EN Vario Curtain Sider Roof. Assembly instructions.

Similar documents
Competence since Suer in focus. Cargotrail kits to DIN EN12642 Code XL

TITGEMEYER Gruppe24GB(0717)1. n Superstructure Systems

01 09 Installation guidelines Air suspension units GL70 GL70HD GL70L GN Air suspension units GL70 GL70HD GL70L

Contents. Page. 1. Product description. 2. The AXC line of linear axes. 3. AXLT line of linear tables. AXC and AXS product overview...

E/ECE/324/Rev.1/Add.57/Rev.2/Amend.4 E/ECE/TRANS/505/Rev.1/Add.57/Rev.2/Amend.4

Locking Assemblies for use with bending loads

WHAT to achieve: Customs seals can be simply and effectively affixed. The vehicle contains no concealed space where goods may be hidden.

The GK units differ from the LK units in that the springs of the GK units have a spring eye at the front.

Installation Instructions

Technical specification. Electric cold milling machine W 350 E

Horizontal Directional Drilling Rigs t

SPARE PARTS CURTAINSIDER

Tempwall Autostow Mounting Instruction v1.0

Installation Instructions

Type: Date: Version: 1.0. Frigowall 2D & 3D Mounting Instruction v1.0

TITGEMEYER Gruppe21GB(0517)1. Construction profiles and accessories

MECHANICS. Aluminium profiles Linear guides Drive elements Linear units Rotational units

Technical data/component parts

Technical specification. Cold milling machine W 100

Statik und Holzverbindung TWINLOC Statics and connector TWINLOC

Vivaro Conversion Recommendations. List of contents

Rear end adaptations. Adapted length of rear overhang. Variant codes for some commonly occurring dimensions

Miniature Shock Absorbers SC²25 to SC²650 Self-Compensating

Curtainsider semitrailer S.CS MEGA with VARIOS TopTechnology. Configurator

Installation Instructions

Installation Instructions

G500REC Manual Covering System for Containers

Lashing. SpanSet Truxafe. Directions for use

KRONE - Profi Liner. Quantity: 2 Type: SDP 27 elp3-cs. Technical specification/description

Model E600 Tarping System

Fédération Internationale Speeddown

SLEWING RING CHARACTERISTICS, APPLICATIONS

Product overview. Phone Fax

Original operating instructions. Transit silo. Model. Transit silo

Installation Instructions

Locking Assemblies & Locking Elements

PARTS LIST. Reproduction. Not for. Models Mfg. No. Description Pico 6, SP 44cm Walk Behind, CE (2010)

DE/EN Ersatzteile Spare Parts.

Timing-Belt Reverse Unit 8 80 R50 II Notes on Use and Installation

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

KROFTMAN CONTAINER SHELTER TC812

RO Automatic trailer coupling. Repair instructions. 5KPVM02000 Towing Hitch Automatic Rockinger RO244A

LIGHT DUTY ROLL UP DOOR

SPECIALTY TOP CO. STC INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTTRAC TOP PART # BRONCO

REX & MU.T tiltable trailers series

Heavy-Duty Shock Absorbers HLS-110. Deceleration Technology. ONLINE Calculation and 2D / 3D CAD Download. F m

Transportation. platform trucks, hand trolleys, transport safety, trolleys

Front-mounted equipment. Fitting front-mounted equipment

Installation Instructions

Dodge Ram 1500, Quad/Reg. Cab, w/6.4ft. & 8ft. Bed, 2 & 4 WD. For updates see PRODUCT SUPPORT tab at

Miniature Shock Absorbers SC190 to SC925 Soft-Contact and Self-Compensating

Installation Instructions

Technical specification. Cold milling machine W 35

Power Transmission Solutions

The company. Regards, Rosa and Josef Unsinn

Convertible Top Installation Instructions

Installation Instructions

Water heater unit. Installation instructions. Peugeot Partner. Citroen Berlingo. Supplementary heating Thermo Top C. Table of Contents.

Söll GlideLoc Aluminium Ladders

Standard. Industrial Storage Technology

TITGEMEYER Tf1568GB(0614)2. GETO Sider Frame base assembly for truck chassis Assembly instructions

W BW GW. Workshop manual. Mechanical suspensions BPW, series ECO Cargo W / BW / GW. BPW-WH-W-BW-GW e

K9-F17 INSTALLATION INSTRUCTIONS K9 Kit for FORD INTERCEPTOR SEDAN

Rectangular profiles RE 40

Safety Shock Absorbers SCS33 to SCS64

Roll Bar (MMRB-6.1 to -6.7)

Technical specification

Service - Safety Manual

Mounting SySteMS ApplicAtionS overview version 1.2 March 2013

GETO City body kit A high-performance solution for Sprinter Class vehicles

Product catalogue 2006

Installation Instructions

ECO Plus - Warranty documents. Axle systems with air suspension

Technical specification

Installation Instructions

Technical specification. Recycler WR 2400

SNR, YOUR GUIDE TO LINEAR MODULES

Full Service guide. Please read this guide carefully and in its entirety. Contents. 1. Full Service Full service for the complete trailer

The benchmark for perfect concrete paving in the 12-m class. Slipform Pavers. SP 124 SP 124 i SP 124 L SP 124 L i

SEMITOP2,3,4 Press-Fit

Cold milling machine W 1200 F. Technical specification

Kaltfräse Cold milling W 200 machine W 100 / W 100i

Installation Instructions Tigertop

HDD-Compact Drilling Rig with on board pump

Installation Instructions

Features. High spring work combined with low weight and volume. High Damping Potential. Overload-safe in blocked position. RINGFEDER Friction Spring

Complete Systems for Light Assembly

Conversion Guideline Opel Movano [ X62 ]

AC 100. Operating instructions Pneumatic Crimper AC 100. Date of issue: 05/2010. Keep for future use!

Demag crane sets. Tailored component sets for suspension and single and double-girder overhead travelling cranes

1 Product Description System Layout Safety Instructions Intended Use Installation... 3

Toothed belt axis ELGC-TB-KF. Operating instruction [ ]

Installation Instructions

Datasheet PDCSY-MW-CHM. Technical Overview. Features. Product warranty and total quality commitment. General Information.

Installation Instructions

Technical specification. Cold milling machine W 2100

Compact Heat Meters. Features. -A Pulsed output. -B M-Bus output. Accessories. UK Sales Tel: International Tel:

Product information. DIY Sensor Profiles

PS Strong and versatile

GUIDANCE NOTES. Solar Collectors. On-Roof Installation (First Fix) Please leave these instructions with the User. Baxi Heating UK Ltd 2012

Transcription:

EN 2016 07 Vario Curtain Sider Roof Assembly instructions

Contents? Operation 3 Inserting sliding pillars 36 Hook in sliding pillars 37 Installing batten pockets 38 Designated use 4 Installing battens 39 Guide rails 40 Preassemble bows 41 General information 5 Mount bows 42 Preassemble end carriage 43 Preassemble end bow 45 Preassemble end carriage / end bow Assembly (for use with tarpaulin back cover) 46 Front dimensions 8 Preassemble end carriage / gantry beam (for use with doors) 47 Pre-assemble bulkhead 9 Slide up end carriage 48 Installing the bulkhead 14 End plug / stopper 49 Preparing the rear (PWP SA) 16 Rivet folding joints 50 Rear doors (PWP SA) 19 Mount safety rope 51 Guide rails 20 Safety rope tension 52 Guide rail package 21 Build roof package 53 Installing the guide rails 33 Drill front locking hole 54 Installing pillar bases 34 Roof mounted 55 2

Operation 3

1a 1b 2. 75 kg / m 2 3. 2. 3. The Edscha Trailer Systems sliding roofs and their operating components are exclusively manufactured for their due employment on truck specific transport operations. Any usage going beyond such applications is considered as misuse. For resulting damages the manufacturer European Trailer Systems GmbH repudiates any liability; for this the user alone bears the full risk. The intended usage also includes the observance of the operation, care and maintenance instructions and of the mounting and repair instructions as prescribed by the manufacturer.! The manufacturer, European Trailer Systems GmbH, is discharged from any liability if: the Edscha Trailer Systems sliding roof and its components are changed arbitrarily EdschaTS original parts are exchanged against other components; the Edscha Trailer Systems sliding roof and its operating components are not handled and serviced in compliance with the prevailing Edscha Trailer Systems instructions! All the arising exclusions of risk and liability shall remain valid also if: examiners or experts of the technical testing bodies or experts from officially recognised organisations have performed acceptance tests; official approval exists.!!! 1a 1b Remove roof loads before starting a trip 2. Roof load 75 kg / m 2 3. Cannot be walked on The vehicle equipment supplier is obligated in principle to check whether the products shown satisfy the demands of the user. 2016 European Trailer Systems GmbH 4

General information Structure - planning / preparation 1.0 Measure existing vehicle structure 2.0 Planning the structural extension 2.1 Taking important legal factors into account: Permitted curb weight / total weight Vehicle dimensions: total height / length / width Laws / traffic safety / insurance / load safety 2.2 Taking important technical factors into account: Vehicle structural analysis Load capacity / material of existing structure Planned vehicle use / loading possibilities 5

General information Structure - parameters / requirements Roof track width (e.g. 2520 mm) Structural length / height / width (e.g. 13500 x 4000 x 2550 mm) Rear design (e.g. soft door / doors --> effect on end carriage or gantry beam) Roof design (CS / VP / fixed posts / sliding posts) Screws All screws / nuts with lock / galvanised 6.8 8.8 10.9 MA (Nm) M4 2,2 3,0 4,4 M5 4,5 5,9 8,7 M6 7,6 10 15 M8 18 25 36 M10 37 49 72 M12 64 85 125 M14 100 135 200 M16 160 210 310 M18 220 300 430 M20 310 425 610 M22 425 580 830 M24 535 730 1050 Tightening torques and rigidity classes (see table) 6

General information Vehicle structural analysis - forces / moments The chassis must be capable of taking up a bending torque 10 knm in the area of the front frame Prerequisite: roof with longitudinal beams Distance between posts 3500 mm The chassis must be capable of taking up a bending torque 4.5 knm in the post area Prerequisite: load capacity 20 kn / running meter Front wall rigidity 500 kn area load (0.4 x load capacity recommended) The chassis must be capable of taking up a bending torque 40 knm in the area of the rear frame Prerequisite: load capacity 270 kn Correct realisation Tools Execution of welded seams Tolerances Aids Quality control, tests 7

1 M b 5 knm M b 5 knm 98 337,5 120 A 25 70 25 337,5 98 FH 18 Front dimensions Process step: Preparation of the base frame Process: Parameters: Material: Tools: Aids: Preparation: Measurement and drilling Edscha TS bulk head Edscha TS bulk head drilling machine Folding rule, centre punch Measurement and drilling 8

2 C= A - 785mm D = B - ~150mm B C= A - 785mm A 18 Pre-assemble bulkhead 01 Process step: Process: Parameter: Material: Tools: pre-assemble bulkhead Mount individually cut front plate Platform width, installation height Plywood panel, bulkhead elements (2021), screws measurement/marking tools, saw, drilling machine, screw driver Aids: Preparation: 9

3 Pre-assemble bulkhead 02 Process step: pre-assemble bulkhead Process: Parameters: Material: Tools: Mount bulkhead cover (adjust if necessary) Installation width, roof track width Edscha TS bulkhead cover (2021), screws torque wrench, screw driver Aids: Preparation: 10

4 Pre-assemble bulkhead 03 Process step: pre-assemble bulkhead Process: Parameters: Material: Tools: Mount assembly sets roof track width, guide rail package Edscha TS Montagesätze torque wrench Aids: Preparation: 11

5 FH Pre-assemble bulkhead 04 Process step: pre-assemble bulkhead Process: Material: Tools: Mount support angle (adjust if necessary) Edscha TS support angle, screws Screw driver Aids: Preparation: 12

6 Pre-assemble bulkhead 05 Process step: pre-assemble bulkhead Process: Material: Tools: Mount protective plate (adjust if necessary) Edscha TS protective plate, screws / rivets Riveting pliers / screwdriver Aids: Preparation: 13

7 1. 3. 2. 3. Installing the bulkhead 01 Process step: installing the bulkhead Process: Parameter: Material: Tools: Aids: Align bulkhead and mount Platform width Pre-mounted Edscha TS bulkhead torque wrench, wrench crane Preparation: 14

8 3. Installing the bulkhead 02 Process step: installing the bulkhead Process: Parameter: Material: Tools: Screw bulkhead on Torques pre-assembled Edscha TS bulk head torque wrench, wrench Aids: Preparation: 15

40 80 150? 9 M b 40 knm M b 40 knm Ø18 128 30 Preparing the rear 01 Process step: preparing the rear Process: Parameters: Drill holes for rear frame Platform width, requirements PWP SA Material: Tools: measurement/marking tools, drilling machine Aids: Preparation: 16

10 Preparing the rear 02 Process step: preparing the rear Process: Parameters: Material: Tools: Screws on rear pillars Platform width, requirements PWP SA Edscha TS rear pillars 2102, attachment materials wrench, torque wrench Aids: Preparation: 17

11 1. 2. Preparing the rear 03 Process step: preparing the rear Process: Parameters: Material: Tools: Mount assembly sets roof track width, guide rail package Edscha TS assembly sets, attachment material wrench, torque wrench Aids: Preparation: 18

12 * Rear doors (PWP SA) Process step: installation rear frame / rear doors Process: Parameters: installation rear frame / rear doors Platform width, installation height, requirements PWP SA Material: Edscha TS rear frame (2102) Tools: Aids: Preparation: torque wrench, wrench crane See assembly instructions PWP Defender Assembly instructions PWP Defender: http://bit.ly/29gzdjr (Sandwich) http://bit.ly/29qllzm (Snaplock) 19

13 Sliding pillar Fixed pillar Guide rails Process step: mount guide rails 20

14 ~250 mm ~50 mm Guide rail package 01 Weld CurtainSider profile and sliding pillar profile (top) 21

15 ~50 mm ~250 mm Guide rail package 02 Weld CurtainSider profile and sliding pillar profile (base) 22

16 ~50 mm ~250 mm! See page 38 and consecutive pages Guide rail package 03 Weld running rail and rectangular tube (top) 23

17 ~50 mm ~250 mm Guide rail package 04 Weld running rail and rectangular tube (base) 24

18 Guide rail package 05 Join welded profile packages 25

19 ~250 mm ~50 mm Guide rail package 06 Weld profile packages (outside) 26

20 ~50 mm ~250 mm Guide rail package 07 Weld profile packages (inside) 27

21 Guide rail package 08 Join welded profile package with stabilisation tube 28

22 ~50 mm ~250 mm Guide rail package 09 Weld profile package (with a high profile weight or long self-supporting lengths the profiles may need to be welded with preload, see following illustrations) 29

23 2. 2. a a 1. 0 0 0 + X mm Guide rail package 10 Weld profile package with preload. Compensate profile deflection through counterload on profile. 30

24 0 0 0 + X mm ~250 mm ~50 mm Guide rail package 11 Join welded profile packages (base) 31

25 ~50 mm ~250 mm 0 0 0 + X mm Guide rail package 12 Join welded profile packages (top) 32

26 Installing the guide rails 33

27 x 4000 x x x Installing pillar bases 01 Process step: Process: Parameters: Material: Tools: installing pillar bases installing pillar bases Installation length Edscha TS pillar bases (LP2) measurement/marking tools Aids: Preparation: 34

28 25 50 13 min. 100mm M b 4,5 knm Installing pillar bases 02 Process step: Process: Parameters: Material: Tools: installing pillar bases installing pillar bases Platform height Edscha TS pillar bases (LP2) measurement/marking tools, drilling machine Aids: Preparation: 35

29 Detail 1. * Profilschlitz 1. 2. Inserting sliding pillars *Notch to be performed by customer 36

30 4. 1. 2. 3. Hook in sliding pillars 37

31 Installing batten pockets 38

32 Installing battens 39

33 a! See page 21 and consecutive pages 90 b a b Guide rails The rails must be mounted in parallel within a maximum angle deviation of ± 1 and must be braced against rotation at the same height in order to ensure perfect roof running. Measurement a b -> see figure 48 40

34 20 Nm 1. 2. 20 Nm 1. 2. Preassemble bows Push the bow bracket (right / left) onto the bow from the outside until the provided mounting holes align. Fasten the bulkhead bow bracket to the bow on both sides, using the pan head screw M8x50 and locknut M8 (torque: 20 Nm) 41

35 Mount bows 42

36 Preassemble end carriage 01 Carry out process on both sides 43

37 2. 1. Preassemble end carriage 02 44

38 Preassemble end bow Carry out process on both sides 45

39 Preassemble end carriage / end bow (for use with tarpaulin back cover) 46

40 Preassemble end carriage / gantry beam (for use with doors) 47

41 Slide up end carriage Push the pre-assembled end carriage into the provided chambers of the running rail profiles. 48

42! 20 Nm 10 U/min max.! End plug / stopper Carry out process on both sides 49

43 Rivet folding joints 50

44 Mount safety rope Must be securely connected to vehicle bulkhead 51

45 40 mm Safety rope tension Carry out process on both sides 52

46 ~250 1. 2. (see figure 47) Build roof package 53

47 10 Drill front locking hole 54

48 a b Roof mounted Difference measurement a to b when closed ± 2 mm. All bows and the end carriage must have the same width within a tolerance of ± 2 mm in order to allow perfect running of the roof. 55

Structural components side curtains Post position Front cm cm cm Distance between tarpaulin eyelets with expander cable from the front cm Length and width of roof Exact length of roof: Exact width of roof cm cm Front x cm Rear 56

Subject to technical changes 07 / 2016 No. 808 837 Your sales partner in India: European Trailer Systems c/o RINGFEDER POWER TRANSMISSION INDIA PRIVATE LIMITED Plot No. 4, Door No. 220, Mount-Poonamallee Road, Kattupakkam, Chennai 600 056, India Phone: +91 (0) 44-2679 1411 Fax: +91 (0) 44-2679 1422 E-mail:sales.india@EdschaTS.com European Trailer Systems GmbH Im Moerser Feld 1f, 47441 Moers, Germany Phone: +49 (0) 2841 6070 700 Fax: +49 (0) 2841 6070 333 Das Original