OTTO HYDRAULICS GmbH & Co KG SYSTEME UND KOMPONENTEN FÜR ÖLHYDRAULISCHE ANTRIEBE UND STEUERUNGEN SIEMENSSTRASSE 12/ FRIEDRICHSHAFEN

Similar documents
General Operating Manual

Starting up hydraulic systems

PRODUCT SERVICE MANUAL FOR BK12DHZ PUMPS

PRODUCT SERVICE MANUAL. BK6DHZ(C)-250, 275, 312 and 400 PUMPS

Operating Instructions for Elevator Buffers type LP

PRODUCT SERVICE MANUAL

INSTRUCTION MANUAL AND PARTS LIST FOR 3SIC AND 4SIC SERIES PUMPS

Mod: KLD6-12/35XLAS-N

INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D_-187, 218, 250 and 312 SERIES PUMPS

PRODUCT SERVICE MANUAL FOR. F312XICR-312_, 325_, 400_ and 437_ Pumps. For Solar Turbines

GL Ludemann Y-Strainers

Installation manual portable distributors

NEOTECHA NTB-NTC BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Instructions for use. Hawker Premier

General operating manual for assembly, commissioning and maintenance of valves and hydraulic manifolds

Rotary feed-through DDF-S/-KS

Product Service Manual For DLH12DHT SERIES PUMPS

Installation, Operation, and Maintenance Manual

Storage, operating and maintenance instructions for AZ plug valves and Standard valves

Installation, Operation, and Maintenance Manual

Installation and Operating Manual for Tank and Equipment Cleaning Nozzles Series 5TM

Operating conditions of VRLA batteries in HVCBS and LVDBS Systems

Hydronic Corporation

These installation and maintenance instructions must be read in full and completely understood before the installation!

DELHOIST DOUBLE ACTING TELESCOPIC CYLINDERS Stoney Rise Road (P.O. Box 20), Devonport, Tasmania 7310

Operating manual Separator

FLENDER ZAPEX couplings. Type ZWT. Operating instructions BA 3505 EN 10/2011. FLENDER couplings

NEOTECHA NEOSEAL BUTTERFLY VALVE INSTALLATION AND MAINTENANCE INSTRUCTIONS

Air Operated Diaphragm Pumps Operating and Maintenance Instructions

Assembly and Maintenance Manual Type ASNU

PNEUMATIC PUMP Series

Filter elements for installation in Pall filter housings. Type 16. filter elements. Contents. Features. RE Edition:

Installation and operating manual Quick closing valve (Bellow sealed) LK product no:

HYDRAULIC GROUPS 1.1KW 1~ / 6.1CC. Article Code: 1GH008

Turbocharger / TPS-H Original assembly instructions English

Installation and Operation Manual

Duplex Filter Pi 4700

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080


VEM motors Thurm GmbH

Internal Gear Pumps Installation Manual

INSTRUCTION MANUAL. I/P Converter DSG BXXY3Z DSG BXXY4Z

12 Volt Heavy-Duty Air Inflator

INDECO LUBEMAXX. Operating and Assembly Manual INDECO LUBEMAXX

SAVE THESE INSTRUCTIONS

Operating instructions Accu Jet

Turbocharger / A100-L Original assembly instructions English

Installation and Maintenance Manual

Operating Instruction

Installation manual wall-mounted distributor

WELDING INVERTER. PEGAS 160 E Smart PEGAS 200 E Smart OPERATING MANUAL. ALFA IN a.s. PEGAS E Smart Manual EN 04

Installation, Operation, and Maintenance Manual

12V Oil Extractor Pump

INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D-275 SERIES PUMPS (Idler Cup and Hydrostatic Thrust Designs)

SPARKSCAN1 HIGH VOLTAGE CLAMP OPERATING MANUAL

X.. Series Helical and Bevel-Helical Gear Units

15-GALLON OIL DRAIN DOLLY WITH 12 VOLT PUMP

Type 5411, Operating Instructions. Bedienungsanleitung Manuel d utilisation

110 Volt/12 Volt Portable Inflator

Voltmaster Centrifugal Trash Pumps

Assembly and Maintenance Manual Type AS

Type 6213 EV, 6281 EV

Air-Operated Waste Oil Drainer

Operating Instructions

K12DHZ-312P Pump PRODUCT SERVICE MANUAL. Imo Part Number / BOM # 3220/523

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

back to main page Type: Butterfly valves Instructions and Operation Manual Warning! Warning! Danger for life! 1. Intended use Danger for life!

Operating and installation instructions

Original operation instructions GFC escalator gear units FTSST158.1, FTSST180.1, FTSST212.1

Safety Shock Absorbers SCS33 to SCS64

(R86049) WARNING: To reduce the risk of injury, the user must read and understand the operator s manual before using this product.

Flow control valve type SJ

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

Turbocharger / VTR..0, VTR..1 Original assembly instructions English

USER INSTRUCTIONS. Kämmer SmallFlow - Series / Low and Micro Flow Valves. Installation Operation Maintenance. Experience In Motion

Operating and installation instructions

TSCHAN - TORMAX VSG. Installation and Operation Manual TSCHAN Highly flexible shaft coupling BAWE 009-GBR-0 05/2004

Copyright 1998 Inter-Industry Conference On Auto Collision Repair v.4.0

Established Leaders in Valve Actuation CP RANGE COMPACT PNEUMATIC ACTUATORS INSTALLATION AND MAINTENANCE MANUAL. Publication F230E Date of issue 03/08

Replacement cartridge filter

Sediment strainer (Type Y)

Safety Shock Absorbers SDH38 to SDH63

Printed: Doc-Nr: PUB / / 000 / 00

Axial Piston Variable Pump A2VK

OPTIFLUX 2000 Quick Start

EPS 16 ATEX 1072 X, IECEx EPS X. Operating Instructions. Solenoid coil Type AC19 Magnetspule Typ AC19 Bobine magnétique Type AC19

Operating manual. Custom made gearboxes

IMPORTANT SAFETY NOTICE

GENERAL WARNING. General instructions. Technical assistance. Doseuro S.r.l. Liability

Installation and operating manual

Assembly instructions

EV-2051-M Electric Motor. Operation and Maintenance Manual

Angle seat valve with diaphragm actuator VZXA-...-M

Swiveling gripper finger GFS 16-40

BEFORE USING THE PRODUCT

Operating Instructions

2-in-1 Air Operated Waste Oil Drainer

LP 9-20 E PAC. Crowder Supply Co., Inc Roslyn St., Commerce City, CO Toll Free:

Angle seat valve with piston actuator VZXA-...-K

Transcription:

Hydraulik-aggregates Otto-Hydraulics Operating manual Author: Reinhard Otto Date: 16.01.2016 Operating manual rev.1 page: 1/11

Table of Contents Page 1...General information of this operating manual 3 2...Usage and application information for the hydraulic aggregate 3 3...Operating mode 4 4...Safety instructions 4 5...Identification of aggregate 6 6...Applied directives and standards 7 7...Operating limits 7 8...Storage 7 9...Operating medium 7 10...Installation 8 10.1...Mechanical installation 8 10.2...Connection of electric motor 8 10.3...Connection of solenoid valve 9 10.4...Hydraulic connection 9 11...Start-up procedure 9 12...Maintenance instructions 9 13...Disassembly and disposal 10 Operating manual rev.1 page: 2/11

1 General information of this operating manual This operating manual applies to all aggregates of Otto-Hydraulics. The user is solely responsible for the use of these instructions and fully accepts the corresponding risk. Otto Hydraulics GmbH & Co KG (hereinafter referred to as OH) shall not be responsible for exceptional and indirect damage or for accidental and consequential damage deriving from the use of this manual or from the use of the product or due to inexperience in the use of the manual or the product. OH shall not be responsible, and also not towards third parties, for bad or improper installation, maintenance or repair of the product or for the use of non-original spare parts. To ensure the correct use of the aggregate, OH requests to follow the instructions and recommendations of this manual. The manual is intended for users with competent personnel specialization in the areas of hydraulics, electrics and mechanics. This manual cannot take the place of professional and skilled personnel. The user must ensure that his personnel is familiarized with this operating manual and that they understand the instructions contained therein. The hydraulic aggregate and its components may only be assembled, installed, started up and serviced by trained and competent personnel. The operator is responsible for the choice of aggregate and accessories. It is therefore important for the operator to examine any problems associated with his special application by using appropriate analyses and trials. The operator is also responsible for the installation of safety systems and the mounting of warning notices, as required in the applicable directives. 2 Usage and application information for the hydraulic aggregate The aggregates are designed for operating with impetuses, in doing so its usually switches on an E-Motor to provoke a hydraulic pump. So for example a load can be lifted through one or more hydraulic cylindres. Normally the lifting speed is determined by the dimensions of the hydraulic cylinder, by the rotational speed of the electric motor and by the working volume of the Operating manual rev.1 page: 3/11

installed hydraulic pump. The particular applications have to be settled before the projection of the aggregat and they have to be documentated and noted clearly. The hydraulic aggregate shall only be used for the settled application stated above. During operation and starting up of the hydraulic aggregate, make sure that: - the aggregate is not exposed to mechanical oscillations and vibrations that could cause hydraulic medium to leak from the filling neck. - the aggregate is not operated in an extremely dusty environment. - the system parts to be connected to the aggregate, such as hydraulic cylinders, pipe and hose lines, are absolutely clean inside. - the hydraulic medium used to fill the system must be absolutely clean. 3 Operating mode The Aggregat may only be operated in intermittent operation as given in the specific documentation of the aggregate. Continuous operation leads, if the aggregate isn t intended for such operations, to overheating and can cause damage, e.g.: Motor burnout, evaporation of hydraulic medium, leakage of poisonous vapours and melting of plastic parts 4 Safety instructions The hydraulic aggregate has been designed and built according to current acknowledged state-of-the-art technology. It complies with existing laws and directives. The operator is responsible for the integration of the aggregate in his machine or system. The machine or the system in which the aggregate will be installed may only be prepared, started up and serviced by well-trained personnel. The following describes several dangerous states which can occur during operation. Sometimes a potentially hazardous situation appears to be normal, but it should not be underestimated. Likewise, it should not be underestimated that excessive trust and measures which have become habitual could lead to a decline in the ability to perceive dangerous situations. Unpredictable liquid splashes and leakages that are hot enough to Operating manual rev.1 page: 4/11

cause burns can occur during starting up, normal operation, during maintenance, adjustment work, system venting and while switching from valves or control units. Hydraulic medium can be hazardous to health, contact with skin and eyes can cause serious damage. The instructions contained in the safety data sheets of the hydraulic medium manufacturer regarding protection of personnel and safety must be obeyed. Hydraulic medium can be harmful to the environment. It is therefore recommended to place the aggregate in a spill tray to prevent environmentally harmful liquid from leaking and causing pollution. The intentional or unintentional manipulation of valves, accessories or components is not permitted. Opening a regulating valve can cause e.g. a load to drop unhindered or may release a clamped structure. All installation, maintenance, disassembly and replacement work on the hydraulic aggregate and its components may only be done in compliance with the safety instructions. During this work the hydraulic system must be depressurized (pressure 0) and the drives that are powered by the aggregate must be relieved (load 0). All electrical connections must be installed by competent personnel. Before beginning maintenance or repair work, the aggregate must be disconnected from all electrical power supplies for the electric and other electrically powered devices. Operating manual rev.1 page: 5/11

Parts of the hydraulic aggregate can become so hot that it can burn the skin. Observe the respective identification. The aggregate hast to be mounted into the maschine / the environment, that maintance work can be handled, easily. The following is recommended for repair and maintenance work: - use safety equipment such as protective goggles, gloves and safety shoes - work in a clean environment - use tools, equipment and facilities that are clean and in a good condition. Work under best possible safety conditions - use of oil-absorbing media 5 Identification of aggregate The aggregate is identified by a nameplate. The following important information is visible on the nameplate: - Manufacturer information - Order number - Type number - Output of electric motor - Hydraulic operating pressure - Discharge rate of hydraulic pump - Utilised hydraulic medium - Container content - Operating voltage of electric motor - Control voltage of solenoid valves - Year of manufacture (Year of construction) - W-No.: (Serial number) Operating manual rev.1 page: 6/11

The individual aggregate can be clearly allocated by the data visible on the nameplate. In case of service, the W-No. is particularly important because it identifies all of the installed components. 6 Applied directives and standards Machinery Directive 2006/42/EG The machine or system into which the incomplete machine (hydraulic aggregate) will be incorporated may only then be put into operation if it has been determined that the machine or system complies with the provisions of the Machinery Directive. EN 982 Niederspannungsrichtlinie 2006/95/EG 7 Operating limits - max. pressure: see nameplate - max. volumetric flow: see nameplate - min. temperature operating medium: - 10 C - max. temperature operating medium: + 70 C - min. ambient temperature: - 10 C - max. ambient temperature: + 40 C 8 Storage The aggregate must be treated with caution. The aggregate should be stored in an environment that is not exposed to dust and direct sunlight. The ambient temperature should be between -10 C and +40 C. 9 Operating medium For the operating of the hydraulic-aggregate, hydraulic oil of DIN 51524 Part 2, is appropriate Suitable viscosity: 10 cst - 380 cst If the operator would like to deviate from this specification, he may only do so after consultation with OH. The aggregate must be filled absolute via micro filter, filter fineness 20µm Operating manual rev.1 page: 7/11

10 Installation 10.1 Mechanical installation Attention must be paid to greatest possible cleanliness during installation of the aggregate. The aggregate must be set up at a location with easy access in case of inspection and maintenance work. The set-up site must be selected appropriately to provide protection from falling parts. The aggregate should be securely fastened to the set-up site and situated as far from sources of noise and vibration as possible. 10.2 Connection of electric motor The electric motor must only be electrically connected with the screwed cable glands at the terminal boxes provided by the manufacturer. It is important to check, whether the motor is connected correctly as given by the manufacturers specifications. It is important to check, whether the motor is an AC or DC Motor. If AC Motors are used it is importend to check whether it is a 1-phase or 3-phase Motor The terminal box of the electric motor contains metal components which have a hazardous high voltage charge. After the motor has been connected electrically, ensure the immediate closure of the the terminal box with the terminal box cover. When connecting the electric motor, comply with the appropriate instructions in the electric motor operating instructions. The electric motor operating instructions are part of this operating manual and have been enclosed as such. 10.3 Connection of the solenoid valves The solenoid valves are to be electrically connected via the device plug screwed to the magnetizing coil by means of suitable cable. Operating manual rev.1 page: 8/11

10.4 Hydraulic connection The hydraulic connections are identified by the letters "Z1" and "Z2". The screwed in adapters have a bore hole shape X as per DIN 3582/ISO 1179-1, ISO 9974-1. The connections of the hydraulic pressure supply are: threaded stems as per DIN 3853/ISO8434 with bore shape W as per DIN 3861. 11 Start-up procedure The direction of rotation of the motor has to be checked.in its delivered state, the pressure control valve is pre-set to the pressure value shown on the nameplate. Before starting up, ensure that the oil container is filled with oil. After the system has been started up and the first movements of the lifting device have been executed, the system must be vented. Air accumulates at the highest points in the system, where it can be discharged through (ideally) previously installed ventilating valves. If the lines between the aggregate and drive are not very long, the system will vent automatically through repeated operation. This venting operation should occur during the idle state of the drive. After this start-up procedure, the system is filled with hydraulic medium, the fluid level in the aggregate container has dropped accordingly and fluid should be refilled. After several operating hours, the system fluid level must be checked again and refilled as necessary. 12 Maintenance instructions Reliable operation of the hydraulic aggregate also depends on correct maintenance. Shortly after start-up it should be ensured that all screws and hydraulic couplings are firmly tightened. Pulsations and vibrations could have loosened the screws or screw connections. It is necessary to keep the hydraulic aggregate clean in order to more easily discern leakages. To clean, use only a clean dry cloth; never use solvents or other cleaning agents. Before beginning maintenance or repair work, the aggregate must be disconnected from all electrical power supplies for the electric motor and other electrically powered devices. Depressurize all parts of the system. We recommend the following control intervals: - 1 week after start-up - 4 weeks after start-up - subsequently every 3 months During the controls, the following should be inspected Operating manual rev.1 page: 9/11

- Fluid level in container Here it is important that all drives with differential surface, e.g. hydraulic cylinders, are in a retracted position during the reading. - Condition of hydraulic fluid and hydraulic fluid change pay attention here to colour (darkened), smell and milkiness; in the event of these changes replace the hydraulic fluid. The hydraulic fluid should be analysed once a year or, if this is not possible, the oil should be replaced. When changing the hydraulic fluid, comply with the laws for handling water-polluting service fluids. The cylinders in the system must be in a retracted position, if possible. Only new and clean hydraulic oil HLP may be filled as per DIN 51524 Part 2. We recommend filling in oil of the same brandand the same type. - Temperature: The maximum oil temperature of 80 C may not be exceeded. If the operating time - too high or too low motor supply voltage - oil leakage in the aggregate or in the entire system. - external leakage All components, joints and connections must be examined for signs of external leakage. Screws, screw connections and pipe connections must betightened as necessary, defective seals must be replaced. - Annotations concerning replacement of filterelements In general filters, returnfilters and pressurefilters are equipped with single-use elements. These need to be replaced against new ones, after their dirt absorbtion capacity is depleted. The worn elements must be disposed as hazardous waste. Please find below our recommendations for the proper time for exchange of filterelements: If filters are equipped with optical and electical maintenance indicators, filterelements need to be replaced when the indicator changes colour from green to red. In case the indicator consists of a pressure gauge, the filter condition can be red by the orientation of the Indicator pointer, when reaching the red area the e lement must be replaced. Electrical maintenance indicators generate an electrical signals which need to be evaluated. Please note, most indicatorsystems give a meaningful value only when there is Operating manual rev.1 page: 10/11

an oil flow through the filter. If no maintenance indicator is available, the first element replacement shall take place after commissioning of the hydraulic system. Afterwards we recommend to exchange the filterelements after 500 operating hours or once a year according to which occurs first. 13 Disassembly and disposal When the hydraulic aggregate is to be put out of operation and scrapped, the remaining hydraulic medium must be carefully drained from all aggregate parts. The hydraulic oil must be disposed of according to existing provisions, regulations and laws. The hydraulic aggregate to be scrapped should be dismantled into its individual parts and the various materials disposed of separately in accordance with existing provisions. The disassembly should be carried out by competent personnel; there are no exceptional hazards as long as suitable tools and facilities are used. - subject to change - Operating manual rev.1 page: 11/11