NOKOMMS. kéï=~ë=çñw= pfoliru c^kq^pqf` fåëí~ää~íáçå=fåëíêìåíáçåë=iáöüí=qê~åâ=póëíéã. båöäáëü

Similar documents
CEILING ATTACHMENT FOR MACH M2

ACROBAT SWING STAND MODEL

CEILING ATTACHMENT ACROBAT SWING

Operating instructions ErgoPack 600 E

ACROBAT SWING STAND MODEL

TOYOTA YARIS (HB) CARGO NET Preparation

INSTALLATION INSTRUCTIONS

3875 Cypress Drive Petaluma, CA Fax

INSTALLATION INSTRUCTIONS

Installation Instructions READ THOROUGHLY BEFORE BEGINNING Signature Series Rail Kit Dodge Ram Trucks-all, including Mega-cabs

STAND FOOT - STAND TUBE

,)0-3()28:EVMS 1EMRXIRERGI-RWXVYGXMSRW

STAND MODEL FOR MACH M2

Drive Unit e-drive1. Installation instructions 04/2014. English translation of the original German installation instructions

VHM-P (Non-Locking) Variable Height Arm with VESA Mounting Plate for 75 x 75mm or 100 x 100mm applications

GENUINE PARTS INSTALLATION INSTRUCTIONS

Operating Instructions

Edition Manual Chapter Page Workshop Manual, Stiga Park 5 Belts 11

GPS AutoSteer System Installation Manual

TESLA MODEL S REAR UNDER SPOILER & DIFFUSER SYSTEM

THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL. WELLS ENGINE UNIT 230 VOLT Product No. U905, U906, U907, U908

Disassembly. 1 Pull off the QUIK-LOK cable from the machine.

GENUINE PARTS INSTALLATION INSTRUCTIONS

GPS AutoSteer System Installation Manual

Exchange of rollers from the XTS-Mover

Instructions for MB832 Manual Barrier Ver0614

CAUTION. INSTALLATION INSTRUCTIONS Part Number Hidden Winch Kit with special XD 9000 Short Drum Winch For Ford F-150 Truck

VHM-P (Non-Locking) and VHM-PL (Locking) Variable Height Arm with Slide-In Mounting Plate

POWER STEERING PUMP REBUILDING SPK101 Read instructions completely before removal & disassembly

WATERFLUX 3070 Quick Start

D-LUX DENTAL LIGHT INSTALLATION AND OPERATION INSTRUCTIONS. Model AL-711M Model AL-712M Model AL-715M

Flue installation instructions. Air flue duct for use with ecomax and ecotec boilers. For the installer

PFadvantage MF 6850/6855; Ideal 9080/9090

Introduction. The words WARNING, CAUTION and NOTE carry special meanings and should be carefully reviewed.

Dr. Mach Lamps and Engineering

A-dec O Clock Delivery System

Operating Instructions Flexdip CYA112

Front seats. j a t CAUTION! Before beginning repairs on the electrical system: Obtain the anti-theft radio security code. Switch the ignition off.

qn=l=qo=l=qp=üáöüëéééç=ü~åçéáéåé

C.fm Page 1 Thursday, February 21, :28 AM Raptor user manual

GENUINE PARTS INSTALLATION INSTRUCTIONS

Part Name/Description Part Number Quantity Instruction Kit Metalfor Flow Sensor

Mirror Solutions Bevel & Pivot Models Installation Instructions INSTALLATION INSTRUCTIONS. Figure 1

Dr. Mach Lamps and Engineering

INSTALLATION NOTES: nbeckon-26

RH722 Instruction Manual

DeZURIK " BAW AWWA BUTTERFLY VALVES WITH EPOXY-RETAINED SEAT

Rear Vision System Liftgate Emblem Camera for Aftermarket Display Ford Flex (Kit part number )

TOYOTA TUNDRA COLD AIR INTAKE Preparation SEQUOIA

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

A-dec 541 Delivery System and 545 Assistant s Instrumentation

SCION xd INTERIOR LIGHTING UPGRADE Preparation

TOYOTA RAV4/HV INTERIOR LIGHT KIT Preparation

SERVICE BULLETIN DANGER. IMPORTANT This modification should be accomplished only by a qualified commercial, industrial, trained service technician.

The POWER. In PRESENTATION PRODUCTS. Instruction Book for BOARDROOM ELECTROL DA-LITE SCREEN COMPANY, INC.

GPS AutoSteer System Installation Manual

Sentinel Field Satellite Controller

(Refer to qualified personnel)

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

INSTALLATION INSTRUCTIONS

Installation Instructions for Chevrolet Corvette Lingenfelter High Flow Air Intake System (6.0L LS2 V8 engine)

Installation Instructions Table of Contents

DayStar Quick Start Guide

SOLAR CHARGE CONTROLLER

7100SZ Series SafeZone Installation and Instruction Manual

INSTRUCTION MANUAL MAGNA RAIL

Installing instruction Power-restraining FB33 March 2005

Installation Guide Rollerdor RD77 Econ Roller Garage Door

SCION FR-S CENTER ARMREST Preparation

YARIS 4-DOOR 2007 INTERIOR LIGHT UPGRADE

Legacy Installation Manual

1.5 WIPER MOTOR INSTALLATION INSTRUCTIONS (ITEM # S: 71081, 71011, 71082, 71012, 71182, 71112)

Installation Notes. PlayPorTT Kiosk Anti-Tip Safety Cable. (p/n )

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1

JEEP JK 4 X-SERIES SUSPENSION KIT Thank you for choosing Rough Country for your suspension needs.

D.fm Page 1 Wednesday, March 5, :21 PM Raptor user manual

The Da-Lite Difference.

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales For hazardous areas

TOYOTA YARIS HATCHBACK INTERIOR LIGHT UPGRADE Preparation

DENTAL LIGHT INSTALLATION AND OPERATION INSTRUCTIONS

Service manual. English. F5 Corpus

PRODUCT USE INFORMATION

1 Product Description System Layout Safety Instructions Intended Use Installation... 3

JEEP TJ & (XJ 84-01) ATLAS 2 SP.

GENUINE PARTS INSTALLATION INSTRUCTIONS

MF 9690, 9790, Challenger 660, 670

INSTALLATION MANUAL. Melink Corporation (513) Revision

Down and Out Motor Mount Assembly & Installation Directions

Toyota 4RUNNER With/MR Overhead Video

Instruction Book for. ContouR ElECtRol

Installation Manual. For. Trident Boat Lifts

GENUINE PARTS INSTALLATION INSTRUCTIONS

Mounting instructions Directions for use MAKROLUX. Halogen-spot lamp for consulting room and hospital

Instructions for Fitting, Operating and Maintenance Canopy Door RE / (St.: )

INSTALLATION INSTRUCTIONS

Do not dispose of packaging until the shades are operating to your satisfaction.

book Seite 1 Mittwoch, 4. Juli : qn=`i^ppf` Operating Instructions. båöäáëü. lééê~íáåö=fåëíêìåíáçåë

PIL0478 ISSUE 01/ 07/16

Lucent Technologies Whippany Physical Design

MODEL BA735QC. Instruction Manual. Qwik Change Extension Arm

Transcription:

kéï=~ë=çñw= NOKOMMS pfoliru c^kq^pqf` fåëí~ää~íáçå=fåëíêìåíáçåë=iáöüí=qê~åâ=póëíéã båöäáëü

General information Sirona Dental Systems GmbH General information About this document This document describes the installation of the SIROLUX FANTASTIC as a Light Track System. You will require the drilling template for reliable and safe fastening to the ceiling. REF 60 53 503 Light Track System The requirements for installing the SIROLUX FANTASTIC as a Light Track System model are described in the Instructions SIROLUX FANTASTIC Light Track System, wall model, cabinet model. REF 60 53 529 Light Track System, wall model, cabinet model kéï=~ë=çñw= NOKOMMS Changes since the last version: 12.2004 Chapter or section, page 2 D3494.031.01.02.02

Sirona Dental Systems GmbH Contents 1 Before you begin... 5 1.1 Safety information... 6 1.2 Installation versions... 7 1.3 Dimensions/Space requirements... 8 1.4 Installation in fixed network... 11 båöäáëü 2 Delivery and transport... 13 2.1 Delivery... 14 3 Installation... 17 3.1 Required tools... 18 3.2 Determining the fastening points... 19 3.3 Drilling the holes... 20 3.4 Mains power voltage selection... 21 3.5 Fastening and connecting the ceiling rails... 23 3.6 Shortening and mounting the support tube... 24 3.7 Mounting the flexible support arm with lamp... 26 D3494.031.01.02.02 3

Sirona Dental Systems GmbH 4 D3494.031.01.02.02

SIROLUX FANTASTIC Light Track System 1 Before you begin D3494.031.01.02.02 5

1 Before you begin Sirona Dental Systems GmbH 1.1 Safety information It is essential that you comply with the warning and safety information contained in the. All such information is highlighted by the signal words CAUTION, WARNING or DANGER. DANGER It is essential that you switch the line voltage OFF at the main switch of the building installation before beginning installation of the unit! CAUTION The installation must be carried out in accordance with the requirements stated in our. CAUTION The installation may be carried out only by personnel specifically authorized by SIRONA. CAUTION Any person who assembles or modifies a medical electrical system complying with the standard IEC 60 601-1-1 (safety requirements for medical electrical equipment) by combining it with other equipment is responsible for ensuring that the requirements of this regulation are met to their full extent for the safety of the patients, the operators and the environment. CAUTION Electromagnetic compatibility: The unit should not be operated in the immediate vicinity of other devices (see also "Installation Requirements ). If this proves to be unavoidable, the unit should be monitored to ensure that it is used properly. CAUTION Use an ESD wrist band during installation. Connect it to the protective ground wire. CAUTION When opening the unit: Please observe the usual precautionary measures for handling PCBs (ESD). Touch a ground point to discharge static electricity before handling any components. If any equipment not approved by SIRONA is connected, it must comply with the applicable standards: - IEC 60 950-1 for information technology equipment and - IEC 60 601-1 for medical electrical equipment. See also Installation Requirements. In case of doubt, contact the manufacturer of the system components. CAUTION Wireless phone interference with medical electrical equipment: To ensure safe operation of medical electrical equipment, the use of mobile wireless phones in practice or hospital environments is prohibited. 6 D3494.031.01.02.02

Sirona Dental Systems GmbH 1 Before you begin 1.2 Installation versions Light Track System båöäáëü The SIROLUX FANTASTIC is available in three different versions: As a ceiling model As a Light Track System as a wall and cabinet model These installation instructions describe the installation of the SIROLUX FANTASTIC in the Light Track System version. D3494.031.01.02.02 7

1 Before you begin Sirona Dental Systems GmbH 1.3 Dimensions/Space requirements 1.3.1 Dimensions of SIROLUX FANTASTIC 1:20 Light Track System Side view approx. 1500 59 * 735 29 ** 835 1035 32 7/8 40 3/4 *approx. 2500 98 1/2 **approx. 2600 2800 102 1/2 110 1/4 777 30 1/2 1660 65 3/8 Tube * Short support tube ** Long support tube 8 D3494.031.01.02.02

Sirona Dental Systems GmbH 1 Before you begin Side view båöäáëü 1975 77 3/4 30 30 700 27 1/2 D3494.031.01.02.02 9

1 Before you begin Sirona Dental Systems GmbH 1.3.2 Dimensions of SIROLUX FANTASTIC 1:20 Light Track System with C8 +, ProFeel + Top view 155 25 264 10 3/8 155 335 500 (min. 300) 19 5/8 (min. 11 3/4 ) 10 D3494.031.01.02.02

Sirona Dental Systems GmbH 1 Before you begin 1.4 Installation in fixed network 2 8 A - 16 A L N båöäáëü 1 3 L N 1 3-wire power cable N, L, PE, 2 x AWG 14 plus PE, (3 x 1.5 mm 2 ). 2 Overcurrent circuit breaker 8 A - 16 A. 3 Power switch for lamp. The switch must be located in the same room as the Light Track System. D3494.031.01.02.02 11

1 Before you begin Sirona Dental Systems GmbH 12 D3494.031.01.02.02

SIROLUX FANTASTIC Light Track System 2 Delivery and transport D3494.031.01.02.02 13

2 Delivery and transport Sirona Dental Systems GmbH 2.1 Delivery SIROLUX FANTASTIC lamp Support tube Installation material Installation material Dimensions (cm): 100 x 59 x 31 (Inch):40x23x12 18 kg (40 lbs) Dimensions: Short support tube (cm): 75 x 12 x 12 (Inch): 30 x 5 x 5 Long support tube (cm): 115 x 12 x 12 (Inch): 45 x 5 x 5 4 kg/5 kg (8.8 lbs/11 lbs) Light Track System Dimensions(cm):210x40x22 (Inch):83x16x9 31 kg (68.3 lbs) 2.1.1 Packaging All SIRONA equipment is carefully checked and packed prior to shipment. Please carry out incoming inspection of the equipment in order to make sure that it was not damaged during transport. Check the packaging and the equipment for visible signs of damage. Check the shipment for completeness based on the attached scope of supply checklist. i NOTE If the shipment was damaged during transport, document all damage carefully and contact the responsible carrying agent immediately. i NOTE Disposal: Return the packaging materials to SIRONA or dispose of them in compliance with the legal regulations applicable in your country. 14 D3494.031.01.02.02

Sirona Dental Systems GmbH 2 Delivery and transport 2.1.2 Scope of supply (see also page 14) The following components are contained in the scope of supply of the SIROLUX FANTASTIC Light Track System model: Light Track System incl. installation material Tube support incl. installation material SIROLUX FANTASTIC lamp incl.: Lamp handles Cable takeup båöäáëü 2.1.3 Transport If possible leave the packaging attached to the unit during transport in order to protect it against damage. Avoid severe jolts and vibrations! The lamp reflector is a sensitive component which therefore must be handled with care. D3494.031.01.02.02 15

2 Delivery and transport Sirona Dental Systems GmbH 16 D3494.031.01.02.02

SIROLUX FANTASTIC Light Track System 3 Installation D3494.031.01.02.02 17

3 Installation Sirona Dental Systems GmbH 3.1 Required tools 1. 2. 3. 4. 5. 6. dia. 12 mm 1/2 7. 8. 9. 10. 1. Scissors 2. Plumb line 3. Center punch 4. Hammer 5. Carbide drill bit 6. Impact drilling machine or percussion drill 7. Torque wrench 8. Metal-cutting saw 9. Spirit level 10. Offset screwdriver Adhesive tape 18 D3494.031.01.02.02

Sirona Dental Systems GmbH 3 Installation 3.2 Determining the fastening points båöäáëü 500mm (min. 300mm) 19 5/8" (min. 11 3/4") DANGER Shock hazard! Be sure to switch the line voltage OFF at the main switch of the building installation BEFORE beginning the installation procedure. DANGER Shock hazard! When determining the fastening points, make sure that none of them are located above electrical cables installed in the ceiling. Attaching the drilling template and center punching the fastening points Attach the drilling template to the ceiling according to the relevant instructions provided for that purpose. Center punch the three boldly encircled fastening holes and remove the drilling template again. Preparing the drilling template Cut an opening in the drilling template at the location where the power cable is to be inserted. Insert the power cable through the opening in the drilling template. D3494.031.01.02.02 19

3 Installation Sirona Dental Systems GmbH 3.3 Drilling the holes 1. Important information on ceiling construction WARNING The total weight of the SIROLUX FANTASTIC Light Track System is approx 31 kg. The ceiling construction must be suitable for mounting the SIROLUX FANTASTIC Light Track System (see On-site Installation, Dimensions, Technical data ). WARNING The Light Track System may come loose from the ceiling if not fastened properly. Always used fasteners which are appropriate for the ceiling constructure at hand. WARNING Never use a worn-out drill bit (decreased diameter). For concrete ceilings WARNING The heavy duty steel wall plugs supplied may be used only for concrete ceilings! For other ceilings WARNING For all nonconcrete ceilings, the ceiling construction must be checked for sufficient fastening substance and special wall plugs must be purchased from a specialized dealer. For wood joist ceilings, an (approx. 10 mm thick) anchor plate is required, which can be made by a local fitter. Two spacers can be made for suspended. Please provide detailed information on the load capacity of the ceiling and purchase the appropriate installation materials from a specialized dealer. 1. Drill the wall plug hole depending on the condition of the ceiling and the installation materials (for concrete ceilings: approx. 70 mm deep with a hole diameter of 12 mm). 20 D3494.031.01.02.02

Sirona Dental Systems GmbH 3 Installation 3.4 Mains power voltage selection 3.4.1 230V mains power supply 1. båöäáëü Kl 11 F1 2. Kl.11 Fuse F1: T2AH Unscrew the front and rear cover of the Light Track System rail. CAUTION The Light Track System rail is configured for 230V mains power at the factory. Changes are only required if the Light Track System shall be connected to 115V. Before connecting to mains power, check that the labels show the proper mains power selection. 1. Label positions for 230V mains power and fuse F1 with T2AH. 2. Wiring scheme of terminal Kl 11 for operation with 230V. D3494.031.01.02.02 21

3 Installation Sirona Dental Systems GmbH 3.4.2 115V mains power supply 1. Kl 11 F1 2. Kl 11 Fuse F1: T4AH Unscrew the front and rear cover of the Light Track System rail. CAUTION The Light Track System rail is configured for 230V mains power at the factory. Changes are required before connecting to 115V mains power. 1. Remove the labels for 230V mains power and fuse F1 T2AH. Stick on the labels for 115V mains power and F1 T4AH. Exchange the fuse F1 T2AH with a fuse of type T4AH. 2. Rewire the leads on terminal Kl 11 as shown. 22 D3494.031.01.02.02

Sirona Dental Systems GmbH 3 Installation 3.5 Fastening and connecting the ceiling rails 1. B A B båöäáëü 2. Kl 12 C C 1. Run the power cable as shown and screw on the two ceiling mounts A. Install the cable for the composite function as well (if available). Check the two ceiling mounts horizontally with the spirit level. If necessary, compensate on the right or left at locations B. 2. Thread the power cable through the opening in the holder and fit the ceiling rail. Screw on the ceiling rail tight with four screws C and washers. Connect the power cable to terminal Kl 12: L (brown) to 12 L N (blue) to 12 N PE (green/yellow) to 12 PE D3494.031.01.02.02 23

3 Installation Sirona Dental Systems GmbH 3.6 Shortening and mounting the support tube 1. 2. X X Dia. 5 mm +0.1 Y A B Unscrew the slide cover (watch out for washer). i NOTE If the room height is between 260 cm and 280 cm, you will require the long support tube, which then must be shortened as required. 1. Shorten the support tube. Place the support tube in the slide and fasten it with the Allen screws. Transfer the 176 cm dimension from the floor to the support tube. Measure dimension X. Loosen the Allen screws again slightly and remove the support tube. Cut dimension X off of the upper end of the tube. Drill hole A 9 mm from the end of the tube with a diameter of 5 mm +0.1 at the upper end of the tube opposite safety plate B (see illustration above). i NOTE Tip: To make sure that the support tube does not slip away while you're center punching and drilling it, you can unscrew safety plate B (see also page 26) and e.g. place a ruler underneath the flattened side of the tube connection to fix the tube in its position. 2. Measure the new length of the support tube, Y. 24 D3494.031.01.02.02

Sirona Dental Systems GmbH 3 Installation 3. 4. D E båöäáëü 500 Ncm ± 20 Ncm 1C 3. Measure the length of the cable and stow the excess cable length in cable takeup C. i NOTE The remaining length of cable should correspond to the length of the support tube, Y. 4. Mount the support tube. Thread the cable incl. cable takeup into the support tube from above. Insert the support tube into the slide as shown and hammer in dowel pin D. i NOTE Dowel pin D is included in the scope of supply of the support tube. Tighten the two Allen screws E firmly. D3494.031.01.02.02 25

3 Installation Sirona Dental Systems GmbH 3.7 Mounting the flexible support arm with lamp 1. 2. 4. B1 1 A D 3. 5. 2B C1 2F 1E 2C 1. Attach slide cover A (see dismantling instruction on page 24). Preparing the flexible lamp support arm 2. Pull the bellows back slightly on the flexible lamp arm. Using a screwdriver, carefully pry the two parts of support ring B apart on both sides and remove both ring halves. 3. Using a screwdriver, carefully pry apart the two covers C on both sides of the articulated arch and remove them. 4. Fit sleeve D (included in the scope of supply of the support tube) onto the shaft of the flexible support arm. Mounting the flexible lamp support arm 5. Now loosen screw E on the support tube and pull out safety plate F, unless you already did this before drilling the hole in the support tube (see page 24). 26 D3494.031.01.02.02

Sirona Dental Systems GmbH 3 Installation 6. 7. 8. 2F båöäáëü G1 9. H 6. Pull the cables of the support tube downward through the shaft and the articulated arch of the flexible lamp support arm. 7. Insert the shaft of the lamp support arm into the support arm from below and fasten this connection by refitting safety plate F. i NOTE When assembling, make sure that the two stop pins G of the flexible support arm and the support tube are not located on top of each other. 8. Plug the cables together, roll them up in a loop and stow them in the arm. i NOTE The large connector should be stowed in the articulated arch so that it points toward the lamp. The small connector should be stowed in the articulated arch so that it points upward toward the support arm. CAUTION Make sure that the cables are not crushed. 9. Adjust the brake of the flexible lamp support arm with brake screw H. i NOTE The brake should be adjusted so that the support arm shows a slight braking resistance and does not automatically move under its own weight. D3494.031.01.02.02 27

3 Installation Sirona Dental Systems GmbH 10. 11. 12. J3 4K L2 M 10. Screw the covers of the ceiling adapter back on. 11. Push sleeve J upward onto the support tube, reattach covers K and support ring L to the flexible lamp support arm and push the bellows back onto the support ring (see also dismantling on page 26). 12. Attach the two handles M to the lamp while pressing the button. Four handle positions are possible. 28 D3494.031.01.02.02

té=êéëéêîé=íüé=êáöüí=íç=ã~âé=~åó=~äíéê~íáçåë=ïüáåü=ã~ó=äé=êéèìáêéç=çìé=íç=íéåüåáå~ä=áãéêçîéãéåíëk «=páêçå~=aéåí~ä=póëíéãë=dãäe=ommnjommq péê~åüéw=éåöäáëåü= mêáåíéç=áå=déêã~åó apqvqkmpnkmnkmokmo===nokomms ûkjkêkw=nmu=nmv fãéêáã =Éå=^ääÉã~ÖåÉ páêçå~=aéåí~ä=póëíéãë=dãäe få=íüé=rp^w c~äêáâëíê~ëëé=pn páêçå~=aéåí~ä=póëíéãë=ii` SQSOR=_ÉåëÜÉáã QUPR=páêçå~=aêáîÉI=pìáíÉ=NMM déêã~åó `Ü~êäçííÉI=k`=OUOTP ïïïkëáêçå~kåçã rp^ få=`~å~ç~w páêçå~=`~å~ç~ PORM=oáÇÖÉï~ó=aêáîÉ=J=råáí=R jáëëáëë~ìö~i=låí~êáç=iri=rvs `~å~ç~ lêçéê=kçk SM=RP=QSN=aPQVQ