factors for Transmission connected generators... 9 8. TUoS (> 132 KV or direct Transmission connected) losses charge for generators...10 9. TUoS (> 132 KV or direct Transmission connected) network charge for loads...10 10. TUoS network charge for generators...10 11. Ancillary service charge for Transmission connected generators and loads...10 12. Ancillary service charge for Distribution connection generators and loads...10 13. Urbanp ETUoS network charge for loads...11 14. Rural p ETUoS network charge for loads...11 15. Urbanp DUoS network charge and urban low voltage subsidy charge for loads...11 16. Ruralp DUoS network charge for loads...12 17. DUoS network charge for generators...12 18. DUoS distribution losses charge for generators...12 19. Service and administration charges...13 19.1. Urbanp service and administration charges...13 19.2. Ruralp service and administration charges...13 20. Electrification and rural subsidy charge...13 URBANp TARIFFS...14 21. WEPS...14 22. Nightsave Urban (Large) tariff...17 23. Nightsave Urban (Small) tariff...20 24. Megaflex tariff...23 25. Miniflex tariff...26 26. Genflex Urban tariff...29 27. Businessrate tariff...31 28. Public lighting non-local authority tariff...32 29. Homepower tariffs...33 29.1. Homepower Standard tariff...33 29.2. Homepower Bulk tariff...33 30. Homelight non-local authority tariff...34 RURAL TARIFFS...35 31. Nightsave Rural tariff...35 32. Ruraflex tariff...37 33. Genflex Rural tariff...39 34. Landrate, Landrate Dx and Landlight tariff...41 34.1. Landrate 1, 2, 3 and 4...41 34.2. Landrate Dx...41 34.3. Landlight...41 SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 4 of 43

37. Charges payable monthly...43 38. Special charges for services rendered...43 39. Variation of standard prices...43 40. Value-added tax...43 Tables Page No Table 1: Treatment of public holidays... 8 Table 2: Loss factors (Distribution loads and generators)... 9 Table 3: Loss factors (Transmission loads)... 9 Table 4: Loss factors for Transmission connected generators)... 9 Table 5: TUoS network charge for direct Transmission connected loads... 10 Table 6: TUoS network charge for Transmission connected generators... 10 Table 7: Ancillary service charge for Transmission connected generators and loads... 10 Table 8: Ancillary service charge for Distribution connected generators and loads... 11 Table 9: ETUoS charge for Distribution connected Urbanp loads... 11 Table 10: ETUoS charge for Distribution connected Ruralp loads... 11 Table 11: Urbanp DUoS network charge and urban low voltage subsidy charge for Distribution connected loads... 12 Table 12: Ruralp DUoS network charge for Distribution connected loads... 12 Table 13: DUoS network charge for Distribution connected generators... 12 Table 14: Urbanp Service and administration charges... 13 Table 15: Ruralp service and administration charges... 13 Table 16: Electrification and rural subsidy charge... 13 Table 17: WEPS non-local authority tariff... 15 Table 18: WEPS local authority tariff... 16 Table 19: Nightsave Urban (Large) non-local authority tariff... 18 Table 20: Nightsave Urban (Large) local authority tariff... 19 Table 21: Nightsave Urban (Small) non-local authority tariff... 21 Table 22: Nightsave Urban (Small) local authority tariff... 22 Table 23: Megaflex non-local authority tariff... 24 Table 24: Megaflex local authority tariff... 25 Table 25: Miniflex non-local authority tariff... 27 Table 26: Miniflex local authority tariff... 28 Table 27: Genflex Urban tariff... 30 Table 28: Businessrate non-local authority tariff... 31 Table 29: Businessrate local authority tariff... 31 Table 30: Public Lighting non-local authority tariff... 32 Table 31: Public Lighting local authority tariff... 32 Table 32: Homepower Standard and Homepower Bulk non-local authority tariff... 33 Table 33: Homepower Standard local authority tariff... 34 Table 34: Homelight non-local authority tariff... 34 Table 35: Nightsave Rural non-local authority tariff... 36 Table 36: Nightsave Rural local authority tariff... 36 Table 37: Ruraflex non-local authority tariff... 38 Table 38: Ruraflex local authority tariff... 38 Table 39: Genflex Rural tariff... 40 Table 40: Landrate, Landrate Dx and Landlight non-local authority tariff... 42 Table 41: Landrate, Landrate Dx and Landlight local authority tariff... 42 Figures Page no Figure 1: Nightsave TOU periods... 6 Figure 2: WEPS, Megaflex, Genflex Urban, Genflex Rural, Transflex 1, Transflex 2, Miniflex and Ruraflex: low and high demand seasons TOU periods... 6 Figure 3: Transmission zones for loads... 7 Figure 4: Transmission zones for generators... 7 SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 5 of 43

3. Time-of-use periods 3.1. Nightsave Urban Large, Nightsave Urban Small and Nightsave Rural TOU periods Figure 1: Nightsave TOU periods 3.2. WEPS, Megaflex, Genflex Urban, Genflex Rural, Transflex 1, Transflex 2, Miniflex and Ruraflex: low and high demand seasons TOU periods Figure 2: WEPS, Megaflex, Genflex Urban, Genflex Rural, Transflex 1, Transflex 2, Miniflex and Ruraflex: low and high demand seasons TOU periods SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 6 of 43

4. Transmission zones 4.1. Transmission zones for loads Distance Zone 300 km 0 > 300 km and 600 km 1 > 600 km and 900 km 2 > 900 km 3 Figure 3: Transmission zones for loads 4.2. Transmission zones for generators Figure 4: Transmission zones for generators SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 7 of 43

5. NMD rules and charges payable in the event of an NMD exceedance As set out in the NMD rules (as amended from time to time with the approval of NERSA) an exceedance of the NMD will impact the Distribution network capacity charge* and the Transmission network charges and the urban low voltage subsidy charge as applicable for the Ruraflex, Nightsave Rural, Megaflex, Nightsave Urban Small and Nightsave Urban Large tariffs. The amount payable through the excess network capacity charge in the event of an exceedance is calculated on the number of times the NMD is exceeded multiplied by the portion of the demand exceeding the NMD multiplied by the sum of the Distribution network capacity charge* and the Transmission network charge and if applicable the urban low voltage subsidy charge for the respective tariffs. These rules shall also apply to Genflex urban and Genflex rural customers once the updated NMD rules which incorporate the maximum export capacity have been approved by NERSA. For more information refer to the NMD rules at www.eskom.co.za/tariffs. *Note that references in the NMD rules to the network access charge must be replaced with the network capacity charge and to the excess network access charge must be replaced with excess network capacity charge. 6. Public holidays The table below indicates the treatment of public holidays in terms of the following tariffs, namely Nightsave (Urban Large & Small), WEPS, Megaflex and Miniflex tariffs for the period 1 April 2015 to 31 March 2016 for non-local-authority supplies. The holidays until 16 June 2016 are shown to accommodate local authority supplies. The appropriate seasonally differentiated energy charges, energy demand charges and network demand charges will be applicable on these days. Any unexpectedly announced public holiday will be treated as the day of the week on which it falls. The following public holidays will always be treated as a Sunday for Miniflex, Megaflex, Genflex urban, Transflex 1 and Transflex 2, WEPS tariffs; New Year s Day, Good Friday, Family Day, Christmas Day and Day of Goodwill. All public holidays for the Nightsave (Rural), Genflex rural and Ruraflex tariffs will be treated as the day of the week on which it falls. Table 1: Treatment of public holidays Date Day Actual day of the week Nightsave Urban Large Nightsave Urban Small TOU day treated as Megaflex, Miniflex, WEPS, Genflex Urban, Transflex 3 April 2015 Good Friday* Friday Sunday Sunday 6 April 2015 Family Day* Monday Sunday Sunday 27 April 2015 Freedom Day Monday Sunday Saturday 1 May 2015 Workers Day Friday Sunday Saturday 16 June 2015 Youth Day Tuesday Sunday Saturday 9 August 2015 National Women's Day Sunday Sunday Sunday 10 August 2015 Public Holiday Monday Sunday Saturday 24 September 2015 Heritage Day Thursday Sunday Saturday 16 December 2015 Day of Reconciliation Wednesday Sunday Saturday 25 December 2015 Christmas Day* Friday Sunday Sunday 26 December 2015 Day of Goodwill* Saturday Sunday Sunday 1 January 2016 New Year s Day* Friday Sunday Sunday 21 March 2016 Human Rights Day Monday Sunday Saturday 25 March 2016 Good Friday* Friday Sunday Sunday 28 April 2016 Family Day* Monday Sunday Sunday 27 April 2016 Freedom Day Wednesday Sunday Saturday 1 May 2016 Workers Day Sunday Sunday Sunday 2 May 2016 Public Holiday Monday Sunday Saturday 16 June 2016 Youth Day Thursday Sunday Saturday SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 8 of 43

USE-OF-SYSTEM CHARGES The following charges are the charges for the use of the Distribution and Transmission System as contained in Eskom s tariffs. The rates provided in this section for use-of-system charges are the rates applicable to non-local authority tariffs. The use-of-system charges applicable to local-authorities are explained for each charge where applicable. The NMD rules shall apply to all relevant use-of-system charges. 7. Loss factors The active energy charges are shown inclusive of losses for Distribution and Transmission at the applicable loss factors, which differ by the voltage category and transmission zone; 7.1. Loss factors (Distribution loads and generators) The Distribution loss factors for loads and generators connected to Distribution System as measured at the point of supply/pod are given in the table below. The same loss factors shall apply for loads as well as for the calculation of the distribution losses charge (refer to paragraph 18) for Distribution connected generators; Table 2: Loss factors (Distribution loads and generators) 7.2. Loss factors (Transmission loads) The Transmission loss factors for loads connected to the Distribution and Transmission System as measured at the point of supply/pod are given in the table below. Refer to Figure 3 for a map of the Transmission zones applicable to loads Table 3: Loss factors (Transmission loads) 7.3. Transmission loss factors for Transmission connected generators The loss factors applied to all energy generated as measured at the point of supply for generators connected to the Transmission System are given in the table below. Refer to Figure 4 for a map of the Transmission zones applicable to generators Table 4: Loss factors for Transmission connected generators) SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 9 of 43

8. TUoS (> 132 KV or direct Transmission connected) losses charge for generators Losses charges = energy produced in peak, standard and off-peak periods x WEPS rates excluding losses in each TOU period x (Transmission loss factor (for generators)-1/transmission loss factor (for generators)). 9. TUoS (> 132 KV or direct Transmission connected) network charge for loads The TUoS charges are payable by all loads connected to the Transmission System based on the annual utilised capacity and are given in the table below. Refer to Figure 3 for a map of the Transmission zones applicable to loads Table 5: TUoS network charge for direct Transmission connected loads The charges applicable to local authorities are the WEPS local authority > 132 kv Transmission network charge 10. TUoS network charge for generators The TUoS charges are payable by all generators connected to the Transmission System based on the maximum export capacity and are given in the table below. Refer to Figure 4 for a map of the Transmission zones applicable to generators Table 6: TUoS network charge for Transmission connected generators TUoS network charges for Transmission connected generators Network charge [R/kW] VAT incl Cape R 0.00 R 0.000 Karoo R 0.00 R 0.000 Kwazulu-Natal R 1.68 R 1.900 Vaal R 5.60 R 6.350 Waterberg R 7.18 R 8.130 Mpumalanga R 6.65 R 7.540 11. Ancillary service charge for Transmission connected generators and loads The ancillary service charges are payable by all generators and loads connected to the Transmission System based on the active energy as measured at the point of supply, and are given in the table below. Table 7: Ancillary service charge for Transmission connected generators and loads Transmission connected ancillary service charge Generators Loads Ancillary service charge [c/kwh] VAT incl 0.28 0.32 0.28 0.32 The charges applicable to local authorities are the WEPS local authority > 132 kv Transmission ancillary service charge. 12. Ancillary service charge for Distribution connection generators and loads The ancillary service charges are payable by all loads and generators connected to the Distribution System based on the active energy consumed or generated as measured at the point of supply and are given in the table below: SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 10 of 43

Table 8: Ancillary service charge for Distribution connected generators and loads Charge Ancillary service charge Urban p [c/kwh] VAT incl < 500V 0.33 0.38 500V & < 66kV 0.32 0.36 66kV & 132kV 0.30 0.34 Charge Ancillary service charge Rural p [c/kwh] VAT incl < 500V 0.33 0.38 500V & 22kV 0.33 0.38 The charges applicable to local authorities are the WEPS local authority ancillary service charges. 13. Urban p ETUoS network charge for loads The TUoS charges are payable by all Urbanp loads connected to the Distribution System based on the annual utilised capacity and are given in the table below. Table 9: ETUoS charge for Distribution connected Urbanp loads ETUoS Urban p Transmission zone Voltage [R/kVA] VAT incl 300km < 500V R 7.12 R 8.12 500V & < 66kV R 6.51 R 7.42 66kV & 132kV R 6.34 R 7.23 > 300km & 600km < 500V R 7.18 R 8.19 500V & < 66kV R 6.57 R 7.49 66kV & 132kV R 6.39 R 7.28 > 600km & 900km < 500V R 7.27 R 8.29 500V & < 66kV R 6.63 R 7.56 66kV & 132kV R 6.43 R 7.33 > 900km < 500V R 7.29 R 8.31 500V & < 66kV R 6.71 R 7.65 66kV & 132kV R 6.48 R 7.39 The charges applicable to local authorities are the WEPS local authority Transmission network charges for the above voltages. 14. Rural p ETUoS network charge for loads The TUoS charges are payable by all Ruralp loads connected to the Distribution System based on the annual utilised capacity and are given in the table below. Table 10: ETUoS charge for Distribution connected Ruralp loads ETUoS Rural p Transmission zone Voltage [R/kVA] VAT incl 300km < 500V R 14.88 R 16.96 500V & < 66kV R 13.64 R 15.55 > 300km & 600km < 500V R 14.93 R 17.02 500V & < 66kV R 13.73 R 15.65 > 600km & 900km < 500V R 15.01 R 17.11 500V & < 66kV R 13.78 R 15.71 < 500V R 15.07 > 900km R 17.18 500V & < 66kV R 13.79 R 15.72 For the charges applicable to local authorities tariffs, refer to paragraph 16 15. Urban p DUoS network charge and urban low voltage subsidy charge for loads The DUoS network charges are payable by all Urbanp loads connected to the Distribution System and are given in the table below. The DUoS network capacity charge and the urban low voltage subsidy charge is payable on based on the annual utilised capacity. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 11 of 43

The DUoS network demand charge is payable on the chargeable demand for Megaflex and Nightsave Urban and on kwh in peak and standard periods for Miniflex. Table 11: Urbanp DUoS network charge and urban low voltage subsidy charge for Distribution connected loads Distribution network charges urban p Network capacity charge [R/kVA/m] Network demand charge [R/kVA/m] Urban low voltage subsidy charge [R/kVA/m] Voltage VAT incl VAT incl VAT incl < 500V R 14.15 R 16.13 R 26.83 R 30.59 R 0.00 R 0.00 500V & < 66kV R 12.98 R 14.80 R 24.62 R 28.07 R 0.00 R 0.00 66kV & 132kV R 4.63 R 5.28 R 8.58 R 9.78 R 11.43 R 13.03 > 132kV R 0.00 R 0.00 R 0.00 R 0.00 R 11.43 R 13.03 The charges applicable to local authorities are the WEPS local authority network capacity, network demand and urban low voltage subsidy charges for the above voltages. 16. Rural p DUoS network charge for loads The DUoS network charges are payable by all Ruralp loads connected to the Distribution System and are given in the table below. The DUoS network capacity charge is payable on based on the annual utilised capacity. The DUoS network demand charge is payable on the active energy in all time periods. Table 12: Ruralp DUoS network charge for Distribution connected loads Voltage < 500V 500V & 22kV Distribution network charges rural p Network capacity charge [R/kVA/m] Network demand charge [c/kwh] VAT incl VAT incl R 14.88 R 16.96 21.19 24.16 R 13.64 R 15.55 18.57 21.17 The charges applicable to local authorities for the Ruralp ETUoS and DUoS for loads are the Ruraflex local authority combined network capacity charges for the above voltages. 17. DUoS network charge for generators The DUoS network charges are payable by all generators connected to the Distribution System and are given in the table below The DUoS network charge is payable on based on the maximum export capacity. Table 13: DUoS network charge for Distribution connected generators Distribution network charges for Generators Voltage < 500V 500V & < 66kV 66kV & 132kV Network capacity charge [R/kW/m] VAT incl R 11.44 R 13.04 18. DUoS distribution losses charge for generators The DUoS generator network charge shall be rebated based on the following formula: distribution losses charge = energy produced in peak, standard, and off-peak periods x WEPS energy rate excluding losses in peak, standard, and off-peak periods x (Distribution loss factor x Transmission loss factor 1). Refer to Table 17 and Table 18 for the WEPS energy rates excluding losses. Refer to Table 2 and Table 3 for the loss factors. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 12 of 43

19. Service and administration charges 19.1. Urban p service and administration charges The DUoS and TUoS service and administration charges are payable by all Urbanp generators and loads based on the monthly utilised capacity or maximum export capacity and are given in the table below: Table 14: Urbanp Service and administration charges Service and administration charges (urban p ) Customer categories utilised capacity / maximum export capacity Service charge [R/account/day] Administration charge [R/POD/day] [kva or MVA = loads] [kw or MW = generators] 100 kva/kw > 100 kva/kw & 500 kva/kw > 500 kva/kw & 1 MVA/MW > 1 MVA/MW Key customers or Transmission connected VAT incl VAT incl R 11.55 R 13.17 R 2.54 R 2.90 R 52.80 R 60.19 R 14.80 R 16.87 R 162.48 R 185.23 R 29.41 R 33.53 R 162.48 R 185.23 R 73.23 R 83.48 R 3,183.88 R 3,629.62 R 101.68 R 115.92 The charges applicable to local authorities are the WEPS local authority charges for the above customer categories. 19.2. Rural p service and administration charges The DUoS service and administration charges are payable by all Ruralp generators and loads based on the monthly utilised capacity or maximum export capacity and are given in the table below. Table 15: Ruralp service and administration charges Service and administration charges (rural p ) Customer categories utilised capacity / maximum export capacity Service charge [R/account/day] Administration charge [R/POD/day] [kva or MVA = loads] [kw or MW = generators] 100 kva/kw > 100 kva/kw & 500 kva/kw > 500 kva/kw & 1 MVA/MW > 1 MVA/MW Key customers VAT incl VAT incl R 14.64 R 16.69 R 4.16 R 4.74 R 49.94 R 56.93 R 23.15 R 26.39 R 153.63 R 175.14 R 35.53 R 40.50 R 153.63 R 175.14 R 65.93 R 75.16 R 3,010.96 R 3,432.49 R 65.93 R 75.16 The charges applicable to local authorities are the Ruraflex local authority charges for the above customer categories. 20. Electrification and rural subsidy charge The Electrification and rural subsidy charge is payable by all Urbanp loads connected to the Eskom Transmission and Distribution System for the delivery of energy and is given in the table below. Table 16: Electrification and rural subsidy charge Electrification and rural network subsidy charge Tariff Megaflex, Miniflex, Nightsave Urban Large, Nightsave Urban Small, Businessrate Total electrification and rural network subsidy charge [c/kwh] VAT incl 6.33 7.22 The charges applicable to local authorities are the WEPS local authority charges for the above tariffs. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 13 of 43

URBANp TARIFFS 21. WEPS WEPS has the same rates and structure as Megaflex and represents the wholesale costs in the most unbundled format. The following charges apply: seasonally and time-of-use differentiated c/kwh active energy charges including losses, based on the voltage of supply and the transmission zone; seasonally and time-of-use differentiated c/kwh active energy charges excluding losses three time-of-use periods namely peak, standard and off-peak, as specified in paragraph 3.2; the treatment of public holidays for the raising of the active energy charge and the network demand charge shall be as specified in paragraph 6; a R/kVA/month Transmission network charge based on the voltage of the supply, the transmission zone and the annual utilised capacity measured at the POD applicable during all time periods; a R/kVA/month Distribution network capacity charge based on the voltage of the supply and the annual utilised capacity measured at the POD applicable during all time periods; a R/kVA/month Distribution network demand charge based on the voltage of the supply and the chargeable demand measured at the POD applicable during peak and standard periods; a R/kVA urban low voltage subsidy charge based on the voltage of the supply and charged on the annual utilised capacity measured at the POD applicable during all time periods; a c/kwh ancillary service charge based on the voltage of the supply applicable during all time periods; a R/Account/day service charge based on the monthly utilised capacity of each account; a R/POD/day administration charge based on the monthly utilised capacity of each POD linked to an account; a c/kvarh reactive energy charge supplied in excess of 30% (0,96 power factor or less) of the kwh recorded during the peak and standard periods. The excess reactive energy is determined per 30-minute integrating period and accumulated for the month and will only be applicable during the high-demand season; a c/kwh electrification and rural network subsidy charge, applied to the total active energy measured at the POD in the month; a c/kwh affordability subsidy charge applied to the total active energy purchased from Eskom at the POD in the month applicable to non-local authority tariffs only; additional charges in the event of an NMD exceedance as specified in paragraph 5 and in accordance with the NMD rules. Note: The WEPS rate excluding losses is used for the reconciliation of accounts for 1) wheeling of energy and 2) where Eskom purchases energy from an IPP but the energy is supplied directly to a customer. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 14 of 43

Table 17: WEPS non-local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 15 of 43

Table 18: WEPS local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 16 of 43

22. Nightsave Urban (Large) tariff Electricity tariff suitable for high load factor Urbanp customers with an NMD greater than 1 MVA with the following charges: seasonally differentiated c/kwh active energy charges including losses based on the voltage of the supply and the Transmission zone; seasonally differentiated R/kVA energy demand charges based on the voltage of the supply, the Transmission zone and charged on the chargeable demand in peak periods as specified in paragraph 3.1; the treatment of public holidays for the raising of the energy demand charge and the network demand charge shall be as specified in paragraph 6; a R/kVA transmission network charge based on the voltage of the supply, the Transmission zone and charged on the annual utilised capacity measured at the POD applicable during all time periods; a R/kVA Distribution network capacity charge based on the voltage of the supply and the annual utilised capacity measured at the POD applicable during all time periods; a R/kVA Distribution network demand charge based on the voltage of the supply and the chargeable demand measured at the POD applicable during peak periods only; a R/kVA urban low voltage subsidy charge applicable to > 66 kv supplies based on the voltage of the supply and charged on the annual utilised capacity measured at the POD applicable during all time periods. a c/kwh ancillary service charge based on the voltage of the supply applicable during all time periods; a R/account/day service charge based on the monthly utilised capacity of each POD linked to an account; a R/POD/day administration charge based on the monthly utilised capacity of each POD linked to an account; a c/kwh electrification and rural network subsidy charge applied to the total active energy measured at the POD in the month; a c/kwh affordability subsidy charge applied to the total active energy purchased from Eskom at the POD in the month applicable to non-local authority tariffs only; and additional charges in the event of an NMD exceedance as specified in paragraph 5 and in accordance with the NMD rules. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 17 of 43

Table 19: Nightsave Urban (Large) non-local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 18 of 43

Table 20: Nightsave Urban (Large) local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 19 of 43

23. Nightsave Urban (Small) tariff Electricity tariff for high load factor Urbanp customers with an NMD from 25 kva to 1 MVA with the following charges: seasonally differentiated c/kwh active energy charges including losses based on the voltage of the supply and the Transmission zone; seasonally differentiated R/kVA energy demand charges based on the voltage of the supply, the transmission zone and charged on the chargeable demand in peak periods as specified in paragraph 3.1; the treatment of public holidays for the raising of the energy demand charge and the network demand charge shall be as specified in paragraph 6; a R/kVA Transmission network charge based on the voltage of the supply, the Transmission zone and charged on the annual utilised capacity measured at the POD applicable during all time periods; a R/kVA Distribution network capacity charge based on the voltage of the supply and the annual utilised capacity measured at the POD applicable during all time periods; a R/kVA Distribution network demand charge based on the voltage of the supply and the chargeable demand measured at the POD applicable during peak periods only; a R/kVA urban low voltage subsidy charge applicable to > 66 kv supplies based on the voltage of the supply and charged on the annual utilised capacity measured at the POD applicable during all time periods; a c/kwh ancillary service charge based on the voltage of the supply applicable during all time periods; a R/account/day service charge based on the monthly utilised capacity of each POD linked to an account; a R/POD/day administration charge based on the monthly utilised capacity of each POD linked to an account; a c/kwh electrification and rural network subsidy charge applied to the total active energy measured at the POD in the month; a c/kwh affordability subsidy charge applied to the total active energy purchased from Eskom at the POD in the month applicable to non-local authority tariffs only; and additional charges in the event of an NMD exceedance as specified in paragraph 5 and in accordance with the NMD rules. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 20 of 43

Table 21: Nightsave Urban (Small) non-local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 21 of 43

Table 22: Nightsave Urban (Small) local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 22 of 43

24. Megaflex tariff TOU electricity tariff for urbanp customers with an NMD greater than 1 MVA that are able to shift load, with the following charges: seasonally and time-of-use differentiated c/kwh active energy charges including losses, based on the voltage of supply and the Transmission zone; three time-of-use periods namely peak, standard and off-peak, as specified in paragraph 3.2; the treatment of public holidays for the raising of the active energy charge and the network demand charge shall be as specified in paragraph 6; a R/kVA/month Transmission network charge based on the voltage of the supply, the Transmission zone and the annual utilised capacity measured at the POD applicable during all time periods; a R/kVA/month Distribution network capacity charge based on the voltage of the supply and the annual utilised capacity measured at the POD applicable during all time periods; a R/kVA/month Distribution network demand charge based on the voltage of the supply and the chargeable demand measured at the POD applicable during peak and standard periods; a R/kVA urban low voltage subsidy charge based on the voltage of the supply and charged on the annual utilised capacity measured at the POD applicable during all time periods a c/kwh ancillary service charge based on the voltage of the supply applicable during all time periods; a R/account/day service charge based on the monthly utilised capacity of each account; a R/POD/day administration charge based on the monthly utilised capacity of each POD linked to an account; a c/kvarh reactive energy charge supplied in excess of 30% (0,96 power factor or less) of the kwh recorded during the peak and standard periods. The excess reactive energy is determined per 30-minute integrating period and accumulated for the month and will only be applicable during the high-demand season; a c/kwh electrification and rural network subsidy charge, applied to the total active energy measured at the POD in the month; a c/kwh affordability subsidy charge applied to the total active energy purchased from Eskom at the POD in the month applicable to non-local authority tariffs only; and additional charges in the event of an NMD exceedance as specified in paragraph 5 and in accordance with the NMD rules. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 23 of 43

Table 23: Megaflex non-local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 24 of 43

Table 24: Megaflex local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 25 of 43

25. Miniflex tariff TOU electricity tariff for Urbanp customers with an NMD from 25 kva up to 5 MVA, with the following charges: seasonally and time-of-use differentiated c/kwh active energy charges including losses, based on the voltage of supply and the Transmission zone; three time-of-use periods namely peak, standard and off-peak, as specified in paragraph 3.2; the treatment of public holidays for the raising of the active energy charge and the network demand charge shall be as specified in paragraph 6; a R/kVA/month network capacity charge combining the Transmission and Distribution network capacity charges based on the voltage of the supply, the Transmission zone and the annual utilised capacity measured at the POD applicable during all time periods. a c/kwh Distribution network demand charge based on the voltage of the supply and the energy measured at the POD during the peak and standard periods; a R/kVA urban low voltage subsidy charge based on the voltage of the supply and charged on the annual utilised capacity measured at the POD applicable during all time periods; a c/kwh ancillary service charge based on the voltage of the supply applicable during all time periods; a R/account/day service charge based on the monthly utilised capacity of each account; a R/POD/day administration charge based on the monthly utilised capacity of each POD linked to an account; a c/kvarh reactive energy charge supplied in excess of 30% (0,96 power factor or less) of the kwh recorded during the entire billing period. The excess reactive energy is determined using the billing period totals and will only be applicable during the high-demand season; a c/kwh electrification and rural network subsidy charge, applied to the total active energy measured at the POD in the month; a c/kwh affordability subsidy charge applied to the total active energy purchased from Eskom at the POD in the month applicable to non-local authority tariffs only; and additional charges in the event of an NMD exceedance as specified in paragraph 5 and in accordance with the NMD rules.. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 26 of 43

Table 25: Miniflex non-local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 27 of 43

Table 26: Miniflex local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 28 of 43

26. Genflex Urban tariff An electricity tariff for Urbanp customers connected at medium voltage, high voltage and Transmission voltages that consume energy (importers of energy from the Transmission and Distribution System) and generate energy (exporters of energy to the Transmission and Distribution System) at the same point of supply (or metering point). The following charges shall apply for the consumption and generation of energy: seasonally and time-of-use differentiated c/kwh active energy charges including losses, based on the voltage of supply and the Transmission zone for energy supplied at the POD; three time-of-use periods namely peak, standard and off-peak, as specified in paragraph 3.2; the treatment of public holidays for the raising of the active energy charge and the network demand charge shall be as specified in paragraph 6; a R/account/day service charge based on the monthly utilised capacity (MUC) and/ or maximum export capacity of all points of supply/points of delivery linked to an account. a R/POD/point of supply/day administration charge based on monthly utilised capacity (MUC) and maximum export capacity of each POD/point of supply linked to an account;. for Transmission connected supplies,the higher of the value of : the a R/kVA/month Transmission network charge (loads) payable each month based on the voltage of the supply, the Transmission zone and the annual utilised capacity measured at the POD applicable during all time periods or, the R/kW/month Transmission network charge (generators) payable each month for transmission-connected generators based on the Transmission zone for generators and the maximum export capacity applicable during all time periods for each premise; for Distribution supplies connected supplies,the higher of the value of : the R/kW/month Distribution network capacity charge (generators) based on the voltage of the supply and the maximum export capacity measured at the POD applicable during all time periods; less a distribution losses charge based on loss factors specified in paragraphs 7.1 and 7.2 using the following formula (refer to paragraph 18): energy produced in peak, standard and off-peak periods x WEPS rates excluding losses in each TOU period x (Distribution loss factor x Transmission loss factor (for loads)-1) measured at each point of supply not beyond extinction); or a R/kVA/month Transmission network charge based on the voltage of the supply, the Transmission zone and the annual utilised capacity measured at the POD applicable during all time periods; and the R/kVA/month Distribution network capacity charge (loads) based on the voltage of the supply and annual utilised capacity measured at the POD applicable during all time periods; and a R/kVA/month Distribution network demand charge based on the voltage of the supply and the chargeable demand at the POD applicable during peak and standard periods; for Transmission connected generators a losses charge based on loss factors specified in paragraph 7.3 at each point of supply is applied based on the following formula (refer to paragraph 8); energy produced in peak, standard and off-peak periods x WEPS rates excluding losses in each TOU period x (Transmission loss factor (for generators)-1/transmission loss factor (for generators)). a R/kVA urban low voltage subsidy charge based on the voltage of the supply and charged on the annual utilised capacity measured at the POD applicable during all time periods; a c/kwh ancillary service charge applied on the total active energy supplied and produced in the month based on the voltage of the supply applicable during all time periods; SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 29 of 43

a c/kvarh reactive energy charge supplied in excess of 30% (0,96 power factor or less) of the kwh recorded during the peak and standard periods. The excess reactive energy is determined per 30-minute integrating period and accumulated for the month and will only be applicable during the high-demand season; a c/kwh electrification and rural subsidy (ERS) applied to the total active energy supplied in the month; a c/kwh affordability subsidy charge applied to the total active energy supplied in the month; and additional charges in the event of an NMD exceedance in accordance with the NMD rules. Notes: A comparison is made on a monthly basis to determine the higher (in rand value) of the network charges as a consumer and as a generator located at the same point of supply/ metering point and these rand values will be used for billing purposes. The network charges, loss charges, Distribution losses charge, ancillary service charges as well as administration charges and service charge applicable for generators will depend on whether the generator is Transmission or Distribution connected. Table 27: Genflex Urban tariff The loss charges applied as per paragraph 18 for Distribution connected generators and paragraph 8 for Transmission connected generators SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 30 of 43

27. Businessrate tariff Suite of electricity tariffs for commercial usage and for also for high consumption, non-commercial supplies such as churches, schools, halls, clinics, old-age homes or similar supplies in Urbanp areas with an NMD of up 100kVA, with the following charges: a single c/kwh active energy charge measured at the POD a R/day network capacity charge based on the NMD (size) of the supply; a c/kwh network demand charge based on the active energy measured at the POD; a c/kwh ancillary service charge based on the active energy measured at the POD; and a R/day service and administration charge for each POD, which charge shall be payable every month whether any electricity is used or not, based on the applicable daily rate and the number of days in the month. Businessrate 1 Businessrate 2 Businessrate 3 Businessrate 4 The suite of Businessrate tariffs are categorised as follows: single-phase 16 kva (80 A per phase) dual-phase 32 kva (80 A per phase) three-phase 25 kva (40 A per phase) dual-phase 64 kva (150 A per phase) three-phase 50 kva (80 A per phase) dual-phase 100 kva (225 A per phase) three-phase 100 kva (150 A per phase) single-phase 16 kva (80 A per phase) dual-phase 32 kva (80 A per phase) three-phase 25 kva (40 A per phase) Table 28: Businessrate non-local authority tariff Table 29: Businessrate local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 31 of 43

28. Public lighting non-local authority tariff Electricity tariff for public lighting or similar supplies in Urbanp areas where Eskom provides a supply for, and if applicable maintains, any street light or similar public lighting and where, the charge for the supply and service is fixed based on the number of lights and light fixtures. This tariff is applicable only in Eskom-designated urban areas. The suite of Public Lighting tariffs are categorised as follows: All night (typically streetlights) 333,3 hours per month 24 hours (typically traffic lights) 730 hours per month Urban fixed (typically telephony installations Based on 200 kwh per month Table 30: Public Lighting non-local authority tariff Table 31: Public Lighting local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 32 of 43

RESIDENTIAL TARIFFS 29. Homepower tariffs The suite of Homepower tariffs are categorised as follows: Homepower 1 dual-phase 32 kva (80 A per phase) three-phase 25 kva (40 A per phase) Homepower 2 Homepower 3 Homepower 4 Homepower Bulk dual-phase 64 kva (150 A per phase) three-phase 50 kva (80 A per phase) dual-phase 100 kva (225 A per phase) three-phase 100 kva (150 A per phase) single-phase 16 kva (80 A per phase) No limit 29.1. Homepower Standard tariff Suite of electricity tariffs for residential customers and also may be applied to supplies such as churches, schools, halls, clinics, old-age homes or similar supplies in Urbanp areas with an NMD of up to 100 kva, with the following charges: Inclining block rate c/kwh energy charges applied to all energy consumed, divided into two consumption blocks; and a R/POD/day network capacity charge based on the NMD (size) of the supply; 29.2. Homepower Bulk tariff An electricity tariff for residential bulk supplies to sectional title developments* only, applicable to non-local authority supplies only with the following charges: a c/kwh energy charges applied to all energy consumed, and a R/kVA network capacity charge based on the NMD or if measured the maximum demand of the supply; *Sectional title developments also have a choice other applicable tariffs such as Homepower Standard, Miniflex and Nightsave Urban Small. Table 32: Homepower Standard and Homepower Bulk non-local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 33 of 43

Table 33: Homepower Standard local authority tariff 30. Homelight non-local authority tariff Suite of electricity tariffs based on the size of the supply that provides a subsidy to low-usage single phase residential supplies in Urbanp and electrification areas and has the following charges: Inclining block rate c/kwh energy charges applied to all energy consumed, divided into two consumption blocks; The Homelight suite of tariffs is made up of the following tariffs: Homelight 20A Homelight 60A 20A supply size (NMD) typically for low consuming supplies 60A prepayment or 80A conventionally metered supply size (NMD) typically for medium to high consuming supplies Table 34: Homelight non-local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 34 of 43

RURAL TARIFFS 31. Nightsave Rural tariff Electricity tariff for high load factor Ruralp customers, with an NMD from 25 kva at a supply voltage < 22 kv (or 33 kv where designated by Eskom as Ruralp), and has the following charges: seasonally differentiated c/kwh active energy charges including losses based on the voltage of the supply and the Transmission zone; seasonally differentiated R/kVA energy demand charges based on the voltage of the supply, the Transmission zone and charged on the chargeable demand in peak periods as specified in paragraph 3.1; the treatment of public holidays for the raising of the energy demand charge and the network demand charge shall be as specified in paragraph 6; a bundled R/kVA month Transmission and Distribution network capacity charge based on the voltage of the supply, the Transmission zone and the annual utilised capacity measured at the POD applicable during all time periods; a c/kwh Distribution network demand charge based on the voltage of the supply and the energy measured at the POD during all the TOU periods; a c/kwh ancillary service charge based on the voltage of the supply applicable during all time periods; a R/account/day service charge based on the monthly utilised capacity of each POD linked to an account; a R/POD/day administration charge based on the monthly utilised capacity of each POD linked to an account; and additional charges in the event of an NMD exceedance as specified in paragraph 5 and in accordance with the NMD rules. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 35 of 43

Table 35: Nightsave Rural non-local authority tariff Table 36: Nightsave Rural local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 36 of 43

32. Ruraflex tariff TOU electricity tariff for Ruralp customers with dual and three-phase supplies with an NMD from 25 kva with a supply voltage <22kV (or 33 kv where designated by Eskom as Ruralp) and has the following charges: seasonally and time-of-use differentiated c/kwh active energy charges including losses, based on the voltage of supply and the Transmission zone; three time-of-use periods namely peak, standard and off-peak, as specified in paragraph 3.2; the treatment of public holidays for the raising of the active energy charge and the network demand charge shall be as specified in paragraph 6; a R/kVA/month network capacity charge combining the Transmission and Distribution network capacity charges based on the voltage of the supply, the Transmission zone and the annual utilised capacity measured at the POD applicable during all time periods; a c/kwh Distribution network demand charge based on the voltage of the supply and the energy measured at the POD during all the TOU periods; a c/kwh ancillary service charge based on the voltage of the supply applicable during all time periods; a R/account/day service charge based on the monthly utilised capacity of each account; a R/POD/day administration charge based on the monthly utilised capacity of each POD linked to an account; a c/kvarh reactive energy charge supplied in excess of 30% (0,96 power factor or less) of the kwh recorded during the entire billing period. The excess reactive energy is determined using the billing period totals and will only be applicable during the high-demand season; and additional charges in the event of an NMD exceedance as specified in paragraph 5 and in accordance with the NMD rules. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 37 of 43

Table 37: Ruraflex non-local authority tariff Table 38: Ruraflex local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 38 of 43

33. Genflex Rural tariff An electricity tariff for Ruralp customers that consume energy (importers of energy from the Eskom System) and generate energy (exporters of energy to the Eskom System) at the same point of supply (or metering point). The following charges shall apply for the consumption and generation of energy: seasonally and time-of-use differentiated c/kwh active energy charges including losses, based on the voltage of supply and the Transmission zone; three time-of-use periods namely peak, standard and off-peak, as specified in paragraph 3.2; the treatment of public holidays for the raising of the active energy charge and the network demand charge shall be as specified in paragraph 6; a R/kVA/month network capacity charge combining the Transmission and Distribution network capacity charges based on the voltage of the supply, the Transmission zone and the annual utilised capacity measured at the POD applicable during all time periods; a c/kwh Distribution network demand charge based on the voltage of the supply and the energy measured at the POD during the all TOU periods; a c/kwh ancillary service charge applied on the total active energy supplied and produced in the month based on the voltage of the supply applicable during all time periods; a R/account/day service charge based on the monthly utilised capacity of each account; a R/POD/day administration charge based on the monthly utilised capacity of each premise linked to an account; a c/kvarh reactive energy charge supplied in excess of 30% (0,96 PF) of the kwh recorded during the entire billing period. The excess reactive energy is determined using the billing period totals and will only be applicable during the high-demand season; and additional charges in the event of an NMD exceedance in accordance with the NMD rules. SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 39 of 43

Table 39: Genflex Rural tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 40 of 43

34. Landrate, Landrate Dx and Landlight tariff 34.1. Landrate 1, 2, 3 and 4 The suite of Landrate, Landrate Dx and Landlight tariffs are categorised as follows: Landrate 1 single-phase 16 kva (80 A per phase) dual-phase 32 kva (80 A per phase) three-phase 25 kva (40 A per phase) Landrate 2 dual-phase 64 kva (150 A per phase) three-phase 50 kva (80 A per phase) Landrate 3 dual-phase 100 kva (225 A per phase) three-phase 100 kva (150 A per phase) Landrate 4+ single-phase 16 kva (80 A per phase) Landrate Dx* single-phase 5 kva (limited to 10 A per phase) Landlight single-phase 20A Suite of electricity tariffs for Ruralp customers with single, dual or three-phase conventionally metered supplies with an NMD up to 100 kva with a supply voltage < 500 V with the following charges: a single c/kwh active energy charge measured at the POD; a R/day network capacity charge based on the NMD of the supply; a c/kwh network demand charge based on the active energy measured at the POD; a c/kwh ancillary service charge based on the active energy measured at the POD; and a R/day service and administration charge for each POD, which charge shall be payable every month whether any electricity is used or not, based on the applicable daily rate and the number of days in the month. 34.2. Landrate Dx An electricity tariff for Ruralp single phase non-metered supplies limited to 5kVA typically suited to small telecommunication installations where the electricity usage is low enough not to warrant metering for billing purposes and has the following charges: A R/day R/POD fixed charge based on Landrate 4 at 200 kwh per month. 34.3. Landlight An electricity tariff that provides a subsidy to low-usage single phase supplies in ruralp areas, limited to 20A and being a prepaid supply and has the following charges: a single c/kwh active energy charge SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 41 of 43

Table 40: Landrate, Landrate Dx and Landlight non-local authority tariff Table 41: Landrate, Landrate Dx and Landlight local authority tariff SC0207(2015/16) Eskom schedule of standard prices 2015/16 (Rev 00 1 April 2015) Page 42 of 43