PIPELINES (Last update - February 2004)

Similar documents
LACT MEASUREMENT. Total Head = Or PSI = S.G. 2.31

Fully Welded Ball Valves

OIL HANDLING SYSTEMS

DESIGN, OPERATION & MAINTENANCE OF L.A.C.T. UNITS

Fully Welded Ball Valves

HIPPS (High Integrity Pressure Protection System)

ELEVATED PRESSURE PULSATION WITH A METHANOL INJECTION RECIPROCATING PUMP SYSTEM

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

NMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST

VALVOLE. Choke Valves Gate Valves WellHead Control Panels Control Systems Oil & Gas Upstream Equipment CELEBRATING

M&J Valve Product Overview

2" - 24" OS Series Butterfly Valves. Operation and Maintenance Manual. Job Name: Contractor: Date:

LIQUID MEASUREMENT STATION DESIGN Class No

Lease Automatic Custody Transfer

GROVE B4, B5 and B7 Side-entry Ball Valves

RULE 2260 REGISTRATION FOR EQUIPMENT SUBJECT TO CALIFORNIA S GREENHOUSE GAS OIL AND GAS REGULATION

Fully Welded Ball Valves

AIR POLLUTION AND ENERGY EFFICIENCY. Guidelines for onboard sampling and the verification of the sulphur content of the fuel oil used on board ships

BSEE INC/Civil Penalty Update. Gulf Coast Action Team (GCAT) Meeting Shell Robert Facility Robert, Louisiana May 14, 2014

FUNDAMENTALS OF INSERTION TURBINE METERS Les Bottoms Thermo Electron Corporation, Flow Systems

TRUNNION MOUNTED METAL SEATED BALL VALVES

VELAN TRUNNION-MOUNTED

PBV s Engineering Excellence At Work

of Fire Pump Assemblies

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration. MAOP Verification for Natural Gas Pipelines

FLORENCE ELECTRICITY DEPARTMENT. GENERAL POWER RATE--SCHEDULE GSC (October 2015) Availability

PHMSA Office of Pipeline Safety Dave Mulligan Western Region

Slab & Double Expanding Gate Valves

RAM Company USA Products Line

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

WAFER STYLE ILBP PROPORTIONING MODULES WITH CHECK VALVE. NPR160 Approvals: UL, ULC

ASME B31.8 INTERPRETATIONS VOLUME 13

LINE STOPPING. Extending and modifying your existing pressurized system while it s under full operating conditions.

Installation, Operation, and Maintenance Manual

To ensure proper installation, digital pictures with contact information to before startup.

NEECO INDUSTRIES INC. INSTRUCTION MANUAL 7 1/16 10K SLAB GATE BODY

Appendix D. Hazardous Materials Technical Appendix

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

FUNDAMENTALS OF ORIFICE METERING Ken Embry FMC Measurement Solutions

BOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL

LEWA plunger pumps. for process applications. innovative sealing technology rugged and reliable compact design high hydraulic power up to 3500 bar

262CC. Quick Start Guide

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Diagram 1 - Shoulder Assistance

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

Introduction Certifications References Standards Ball Valves Trunnion Mounted Ball Vaves Product Range...

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. LARGE MANUFACTURING SERVICE RATE SCHEDULES (November 2018)

35 Dealing with Type II and N Pattern Assemblies Pete Chapman

FULLY WELDED BALL VALVES

FULLY WELDED BALL VALVES

FLORENCE ELECTRICITY DEPARTMENT. MANUFACTURING SERVICE RATE--SCHEDULE TDMSA (October 2015) Availability

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS

STEALTH INTERNATIONAL INC. DESIGN REPORT #1001 IBC ENERGY DISSIPATING VALVE FLOW TESTING OF 12 VALVE

E N G I N E E R E D V A L V E S. B4, B5 & B7 Side Entry Ball Valves GROVE

Through Conduit Gate Valves Slab & Expanding

FULLY WELDED BALL VALVES

Proposal for amendments to UN Regulation No. 110 CNG/LNG vehicles

Series 957, 957N, 957Z, 957RPDA, 957NRPDA, 957ZRPDA

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

LOADING OF ORGANIC LIQUID CARGO VESSELS. (Adopted 10/13/1992, revised 1/18/2001)

Operator Qualification (OQ) Report

BUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3

Backflow Prevention. Quick Reference Guide

TECHNICAL BULLETIN. Valbart TM Through conduit slab gate valve. Experience in Motion FCD VBENTB A4 - (9/16)

24-48 HP250II Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: Document #: 2448HP250OOOM Revision Date: 1/10/11

Installation, Operation, and Maintenance Manual

The purpose of this rule is to limit VOC emissions from the transfer of organic liquids.

DN 15 to DN100 Between flanges PN10/16/25/40 and Class C C

Oilman Group API 6A PRODUCTS OILMAN GROUP LTD. Shanghai Houston

British Standard institute-bs Valve Standards

Wet pipe low flow foam/water manifold system

Applications Closed Head Foam-Water Sprinkler Systems Aircraft Hangars Flammable Liquid Warehouses, Drum Storage Facilities

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool

Colt Series C400, C500

INSTALLATION & MAINTENANCE MODEL mm

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION

DAY 2 Breakouts II and III. POWER CABLE Day 2

CONTROL BALL VALVES LOW NOISE HIGH CAPACITY ROTARY CONTROL VALVE CBV-8600

Ballcentric Plug Valve

CP400 Series Commercial/Industrial Pressure Loaded Pressure Reducing Regulators

RAIN BIRD - AQUAGATOR AQUAGATOR INSTALLATION & TROUBLESHOOTING MANUAL

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ENGINEERING STANDARD FOR MACHINERY PIPING

Fuel Oil Fill, Transfer, and Storage (CG-47): Components

Series VF Floating Ball Valve Installation, Operation & Maintenance XXXX - X X X X X X XX XX. Base Part Numbers CONTENTS. Trim Option Suffix Code

PRODUCT NEWS CAT.NO.-70 KPC CORPORATION FLOW CONTROL DIVISION

Materials : Stainless steel ASTM A351 CF8M

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines

ECCENTRIC PLUG VALVES

Anderson Greenwood Series 400 Piston Pilot POPRV Installation and Maintenance Instructions

Materials : Carbon steel or Stainless steel

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

NJ USA. PO Box 226 Monmouth Junction, NJ USA. Fax:

ADESCO.LLC January 21, 2011

TECHNICAL BULLETIN. Valbart TCSGV. Through Conduit Slab Gate Valve. Experience In Motion

UPDATE LOG FOR TECHNICAL PROVISIONS DIVISION 4 Date Item(s) Changed Page # 10/1/13 TECHNICAL PROVISIONS DIVISION 4 VALVE SPECIFICATIONS

PWM APi 610 BB3 Multistage Pump

Transcription:

PIPELINES (Last update - February 2004) Note: 1. The PINC s L-102 through L-143 address DOI regulated offshore pipelines, only. 2. During pipeline inspections, the API RP 14C SAC reference must be verified when a safety device is SACed out on a pipeline component. When a SAC alternate device is acceptable, the device(s) on the upstream or downstream component must be tested to ensure adequate protection. OPERATIONAL PIPELINES (Last update - July 2002) L-102 IS EACH PIPELINE PUMP EQUIPPED WITH AN OPERABLE PSV? Pipeline pump - Primary pump which transfers produced liquid hydrocarbon from the process system to sales or to pipelines commingled for sales. Non-pipeline pumps - Transfer produced liquid hydrocarbons and chemicals within the production process system or from containment systems to the process system. 1. Inspect each pump to verify that it is equipped with a PSV and is: A. Located on the pump discharge piping upstream of any block valve and installed to sense pressure throughout the pump discharge piping. B. Located so that the PSV cannot be isolated except while testing. 2. Verify operation of the PSV by testing in accordance with Appendix 4. Note: API test tolerance does apply. 1. Pump is not equipped with a PSV. 2. PSV is not operable. 3. PSV is not located as required. 4. PSV is isolated. Enter one item checked for each pipeline pump inspected. L-103 IS EACH PIPELINE PUMP EQUIPPED WITH AN OPERABLE SDV? Pipeline pump - Primary pump which transfers produced liquid hydrocarbon from the process system to sales or to pipelines commingled for sales. Non-pipeline pumps - Transfer produced liquid hydrocarbons and chemicals within the production process system or from containment systems to the process system. 1. Inspect each pump to verify that it is equipped with an SDV located in the pump suction line as near the storage component or surge as possible. 2. Verify operation of the SDV by testing in accordance with Appendix 7. 1. Pump is not equipped with a SDV. 2. SDV is not operable. 3. SDV is not located as required. Enter one item checked for each pipeline pump inspected.

L-104 IS EACH PIPELINE PUMP EQUIPPED WITH A FSV? Pipeline pump - Primary pump which transfers produced liquid hydrocarbon from the process system to sales or to pipelines commingled for sales. Non-pipeline pumps - Transfer produced liquid hydrocarbons and chemicals within the production process system or from containment systems to the process system. Inspect each pump discharge to verify that it is equipped with a FSV. Issue a component shut-in (C) INC when the pump is not equipped with a FSV. Enter one item checked for each pipeline pump inspected. L-106 IS THE PSH ON EACH PIPELINE PUMP SET NO HIGHER THAN 15 PERCENT ABOVE THE HIGHEST PRESSURE IN THE OPERATING RANGE AND NOT ABOVE THE PIPELINE'S MAOP? 1. Inspect each pipeline pump to verify that it is equipped with a PSH sensor. 2. Conduct actuation test on the PSH sensor in accordance with Appendix 1 and document activation 3. Verify that PSH is set no higher than 15 percent above the highest pressure in the operating range and below the pipeline's MAOP. 4. Verify that the PSH sensor activates the SDV located on the storage component outlet in accordance with API RP 14C, paragraph A.7.3.3. Note: API test tolerance does apply. 1. Pipeline pump is not equipped with a PSH sensor. 2. PSH sensor does not activate as required. Enter one item checked for each PSH inspected. L-107 IS THE PSL ON EACH PIPELINE PUMP SET NO LOWER THAN 15 PERCENT BELOW THE LOWEST PRESSURE IN THE OPERATING RANGE? 1. Inspect each pipeline pump to verify that it is equipped with a PSL sensor. 2. Conduct actuation test on the PSL sensor in accordance with Appendix 1 and document activation 3. Verify that PSL is set no lower than 15 percent below the lowest pressure in the operating range. 4. Verify that the PSL sensor activates the SDV located on storage component outlet in accordance with API RP 14C, paragraph A.7.3.3. Note: API test tolerance does apply. 1. Pipeline pump is not equipped with a PSL sensor. 2. PSL sensor does not activate as required. Enter one item checked for each PSL inspected. L-108 ARE INCOMING PIPELINES TO A PLATFORM EQUIPPED WITH AN FSV? Authority: 1004(b)(1) Inspect each incoming pipeline to verify that it is equipped with an FSV installed in the incoming pipeline immediately upstream from the process station so that the entire line is protected from backflow. 1. Incoming pipeline is not equipped with an FSV. 2. FSV is not located in the incoming pipeline so that the entire line is protected from backflow. Enter one item checked for each incoming pipeline inspected.

L-109 IS EACH INCOMING, CROSSING, AND BIDIRECTIONAL PIPELINE EQUIPPED WITH AN SDV IMMEDIATELY UPON BOARDING THE PLATFORM? Authority: 1004(b)(2) 1004(b)(4) 1004(b)(8) Inspect each incoming, crossing, and bidirectional pipeline to verify that it is equipped with an SDV: 1. Immediately upon boarding the platform. 2. Connected to the automatic, and remote emergency shut-in systems. 3. Actuated by the PSH and PSL sensors located on the departing portion of the pipeline. 4. Verify that the SDV is operable. Bleed the pressure off the actuator and allow the SDV to reach 3/4 closed position. Note: 1. Unmanned non-production facilities do not require an SDV on a crossing pipeline. 2. Exclude gas-lift or water injection pipelines on unmanned platforms. 1. Pipeline is not equipped with SDV. 2. SDV is not located as required. 3. SDV is not connected as required. 4. SDV is not operable. Enter one item checked for each pipeline inspected. L-112 IS THERE A PSH LOCATED ON EACH DEPARTING, CROSSING, OR BIDIRECTIONAL PIPELINE AND SET NO HIGHER THAN 15 PERCENT ABOVE THE HIGHEST PRESSURE IN THE OPERATING RANGE AND NOT ABOVE THE PIPELINE'S MAOP? Authority: 1004(b)(3) 1004(b)(4) 1004(b)(8) 1. Inspect each departing pipeline to verify that it is protected by a PSH sensor located downstream of any platform input source and upstream of a departing pipeline FSV. 2. Inspect each crossing pipeline to verify that it is protected by a PSH sensor on the departing portion of the pipeline. 3. Inspect each bi-directional pipeline to verify that it is protected by a PSH sensor immediately upon boarding the platform. 4. Conduct actuation test on the PSH sensor in accordance with Appendix 1 and document activation 5. Verify that PSH is set no higher than 15 percent above the highest pressure in the operating range and below the pipeline's MAOP. Note: The API test tolerance does apply. Issue a component shut-in (C) INC if: 1. The pipeline is not protected by a PSH sensor. 2. The pipeline PSH sensor does not activate as required. 3. The pipeline PSH sensor is not located as required. Enter one item checked for each PSH inspected.

L-113 IS THERE A PSL LOCATED ON EACH DEPARTING, CROSSING, OR BIDIRECTIONAL PIPELINE AND SET NO LOWER THAN 15 PERCENT BELOW THE LOWEST PRESSURE IN THE OPERATING RANGE? Authority: 1004(b)(3) 1004(b)(4) 1004(b)(8) 1. Inspect each departing pipeline to verify that it is protected by a PSL sensor located downstream of any input source and upstream of a departing pipeline FSV. 2. Inspect each crossing pipeline to verify that it is protected by a PSL sensor on the departing portion of the pipeline. 3. Inspect each bi-directional pipeline to verify that it is protected by a PSL sensor immediately upon boarding the platform. 4. Conduct actuation test on the PSL sensor in accordance with Appendix 1 and document activation 5. Verify that PSL is set no lower than 15 percent below the lowest pressure in the operating range. Note: The API test tolerance does apply. Issue a component shut-in (C) INC if : 1. The pipeline is not protected by a PSL sensor. 2. The pipeline PSL sensor does not activate as required. 3. The pipeline PSL sensor is not located as required. Enter one item checked for each PSL inspected. L-114 DOES THE SETTING AT WHICH THE PSV ACTUATES NOT EXCEED THE PIPELINE'S MAOP? Authority: 1002(d) 1. Inspect all pipelines to verify the MAOP. 2. Verify operation of the PSV by testing in accordance with Appendix 4. 3. Verify that the PSV actuation pressure does not exceed the MAOP. Issue a component shut-in (C) INC for the pipeline when the PSV does not actuate as required. Enter one item checked for each PSV inspected. L-121 ARE PIPELINE RISERS INSTALLED AFTER APRIL 1, 1988, PROTECTED FROM PHYSICAL DAMAGE THAT COULD RESULT FROM CONTACT WITH FLOATING VESSELS? Authority: 1003(a)(4) /C Inspect each pipeline riser installed after April 1, 1988, to verify that it is protected from physical damage that could result from contact with floating vessels. Note: Pipelines may be protected by guards or positioned inside the structure. Issue a warning (W) INC when the pipeline riser is not protected from physical damage and is not located near a boat landing. Issue a component shut-in (C) INC for each pipeline riser that is not protected from physical damage and is located near a boat landing. Enter one item checked for each riser inspected. L-124 HAVE PIPELINES THAT HAVE BEEN INSTALLED, RELOCATED, UP RATED, OR REACTIVATED AFTER BEING OUT OF SERVICE FOR MORE THAN 1 YEAR, BEEN HYDROSTATICALLY TESTED WITH WATER TO A STABILIZED PRESSURE OF AT LEAST 1.25 TIMES THE MAOP FOR AT LEAST 8 HOURS? Authority: 1003(b)(1) Verify from facility records that pipelines that have been installed, relocated, up rated, or reactivated after being out of service for more than 1 year have been pressure tested as required. Issue a warning (W) INC if pipeline has not been pressure tested as required. Discuss further enforcement action with supervisor.

Enter one item checked per pipeline inspected. L-125 PRIOR TO RETURNING A PIPELINE TO SERVICE AFTER A REPAIR, HAS THE PIPELINE BEEN PRESSURE TESTED WITH WATER OR PROCESSED NATURAL GAS TO A MINIMUM STABILIZED PRESSURE OF AT LEAST 1.25 TIMES THE MAOP FOR AT LEAST 2 HOURS? Authority: 1003(b)(2) Verify from facility records that pipelines taken out of service for repair have been pressure tested as required prior to returning the pipelines to service. Issue a warning (W) INC if pipeline has not been pressure tested as required. Discuss further enforcement action with supervisor. Enter one item checked per pipeline inspected. L-126 ARE PIPELINES AND ASSOCIATED VALVES, FLANGES, AND FITTINGS DESIGNED, INSTALLED, OPERATED, AND MAINTAINED TO PROVIDE SAFE AND POLLUTION-FREE OPERATIONS. Authority: 1000(a) Note: Use this PINC where no other PINC for pipelines applies. Verify that pipeline and associated valves, flanges, and fittings are designed, installed, operated, and maintained to provide safe and pollution-free operations. Issue a warning (W) INC as required. Discuss further enforcement action with supervisor. Enter one item checked for each pipeline inspected. OUT-OF-SERVICE PIPELINES (Last update - July 2002) Out-of-service pipelines - Pipelines that have not been used to transport oil, natural gas, sulfur, or produced water for more than 30 consecutive days. L-140 ARE PIPELINES OUT OF SERVICE FOR 1 YEAR (365 CALENDAR DAYS), OR LESS, ISOLATED AT EACH END OF THE PIPELINE? Authority: 1006(b)(1) Closed block valve - A block valve that is locked in the closed position. Verify that pipelines out of service for 1 year, or less, are isolated at each end with a blind flange or a closed block valve. Issue a warning (W) INC for each out-of-service pipeline that is not isolated as required. Enter one item checked for each out-of-service pipeline inspected. L-141 ARE PIPELINES OUT OF SERVICE FOR MORE THAN 1 YEAR (365 CALLENDAR DAYS), BUT LESS THAN 5 YEARS (1,825 CALENDAR DAYS), FLUSHED AND FILLED WITH INHIBITED SEAWATER? Authority: 1006(b)(2) Verify that each pipeline out of service for more than 1 year, but less than 5 years, has been flushed and filled with inhibited seawater. Issue a warning (W) INC for each out-of-service pipeline that has not been flushed and filled as required. Enter one item checked for each out-of-service pipeline inspected.

L-142 ARE PIPELINES OUT OF SERVICE FOR 5 YEARS (1,825 CALENDAR DAYS), OR MORE, REMOVED OR DECOMMISSIONED IN PLACE WHEN AUTHORIZED BY THE REGIONAL SUPERVISOR? Authority: 1006(b)(3) 1750 1751 1752 1. Verify that pipelines out of service for 5 years, or more, which the Regional Supervisor determines do not constitute hazards (obstructions) to navigation and commercial fishing operations, unduly interfere with other uses of the OCS, or have other adverse environmental effects, are either removed or decommissioned in place. 2. Verify that out-of-service pipelines that are decommissioned in place: A. Are pigged unless the Regional Supervisor determines that pigging is not practical. B. Are flushed. C. Are filled with seawater. D. Are cut and plugged at each end. E. Have each end of the pipeline buried at least 3 feet below the seafloor or have each end of the pipeline covered with protective concrete mats, if required by the Regional Supervisor. F. Have all pipeline valves and other fittings removed that could unduly interfere with other uses of the OCS. G. Are decommissioned in place in accordance with the decommissioning procedures approved by the Regional Supervisor. 3. Verify that out-of-service pipelines that are removed: A. Are pigged, unless the Regional Supervisor determines that pigging is not practical. B. Are flushed. C. Are removed in accordance with the removal procedures and schedule approved by the Regional Supervisor. Issue a warning (W) INC for out-of-service pipelines that are not removed or decommissioned in place as required. Enter one item checked for each pipeline evaluated. L-143 ARE PIPELINES OUT OF SERVICE FOR 5 YEARS (1,825 CALENDAR DAYS), OR MORE, REMOVED IF THE PIPELINES ARE DETERMINED BY THE REGIONAL SUPERVISOR TO BE OBSTRUCTIONS? Authority: 1006(b)(3) 1752 1754 1. Verify that pipelines out of service for 5 years, or more, and that the Regional Supervisor determines constitute obstructions, are removed. 2. Verify that out-of-service pipelines that are removed: A. Are pigged, unless the Regional Supervisor determines that pigging is not practical. B. Are flushed. C. Are removed in accordance with the removal procedures and schedule approved by the Regional Supervisor. Issue a warning (W) INC for out-of-service pipelines that are not removed as required. Enter one item checked for each pipeline evaluated.