Mi c r o Er a s e r. Conveyor Belt Cleaning System. INSTALLATION GUIDE LIB-CP-MEA Rev. 5

Similar documents
ERASER MDP. INSTALLATION GUIDE LIB-CP-MDP Rev. 2. Conveyor Belt Cleaning System

ERASER SHD. INSTALLATION GUIDE LIB-CP-SHD Rev. 2. Conveyor Belt Cleaning System

ERASERTM. ACCUFLO Conveyor Belt Cleaning System SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1

ERASER HDTM. ACCUFLO Conveyor Belt Cleaning System SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1

57-1. Front door. Tools. Special tools and equipment. T Socket 3320/2 Bit insert for Socket T Assembly tool

Installation Instructions

920 Remote Control Switches

1-3/8 Designer Metals Telescoping Traversing Rod Installation Instructions

INSTALLATION INSTRUCTIONS ELEVATION FRONT BUMPER DODGE RAM

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

8G Brake Assembly Alignment

Second Stage Regulator - 1/4 Turn

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

AmTryke Adult Recumbent Model HP1000 #50-HC-1000

PILLOWS DECK-MOUNT BATH FAUCET WITH FLUME SPOUT

GENUINE PARTS INSTALLATION INSTRUCTIONS

HYDRAULICS. TX420 & & lower. Hydraulic Tandem Pump Removal. 4. Remove the LH side panel (Fig. 0388).

(1) License Plate Light (2) License Plate Plugs

CONTENTS. Product Features and Specifications Installation Requirement Steps of Installation 4. Exploded View Test Run...

Timing Belt: Service and Repair Installation NOTE: Check the water pump for water leakage and the oil seal for oil leakage.

Installation Instructions BR20 Rear Bumper Replacement Part # 28178T Toyo ta Tundra 2/4WD

MARTIN TWIST Tensioner

NOTE: Refer to hardware list provided to identify fasteners supplied. Figure 2-1

INSTALLATION INSTRUCTIONS

PRELIMINARY INSTALLATION INSTRUCTIONS. PARTS LIST Left front trim piece

2013 RT / 2014RT / 2015 RT - Shock Spring Adjuster Installation Instructions

INSTRUCTIONS INSTRUCCIONES CONSIGNES

INSTALLATION INSTRUCTIONS

2017 Current Ford Raptor Stealth Fighter Rear Bumper Installation Instructions

CBT25, 50 & 100 driveshaft

1335X WINCH & 1356X POWER WINCH ATTACHMENT

INSTALLATION GUIDE Bolt-On Drag-Race Strut Clip Chevy II

UAN Series Pneumatic Nutrunner Repair Manual

Approximate installation time: 2 hrs. REV. DATE: 3/17/2016 Page 1 of 7

Martin Compact Cleaner

STEERING SYSTEM - MANUAL RACK & PINION

ROCK MONSTER Wheel Manual. 5/31/2017 MP ROCKMONSTER MANUAL - REV E 1

MM Rear Coil-Over Kit - Bilstein Shocks (MMCO-3)

(2) License Plate Plugs

CONTENTS. Product Features and Specifications Installation Requirement Installation Exploded View Operation Instruction...

Max IV Rear Axle Replacement For models after Serial Number and all rear splined axle replacements.

Instruction Sheet Kit Number:

Right Bar Light L Bracket Left Bar Light L Bracket. License Plate Bracket

INSTALLATION INSTRUCTIONS

Read these instructions thoroughly before attempting to install this option.

Installation Instructions

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1

Martin Twist Tensioner

Universal Super Shield & Ultimate Aluminum w/electric Drive Conversion Kits , , Installation Instructions

Detroit Speed, Inc. Rear QUADRAlink Suspension Kit with 3 Axle Tube Camaro/Firebird P/N:

Installation Instructions

L/6.7L DODGE CUMMINS

INSTALLATION & OWNER S MANUAL

Martin QC1 Cleaner XHD with Metal Tipped Blade

Z-Gate Universal Shifter

Section 13. Tail Rotor Drive. RotorWay International A600 TALON Construction Manual. Section 13. Page A

Passenger/Right Support Bracket Driver/Left Support Bracket

INSTALLATION INSTRUCTIONS WARN FRONT RECEIVER For: DODGE RAM, 2500 and 3500, + 03 Kit Number: 65370

Disassembly and Reassembly Manual

Rineer 15 Series Hydraulic Motor Service Manual

EZ-Glide Wheels Installation Patent Pending Revised 8/23/2011

E-LIFT II+ SYSTEM WITH SPRING LEVER FOR A-SERIES AND FULL FRAME LOOMS

FlexJet Carriage Circuit Board (PCB) Replacement

3. Timing Belt 2-3 SERVICE PROCEDURE A: REMOVAL 1. CRANKSHAFT PULLEY AND BELT COVER

INSTALLATION INSTRUCTIONS

Thank you for purchasing a Nelson RainTrain2.

Martin Twist Tensioner

Installation Instructions

XX, TOYOTA, TACOMA FRONT BUMPER INSTALLATION INSTRUCTIONS THIS BUMPER SHOULD ONLY BE INSTALLED BY A PROFESSIONAL. SAFETY

Lower Radiator Grill Debris Shield

Installation Instructions Table of Contents

Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Installation Manual v1.0: RPM Governor Spring Installation Dodge. Please read all instructions before installation.

rings used in the TuckAway Electric Monitor (#3352)

2011-up Polaris RZR 800* Cab Enclosure Kit. Caution: Before using this product, read this manual and follow all safety instructions.

INSTALLATION INSTRUCTIONS

CONTENTS. Product Features and Specifications...1. Installation Requirement Steps of Installation.. 5. Exploded View Test Run...

Parts List DAKAR PRO Brackets Part # Chevrolet Silverado /4WD

YZ-PSSB10 Yamaha YXZ 1000 R Behind Seat 10 Subwoofer Enclosure

Lexus ES Fine Mesh and Adaptive Cruise Control Fine Mesh Grilles Upper and Lower Replacements

N. 15th Street, Middlesboro, KY TARP-N-GO SYSTEMS INSTALLATION INSTRUCTIONS

Suzuki Samurai Coated Stainless Steel Braided Brake Lines (SKU# SB-BL) Installation Instructions

Martin QC2 Cleaner. Go to Martin QC2 Cleaner web page. Operator s Manual M3429

Parts List See cover Page

Suzuki Samurai to Toyota Front Spring Swap Kit, with Missing Link Shackles (SKU#SSP-TSFM) Installation Instructions

2-row and All-row systems included.

MT (10/19/07) Rev. 02 PARTS MANUAL

2001 ACCORD - Timing Belt and Balancer Belt Installation

Parts List. Item Qty. Part # Description Item Qty. Part # Description Torque. 1 1 Bumper Replacement Shell 10 4 ½ x 1 ½ Hex Bolt 65 Ft.

JUL 17 Rev M

Wheel Angle Sensor Kit Installation

This Package should contain: 1. Two CorkSport Assembled Front Adjustable Struts 2. Two CorkSport Rear Adjustable Shocks 3. Two CorkSport Rear Springs

INSTALLATION INSTRUCTIONS HEAVY DUTY FRONT BUMPER CHEVY SILVERADO 1500

A B C D E F. Tools Required (supplied by others)

Flow Sensor Deflector Deflector

Sachs shock manual. ( ) 2 & 4 Stroke RR Enduro. ( ) RS Dual Sport

2.88 OD Universal Mast Mount

Fig A ADDICTIVE DESERT DESIGNS. Preparation: Removal:

Atlas PV-9WP Addendum

Transcription:

INSTALLATION GUIDE LIB-CP-MEA-03-01 Rev. 5 Mi c r o Er a s e r Conveyor Belt Cleaning System Patent Pending 1110 Wright Street Marquette, MI 49855 Phone: 1-800-991-2746 Fax: 906-226-9779 www.argonics.com

Mi c r o Er a s e r Conveyor Belt Cleaning System I WARNING I Always obey all applicable safety rules. Be sure all power to the conveyor has been disconnected and controls are locked out. Installation Tools Required - Tape measure - Welder or Drill - Cutting Torch or Hole Saw (3½") - ½" End Wrench - Level - ¾" End Wrench - Scribe or Chalk - ⅝" End Wrench or Crescent Wrench Bolts, lockwashers and nuts for mounting are not supplied Safe Torque Ratchet System - Assembly Breakdown Letter Part Quantity Description A CP-MR- XX -G83 1 RAPTOR BLADE B CP-AR-52B-Y83 2 STANDARD DUST CAP C* CP-AR-98407A140 2 RETAINING RING D* CP-MI-12C-G83 1 MICRO INNER RATCHET CATCH E* CP-AR-32C-G83 1 STANDARD OUTER RATCHET CATCH F CP-AR-30R 2 STANDARD RATCHET MOUNTING SPOOL G* CP-MI-41M 1 MICRO RATCHET SPOOL WASHER H CP-MI-13-RT-B93 2 MICRO INNER SNAP SEAL I CP-AR-LC45-G83 2 MICRO LOCKING COLLAR J CP-MI-12B or 2 STUB END CP-MI-10B 2 EXTENDED STUB END K* CP-MI-63-1475-E-B93 or 1.63" PERMA-TORQUE TENSIONER CP-MI-63-1975-E-B93 1.63" EXTENDED PERMA-TORQUE TENSIONER L CP-MI- XX A 1 MAINFRAME M CP-MI-41M-ST 1 MICRO RAT. SPOOL WASHER (ONLY WITH SINGLE TENSIONER) N CP-AR-275 1 SAFETY SNAP PIN.375" x 2.75" O CP-AR-303 1 SPRING PIN P CP-AR-512540 2 BOLT, 0.5"-13 NC, ZINC PLATED 1.25" LONG Q BOLT-0.38X1.75NC-ZC 2 BOLT, 0.375"-16 NC, ZINC PLATED 1.75" LONG R NUT-0.38-16NC-ZINC 2 NUT,.375"-16 NC, ZINC PLATED T CP-AR-5125S 6 STAINLESS HEX SET SCREW, 0.5" x 1.25" U CP-AR-45305 4 S-HOOKS, SIZE 10, ZINC PLATED V CP-AR-3607t24-12 2 SASH CHAIN, SIZE 8, ZINC PLATED - 12" W WASH-0.38-F-SAE-ZINC 4 WASHER, SAE.375", ZINC PLATED * Systems 36" and above come standard with dual tensioners and require double of each of the noted parts. Page 2

INSTALLATION Note: This Micro Eraser Primary Belt Cleaning System is designed to be used on conveyor pulleys of 16" in diameter and smaller. For a pulley larger than 16" in diameter, we recommend our Eraser for proper cleaning of your conveyor system. Step One: Calculations Measure the distance from the center of your pulley shaft to the outside surface of your conveyor belt. This will be your outside radius ( A on figure 1). Find your outside radius on the dimension table to the left. Add the corresponding X dimension to your outside radius. (Example: 8" Radius + 3" = 11"). This is your Y dimension (Y = 11"). The illustrated Z dimension is a minimum value and provides for the optimum mounting position. Dimension Table - Table 1 Outside Radius X Z 4" - 6½" 3½" 7" 7" & Larger 3" 7" Step Two: Layout From the center of the pulley shaft, scribe an arc (equal to your Y dimension) on the outside of the mounting structure wall. Then measure down from the center of the pulley shaft using the Z dimension, and using a level, scribe a horizontal line across the mounting structure that intersects the arc at Y. Now draw a vertical line approximately 8" long which bisects the horizontal line at the intersection. This bisected point will be the center point of the mounting spool location. If no structure is available at this point, a mounting structure will need to be added. Figure 1 Figure 2 After you have determined the mounting location for your belt cleaning system, align the supplied template (found on page 11 of this guide) with your bisected horizontal and vertical lines on the mounting structure wall and transfer the center hole, bolt holes and perimeter of the template to the chute wall using your scribe. Repeat the layout procedure on the opposite mounting structure. For single tensioner, follow instructions on page 4. For dual tensioner, turn to page 6. Page 3

INSTALLATION - Single Tensioner Step Three (A): Mounting systems equipped with a single tensioner Cut the tensioner hole which was scribed on the mounting structure (your finished hole should be approx. 3½" in diameter). NOTES: For Bolt In Only - Using the bolt circles that you scribed as a guide, drill four 13 16" diameter holes to accept ¾" diameter grade 8 bolts. Single tensioner Micro Eraser systems are shipped with the tensioner on the left side, facing the head pulley. If you need to mount your tensioner on the right side please refer to tensioner assembly instructions on page 9. Remove the urethane locking collars from the stub ends. Remove the mounting spool from the non-tensioner side of the system. Line up the spool with the holes in the chute wall, then bolt it into place using four ¾" grade 8 bolts and lock washers. You can also choose to stitch weld on the flat sides of the mounting spool. Using a ½" end wrench, loosen the three setscrews located on the bottom of each end of the mainframe. Remove the entire tension cartridge from the left side of the mainframe. Lift the mainframe into position. Insert the stub end into the mounting spool on the non-tensioner side. Page 4

INSTALLATION - Single Tensioner Temporarily retighten the three setscrews to hold the mainframe in place. Then carefully lower to let system hang in place. On the other side of the chute, slide the tensioner cartridge through the chute wall and insert it into the mainframe. Temporarily retighten the setscrew on tensioner side to stabilize system. Bolt or stitch weld the mounting spool on the tensioner cartridge to the chute wall. Loosen the setscrews and center the mainframe and blade to the belt. Tighten the setscrews to secure the stub ends. IMPORTANT At the top point of the mounting spool, the inner ratchet catch must always point away from the load pulley. PROCEED TO TENSIONING INSTRUCTIONS ON PAGE 8 Install the urethane locking collars by sliding them over the stub end, snugging them to the chute wall. Tighten the bolts to secure. Page 5

INSTALLATION - Dual Tensioner Step Three (B): Mounting systems equipped with a dual tensioner Cut the tensioner holes which were scribed on the mounting structure (your finished holes should be approx. 3½" in diameter). NOTES: For Bolt In Only - Using the bolt circles that you scribed as a guide, drill four 13 16" diameter holes to accept ¾" diameter grade 8 bolts per mounting spool. Remove the urethane locking collars from the stub ends. Remove both tension cartridges from the mainframe. If there is room, slide the first tensioner cartridge through the chute wall and line up the mounting spool with the template that was transferred to the chute wall. Now bolt or weld into place. Lift the mainframe into position. Slide the mainframe onto the cartridge, then temporarily retighten the three setscrews on the tensioner side to stabilize system. Page 6

INSTALLATION - Dual Tensioner If there is not a lot of room between the chute walls, hold the mainframe in place and slide the tension cartridge into the mainframe. Bolt or weld the mounting spool into position and tighten the setscrews. Slide the second tensioner cartridge through the chute wall and insert into mainframe. Temporarily retighten the setscrew on tensioner side to stabilize system. Bolt or stitch weld the mounting spool on the tensioner cartridge to the chute wall. Loosen the setscrews and center the mainframe and blade to the belt. Tighten the setscrews to secure the stub ends. Install the urethane locking collars by sliding them over the stub end, snugging them to the chute wall. Tighten the bolts to secure. IMPORTANT At the top point of the mounting spool, the inner ratchet catch must always point away from the load pulley. PROCEED TO TENSIONING INSTRUCTIONS ON PAGE 8 Page 7

INSTALLATION - Tensioning Step Four: Tensioning The Micro Eraser system is equipped with our patented internal Perma-Torque tensioner and our Safe Torque ratchet system. The Perma-Torque is an adjustable elastomeric tensioner. The tensioner may be adjusted from a recommended minimum of 20 foot-pounds of force to a maximum of 80 foot-pounds. Exceeding tensioning of 24 clicks or 480 of rotation could damage the tensioner as well as the Safe Torque ratchet system. Nine (9) clicks, or 180 of rotation is recommended for most applications. To tension, first position the alignment notch on the outer ratchet catch with the mounting spool set screw. Grab the blade and rotate to align the ratchet notch. When notch is aligned, tighten the setscrew. (Arrow indicates proper notch position) Use a ⅝" socket wrench on the exposed tensioner hex rod and turn the tensioner up and towards the pulley until the blade makes contact with the belt. Start tensioning by counting the clicks until you have reached the desired rotation. Nine (9) clicks or 180 of rotation is the factory recommended setting. Repeat the same number of clicks on the opposite side for a dual tensioner system. Re-attach the dust cap(s). Tensioning Guide # of clicks Degrees ft-lbs 6 120 20 9 180 * 30 12 240 40 15 300 50 18 360 60 21 420 70 24 480 80 Do Not Overtension *180 is our standard which is recommended for most applications. Releasing Tension When you need to release tension, just loosen the mounting spool set screw. You will see the outer ratchet rotate as the tension is released. Page 8 Installation of your Argonics Micro Eraser belt cleaning system is now complete. Maintenance or re-tensioning should not be required throughout the life of the blade.

INSTALLATION - Left to Right Tensioner Conversion Tensioner Conversion Instructions To mount a single tensioned Micro Eraser system with the tensioner on the right side instead of the left side, you will need to switch the entire tensioning spool to the other side of the mainframe, as well as the direction that the ratchet gears are oriented. It is recommended that you perform this conversion on the ground before the system is mounted. Remove the retainer clip from the hex rod using a flat blade screwdriver. Be sure not to lose the retainer clip. Unscrew the setscrew at the top of the mounting spool and remove both the inner ratchet and outer catch. Make sure you note what direction the gears are pointing. Flip both the inner ratchet and outer catch so the gear teeth are pointed in the opposite direction and slide both back onto the hex rod. Align the outer catch notch to the top of the mounting spool, tighten the set screw and then re-insert the retaining clip to the outer groove of the hex rod. Your Micro Eraser system comes with the tensioner mounted on the left. You will need to switch the entire mounting spool assembly to the right side of the mainframe. IMPORTANT At the top point of the mounting spool, the inner ratchet catch must always point away from your conveyor load pulley. Continue following the installation instructions located on page 4. Page 9

Page 10 NOTES

Mounting Template Transfer the drawing below to cardboard, and use as your mounting spool template. Template is drawn to actual size. Page 11

Other Quality Products From Argonics Page 12 ARGONICS, INC. 1110 Wright St. Marquette, MI 49855 USA Phone: 906-226-9747 1-800-991-2746 Fax: 906-226-9779 Micro Eraser, Raptor, Safe Torque and Perma-Torque are trademarks of ARGONICS, Inc. Marquette, MI. USA www.argonics.com