Kvaerner Structural Solutions Project Reference List Major Projects

Similar documents
Company interests in fields and production licences

Oil and gas fields in norway Industrial Heritage plan

12 Fields in production

kentintrol Koso Kent Introl Offshore installations

Avaldsnes Discovery - a New Giant in Norway

14 Fields in production

eng_fakta_2005_kap :26 Side 66 10Fields in production

Fields in production FACTS

Fields in production. The Valhall field in the southern North Sea. (Photo: Kjetil Alsvik, BP) FACTS

Oil and gas fields in norway Industrial Heritage plan

12 Licensing rounds. 1st-4th licensing rounds. 5th-10th licensing rounds. 11th-16th licensing rounds. Barents Sea project

Norvalves subsea equipment. Product range and project references

Building a competent NOC StatoilHydro s case study

Capital Markets Day Hydro Oil & Energy. Executive Vice President Tore Torvund Norsk Hydro ASA Oslo, January 8, 2002

DIRECT DRIVEN FIRE WATER PUMP WITH ANGLE GEAR

WHO WE ARE. Project & customer focus:

Pareto Oil & Offshore Conference September, 2012

Power Cables between Offshore Oil Platforms Viggo Bunæs page 130

E&P in Brief. A Wintershall Fact Sheet. Wintershall substantially expands production and reserves in Norway

ABB Group June 17, 2012 Slide 1

WHO WE ARE. Project & customer focus:

Semek supplies specially designed, molded plastic products in polyurethane.

for Produced Water Treatment Applications June 2014 Business Centre High Speed Separators

Fremdeles muligheter?

Floating Production What s New In April

Peter Lundberg, ABB HVDC, Nov 2016 HVDC Light - Power from shore. ABB Group November 16, 2016 Slide 1 1JNL A

The ChemicalPLT Interventionless Monitoring

CONFIDENCE DYNA-MAC HOLDINGS LTD.

Power From Shore: An introduction to HVDC Light Offshore

The Matterhorn project Presentation at the Marine Technology Society Luncheon April 22, Émetteur

Egil Birkemoe, ABB Integrated Operations. ABB Group September 24, 2009 Slide 1

Norskehavet og nordover selfie med Statoil Siri Espedal Kindem, Områdedirektør Drift Nord Statoil ASA

Hans Kvarme Nexans Norway AS. Offshore vindkraft Oslo, 14. desember 2010

The Pure Play Tender Drilling Contractor Simplified Overview

12/08/2015. Introduction to Subsea Production Systems. Template and manifold. 05 Templates and Manifolds OIL & GAS. DNV GL 2013 August 2015

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment. REV 1c

Haakon Larsen AS. General CompanyPresentation

QUARTERLY OFFSHORE HYDROCARBON RELEASE REPORT 2017 QUARTER 4

Part of EUREKA PROCESS PUMPS. Keep going. Keep safe.

Super Watt Wave Catcher Barge

RWE Energy Gwynt y Môr Offshore Wind Farm Europe United Kingdom Pile Grouting

Duraplate 301 Onshore/Offshore Track Record

Brage Case Study. Planning for the Future Alv Bjørn Solheim Technical Director and Deputy Managing Director

Cranes & Hoists Oil and Gas Industry. Design Manufacture Install

Statoil ASA (STL) - Oil & Gas - Deals and Alliances Profile

Remote operation of Valemon

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

Offshore Floating Production Unit (FPU): Valves

La Yesca hydroelectric power plant, Mexico

Job Report. Moving Oil Rig Baronia at Ulsan, Korea. Facts Weight: t Moving distance: 120 m. Handling equipment Strand jack F-1000:

Den norske stats oljeselskap a.s - Statoil - was founded as a wholly state-owned limited company by a unanimous vote of the Storting (parliament) on

Company Information Products. How to contact us. Global reach

Variable speed control of compressors. ABB drives control the compressors of the world s longest gas export pipeline

Focus on Onshore/Offshore Opportunities in Latin America

MCL Unitex Ltd Project References

KCC 6.8 HMD 3.9. National Pension 9.1. Hyundai Motors 2.9. HHI Holdings Asan Foundation 3.0. Treasury Stock 0.1. Others 46.5

Dura-Plate 301. Onshore/Offshore Track Record

Introduction to NSW Norwegian German Offshore-Wind Conference. Bergen, Norway 03 May 2010

Hywind Scotland status and plans

REFERENCE LIST. HVDC Light The original VSC technology

Financial Presentation First Nine Months 2014

August Equipment A HEEREMA COMPANY

Jackup Strategy Richard Roper Sr. Director Capital Projects. April 11, 2012

West Phoenix. Further information: Tel: seadrill.com GENERAL. WELL CONTROL Cameron /4-15K. Moss CS50 MkII-DP.

TetraSpar. Industrialized Floating Foundation

Selected References and Typical Case Histories

LIST OF DISTINCTIVE DISPLAYS MODELING PROJECTS

REDEFINING WELL COMPLETION TECHNOLOGIES

MATURE AREAS. Working Group 1 (WOC1) WHAT IS A MATURE AREA? CONNECTION TO A WELL ESTABLISHED MARKET. SIGNIFICANT PRODUCTION RATE (more than 4 Bcf/d)

Gate Valve Drilling & Hot Tap Case Histories

CANDIDATE BRIEF FOR THE POSITION OF ENVIRONMENT, HEALTH AND SAFETY ENGINEER THEDDLETHORPE GAS TERMINAL CONOCOPHILLIPS U.K. LTD

Appendix H: Construction Impacts H-3 Air Quality

Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection

ConocoPhillips. Bespoke Tension Deck for Judy P-20

EMERSON Process Management/ Marine Tank Management Area Sales Manager John Christensen

Company Presentation 2018 Pareto Oil & Offshore Conference

,p1,

HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE

Everett E Henderson Jr R.G. LeTourneau Scorpion Drilling Rig

Goodwin - The International Company. The Goodwin range of Axial Check Valves:

Past, Ongoing and Future Projects PIPE-IN-PIPE. Number of Welding Stations Pipelines welded. Date. Project Country

sg..com PMC Praj Marine Consultants Pte Ltd Singapore

Increasing Tubular Life & Performance.

Pipex px PROTECTION SYSTEMS Pipex px Subsea Cable Protection Systems

Cover graphic should fill and not exceed the defined grey box. Cameron Sense AS. Clement Feng General Manager. Cameron Sense (China) Co. Ltd.

- Shipbuilding Division - Offshore & Engineering and Industrial Plant Division - Engine & Machinery Division

Europe Offshore Wind Supply Chain: Responding to Growth

QUARTERLY OFFSHORE HYDROCARBON RELEASE REPORT 2016 QUARTER 4

HVDC POWER FROM SHORE. B. WESTMAN* K. ERIKSSON* G. PERSSON* A. MÆLAND** ABB Sweden*, Norway**

Africa: just how big will it be?

UNECE Ad Hoc Group of Experts on Harmonization of Fossil Energy and Mineral Resources Terminology, 5th Session

SEAMETRIC INTERNATIONAL AS

Major SPC liquid Epoxy installation list Projects in Australasia April Project Name Details Comments

Brazil Market Increasing Opportunities for U.S. Suppliers of Oil & Gas Equipment and Services

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

EUREKA SURV 68 BALLAST PUMP SYSTEMS

03 MORDEC MORDEC MORDEC MORDEC MORDEC 15 MORDEC 16 MORDEC 17 MORDEC

Cascade and Chinook Journey History and Future

Wirth pile top drill rigs. Reliable systems for on- and offshore

Ingenuity for Life Wind Power Morten Pilgaard Rasmussen. Restricted Siemens AG 2016

Transcription:

Kvaerner Structural Solutions Project Reference List Major Projects Kværner AS Hamnevegen 7, 7652 Verdal, Norway Telephone +47 74 07 40 00 Enterprise no. 916 297 807 VAT www.kvaerner.com

Jackets Phillips Albuskjell Drilling Jacket and Piles FC 4 600 + 2 800 T 06.1975-08.1976 Phillips Ekofisk Quarters Jacket and Piles FC 1 900 + 1 100 T 04.1976-04.1977 Amoco Valhall Drilling Jacket and Piles FC 5 300 + 4 100 T 04.1979 11.1980 Statoil Statpipe Riser Jacket and Piles FC 7 500 + 3 500 T 06.1982-07.1983 BP Norway Ula Drilling Jacket and Piles FC 2 500 + 5 400 T 04.1984-05.1985 Phillips Ekofisk 2/4K W-Jacket and Piles FC 12 500 + 7 000 T 05.1984-06.1986 Norsk Hydro Oseberg B Drilling Jacket and Piles EPC 18 800 + 6 500 T 01.1985-04.1987 Statoil Veslefrikk Drilling Jacket and Piles EPC 9 600 + 6 900 T 10.1987-05.1989 BP Norway Gyda Drilling Jacket and Piles FC 8 300 + 4 900 T 12.1987-09.1989 Statoil Sleipner A Riser Platform Jacket and Piles EPC 4 330 + 1 900 T 10.1991-08.1992 Norsk Hydro Brage Jacket and Piles EPC 18 400 + 7 000 T 11.1990-05.1993 Statoil Europipe 16/11-E Jacket FC 4 730 T 07.1993-07.1994 Statoil Sleipner Vest SLB Jacket and Piles PC 5 400 + 2 300 T 02.1994-04.1995 Statoil Sleipner Vest SLT Jacket PC 6 600 T 02.1994-03.1996 Phillips Ekofisk 2/4X Jacket and Piles EPC 5 700 + 2 940 T 12.1994-04.1996 Phillips Ekofisk 2/4J Jacket and Piles FC 11 800 + 5 000 T 09.1995-04.1997 Saga Varg Monotower and Piles EPCI 2 200 + 1 400 T 01.1996-05.1997 Norsk Hydro Oseberg Øst Jacket and Piles EPC 7 000 + 4 700 T 07.1996-05.1998 Heerema Jotun Jacket and Piles EPC 6 100 + 3 300 T 03.1997-08.1998 Norsk Hydro Oseberg Gass Jacket and Piles EPC 6 000 + 2 300 T 10.1997-03.1999 Phillips Eldfisk Jacket and Piles EPCI 2 400 + 1 110 T 12.1997-05.1999 Norsk Hydro Oseberg Sør Jacket and Piles EPC 7 000 + 3 000 T 04.1997-05.2000 Statoil Huldra Jacket and Piles EPC 5 200 + 2 000 T 09.1998-06.2000 Statoil Kvitebjørn Jacket and Piles EPC 12 000 + 6 000 T 07.2000-08.2002 BP Norway Valhall Jacket and Piles EPC 4 000 + 2 000 T 10.2000-07.2002 Norsk Hydro Grane Jacket and Piles EPC 17 500 + 4 500 T 11.2000-03.2003 Shell UK Goldeneye Jacket and Piles EPC 3 000 + 2 000 T 03.2002-06.2003 BP UK Clair Jacket and Piles PC 8 500 + 4 300 T 03.2002-06.2004 ConocoPhillips Ekofisk 2/4M Jacket and Piles EPC 5 000 + 2 000 T 03.2003-08.2004 ConocoPhillips Ekofisk 2/4M Tripod and Piles EPC 1 200 + 800 T 03.2003-08.2004 Nexen Buzzard Wellhead Jacket and Piles EPC 4 000 + 3 500 T 10.2003-03.2005 Nexen Buzzard Quarter Utilities Jacket and Piles EPC 4 700 + 3 600 T 10.2003-04.2005 Nexen Buzzard Process Jacket and Piles EPC 5 600 + 3 600 T 10.2003-04.2005 BP Norge Valhall Re-Development Jacket and Piles EPC 7 500 T + 4 000 T 02.2007-05.2009 Statoil Gudrun Jacket and Piles EPC 7 200 + 3 200 T 02.2010-07.2011 ConocoPhillips Ekofisk 2/4L Bridge Support Jacket and Piles EPC 1 800 + 1 600 T 03.2010-04.2012 ConocoPhillips Ekofisk 2/4L Jacket and Piles EPC 5 800 + 2 500 T 03.2010-05.2012 BP UK Clair Ridge Drilling & Production Jacket and Piles EPC 22 500 + 6 500 T 07.2010-06.2013 BP UK Clair Ridge Quarters Utility Jacket and Piles EPC 9 400 + 2 900 T 07.2010-06.2013 Lundin Norway Edvard Grieg Jacket and Piles EPC 14 500 + 6 500 T 01.2012-04.2014 Total E&P Norge Martin Linge Jacket and Piles EPSC 16 000 + 5 600 T 02.2012-05.2014 Statoil Johan Sverdrup Phase 1 Riser Platform Jacket and Piles EPC 26 155 + 9 008 T 01.2015 07.2017 2/6

Jackets for offshore wind turbines Multibrid Alpha Ventus 6 steel tripod substructures and piles PC Each approx. 08.2007 - for offshore windmills 670 T 07.2008 / 08.2008 RWE Innogy Nordsee Ost Wind Farm 49 Jacket and Piles for Offshore EPC 550 T each jacket 06.2010-2012/2013 Windmills Flare / Bridge Amoco Ekofisk 2/4G Riser Bridge FC 790 T 03.1980-06.1981 Norsk Hydro Oseberg A Flare boom FC 400 T 11.1986-05.1988 Norsk Hydro Oseberg A Bridge FC 950 T 11.1986-05-1988 Statoil Sleipner A Flare/ Bridge Jacket and Piles EPCI 1 000 + 600 T 03.1992-05.1993 Statoil Sleipner A Flare and Bridge EPCI 420 + 370 T 04.1992-05.1993 Norsk Hydro Oseberg Gass Flare & Bridge EPC 340 + 570 T 03.1997-04.1999 Nexen Buzzard 2 Bridges and Flare FC 290 + 290 + 437 T 06.2005-03.2006 Vetco Aibel Alvheim Flare Tower EPC 150 T 08.2005-04.2006 Aker Stord Gjøa Flare FC 312 T 10.2008-07.2009 Other projects Saga Snorre TLP Well Template and Piles FC 1 950 + 1 200 T 06.1989-07.1990 Norsk Hydro Oseberg II Conductors FC 4 200 T 07.1990 Statens Vegvesen Krifast, Bergsøysund Floating Bridge, Steel Structure EPCI 6 480 T 06.1990-06.1992 Norske Shell Draugen Offshore Loading Unit EPCI 1 690 T 05.1991-09.1993 Ulstein Verft Westfal Larsen Munchloader Gantry Cranes FC 1 600 T 08.1994-02.1995 Hydro Ormen Lange Slug catcher FC 10 100 T 07.2004-08.2006 3/6

Topsides Shell UK Brent B Deck FC 3 000 T 08.1973-04.1975 Shell UK Brent D Deck FC 3 500 T 07.1974-08.1976 Phillips Ekofisk 2/4H 4 Quarters Modules FC 2 800 T 03.1978-09.1977 Elf Frigg 2 Modules for TCP-2 FC 240 T 12.1979-05.1977 Mobil Statfjord B 5 Preassemblies/Modules FC 1 023 T 01.1979-01.1980 Amoco Valhall A Drilling Deck FC 2 800 T 03.1979-04.1981 Amoco Ekofisk 2/4G Riser Deck FC 1 730 T 03.1980-06.1981 Statoil Statpipe Deck for Riser Platform FC 1 940 T 04.1983-06.1984 Statoil Gullfaks A 3 Modules M11/M12/M24 FC 1 200+ 1 200+ 2 000 T 08.1982-02.1985 Statoil Gullfaks B 1 Module: M12 FC 1 300 T 06.1985-08.1986 Statoil Gullfaks C Module Nodes FC 88 no. of nodes 11.1985-10.1986 Statoil/Aker Stord Gullfaks C Module Supp. Frame (section) FC 4 400 T 10.1986-06.1987 Statoil Gullfaks C 2 Modules: M11/M12 FC 1 000 + 1 150 T 11.1986-02.1988 Norsk Hydro Oseberg II Deck (LTF) FC 3 500 T 12.1988-07.1990 Saga Snorre Drilling Derrick, Sub-structure and Skidbase FC 1 970 T 12.1989-03.1991 Statoil Sleipner A Module Support Frame (COP) FC 6 000 T 10.1989-07.1991 Statoil Sleipner A Module D22 FC 3 790 T 09.1991-01.1992 Statoil Sleipner A Riser Platform Topside EPC 3 500 T 10.1991-08.1992 Conoco Heidrun Wellbay Module M20 FC 8 600 T 01.1992-07.1994 Saga Varg Wellhead Platform Topside EPCI 1 000 T 01.1996-06.1997 Phillips Ekofisk 2/4 J Utilities Module EPC 4 300 T 09.1995-07.1997 Norsk Hydro Oseberg Gass Topside EPC 8 000 T 03.1997-04.1999 Aker Stord, Snorre B Deck Sections FC 2 000 T 03.1999-10.1999 Aker Stord Valhall Deck sections and boxgirders FC 1 070 T 01.2001-07.2001 Aker Stord Kristin Utility Module FC 1 500 T 10.2002-10.2003 Aker Stord Gjøa Prefab. Steel Sections FC 1 250 T 07.2007-10.2008 Aker Egersund Kashagan Piperacks FC 125 T 10.2007-06.2008 Aker Egersund Kashagan Module 18 + Module 20 FC 1 000 T 03.2008-10.2008 Kværner Stord Nyhamna EPCm 3 Compressor Modules FC 1 054+1 050+1 055 T 02.2014-08.2014 4/6

Drilling rigs and facilities Client Project Weight CA - Delivered Deep Sea Drilling A/S H-3 Drilling Platform EPC Displ.ment 19 300 T 11.1971-02.1974 K/S Gotaas Larsen Drilling A/S & Co. and Rowan Inc. H-3 Drilling Platform EPC Displ.ment 19 300 T 03.1972-09.1974 Blandford Shipping Co. Ltd. UK H-3 Drilling Platform EPC Displ.ment 19 300 T 01.1973-03.1975 I/S Polyglomar Driller H-3 Drilling Platform EPC Displ.ment 19 300 T 02.1973-06.1975 Blandford Shipping Co. Ltd. UK H-3 Master Construction Barge EPC Displ.ment 19 300 T 10.1974-05.1976 K/S Golar-Nor Prospecting A/S & Co. H-3 Drilling Platform EPC Displ.ment 19 300 T 12.1973-07.1976 K/S Sverre Ditlev-Simonsen Drilling A/S H-3 Drilling Platform EPC Displ.ment 19 300 T 01.1974-03.1977 Aker Mek. Verksted H-3 Byford Dolphin (ex Deep Sea Driller) Repair of wrecked rig EPC Displ.ment 19 300 T 04.1977-06.1979 Amoco Valhall A Drilling Deck FC 2 800 T 03.1979-04.1981 K/S Deep Sea Drilling Company A/S H-3.2 Drilling Platform EPC Displ.ment 24 190 T 09.1980-02.1983 E. Rasmussen H-3.2E Flotell Polycrown EPC Displ.ment 15 000 T 07.1982-05.1984 Saga Snorre Drilling Derrick, Sub-structure and Skidbase FC 1 970 T 12.1989-03.1991 Statoil Sleipner A Drilling Wellhead Module (D22) FC 3 790 T 09.1991-01.1992 Norsk Hydro Njord Hull for Semisub. Floater EPC 11 000 T 03.1995-02.1997 Chevron/Anadarko Blind Faith Hull for Semisubmersible Floater EPC 9 280 T 10.2005-07.2007 Aker Drilling (Aker Kvaerner Stord) Aker H-6e. Hull for Drilling Rig 15 000 10.2005-08.2007 Aker Drilling (Aker Kvaerner Stord) Aker H-6e. Hull for Drilling Rig 15 000 10.2005-08.2007 Projects in progress Client Field Project LOI/CA - Delivery Statoil Johan Sverdrup Drilling Platform Jacket and Piles LOI 06.2014/ CA 09.2015 Spring 2018 Statoil Johan Sverdrup Process Platform Jacket and Piles CA 10.2015 Summer 2018 Kværner / Statoil Njord A Njord Blisters CA 03.2017 Summer 2018 Repsol, Norway Yme New Development Caisson Support Structure CA 11.2017 Summer 2018 Aker BP Valhall Flank West Topside and Jacket CA 12.2017 Spring 2019 NUI (Normally Unmanned Installation) 5/6

Kværner AS Hamnevegen 7 7652 Verdal, Norway Tel: (+47) 74 07 40 00 www.kvaerner.com 6/6