ERASER HDTM. ACCUFLO Conveyor Belt Cleaning System SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1

Similar documents
ERASERTM. ACCUFLO Conveyor Belt Cleaning System SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1

Mi c r o Er a s e r. Conveyor Belt Cleaning System. INSTALLATION GUIDE LIB-CP-MEA Rev. 5

ERASER SHD. INSTALLATION GUIDE LIB-CP-SHD Rev. 2. Conveyor Belt Cleaning System

ERASER MDP. INSTALLATION GUIDE LIB-CP-MDP Rev. 2. Conveyor Belt Cleaning System

Instruction Sheet Kit Number:

(1) License Plate Light (2) License Plate Plugs

2015 Ford F150 Rear Bumper w/ LED

1996 Isuzu Truck Rodeo (2WD) V6-3165cc 3.2L SOHC (6VD1)

ECO-SERIES REAR BUMPER FORD F150 PART # FD-2962

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Remove four nuts, then the cooling fan assembly.

INSTALLATION INSTRUCTIONS ELEVATION FRONT BUMPER 2018 FORD F150

Martin Compact Cleaner

Martin Food Grade Cleaner and Tensioners

Martin QC1 Cleaner XHD with Metal Tipped Blade

(2) 12mm x 40mm Short Low Profile Bolt Plates. (2) Spacer Washers. (4) 12mm Plastic Retainers. Passenger/Right Front.

Installation Instructions

INSTALLATION INSTRUCTIONS RATTLER STEEL RUNNING BOARDS FORD TRANSIT VAN (FULL SIZE)

Installation Instructions

INSTALLATION INSTRUCTIONS BULL BAR DODGE RAM 1500 PART # B-D1091;B-D2091

INSTALLATION INSTRUCTIONS LD-1 REAR BUMPER RAM 1500 PART#R R #PW017838

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

INSTALLATION INSTRUCTIONS

INFINITY MULTA SERIES

(6) Universal Mounting Brackets (NOTE: same bracket used for left or right side installation) Driver/left Running Board (example only)

ECO-SERIES REAR BUMPER FORD F150 (accommodated factory hitch receiver) PART # FD-2962

Installation Instructions

Timing Belt. Removal 6A 27 ENGINE MECHANICAL (6VD1 3.2L)

920 Remote Control Switches

I-Sheet Number Rev.B 3-1/2 OVAL BULL BAR DODGE RAM 1500

Martin Food Grade Cleaner and Tensioners

PARTS LIST: PROCEDURE:

INSTALLATION INSTRUCTIONS

TIP-OUT GLASS WINDSHIELD KIT

Installation Instructions

Installation Instructions For Part Number: Scoop and Snorkel Kit

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1

62 Deck Idler Kit High Speed

Driver Side Support Bracket pictured in "no-tow hook" direction. Reverse direction for tow hook equipped vehicles

MARTIN TWIST Tensioner

INSTALLATION INSTRUCTIONS

Martin Twist Tensioner

HD BULL NOSE FRONT BUMPER FORD SUPERDUTY F PARTS LIST:

Detroit Speed, Inc. Mini Tubs Camaro/Firebird P/N:

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Detroit Speed, Inc. 4-Point Roll Cage Camaro/Firebird P/N:

INSTALLATION INSTRUCTION 88148

TOYOTA RAV RUNNING BOARD

Martin Twist Tensioner

MARTIN DURT TRACKER RSV Belt Cleaner

M-5230-V6 Mustang V6 Dual Exhaust Kit INSTRUCTION SHEET

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS ELEVATION FRONT BUMPER DODGE RAM

INSTALLATION INSTRUCTIONS

Ford F-150 Billet Grilles Upper Replacement

Installation Instructions

PARTS LIST: ELEVATION BULL NOSE FRONT BUMPER FORD SUPERDUTY F

Bulletin 1494V Variable Depth, Flange Operated Disconnect Switch Kits for 400 and 600 Amperes (Series A) Switches

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTION BULL BAR DODGE RAM 1500 PART NUMBER

INSTRUCTIONS INSTRUCCIONES CONSIGNES

INSTALLATION INSTRUCTIONS

B. B. 4. Remove the bed bolts A.) Using a 1/2 socket, remove the four inner bed bolts. B.) Using a T-25 Torx driver, remove the four outer bed bolts

INSTALLATION INSTRUCTIONS

Wood Grain Warrior Line Incognito hidden winch bumper installation instructions Lexus GX470

INSTALLATION INSTRUCTIONS FRONT RUNNER GRILLE GUARD 2015 TRANSIT VAN (FULL SIZE)

INSTALLATION INSTRUCTIONS

PRELIMINARY INSTALLATION INSTRUCTIONS. PARTS LIST Left front trim piece

Universal Mounting Kit #0820

Belt Cleaning System Size Information

Electric Power Steering Installation in the Pantera. by Gerry Romack & Alan Cameron

Top Down Rollstar Shade Installation Instructions

INSTALLATION INSTRUCTIONS

Ref Qty Part Description Part Number -1- Kit ( ) Contents:

INSTALLATION INSTRUCTIONS

Passenger/Right. Driver/Left. Driver/Left Side Frame. Mounting Bracket. (2) 12mm Double Nut Plates (models without tow hooks)

INSTALLATION INSTRUCTIONS

M-5230-V6 Mustang V6 Dual Exhaust Kit INSTRUCTION SHEET

INSTALLATION INSTRUCTIONS

Owner smanual. Banks Split Dual Monster Exhaust System Quad-Tip Dodge 6.7L Cummins ISB Pickup Trucks Including Mega Cab

MARTIN Chevron Belt Cleaners

INSTALLATION INSTRUCTIONS GRILLE GUARD SILVERADO 1500 PART #

Installation Instructions

Right Bar Light L Bracket Left Bar Light L Bracket. License Plate Bracket

INSTALLATION and MAINTENANCE INSTRUCTIONS SHO SERIES ELECTRIC CABLE REELS

Service Bulletin No. 2994

INSTALLATION INSTRUCTIONS C-DMM FORD INTERCEPTOR UTILITY SWING-OUT DASH MONITOR MOUNT

TOYOTA 4-RUNNER KIT 5 KIT

THY-355Y OLDSMOBILE GMC CLASS A MOTORHOME, FRONT WHEEL DRIVE (NO REVCON) PARTS INCLUDED TOOLS REQUIRED HARDWARE INCLUDED WARRANTY NOTES

STOP---READ THIS FIRST!

Agri-Fab OWNER'S MANUAL. Model No POINT HITCH TRAILER.

Installation Instructions

The Quality Truck Accessory Реор/е PLEASE INSPECT YOUR PRODUCT FOR DAMAGE BEFORE PROCEEDING ТО INSTALLATION.

RZR WINCH KIT KIT P/N

INSTALLATION INSTRUCTIONS HEAVY DUTY FRONT BUMPER 2015 FORD F150

Transcription:

ERASER HDTM TM ACCUFLO Conveyor Belt Cleaning System Page 1

ERASER HDTM Conveyor Belt Cleaning System ERASER HD TM System Nomenclature CATEGORY MAINFRAME INFORMATION BLADE INFORMATION CP=CONVEYOR PRODUCTS CP - ET 5A / 34 X - G 83 ERASER TRACKER ASSEMBLY BLADE QUANTITY & SIZE A = 6" (Ex: 2A1C) B = 12" C = 18" MAINFRAME LENGTH IN INCHES (Actual Length) Must be minimum 4" longer than total blade length. ASSEMBLY INFORMATION M = Enameled Coated Mild Steel Frame and Mounting Spools, 304 Stainless Steel Stub Ends, One (1) Perma Torque Tensioner and zinc plated steel hardware. D = Enameled Coated Mild Steel Frame and Mounting Spools, 304 Stainless Steel Stub Ends, Two (2) Perma Torque Tensioners and zinc plated steel hardware. See Page 24 for a complete listing of all Systems available. BLADE MATERIAL CODE 83=83A ESTER 90=90A ETHER 93=93A ESTER 80=80A ETHER 58=58A ETHER BLADE MATERIAL COLOR G=GREEN R=RED B=BLACK FM=FLAME RETARDANT MAROON FF=FLAME RETARDANT FOREST GREEN Stainless Systems are available in three (3) Levels which differentiate from the Standard System. Nomenclature Letter Code C, N, T, W Level 1-304 Stainless Steel Mainframe only. B, L, Y, S Level 2-304 Stainless Steel Mainframe, Locking Collars and Spools only. E, F, H, G Level 3 - Complete 304 Stainless Steel System. This includes a 304 Stainless Steel Blade Insert, Tensioner Insert and all Hardware except the Tension Pin and Safety Snap Pin. For 316 Stainless Steel Systems are available. You must add an "R" suffix to the Assembly Information Code. Example: A CP-ET5A/34B-G83, would become a CP-ET5A/34BR-G83. Notes: All Systems are sold and specified in actual required lengths. All Systems 46" and above are provided with two (2) Perma-Torque Tensioners unless otherwise specified. Systems are available to 120" in length. Blade layout is stated in the Part Description line, example: 3A1C3A. Please see the Detailed System Assembly List on Page 24 for a complete listing of all Systems available. Page 2

ERASER HDTM Detailed System Assembly List Conveyor Belt Cleaning System M = Painted Steel Mainframe & Mounting Spools, 304 Stainless Steel Stub Ends; One (1) 93A Black Tensioner (CP-AR-1250E) and Zinc Plated Steel hardware. D = Painted Steel Mainframe & Mounting Spools, 304 Stainless Steel Stub Ends; Two (2) 93A Black Tensioners (CP-AR-1250E) and Zinc Plated Steel hardware. B = 304 Stainless Steel Mainframe, Mounting Spools & Stub Ends; One (1) 93A Black Tensioner (CP-AR-1250E) and Zinc Plated Steel hardware. L = 304 Stainless Steel Mainframe, Mounting Spools & Stub Ends; Two (2) 93A Black Tensioners (CP-AR-1250E) and Zinc Plated Steel hardware. X = Painted Steel Mainframe & Mounting Spools, 304 Stainless Steel Extended Stub Ends; One (1) 93A Black Extended Tensioner (CP-AR-1950- E) and Zinc Plated Steel hardware. Z = Painted Steel Mainframe & Mounting Spools, 304 Stainless Steel Extended Stub Ends; Two (2) 93A Black Extended Tensioners (CP-AR-1950- E) and Zinc Plated Steel hardware. Y = 304 Stainless Steel Mainframe & Mounting Spools & Extended Stub Ends; One (1) 93A Black Extended Tensioner (CP-AR-1950-E) and Zinc Plated Steel hardware. S = 304 Stainless Steel Mainframe, Mounting Spools & Extended Stub Ends; Two (2) 93A Black Extended Tensioners (CP-AR-1950-E) and Zinc Plated Steel hardware. C = 304 Stainless Steel Mainframe & Stub Ends, Painted Steel Mounting Spools; One (1) 93A Black Tensioner (CP-AR-1250E) and Zinc Plated Steel hardware. N = 304 Stainless Steel Mainframe & Stub Ends, Painted Steel Mounting Spools; Two (2) 93A Black Tensioners (CP-AR-1250E) and Zinc Plated Steel hardware. T = 304 Stainless Steel Mainframe & Extended Stub Ends; Painted Steel Mounting Spools; One (1) 93A Black Extended Tensioner (CP-AR-1950-E) and Zinc Plated Steel hardware. W = 304 Stainless Steel Mainframe & Extended Stub Ends; Painted Steel Mounting Spools; Two (2) 93A Black Extended Tensioners (CP-AR-1950- E) and Zinc Plated Steel hardware. E = 304 Stainless Steel Mainframe, Mounting Spools & Stub Ends; One (1) 93A Black Tensioner (CP-AR-1250E). System includes Stainless Steel Insert in the Blade. All hardware is Stainless Steel with the exception of the Tensioner Pin and Safety Snap Pin. F = 304 Stainless Steel Mainframe, Mounting Spools & Stub Ends; Two (2) 93A Black Tensioners (CP-AR-1250E). System includes Stainless Steel Insert in the Blade. All hardware is Stainless Steel with the exception of the Tensioner Pin and Safety Snap Pin. H = 304 Stainless Steel Mainframe, Mounting Spools & Extended Stub Ends; One (1) 93A Black Extended Tensioner (CP-AR-1950-E). System includes Stainless Steel Insert in the Blade. All hardware is Stainless Steel with the exception of the Tensioner Pin and Safety Snap Pin. G = 304 Stainless Steel Mainframe, Mounting Spools & Extended Stub Ends; Two (2) 93A Black Extended Tensioners (CP-AR-1950-E). System includes Stainless Steel Insert in the Blade. All hardware is Stainless Steel with the exception of the Tensioner Pin and Safety Snap Pin. Page 3

ERASER HD TM Sizing Chart Conveyor Belt Cleaning System Note: Part Number A B Min. B Max. C Min. C Max. CP-ET2A/16M-G83 12.00 25.00 34.00 4.50 9.00 CP-ET3A/22M-G83 18.00 22.50 40.00 0.25 " CP-ET4A/28M-G83 24.00 28.50 46.00 " " CP-ET5A/34M-G83 30.00 34.50 52.00 " " CP-ET6A/40M-G83 36.00 40.50 58.00 " " CP-ET7A/46D-G83 42.00 46.50 64.00 " " CP-ET8A/52D-G83 48.00 52.50 70.00 " " CP-ET9A/58D-G83 54.00 58.50 76.00 " " CP-ET10A/64D-G83 60.00 64.50 82.00 " " CP-ET11A/70D-G83 66.00 70.50 88.00 " " CP-ET12A/76D-G83 72.00 76.50 94.00 " " CP-ET13A/82D-G83 78.00 82.50 100.00 " " CP-ET14A/88D-G83 84.00 88.50 106.00 " " CP-ET15A/94D-G83 90.00 94.50 112.00 " " CP-ET16A/100D-G83 96.00 100.50 118.00 " " To get minimum B or C, Shaft Collars must be removed. Extended Tensioner adds 14" to B max. or 7" to C max. Page 4

ERASER HDTM Installation Guide Page 5

WARNING Always obey all applicable safety rules. Be sure all power to the conveyor has been disconnected and controls are locked out. Installation Tools Required - Tape measure - Welder or Drill - Cutting Torch or Hole Saw (3½") - ½" End Wrench - Level - 1¼" End Wrench or Crescent Wrench - Scribe or Chalk ASSEMBLY BREAKDOWN Page 6 Letter Part Number Qty. Description A CP-MHD-xx-G83 varies Heavy Duty Blades B CP-AR-66D 2 Mounting Spool C CP-AR-231C 2 Set Collar D CP-AR-12B or 2 Stub End CP-AR-22B 2 Extended Stub End E CP-ET-"xx"A 1 Mainframe F CP-AR-1250E 1* Perma-Torque Tensioner or CP-AR-1950E 1* Perma-Torque Extended Tensioner G CP-AR-35F 1* Retainer Washer H CP-AR-4125 1* Self-Locking Twist Pin I CP-AR-5006 1* Tension Pin J CP-AR-5125 2 Square Head Set Screw 2" x 14" K CP-AR-153 2 Retainer Clip L CP-AR-5150 4 Square Head Set Screw 2" x 12" M CP-AR-5075 4 Square Head Set Screw 2" x w" * Systems 46" and above are provided with dual tensioners and require two(2) of each of the noted parts.

Dimension Table Outside Radius X Z 4" - 6" 7w" 11" 7" - 9" 62" 11" 10" - 12" 5" 11" 13" - 15" 42" 11" 16" - 19" 32" 11" 20" - 22" 3" 11" 23" and Larger 2w" 11" Step Two: Layout From the center of the pulley shaft, scribe an arc (equal to your "Y" dimension) on the outside of the mounting structure wall. Then measure down from the center of the pulley shaft using the "Z" dimension, and using a level, scribe a horizontal line across the mounting structure that intersects the arc at "Y". Using a level and scribe, draw a vertical line approximately 8" long which bisects the horizontal line at the intersection. This bisected point will be the center point for the mounting spool location. If no structure is available at this point, metal will need to be added. Step One: Calculations Measure the distance from the center of your pulley shaft to the outside surface of your conveyor belt. This will be your Outside Radius ("A" on the illustration below). Find your Outside Radius on the Dimension Table to the left. Add the corresponding "X" dimension to your Outside Radius. (Example: 14" Radius + 412" = 182"). This is your "Y" dimension (Y = 1812"). The illustrated "Z" dimension is a minimum value and provides for the optimum mounting position. V-Grooves The Eraser HD System comes fully assembled. Remove the mounting spools from the system. The mounting spools are designed to be welded or bolted into position. Using a mounting spool as a template, line up the centering V-grooves machined into the flange of the mounting spool with the bisected horizontal and vertical lines on the mounting structure wall. Trace the inside diameter of the spool and the entire perimeter of the square flange to the mounting structure wall. Also, transfer the bolt hole pattern if you intend to bolt the system into place rather than weld. Repeat this Step Two process for the other side of the mounting structure. Page 7

Step Three: Mounting Cut the center hole with approximately a s" larger radius than the trace which was scribed on each side of the mounting structures (your hole should be approx. 32î in diameter). NOTE: For Bolt In Only - Using the traces that you scribed for the mounting holes, drill four m" diameter holes to accept w" diameter grade 8 bolts. Place the mounting spool onto the side of the mounting structure wall. Use the scribed perimeter lines to line up the spool and then weld or bolt it into place. If welding, four stitch welds is sufficient on the flats of the mounting spool. Using a 2" end wrench, loosen the (3) square head set screws at each end of the mainframe. Remove the stub end pipes (and tensioner assembly) from the mainframe. Loosen the locking collar set screw and collapse unit as fully as possible. Lift the mainframe into position. Telescope the stub ends and slide tensioner assembly through the holes in the mounting structure. Temporarily install tension pin through mounting spool. Center the blade with the belt and snug the mainframe set screws to secure the stub ends. Snug locking collars to inside wall and cinch the set screw. Check for free rotation, minimal lateral movement of the assembly shaft, and consistent contact of the blade to the belt. Adjust if necessary, realign, and tighten all mainframe set screws. WARNING When tensioning be sure to keep body clear of the tensioner path. Step Four: Tensioning The ERASER HD System is provided with our exclusive internal Perma-Torque Tensioner. The Perma-Torque is an adjustable elastomeric tensioner. The tensioner may be adjusted from a recommended minimum of 25 foot pounds of force to a maximum 80 foot pounds. Exceeding tensioning of 14 holes or 504 will damage the tensioner. Five holes or 180 is our standard, which is recommended for most applications. To tension, first remove the tensioning pin, then use a 14" end wrench on the exposed hex bar and turn the tensioner towards the pulley. When you have reached the desired rating, replace the tensioning pin. The s" diameter hole in the hex bar will be in line with the holes in the mounting spool and the hole in the tensioner. This helps to align the tensioning pin. You may optionally choose to use a crescent wrench, pipe wrench, large screwdriver or pry bar in place of the 14" end wrench. Tensioning Guide No. of holes Degrees Foot Pounds 3 108 25 *5 180 30 6 216 40 8 288 45 10 360 52 12 432 60 14 504 80 Do Not Overtension * 180 is our standard which is recommended for most applications. Installation is now complete. Maintenance or retensioning should not be required throughout the life of the blade. Page 8