Rehabilitation of Diesel Railcars Project, Diesel Railcar Rehabilitation Project

Similar documents
Locomotive Building Project

(1) Current State and Issues of the Electricity Sector in Indonesia

Ex-Ante Evaluation (for Japanese ODA Loan)

Philippines Metro Manila Rail Commuter Maintenance Depot Construction Project

Transfer of Rolling Stock to Indonesia and Technical Support for Maintenance

Sound Transit Operations July 2016 Service Performance Report. Ridership

1 Copyright(C) 2012 Isuzu Motors Limited All rights reserved

Disaster Prevention and Rehabilitation Project (Philippine-Japan Friendship Highway and Naguilian Road)

Q3 report Joakim Olsson CEO and President October 24, Innovative Vehicle Technology

FOR IMMEDIATE RELEASE

Japanese ODA Loan. Ex-ante Evaluation

1. Trends in the current fiscal year and previous fiscal year 3. Business overview 2. Secular trends in first quarter financial results


Analyst Presentation Barloworld Automotive 29 February 2008

Ghana Kumasi-Paga Road Rehabilitation Project. Report date: March 2001 Field survey: July Project Profile and Japan s ODA Loan

FY H1 Financial Results

FY2/18 (March 2017~February 2018)

High Quality Service through Continuous Improvement st Quarter Performance Report

FY2/18 2Q(March 2017~August 2018)

Analysis of Operating Results and Financial Status

The Group is expected to continue benefiting from stable coal prices, but in the car market, competitive pressures are likely to intensify.

FOR IMMEDIATE RELEASE

Scaling Successful Mini-grid Programs: Experience of Bangladesh

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA )

FOR IMMEDIATE RELEASE

Customer Service, Operations and Security Committee. Information Item III-A. January 12, 2017

FY2012. H1 Financial Results. November 8, Copyright(C) 2011 Isuzu Motors Limited All rights reserved

Philippines Revitalization of Main Line South Project

The Case for. Business. investment. in Public Transportation

Strong performance by the Bolloré Group s operating activities in 2018 Mr Cyrille Bolloré unanimously appointed Chairman and Chief Executive Officer

January Manufacturing Technology Orders Off After a Strong December

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Project Site Afghanistan Nepal Pakistan India

2Q06 Results. Investor Relations

KCB GROUP PLC INVESTOR PRESENTATION. Q FINANCIAL RESULTS

Aim: Integration of Road Infrastructure of Georgia with European Standards and effective satisfaction of the Road User needs. Annual Report 2013

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

Group Results 6 months ended 30th June. Net revenue 88,208 92,505 (5) Net income* 7,116 8,052 (12) Net earnings per share (12)

FISCAL YEAR MARCH 2018 FIRST HALF FINANCIAL RESULTS

FY2/17 3Q(March 2016~November2016)

Sustainable Urban Transport Index (SUTI)

Feasibility Study for Promotion of International Infrastructure Projects in FY2011

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

Implementation Status & Results India Mumbai Urban Transport Project (P050668)

Economic & Steel Market Development in Japan

PT Astra International Tbk 2017 Full Year Financial Statements

PT Astra International Tbk 2018 Third Quarter Financial Statements

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE

Progress and Challenges in Philippine Energy Sector Reform

FOR IMMEDIATE RELEASE

Three Toll Roads Construction Project Report Date: October, 2002 Field Survey: August, Project Profile and Japan s ODA loan

System Status Briefing

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

NATIONAL REPORT: SPAIN. At 31/12/2015

Item

Lessons from Indonesia

INVESTING IN GLOBAL GROWTH OPPORTUNITIES AND CHALLENGES FOR UK SUPPLY BASE.

Commuter Rail Update. October 25, 2018

Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number # Final Report October 1, 2016

Horseshoe Bay Terminal Open House

TORONTO TRANSIT COMMISSION REPORT NO.

FY2/17 (March 2016~February 2017)

Province of North-Brabant ELENA: Zero Emission Buses in the South of the Netherlands

Corporate Communications. Media Information 15 March 2011

FISCAL YEAR END MARCH 2013 FIRST HALF FINANCIAL RESULTS. New Mazda6 (Atenza)

RETAIL SALES SURVEY. Real Sales in October 2017

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. Consent Workshop [ ]

To Our Business Partners

November. Next release: 19 January Sep/AugOct/Sep Nov/Oct Dec 14 December Janu 19 January 2018 Sep/AugOct/Sep Nov/Oct 2017

Earnings conference call

Baoshan Iron & Steel Co., Ltd. August 2010

December. Next release: 13 February Oct/Sep Nov/Oct Dec/Nov Janu19 January Febru13 February 2018 Oct/Sep Nov/Oct Dec/Nov 2017

Consolidated Financial Results for 1Q FY2016 July 29, 2016 Fuji Electric Co., Ltd.

Business Models that Capture the Indirect Value of EV Charging Services

Financial Summary for 2Q-FY2017 And Projections for FY2017

FISCAL YEAR ENDED MARCH 2011 FINANCIAL RESULTS

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through

3 dimensions of fuel pricing Political steps and principles of setting effective fuel pricing mechanisms

Equipment Industry Report,

Pakistan Second 220KV Guddu-Sibbi-Quetta Transmission Project


Slovakia Ex-Post Evaluation of Japanese ODA Loan Project Motorway Construction Project (SLO-P1)

August ATR Monthly Report

1 Copyright(C) 2012 Isuzu Motors Limited All rights reserved

Third Quarter Results (ended December 31, 2014)

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN TRANSPORT PROJECT 2A Loan No IN June 29, 2010 TO THE REPUBLIC OF INDIA

Federated States of Micronesia

Impact of Rising Energy Costs on the Food System in Indonesia

BMW Group posts record earnings for 2010

2017 Rp bn. Net revenue 150, , Net income* 14,184 11, Net earnings per share As at 30th September 2017 Rp bn

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Masao Usui, Meeting Materials for First-half of FY2011 and Business Outlook November 15, 2011 KYB Corporation

Review of Retail Electricity Tariffs

Monthly Operating Report. December 2017

Martin Laubscher Barloworld Automotive

Analysis of Operating Results and Financial Status

1. Project Description. 1.1 Background. Jakarta. Depok depot. Jabodetabek area. Sumatra. Java

Reed Job Index: September 2010

EV s and charging infrastructure in The Netherlands. Presentation EV & PHV Town Symposium Tokyo, June

Full-year Report 2008

Transcription:

Indonesia Rehabilitation of Diesel Railcars Project, Diesel Railcar Rehabilitation Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 Project Site Project Area (Railways centering around Java Island) Inside the Diesel Railcar (1) Background Since the late 1970 s, Indonesia revalued the importance of rail transport especially for the capital Jakarta and its surrounding areas and began positively investing in its railway sector due to the obvious road congestion problems. The procurement of diesel railcars was one aspect of this investment. Starting with the procurement of 24 railcars in 1976, the number had reached 164 by 1987. However, shortages of spare parts due to lack of budget and insufficient skill for inspecting and repairing the railcars etc made the condition of the railcars deteriorated and hindered railway operations. The rehabilitation of these diesel railcars has become a pressing matter from the standpoints of meeting the growing demand for railway transport and maintaining efficient railway operations. (2) Objectives This project was divided into two stages: the fiscal 1988 "Rehabilitation of Diesel Railcars Project" (hereinafter referred to as Phase I) and the fiscal 1996 "Diesel Railcar Rehabilitation Project" (hereinafter referred to as Phase II). The Phase I was aimed to bolster the rail transport capacity for the Jabotabek Area and other major cities by rehabilitating diesel railcars obtained before 1987. This was accomplished by procuring the maintenance parts for 108 railcars and by conducting repairs on 96 of these railcars (excluding 12 out of 108 railcars that were rehabilitated by a team of dispatched JICA experts). Phase II Project continued with the rehabilitation of the diesel railcars while making efficient use of the spare parts purchased under Phase I. (3) Project Scope The project scope for both Phase I and Phase II covered (1) parts procurement, (2) railcar rehabilitation and (3) consulting services. 1

Japan s ODA loan covered the entire portion of purchasing spare parts and the consulting services for both Phase I and II (as well as the costs related to carrying out the rehabilitation operations in Phase I). Figure 1 Java Island Railway Map Java Sea Jakarta Semarang Surabaya Bandung Jogjakarta Solo (4) Borrower/Executing Agency Republic of Indonesia / Directorate General of Land Communication, Ministry of Communication (5) Outline of Loan Agreement Loan Amount/ Loan Disbursed Amount Exchange of Notes/ Loan Agreement Terms and Conditions Final Disbursement Date Phase I: Phase II: Total: 4,819 million / 4,477 million 1,112 million / 971 million 5,931 million / 5,448 million Phase I: April 1988 / July 1988 Phase II: December 1996 / December 1996 Phase I: Interest rate: 3.0% Repayment period: 30 years (10 years for grace period) General Untied Phase II: Interest rate: 2.7% (2.3% for consultant portion) Repayment period: 30 years (10 years for grace period) General Untied Phase I: February 1999 Phase II: March 1999 2. Results and Evaluation (1) Relevance Many sections of the railway system in Indonesia are not electrified, and thus diesel railcars are mainly responsible for handling the nation s passenger and freight transport. Since 1976 Japan has been successively supplying Indonesia with diesel railcars through ODA loans. Strengthening Indonesia s railway transport capacity through the rehabilitation and effective use of these railcars continues to be maintained as a relevant purpose for the project. Plans were to rehabilitate 96 railcars, but this number was reduced to 64 railcars. This is because 32 railcars 2

were removed from the project scope due to deterioration and damage to these railcars that occurred during the delays in working out the contract with consultants by the Indonesia side. Rehabilitation of the 64 railcars was completed after implementing Phase II. (2) Efficiency The Directorate General of Land Communication was the executing agency for this project and the actual rehabilitation was performed by Indonesian Railway Public Corporation (Perum KA: current Indonesian Railway Company PT. KAI). As mentioned above, the internal working process of the contracts with consultants for Phase I required more time than was expected and an additional budgetary measure was needed in order to complete the planned repairs, resulting in the implementation of Phase II. Changes in the project scope during the procurement stage brought about delays in the implementation schedule. As a result, the implementation of Phase I was extended some six years beyond the original schedule, and it is hard to say that the project was implemented in an effective manner. (3) Effectiveness 1) Quantitative Effects <Working condition of Rehabilitated Railcars> Figure 2 shows the condition of all of the diesel railcars in Indonesia, including the 64 railcars repaired by this project and the 12 railcars rehabilitated between September 1987 and December 1988 by the 22 JICA experts that provided instruction and needed equipment. In early 1990s only around one-third of the 150 railcars were in operation. Railcars repaired by this project began to be gradually put back into service from the middle of 1995 and in 1998, and a total of 40 railcars were put back into service at one time. Therefore, from 1998 the number of railcars "In Operation", or SO 1, has been substantive as shown in Figure 2. Currently, more than 90 of the total of 111 railcars are deemed as being "Ready for Use", or SGO 2. The actual number of "In Operation" (SO) railcars has topped 85. The operating ratio (SO/SGO) for the past four years has been maintained at a very high level of more than 90% (see Fig. 3). Figure2 No. of Diesel Railcars in Indonesia (by utilization conditions) 160 147 147 140 120 100 80 60 40 107 55 110 49 118 95 42 106 83 69 110 110 111 111 111 111 93 92 71 71 86 85 63 62 53 65 53 49 20 0 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 Total No. of diesel railcars No. of railcars that can be used (SGO) No. of railcars actually being used (SO) 1 2 SO is derived from the Indonesian word Siap Operasi, which in English means "In Operation". SGO is derived from the Indonesian word Siap Guna Operasi, which in English means "Ready for Use". 3

Figure 3 Diesel Railcar Operating Ratio (SO/SGO) 100% 80% 83.1% 86.1% 84.1% 92.5% 91.5% 92.5% 92.4% 60% 40% 20% 51.4% 44.5% 44.2% 0% 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 This improvement in the number of railcars in operation and the operating ratio demonstrates that the implementation of this project has helped Indonesia to rehabilitate its diesel railcars, which has led to the recovery and maintenance of more efficient railway operations. <Improved Transport Capacity> Table 1 shows the annual redistribution of the rehabilitated diesel railcars. Between 1995 and 1997 the railcars were mainly redistributed in the East Java region and in 1998 the railcars were distributed to some other regions including Central and East Java regions. Table 1 Redistribution of Railcars Rehabilitated by this Project Year Location 1995 1996 1997 1998 Total No.1 Regional Division: Jakarta 8 4-8 20 No.2 Regional Division: Bandung - 4 8 12 24 No.8 Regional Division: Surabaya - - - 8 8 No.6 Regional Division: Jogjakarta - - - 6 6 No.5 Regional Division: Semarang - - - 6 6 Annual Total 8 8 8 40 64 Overall Total 8 16 24 64 PT. KAI material Table 2 Changes in the Number of Railway Passengers 1995 1996 1997 1998 1999 Jabotabek and its Environs 85.4 100.6 105.1 107.9 117.7-17.9% 4.4% 2.7% 9.1% Other Cities and their 24.7 23.5 23.8 28.9 30.9 Environs - 5.0% 1.2% 21.3% 7.1% Inter-city Railways 31.2 30.1 30.7 32.8 38.7 (wide area) - 3.4% 2.0% 6.9% 17.8% Total No. of Passengers 141.3 154.2 159.6 169.6 187.3-9.2% 3.5% 6.3% 10.4% The upper figures denote the annual number of passengers (unit: one million people), while the lower figures indicate the growth rates for previous year. PT. KAI material 4

According to PT. KAI, the railcars rehabilitated by this project have been mainly used in the railway sections around major cities that are not electrified in order to provide passenger transport services. These railcars are also being used to provide passenger service to the "Other Cities and their Environs" within PT. KAI s area of rail passenger service. Table 2 shows the annual number of passengers for each passenger service sector. In 1996 the number of passengers for the "Other Cities and their Environs" decreased from the previous year, but then increased slightly in 1997 and jumped more than 20% in 1998. This can be explained by the fact that the rehabilitated railcars were gradually being redistributed from the second half of 1995 and then in 1998 when a total of 40 of the 64 trains were redistributed and used all at once. This shows how the project helped to improve passenger transport capacity, especially in the "Other Cities and their Environs" by rehabilitating the diesel railcars. <Increased Revenues from Passenger Services> Table 3 shows changes in passenger revenues for PT. KAI. This table shows how the improvement to PT. KAI s ability to transport passengers resulted in increased passenger revenues. As mentioned above, using some of the rehabilitated railcars for passenger service in "Other Cities and their Environs" led to an increase in the number of passengers and a sharp increase in passenger revenues, especially between 1997 and 1998. In the same manner as with the Jabotabek region, this sharp rise for "Other Cities and their Environs" demonstrates the positive result from the large amount of rehabilitated railcars that were reintroduced during this period. Table 3 Transition of Revenues from Passenger Services 1995 1996 1997 1998 1999 Jabotabek and its Environs 259 372 433 470 541-43.8% 16.4% 8.6% 14.9% Other Cities and their 104 117 131 173 198 Environs - 12.6% 12.1% 32.0% 14.6% Inter-city Railways 3,062 3,829 4,426 6,073 8,231 (wide area) - 25.0% 15.6% 37.2% 35.5% Total No. of Passengers 3,424 4,318 4,990 6,716 8,969-26.1% 15.6% 34.6% 33.6% The upper figures denote the annual revenues from passenger services (unit: 100 million rupees), while the lower figures indicate the growth rates for previous year. PT. KAI material <Improved Railcar Comfort and Safety> The railcars rehabilitated by this project helped to raise the level of passenger comfort and safety by improving the opening and closing of doors, the operation of fans within the railcars and toilet functions. Previously there had been problems with doors that would not completely shut while the railcar was in motion. This resulted in some passengers being pushed out of the railcars during the crowded rush hours, in some cases resulting in the passenger s death. By repairing the railcars to make these doors securely shut, this project has contributed to improved safety by helping to reduce the likelihood of passengers falling from the trains. <Improved Traffic Convenience> This project played a major role in improving public transportation for the major cities on Java Island such as Jakarta, Semarang and Surabaya. For example, although the diesel railcars used to be in service, passenger service in the Surabaya region (71km section between Surabaya-Kota and Jombang ) was interrupted due to the poor state of the diesel railcars. Up until the rehabilitated railcars were introduced by 5

this project, the traveling time between above sections took up to 3 hours including bus transfers. However, the time needed to make this trip was reduced to only 2 hours when the diesel railcar service was restarted. <Improved Regional Technologies> Maintenance manuals (in English and Indonesian) were produced through the consulting services provided by this project and instruction was provided on how to inspect and maintain the railcars. These and other steps helped to greatly improve the knowledge and expertise of the technical staff at the executing agency and PT. KAI in regards to rehabilitating the railcars. (4) Impact 1) Environmental Impact This rehabilitation project was conducted at a railcar maintenance plant, and no particular negative impacts were placed on the environment. 2) Social Impact This project did not require the acquisition of land, and there were no resulting social problems such as the relocation of residents. (5) Sustainability 1) Operation and Maintenance Maintenance of the railcars after rehabilitation was entrusted to the PT. KAI regional divisions (hereinafter referred to as DAOP) (see Figure 4). Specifically, the Railcar Section Note has served as the maintenance organization and has been responsible for daily inspections and periodical inspections of every few months at auxiliary railcar storehouses. Major overhauls every few years and large unscheduled repairs are conducted at the railcar repair yard (Balai Yasa) under the direct management of PT. KAI in Jogjakarta. This railcar repair yard said that it has so far overhauled nine out of 64 railcars rehabilitated by this project. Note The regional division (DAOP) consists of the following six sections: Signals and Communications, Train Operations, Railways and Bridges, Railcars, Business Operations and Employment / Health. 6

Figure 4 Organization Chart of Indonesian Railway Company (PT. KAI) President 9 Regional Divisions Board of Directors Planning and Development Center Internal Auditor Education and Training Center Materials and Equipment Distribution Center DAOP I : Jakarta DAOP II : Bandung DAOP III : Cirebon DAOP IV : Purwokerto DAOP V : Semarang DAOP VI : Jogjakarta DAOP VIII : Surabaya DAOP IX : Jember Finance Division Java Regional Division (DAOP I~ DAOP IX) Railcar Maintenance Plant Technology Division Operations Division Personnel and General Affairs Division Sumatra Business Division (North, South and West Sumatra) Materials and Equipment Storage 2) Maintenance Status Table 4 shows the 2000 Railcar Maintenance Plan for DAOP VIII in Surabaya. Eight of the railcars rehabilitated by this project were distributed to this DAOP and plans call for one-, two-, three- and six-month inspections, as well as an annual (12-month) inspection. According to the Railcar Section of this DAOP, the terms "one-month inspection" and "two-month inspection" do not refer to the timeframe in which the inspections must be conducted, but rather the contents of the inspection. In other words, one-month inspections do not have to be conducted every month and two-month inspections do not need to be carried out once every two months. Maintenance is conducted by combining the one-, two-, three- and six-month inspections in accordance with the condition of the railcar. In this manner a maintenance plan is created giving proper consideration to the contents and frequency of the inspections. The 12-month inspection (one-year inspection) cannot be handled by the DAOP because it does not have the needed number of inspecting staff, the skill level, and equipment and materials. Therefore, these inspections are entrusted to the previously mentioned railcar maintenance yard (Balai Yasa), which is under the direct control of PT. KAI. 7

Railcar No. Table 4 2000 Railcar Maintenance Plan for DAOP VIII in Surabaya Maintenance Frequency by Monthly Schedule Railcar Type Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec P1 P2 P3 P6 P12 KD3 82244 P1 P2 P3 P1 P2 P6 P1 P2 3 3 1 1 - KD3 82255 P1 P2 P3 P1 P2 P6 P1 P2 3 3 1 1 - KD3 82208 P2 P12 P1 P2 P3 P1 P2 P6 2 3 1 1 1 KD3 81214 P1 P2 P3 P1 P2 P6 P1 P2 3 3 1 1 - KD3 82257 P3 P1 P2 P6 P1 P2 P3 2 2 2 1 - KD3 82210 P2 P3 P1 P2 P6 P1 P2 P3 2 3 2 1 - KD3 82207 P3 P1 P2 P6 P1 P2 P3 P1 3 2 2 1 - KD3 82288 P2 P3 P1 P2 P6 P1 P2 P3 2 3 2 1-20 22 12 8 1 P1 refers to a one-month inspection, P2 a two-month inspection, P3 a three-month inspection, P6 a six-month inspection and P12 a one-year inspection. These figures were provided by DAOP Surabaya. According to this DAOP, all of the other DAOPs make similar maintenance plans, which are submitted to the PT. KAI headquarters. The headquarters then allots the maintenance budget so that these plans can be carried out. The 2000 maintenance operations for DAOP VIII were as of the end of August proceeding smoothly in accordance with this plan with no particular problems involving any of the railcars. 3) Sustainability of Impact The diesel railcars rehabilitated by this project have for the most part been adequately maintained up until this point, which has allowed these railcars to make a big contribution in improving railway transport capacity for the major cities while improving passenger service. The following provides a general overview of the current situation of the maintenance body after privatization, as well as considerations for maintaining project effects by understanding the current financial situation. <Conditions after Privatization> In 1999 the former Perum KA (Indonesia Railway Public Corporation) was converted into a private company, the current PT. KAI, with the government holding 100% of the shares. Under this new form, the central government (Ministry of Communication) has been responsible for the construction of the needed infrastructure, while the private organization PT. KAI is entrusted with operations and maintenance. This is the so-called "top-bottom" separation method (fixed assets such as land, tracks and station buildings are owned by the government, while movable assets such as railcars are handed over to PT. KAI, and track maintenance, station operation, operational services etc. are entrusted). In this manner the roles are separated so that PT. KAI can focus on improving the quality of rail service and raising profits, while the government can focus on effectively and efficiently preparing infrastructure from the viewpoint of regional development. The fare system, which is supervised and controlled by the Directorate General of Land Communication (DGLC), is divided into three classes: economy class, business class and VIP class. Economy class fares are set directly by the DGLC from the viewpoint of public responsibility. Fares for the other classes are set by the operator, PT. KAI, from the viewpoint of earning profits. However, these fares must be approved by the DGLC in accordance with the 1992 Railway Law. The diesel railcars rehabilitated by this project have been used for economy class (3rd class) service primarily for cities and their surrounding areas. As 8

mentioned earlier, the government regulates economy class fares and the operation of these services does not directly raise profits for PT. KAI. However, PT. KAI is afforded some freedom in setting fares for the business and VIP classes, and thus PT.KAI has been working to secure overall profit by conducting management in such a manner as to use profits gained from these two classes to cover the operation and maintenance of the economy class service. <Financial State of Operation and Maintenance Organization> Table 5 shows the financial condition of PT. KAI, which is responsible for operation and maintenance. These results are for 1999, the first year after privatization, as well as the previous two years. Roughly 70% of the operating income comes from passenger fares. According to the executing agency, roughly 80% of the income from passenger fares comes from the business and VIP classes, which are used by only 20% of the passengers. Furthermore, the economy class fares as above are restricted by the government from the viewpoint of public responsibility and fixed government subsidies are provided each year in return. If government subsidies were not provided in 1997 and 1998 just before privatization, earnings would have worsened and PT.KAI would have had a current account deficit. On the other hand, during the first year of privatization the government cut its subsidies by 60% from the previous year, but PT.KAI still managed to turn a profit. This was the result of reductions in administrative costs and other rationalization efforts. Table 5 Financial Conditions (unit: one million rupees) Before Privatization After Privatization 1997 1998 1999 Operating Income 726,359 937,976 725,189 Operational Service Revenue : Passenger 498,981 671,560 562,874 Operational Service Revenue : Cargo 200,573 217,453 162,315 Ancillary Revenue 23,425 40,413 n.a. Other 3,381 8,550 1,601 Government Subsidies 31,500 31,500 18,375 Overall Income 757,859 969,476 745,165 Operating Expenses 557,128 787,244 555,471 Overall Operating Profit 200,731 182,233 189,693 General Administrative Expense 235,847 246,161 187,526 Operating Profit -35,116-63,928 2,168 Non-operating Profit and Loss 65,486 101,777 28,497 Ordinary Profit 30,370 37,848 30,665 Special Profit and Loss -1,869-8,712 446 Earning Before Tax 28,501 29,137 31,111 Accrued Income Taxes 0 8,732 3,532 After-tax Profit 28,501 20,404 27,579 *From the 1998 Annual Report and PT. KAI accounting documents Table 6 shows the main financial indicators for PT. KAI from 1995 to 1999. The net profit margin for the term, which is a good indication of overall profitability, improved from 2.18% in the year before privatization to 3.7% for the first year of privatization. The asset turnover ratio, which indicates how efficiently assets are being handled, has been in an upward trend since 1996 and has settled at around 0.4x in recent years. The two liquidity indicators, which indicate a company s financial solvency, are both very 9

high. Table 6 Main Financial Indicators Before Privatization After Privatization 1995 1996 1997 1998 1999 Net Profit Margin for the Term (%) 1.76 2.53 3.76 2.18 3.70 Asset Turnover Ratio 0.32x 0.12x 0.35x 0.40x 0.40x Liquidity (%) Liquid Ratio 672 801 440 888 554 Quick Ratio 387 484 328 591 307 *From the 1998 Annual Report and PT. KAI accounting documents Before PT. KAI was privatized, though with subsidies from the government, it was able to obtain a certain degree of profitability and stability as a business entity. There have been some indications that the rationalization of operations brought about by the privatization has bolstered profitability. The budget needed for maintaining the target railcars has been provided on a comparatively stable basis and there are no particular financial concerns. 3. Lessons Learned None. 10

Comparison of Original and Actual Scope Project Scope Item Plan Actual 1. Repair of diesel railcars a) Repair b) Procurement of spare parts 2. Consulting service a) Preparation of repairing implementation schedule and management of spare parts b) Rehabilitation work and instruction Implementation Schedule 1. Loan agreement a) FY1988 ODA Loan b) FY1996 ODA Loan 2. Contract a) Selection of consultant b) Contractor, supplier 3. Rehabilitation Process a) Consulting service b) Procurement of spare parts, rehabilitation work Project Cost <Rehabilitation of Diesel Railcars Project (Phase I)> Foreign currency Local currency Total ODA loan portion Exchange rate <Diesel Railcar Rehabilitation Project (Phase II)> Foreign currency Local currency Total ODA loan portion Exchange rate <Total> Foreign currency Local currency Total ODA loan portion 96 railcars covered Same as above Foreign consultant: 189M/M Local consultant: 150M/M Total : 339M/M July 1988 December 1996 Oct. 1988 ~ Mar. 1989 Apr. 1989 ~ Nov. 1989 Apr. 1989 ~ Mar. 1993 Jan. 1990 ~ Mar. 1993 4,607 million 212 million 4,819 million 4,819 million Rp.1 0.088 (Jul. 1987) 1,112 million 0 million 1,112 million 1,112 million Rp.1 0.046 (Apr. 1996) 5,383 million 548 million 5,931 million 5,931 million 64 railcars covered Same as above Foreign consultant: 222M/M Local consultant: 374M/M Total : 596M/M Same as left Same as left Mar. 1989 ~ Nov. 1990 Sep. 1991 ~ Mar. 1994 Jan. 1991 ~ Jan. 1999 Mar. 1994 ~ Dec. 1998 4,152 million 325 million 4,477 million 4,477 million Rp.1 0.0297 971 million 0 million 971 million 971 million 5,123 million 325 million 5,448 million 5,448 million 11