CRANE & HOIST SAFETY PROGRAM

Similar documents
UNIVERSITY OF TOLEDO

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

OVERHEAD & GANTRY CRANE / RIGGING

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

MOBILE CRANES ONSHORE PROGRAM

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

HEALTH AND SAFETY MANUAL

29 CFR Ch. XVII ( Edition)

Chapter 22 Mobile Cranes

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

The Sanford Underground Research Facility Revised: (07/31/2018) CRANES AND HOISTS Supersedes: (03/23/11)

Crane, Hoist, and Sling Safety Program October 24, 2017

Cranes and Derricks. Objectives. Construction Safety Lecture 18

Crane and Hoist Safety Program

ESSENTIAL SAFETY RESOURCES

Cranes. OSHA Office of Training & Education 1

Ryko Solutions, Inc. Crane and Jib Safety Program

Crane & Hoist Safety Guidelines

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS

Overhead and Gantry Crane Program and Standard Operating Procedure

Moving materials: Crane and hoist safety

Safe Operating Practices & Maintenance Manual

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

CRANE, HOIST AND SLING SAFETY PROGRAM

HOISTING APPARATUS Inspection Guidelines

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Crane Safety Resource Guide P AGE 1

SECTION 14: AERIAL LIFT PROGRAM

Crane & Derrick Operation Procedures for Construction

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330)

STEEL ADJUSTABLE-HEIGHT GANTRY CRANE INSTRUCTION MANUAL

Hoist: An apparatus for raising or lowering a load, but does not include a car or platform riding in guides or horizontal motion.

POWERED INDUSTRIAL TRUCK PROGRAM September 2015

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

Owner s Manual. END TRUCKS Top Running & Underhung SERIES 3

Provide a safe working environment, Govern operator use of heavy equipment, and Ensure proper care and maintenance of heavy equipment.

MOBILE CRANES AND HOIST

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD

PORTABLE LADDER SAFETY PROGRAM

Occupational Safety and Health Admin., Labor

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

British Columbia - Colombie-Britannique. Aerial Lift - Appareil de Levage

END TRUCKS Top Running & Underhung SERIES 3

Health, Safety, Security and Environment

Table of Contents Rev. 10/31/2018 FHA MANUAL. FHA-series Fixed Height Aluminum Gantry Crane Instruction Manual

Provided by: Operating, Maintenance & Parts Manual

CHESTER HOIST AIR LOW HEADROOM CHAIN HOISTS AL-680 SECTION A

FHS-Series Steel Fixed Height Gantry Cranes Instruction Manual

Powered Industrial Truck Safety Program

RELIANT HOLDINGS LTD AND ITS AFFILIATES Safety Management System. Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5

CRANE TESTING REQUIREMENTS FOR PERFORMANCE TESTS

PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...

JIB-FM Series Floor Mounted Jib Cranes Instruction Manual

CRANES & MOBILE LIFTING EQUIPMENT COMPANY POLICY AND PROCEDURE

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

VP, Facilities and Construction Management

Powered Industrial Vehicle Policy

INSTRUCTION MANUAL CONTRX FORKLIFT JIBS JLT, PBJLT, CHJLT

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

SAFETY GUIDANCE MATERIAL

Powered Industrial Trucks

SAFETY DIRECTIVE. 2.0 DEPARTMENTS AFFECTED This directive applies to all departments and employees of the Town of Marana.

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

While handling materials, employees must abide by the following requirements:

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

OVERHEAD CRANE SAFETY:

ELECTRICAL GROUNDING SAFETY PROGRAM

Forklift and Industrial Trucks

Hand Chain Hoists. Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

DEPARTMENT OF PUBLIC SAFETY

40' ' POWERED BOOM: MODE 1 40' - 126' POWERED BOOM: MODE 2

"CRANE SAFETY IN CONSTRUCTION ENVIRONMENTS"

Cranes and Monorails (With Underhung Trolley or Bridge)

Liftcrane Boom Capacities 2250 SERIES 3

Owner s Manual Gantry Cranes

Technical Manual. Inspection Record For: Hoist Model No.: Hoist Serial No.: Hoist Inspection and Maintenance Guide

Health, Safety, Security and Environment

Distributed by Tri-State Equipment Company Inc. Web: PH: FAX:

Crane. Bridge. Crane Control. Crane. Force, breakaway. hook device. hook device. Friction-type pressure gripping lifters. Below. hook device.

Capacity (tonnes) 0.25t. No. of Falls 1. Load Chain (mm) Load Chain Grade 80

OVERHEAD CRANE TERMINOLOGY

LIFTING DEVICES AND LIFTING EQUIPMENT - USE AT INOVYN

Fixed Ladder: A ladder that cannot be readily moved or carried because it is an integral part of a building or structure

CRANE OPERATION INSTRUCTION AND GUIDELINES

Responsible Unit: Facilities Management

NRCT NATIONAL RIGGING & CRANE TRAINING LLC. Contact : CONSTRUCTION-INDUSTRIAL-SAFETY SERVICES

SUNY GENESEO ENVIRONMENTAL HEALTH & SAFETY

Transcription:

CRANE & HOIST SAFETY PROGRAM 1.0 PURPOSE The purpose of the Crane and Hoist Safety Program is to: 1.1 Ensure a safe work environment for employees who operate, maintain, or work around cranes and hoists 1.2 Inform employees of requirements for safely working around cranes and hoists 1.3 Comply with OSHA regulations dealing with cranes and hoists. 2.0 REGULATORY REFERENCE OSHA 29 CFR 1910 Subpart N, Materials Handling and Storage, Sections 1910.179-181. OSHA 29 CFR 1926 Subpart N, Cranes, derricks, hoists, elevators, and conveyors, Sections 1926.550-556 3.0 SCOPE This document is intended as a master document that addresses regulatory requirements. Details specific to implementing the program for a specific department or job can be added by the user in the appendices of the program. This program is applicable to all employees of Indiana University. This program is applicable to all mobile cranes, tower cranes, overhead and gantry cranes, including semi-gantry, cantilever gantry, wall cranes, storage bridge cranes and other hoisting equipment that have the same fundamental characteristics. 4.0 ELEMENTS OF THE PROGRAM 4.1 A key component of the Crane Safety Program is this written document. The document is written by OEHSM, reviewed annually, and modified as necessary to ensure safe crane operations. 4.2 All crane operators and those working near cranes must be trained in safe operations. The training is described in Section 6. 4.3 IU s Physical Plant personnel are responsible for care and maintenance of all cranes used by IU. The protocols for this are presented in Appendix B. 5.0 ADMINISTRATION, RESPONSIBILITIES, COMPLIANCE 5.1 The Office of Environmental Health and Safety is responsible for administering this program, periodically reviewing and updating the written program, and periodically auditing crane operations on campus to ensure compliance with all applicable regulations and safety practices. 5.2 Managers and Supervisors are responsible for 5.2.1 Ensuring all cranes are properly inspected and maintained and in working order 5.2.2 Ensuring any worker assigned to work on a crane is properly trained 5.2.3 Ensuring all crane operating procedures include appropriate safety instructions 5.2.4 Oversight of all crane operations Page 1

5.3 Employees are responsible for 5.3.1 Working only on equipment for which they have received training 5.3.2 following all crane operating procedures 5.3.3 working safely 5.3.4 reporting accidents and incidents to supervisors immediately 5.3.5 notifying supervisors when maintenance or repair of the equipment is required. 5.4 Contractors and sub-contractors are responsible for complying with all elements of this program. 6.0 REQUIRED TRAINING AND RECORDKEEPING All operators must be familiar with and be trained to operate the equipment they are assigned to use 6.2 Recordkeeping: A record will be kept of each employee s training on crane and/or hoisting equipment. Training records will include the following: a) Employee s name b) Employee s signature c) Training topic and brief summary of content d) Date and location of training 6.1.1 Training instructor s name Page 2

Appendix A: Definitions Cantilever Gantry Crane: A gantry or semi-gantry crane in which the bridge girders extend transversely beyond the crane runway on both sides Chain Sprocket or Drum Groove: Grooved or notched wheel in which the hoist rope or chain is seated Competent Person: A person who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them Crane: A machine used to raise, lower or move a load horizontally Engineered Lift: A test load that has been identified and evaluated for use in determining the lifting capacity of the hoisting equipment Gantry Crane: Similar to an overhead crane, except that the bridge for carrying the trolley or trolleys is rigidly supported on two or more legs running on fixed rails or other runway Load Block: The assembly of hook, shackle, swivel, bearing, sheaves, pins, and frame suspended by the hoisting rope and used to attach the load to the hoisting cable or chain Main Line Disconnect: The controller used to isolate power to the hoisting equipment Overhead Crane: A crane with a movable bridge carrying a movable or fixed hoisting device which travels on a fixed runway. Semi-gantry Crane: A gantry crane with one end of the bridge rigidly supported on one or more legs that run along a fixed rail or runway, the other end of the bridge supported by a truck running on an elevated runway or rail Tower Crane: A vertical crane with a horizontal boom; The boom is balanced asymmetrically across the top of the tower. Its short arm carries a counterweight while the long arm carries the lifting gear. Page 3

Appendix B: Specific Procedures This section can be used to add procedures specific to a crane or process Appendix B1: General Operating Information 1.1 The safe design capacity of a crane, or other hoisting equipment, must not be exceeded. 1.2 All cranes and hoisting equipment must be in safe working condition and be inspected by a competent person before use, and during use, to make sure it is in safe working condition. Proper guards must be in place for exposed gears, belts, electrical equipment, couplings and fans. 1.3 All operators must be familiar with and be trained to operate the equipment they are assigned to operate. Documentation of the operators training must be available upon request. 1.4 Equipment shall be inspected by a competent person before each use and during use, and all deficiencies corrected before further use. A documented annual inspection log must be kept with the crane at all times. Boom cable installation documents must be readily available as well. 1.5 No persons shall ever be under a load while it is being lifted. 1.6 To avoid tipping, outriggers must be fully extended and remain firmly on the ground. 1.7 Cribbing is necessary when the ground cannot support outriggers. Boom angle indicators and load charts and a standard hand signal chart must be visibly posted in the crane. 1.8 While moving a crane, the headache ball must be retracted to avoid swinging. 1.9 Minimum clearance between power lines and any part of the crane shall be at least 10 feet. For power lines rated over 50 kv, additional clearance is required. 1.10 Overhead cranes shall have stops at the limit of travel of the trolley. Bridge and trolley bumpers or equivalent automatic devices shall be provided. Bridge trucks shall have tail sweeps. 1.11 A preventive maintenance program based on the crane manufacturer s recommendations shall be established for all overhead and gantry cranes. 1.12 Any temporary or permanent structure, including cranes, that exceed an overall height of 200 feet above ground level or that fall under the notification requirements shall be marked and/or lighted, in accordance with the guidelines of the FAA publication Advisory Circular AC 70/7460-1K. Page 4

Appendix B2 Operating Procedures Note: These are generic procedures, given as examples. Each specific crane will be operated per the operating manual provided by the manufacturer. 2.1 General Operations The operator of the aforementioned devices shall perform his/her duties as follows: 2.1.1 Equipment shall be operated by a qualified operator or trainee that is under the direct supervision of the qualified operator. Exception: Maintenance and test personnel and inspectors, when in the performance of their duties, shall be allowed access only after permission has been granted by the operator. 2.1.2 The operator, when operating the equipment, shall maintain full attention on the task being performed (e.g., no use of headsets, music). 2.1.3 The operator shall ensure that hand signals used during the lift are understood and followed by all involved. 2.1.4 No load in excess of the rated capacity shall be lifted, unless for test purposes, and the test shall be an engineered lift. 2.1.5 Before leaving the crane or carrier unattended, the operator shall land any load, place the controls or master switch in the off position and open the main line device of the specific crane or carrier. 2.1.6 The main line disconnect shall not be closed until the operator has made sure that no one is on or adjacent to the crane or carrier. 2.1.7 If the crane or carrier has been locked out or tagged out, the operator shall not remove the lock or tag, unless the lock or tag has been placed there by the operator. To remove someone else's lock or tag refer to the Indiana University Lockout/Tagout program. 2.1.8 For cab-operated equipment, make sure that all controls are in the "off" position prior to closing the line-disconnect. 2.1.9 During use of cab-operated equipment, if the power should fail, the operator shall turn off all controllers. Before restarting, the operator shall check the motion controls for proper direction to ensure controls are in the neutral position. 2.1.10 Persons boarding or leaving cab-operated equipment shall do so at the designated point of access or egress. 2.2 Attaching the Load 2.2.1 Hoist chains or ropes shall be free of kinks or twists. 2.2.2 Hoist chains or ropes shall not be wrapped around the load. 2.2.3 The load shall be attached to the load block. 2.2.4 Prior to lifting the load, the operator shall make certain that the load, sling, attachments, lifting devices and the load block are unobstructed. 2.3 Moving the Load 2.3.1 The person responsible for directing the lift shall make sure that the load is properly secured, balanced and positioned in the sling or other lifting device. 2.3.2 The person responsible for directing the lift shall make another visual inspection of the hoist chain or rope to make sure there are no kinks or twists. 2.3.3 The load block shall be brought over the load in a manner that will prevent swinging when lifting the load. Page 5

2.3.4 The chain or rope shall be inspected to ensure that it is properly seated in the chain sprocket or drum groove. 2.3.5 Lift equipment shall not be used for side pulls. 2.3.6 The operator shall not move the load while a person is on the load or hook. 2.3.7 The operator shall avoid lifting the load over people. 2.3.8 If the load being lifted approaches the rated load to be handled, the operator shall test the brakes by lifting the load a few inches and applying the brakes. 2.3.9 The load shall not be lowered below the point where there are less than two wraps of rope on the hoisting drum, unless a lower limit device is provided. If a lower limit device is provided, no less than one wrap shall remain. 2.4 Parking the Load 2.4.1 The operator shall not leave a suspended load unattended 2.4.2 The load block of the hoist shall be raised above head level when not in use. 2.5 Hand Signals Hand signals shall be used unless the participants of the lift are equipped with telephones, radios or other equivalent means of communication. Page 6

Appendix B3: Inspection Procedures Indiana University Office of Environmental Health and Safety 3.1 Cranes in Periodic Use A crane or overhead gantry that has not been used for a period of one month or more shall be inspected by the employee trained to use such equipment before each use and the focus for such an inspection is as follows: 3.1.1 Inspect all functional operating mechanisms 3.1.2 Check for damage to or leaks from lines, tanks, valves, drain pumps, and air or hydraulic systems 3.1.3 Check the load hook for deformities or cracks 3.1.4 Check all hoist chains for excessive wear, including end connectors 3.1.5 Check all chains for kinks, twists and distorted links and stretches that are beyond what is recommended by the manufacturer 3.1.6 Inspect the rope for damage such as kinks, cracks, cutting, bending, broken wires, unraveling, corroded or improperly connected end connections. Regardless of how often a crane or overhead gantry is used, the unit shall be inspected annually by an outside contractor qualified to inspect the unit. This inspection shall be the responsibility of the department to arrange. The contractor shall document and provide the owner with a copy of the findings who will in turn provide copies to Environmental Health & Safety. 3.2 Maintenance Preventive maintenance shall be performed as prescribed by the manufacturer as detailed in the owner's manual. Maintenance of the units shall be performed by an outside contractor qualified to perform maintenance. Any unsafe condition noted during the inspection of the crane shall be repaired before the crane is used. Page 7

Appendix C: Forms, Links to Forms, if applicable C.1 CRANE INSPECTION & MAINTENANCE CHECKLIST Date Project Name Inspector Location EVALUATION ITEMS YES NO COMMENTS ACTION TO BE TAKEN GENERAL All new cranes constructed and installed after Aug. 31, 1971, must meet design specifications of ANSI B30.2.0-1967. Re-rate modified cranes as long as a qualified engineer or manufacturer checks the modifications and supporting structure Rated load is plainly marked on each side of the crane Maintain a clearance of 3 inches overhead and 2 inches laterally between the crane and obstructions INSPECTION Prior to initial use, inspect all the new and altered cranes to ensure compliance with regulations Crane inspections are broken into two classifications frequent inspections of daily to monthly intervals and periodic inspections of one to 12-month intervals Frequent inspections must include the following: All functional operating mechanisms for maladjustments interfering with proper operation-daily; Deterioration or leakage in lines, tanks, valves, drain pumps and other parts of air or hydraulic systems- DAILY; Hooks with deformations or cracks visual inspection DAILY; MONTHLY inspection with signed reports; Hoist chains (including end connections) for excessive wear, twists, distorted links interfering with proper function or stretch beyond Page 8

manufacturer s recommendations visual inspection DALY; MONTHLY inspection with signed reports; All functional operating mechanisms for excessive wear of components; And rope reeving for noncompliance with manufacturer s recommendations Periodic inspections are complete inspections, and include the requirements of frequent inspections as well as checking for the following: Deformed, cracked, or corroded members; Loose bolts or rivets; Cracked or worn sheaves and drums; Worn, cracked or distorted parts such as pins, bearings, shafts, gears, rollers and locking and clamping devices; Excessive wear on brake system parts, linings, pawls and ratchets; Load, wind and other indicators over the full range for any inaccuracies; Gasoline, diesel, electric or other power plants for improper performance or noncompliance with applicable safety requirements; Excessive wear of chain drive sprockets and excessive chain stretch; And electrical apparatus for signs of pitting or any deterioration of controller contractors, limit switches and push-button stations Inspect cranes that have been idle for at least one month, but less than six months, per requirements for frequent, periodic and rope inspections Check cranes idle for more than six months per requirements for frequent, periodic and rope inspections Inspect standby cranes at least semiannually in accordance with frequent, periodic and rope inspection maintenance MAINTENANCE Establish a preventive maintenance program based on crane manufacturer s recommendations Before adjustments and repairs are Page 9

started on cranes, take the following precautions: Run the crane to a location where it will cause the least interference with other cranes and operations; Ensure that all controllers are at the off position; Open and lock the main or emergency switch in the open position; Place warning or out of order signs on the crane and on the hook where they are visible from the floor; And provide rail stops or other suitable means to prevent interference from other cranes in operation on the same runway Do not operate the crane until all guards have been reinstalled, safety devices reactivated and maintenance equipment removed Before resuming crane operation, correct any unsafe conditions disclosed by testing Allow only designated personnel to perform adjustments and repairs Promptly provide repairs or replacement as needed for safe operation Page 10

Appendix D: Additional References and Related Programs The American Society of Mechanical Engineers B30.2-2005 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist); B30.16-2003 Overhead Hoists (Under hung); B30.17-2003 Overhead and Gantry Cranes (Top Running Bridge, Single Girder, Under hung Hoist) Crane Manufacturers Association of America CMAA Specification 78 - Standards and Guidelines for Professional Services Performed on Overhead Traveling Cranes and Associated Hoisting Equipment Manufacturers Operations Manual Page 11