Fremdeles muligheter?

Similar documents
Norskehavet og nordover selfie med Statoil Siri Espedal Kindem, Områdedirektør Drift Nord Statoil ASA

Hva er utsiktene for flytende vindturbiner til havs? Klimafrokost, Bergen 15/ Simen Moxnes, Statoil. Statoil ASA

AFE Navigator - The Statoil Experience Esmeralda Wollam - Principal Analyst US Offshore Land Whitney Kuhlman Analyst US Onshore Land

How O&G know-how can leverage the geothermal industry

What is being done about CUI in Statoil

German Business Delegation and Bærum Smart City

The November Conference

Floating Foundations: Opening Up Deeper Waters In the U.S.

Basis for pricing of Gas From the seller s perspective. Statoil ASA

Remote operation of Valemon

MultiKon - Concept for monitoring and control of multiple unmanned offshore facilities

Wireless noise surveillance - test of new technology for dynamic noise maps

NORSOK analyse prosjekt

Hywind roadmap, R&T and operations. Arne Eik, Gudmund Olsen and Nenad Keseric UIB 29 January 2018

E&P in Brief. A Wintershall Fact Sheet. Wintershall substantially expands production and reserves in Norway

Can the O&G Industry Leverage Geothermal Energy Production?

Doing business with Petrobras - Procurement Strategies and Local Content. Policy.

Peter Lundberg, ABB HVDC, Nov 2016 HVDC Light - Power from shore. ABB Group November 16, 2016 Slide 1 1JNL A

Norvalves subsea equipment. Product range and project references

Promoting Norwegian oil and gas capabilities in international markets

Decommissioning & Re-use in NL: A Joint Effort

Welcome and Introduction June 2007

DOING BUSINESS WITH PETROBRAS: PROCUREMENT STRATEGIES

Miljøvennlige fartøysoperasjoner innen forsyningsskip erfaringer i Statoil

Avaldsnes Discovery - a New Giant in Norway

BJC Heavy Industries PCL Opportunity Day 13 March 2017 NEW FORCE IN HEAVY INDUSTRIES

The Regional Municipality of York. Purchase of Six Battery Electric Buses

CO 2 storage offshore Norway, experience and business case

Chief Operating Officer. Nigel Bell, Energy Resource Manager

Pão de Açúcar A sweet high-impact discovery! Pão de Açúcar = The Sugar Loaf Mountain

Suppliers Qualification & Register

AUDI SUSTAINABILITY PROGRAM

Brazil 1. vision of oil ang gas industry in key challenges. Armando Cavanha cavanha.com

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011

Biogas Hybrid Buses in Bergen

Brazil Market Increasing Opportunities for U.S. Suppliers of Oil & Gas Equipment and Services

Kongsberg Digital Maritime Simulation

PPSA s roles and activities in the Brazilian pre-salt

Semek supplies specially designed, molded plastic products in polyurethane.

Enova's support to charging infrastructure in Norway

Request for Assistance (RFA)

2 ND QUARTER 2016 INVESTOR PRESENTATION 26 AUGUST Geir Håøy, President and CEO Hans-Jørgen Wibstad, CFO

Company Presentation 2018 Pareto Oil & Offshore Conference

Energy perspectives and new energy solutions

SEAMETRIC INTERNATIONAL AS

Investor presentation

PRINTING OF BMI WHEELS

Electric minibuses. Three new minibuses for Brive, France. Supply contract for 3 electric minibuses. Awarded: February 2016

Efficient lighting. Savings:

Power Cables between Offshore Oil Platforms Viggo Bunæs page 130

Request for Qualifications. for

Statoil. Lessons from a Study of Political Entrepreneurship. Dubai 12 March 2007

Institutional Presentation

SPP TENDER MODEL. Electric buses. 20 Electric buses for Stolichen Avtotransport

Institutional Presentation

Review and Procurement of Replacement Road Traffic Collision Rescue Tools (Ultra Heavy)

CO2 Storage in Norway. Philip Ringrose, Statoil ASA & NTNU, Trondheim, Norway Classification: Open Statoil ASA

ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM

Electric Vehicle Initiative (EVI) What it does & where it is going

Focus on Brazil. Frederic Delormel, Senior Vice President, Brazil March 30, 2010

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation

ABB s supplier qualification process: Achilles and Power &Tech Frequently Asked Questions (FAQs)

PROJECT RESOLUTE. Canadian Coast Guard Icebreaker Support Program Government of Canada solicitation number: F /A

Capital Markets Day 2007 Kongsberg Maritime 25 September 20O7

Strategy for Promoting Centers of Excellence (CoE) Activities

ABB in Norway. The pioneering technology leader

Veli-Matti Reinikkala, Head of Process Automation Hammerfest press trip 2012 Strategy Oil & Gas opportunity

Challenges and Opportunities in the Canada Newfoundland and Labrador Offshore Oil Industry

Offshore Floating Production Unit (FPU): Valves

Supplier Performance Management Implementing a process to select a single supplier and manage it based on actual performance

PROCUREMENT POLICY AND CRITICAL EQUIPMENT SUPPLY. July /

Proposal from shareholders and response from the board of directors

Muni Forward: Get On Board! Siemens S200 SF Light Rail Vehicle

The Bergen region is at the forefront of developing smart transport solutions

Capital Markets Day. President & CEO, Eivind Reiten Norsk Hydro ASA Oslo, January 8, 2002

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING THE ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

ABB Group June 17, 2012 Slide 1

Focus on value creation

Workshop on International Good Practices of Sustainable Energy Technologies. Beirut Energy Forum 9-11 Sep 2015

CHEMICALS AND REFINING. ABB in chemicals and refining A proven approach for transforming your challenges into opportunities

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

KONGSBERG Maritime AGENDA 07/11/2012. Geir Håøy - President Kongsberg Maritime. Introduction to Kongsberg Maritime. Our markets.

SUPPLIER SIZE - ANNUAL REVENUE PACK Q PRODUCTS & SERVICES ANNUAL FEE. Foreign supplier Unlimited US$ 2.700

SPP TENDER MODEL. Transport. Purchase of Environmentally friendly vehicles The Capital Region of Denmark

LIST OF OPEN TRAINING TRAINING PLANNER 2016/2017 Course location: Lagos, Abuja, Port Harcourt.

L27/38 GenSets Ordered for TML Heavy Transport Vessels

ABB in primary aluminium From mine to market

14 Fields in production

Presentation on the acquisition of Torqeedo GmbH: On our way to becoming market leader for innovative drive systems

DONGFENG MOTOR Co., Limited MID-TERM BUSINESS PLAN

Capital Markets Day Hydro Oil & Energy. Executive Vice President Tore Torvund Norsk Hydro ASA Oslo, January 8, 2002

Doing Business with ConocoPhillips

DIRECT DRIVEN FIRE WATER PUMP WITH ANGLE GEAR

Integrated Drive Systems by Siemens

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

eng_fakta_2005_kap5_ :16 Side 48 6Gas Management System

Kvaerner Structural Solutions Project Reference List Major Projects

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Targeted Group Business and Veteran- Owned Small Business Programs

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

Transcription:

Fremdeles muligheter? - oppsummering av Statoils leverandørdager 2017 Christian Opheim 7 november 2017 Telemark Offshore konferansen 9.11.2017 1 Classification: Open Statoil ASA 2012-10-24

Lifting weights all summer! Aasta Hansteen Njord Cat J Oseberg Vestflanken Hywind Johan Sverdrup Mariner 2 Classification: Open 7 november 2017 Statoil ASA

Safety Integrated in everything I do applicable to all I AM SAFETY I always put safety and security first and understand my risks. Safety and security is what I do every day. I am a role model for safety and security. I am accountable, visible and engaged! 3 Classification: Open 7 november 2017 Statoil ASA

USD-17/bbl Increasing value through sustainable improvements Development break-even major project decisions 2015-17 1) 80 60 40 35 30 25 20 15 10 5 0 Development CAPEX, recoverable resources and NPV 1) -43% Category CAPEX 1 Category 2 2000 1800 1600 1400 1200 1000 800 600 400 200 +12 % 0 Category Category Recoverable 1 resources 2 30 25 20 15 10 5 0 +12 % Category NPV 1 Category a.t. 2) 2 40 Average break-even price project portfolio 3) Average break-even price next generation portfolio 4) 20 0 2013 70 USD/bbl CMU 2016 41 USD/bbl Current 27 USD/bbl Current CMU 2016 2013 1) Johan Castberg, Johan Sverdrup phase 1, Johan Sverdrup phase 2, Oseberg Vestflanken, Peregrino Phase II, Snorre Expansion, Utgard and Trestakk. CAPEX and KPIs from 1Q2013 used with exception of newer projects. 2) Oil and gas price assumptions reduced by 20-30% in same period 4 Classification: 3) Statoil Open operated projects, 7 planned november for sanction 2017within 2022. Statoil Volume ASA weighted. 4) Statoil- and partner-operated projects, sanctioned since 2015 or planned for sanction, with start-up by 2022. Volume weighted.

5 Classification: Open 7 november 2017 Statoil ASA

World class project portfolio and exploration plan Statoil projects sanctioned in 2016/17 Project opportunities Long term opportunities Oseberg Vestflanken II Peregrino II Johan Sverdrup Future Johan Castberg Barents Subsea tie-backs Bay du Nord Brazil Tanzania Renewables 2017 Exploration Drilling Plan Byrding Utgard Snorre Expansion Askeladd Njord Future & Bauge Trestakk Troll Future Krafla/Askja 6 Classification: Open 7 november 2017 Statoil ASA

Oil and gas industry Adjusting to new realities 100 90 80 70 60 50 40 30 Mobile rigs no. Cost (IHS) O&G investments Oil price 20 10 0 2014 2015 2016 2017 7 Classification: Open 7 november 2017 Statoil ASA

Competition and collaboration In very challenging markets 8 Classification: Open 7 november 2017 Statoil ASA

Suppliers critical to NCS value creation Norwegian suppliers have improved competitiveness Internal vs. supplier expenditures Statoil procurement 2016, NOK billions Norwegian supplier spend 2016 NOK 151 Billion Procurement International Procurement Norway 9 Classification: Open 7 november 2017 Statoil ASA

How we work Steps in the procurement process Corporate strategy Category strategy Long term strategy Demand management Invitation to tender Contract-specific strategy Request and contract documents Bid evaluation Supplier performance Negotiations Contract administration Dialogue and clarifications with supplier Clarifications Change orders Contract awards Evaluation of options Market screening Market knowledge Pre-qualification Experience transfer Familiarization meetings Classification: Open Evaluation and Award Estimate & benchmarking Requirements and guaranties Project experience transfer Lessons learned Supplier list 10 Supplier follow-up Specific strategy incl. pre-qualification 7 november 2017 Statoil ASA

How to become a supplier Supplier Portal www.statoil.com 10 Statoil supplier days in 2017 Hammerfest Harstad Sandnessjøen Kristiansund Stjørdal Bergen Florø Stavanger Oslo Kristiansand 11 Classification: Open 7 november 2017 Statoil ASA

Prequalification Valid and representative entry in the Achilles Joint Qualification System Implemented Quality Management System and status Implemented HSE-system and status Financial capacity depending scope and risk Alternatives to Achilles: Sellihca Qualification - Sellihca First Point Assessment Ltd (UK & Nederland) Bygg- og anleggsaktiviteter i Norge: StartBANK Utility Vendor Data Base (UK) 12 Classification: Open 7 november 2017 Statoil ASA

Alternatives when new scope is identified Scope identified and not covered in existing agreements, or we want to challenge the market o Direct PO (Purchase Order) o RFI (Request For Information) o RFQ (Request For Quotation) o ITT (Invitation To Tender) The different alternatives are mainly based upon volume, numbers of transactions during a year, type of service and risk List of potential suppliers are based upon knowledge, networks and official registration system 13 Classification: Open 7 november 2017 Statoil ASA

From project to procurement Award date Johan Castberg 2017 2018 Q3 Q4 Q1 Q2 Q3 Q4 Hull & LQ EPC Turret SPS Flexible risers Umbilical Topside and Integration Marine Installation H1 2019 H2 Snorre exp. Flexible risers SPS Umbilical Marine Installation Askeladd Subsea Umbilical Marine operations Troll Future Topside modifications Subsea & Marine Transport & Installation Johan Sverdrup 2 Power from shore, power cable RP modification P2 jacket P2 topside Transport & Installation Subsea and Marine 14 Classification: Open 7 november 2017 Statoil ASA

Selected upcoming procurements Strategy and pre-qualification phase Invitation to Tender submitted to market Evaluation and negotiation ongoing Awarded Rig Visund Nord IOR Maintenance and services pump (Award Q4-17) Global advertising, design, media services (Award Q4-17) Drilling & Well services & equipment NCS (Award Q1-18) Rig to Snorre Exp. (Award Q4-17) Rig Aasta Hansteen Electro materials (Award Q4-17) Maintenance of valves (Award Q4-17) Valves <4" (Award Q4-17) PSV Vessels for NCS LWI 2020 (Award Q2-18) IMR Vessel (Award Q1-18) Rig Brazil 15 Classification: Open 7 november 2017 Statoil ASA

S tatoil s digital roadmap 1. Digital safety, security & sustainability 6. Process digitalisation & insight 2. Subsurface analytics Statoil data platform 5. Data driven operations 3. Next generation well delivery 4. Field of the future 16 Classification: Open 7 november 2017 Statoil ASA

Fremdeles muligheter? Christian Opheim chop@statoil.com www.statoil.com Statoil ASA This presentation, including the contents and arrangement of the contents of each individual page or the collection of the pages, are owned by Statoil. Copyright to all material including, but not limited to, written material, photographs, drawings, images, tables and data remains the property of Statoil. All rights reserved. Any other kind of use, reproduction, translation, adaption, arrangement, any other alteration, distribution or storage of this presentation, in whole or in part, without the prior written permission of Statoil is prohibited. The information contained in this presentation may not be accurate, up to date or applicable to the circumstances of any particular case, despite our efforts. Statoil cannot accept any liability for any inaccuracies or omissions.