Net Metering Program

Similar documents
INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

S T A F F R E P O R T

To complete the process for a net metering interconnection, please follow the steps below:

Louisville Gas and Electric Company

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

To complete the process for a net metering interconnection, please follow the steps below:

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

To complete the process for a net metering interconnection, please follow the steps below:

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

White River Electric Association, Inc. Net Metering Information & Service Requirements

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

INTERCONNECTION REQUIREMENTS POLICY

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

Umatilla Electric Cooperative Net Metering Rules

Louisiana Net Metering Service. Customer Information Package

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

TILLAMOOK PEOPLE S UTILITY DISTRICT

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

NET METER REQUEST FORM

Definitions. Scope. Customer Generation Interconnection Requirements

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

SCHEDULE NO. ACG33 NET METERING SERVICE

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

TERMS AND CONDITIONS

COMMUNITY SOLAR PROGRAM

HydroGenerations PROGRAM HANDBOOK

Senate Substitute for HOUSE BILL No. 2101

Distributed Generation Interconnection Policy

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

Adopted: September 24, 2015 Version: Version 1.0

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Schedule No. NMR-405 NET METERING RIDER-405 APPLICABLE

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined

ENGINEERING SPECIFICATION

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

2lr1344 CF 2lr1396. Drafted by: Heide Typed by: Rita Stored 02/02/12 Proofread by Checked by By: Senator Pinsky A BILL ENTITLED

ELECTRIC DIVISION CUSTOMER-OWNED RENEWABLE GENERATION INFORMATION PACKAGE

REVISION NO.: 7 EFFECTIVE: 07/07/16

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

Noble County Rural Electric Membership Corporation

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

MICHIGAN ELECTRIC UTILITY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Net +Plus Connection Code

ARKANSAS PUBLIC SERVICE COMMISSION NET-METERING RULES

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

To complete the process for a net metering interconnection, please follow the steps below:

New Hampshire Electric Cooperative s (NHEC) Above the Cap Interconnection (Net Metering) Application Instructions

JEA Distributed Generation Policy Effective April 1, 2018

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

HOUSE BILL No Koch

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

CITY OF SASKATOON ADMINISTRATIVE POLICY

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

JACKSON ELECTRIC COOPERATIVE POLICY NO. 305

Douglas Electric Cooperative Roseburg, Oregon

Schedule SP SOLAR PURCHASE (Experimental)

MISSOURI SERVICE AREA

Interconnection Process for Generation Systems

TERMS AND CONDITIONS XXV. NET METERING CUSTOMERS AND SMALL AGRICULTURAL GENERATORS

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

Noble County Rural Electric Membership Corporation

PUBLIC UTILITY COMMISSION OF OREGON AHD REPORT PUBLIC MEETING DATE: April 10, 2018 EFFECTIVE DATE N/A

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

ACTION FORM. EXHIBIT #1 Regular Council Meeting of 11/27/2006

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

ELECTRICAL DISTRICT # 2

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

Transcription:

Net Metering Program Chapter 1 Purpose and Scope. The purpose of this chapter is to establish rules for determining the terms and conditions governing the interconnection of electric generation facilities with a nameplate generating capacity of not more than 5 kilowatts to the electric system of Payson City Chapter 2 Definitions Electric system means all electrical wires, equipment, and other facilities owned or provided by the utility that are used to transmit electricity to customers. Generating facility means a source of electricity owned by the applicant or generator that is located on the applicant s side of the point of common coupling, and all facilities ancillary and appurtenant thereto, including interconnection facilities, which the applicant requests to interconnect to the utility s electric system. Generator means the entity that owns and/or operates the generating facility interconnected to the utility s electric system. Interconnection means the physical connection of a generating facility to the electric system so that parallel operation may occur. Interconnection agreement means the standardized terms and conditions that govern the interconnection of generating facilities pursuant to these rules. The model interconnection agreement may be modified to accommodate terms and conditions specific to individual interconnections, subject to the conditions set forth in these rules. Interconnection facilities means the electrical wires, switches and other equipment used to interconnect a generating facility to the electric system. Net metering means measuring the difference between the electricity supplied by the utility and the electricity generated by a generating facility that is fed back to the utility over the applicable billing period. Parallel operation or operating in parallel means the synchronous operation of a generating facility while interconnected with the utility s electric system. Utility means Payson City that owns and operates the electrical distribution system, or the electrical distribution system itself, onto which the applicant seeks to interconnect a generating facility. Chapter 3 Technical Standards for Interconnection. 1 General interconnection requirements.

(a) The generator shall comply with the requirements is subsection (a)(i), (a)(ii), and (a)(iii). However, at its sole discretion, the utility may approve alternatives that satisfy the intent of, and/or may excuse compliance with, any specific elements of these requirements. (i) Code and Standards. Applicant shall conform to all applicable codes and standards for safe and reliable operation. Among these are the National Electric Code )NEC), National Electric Safety Code (NESC), the Institute of Electrical and Electronic Engineers (IEEE), American National Standard Institute (ANSI), and Underwriters Laboratories (UL) standards, and local, state and federal building codes. The generator shall be responsible to obtain all applicable permit(s) for the equipment installations on its property. (ii) Safety. All safety and operating procedures for joint use equipment shall be in compliance with the Occupational Safety and Health Administration (OSHA) Standard 29, CFR 1910.269, the NEC, Washington Administrative Code (WAC) rules, the Washington Industrial Safety and Health Administration (WISHA) Standard, and equipment manufacturer s safety and operating manuals. (iii) Power Quality> installations will be in compliance with all applicable standards including IEEE Standard 519-1992 Harmonic Limits. 2 Specific interconnection requirements. (a) Applicant shall furnish and install on applicant s side of the meter, a ULapproved safety disconnect switch which shall be capable of fully disconnecting the applicant s generating facility from the utility s electric system. The disconnect switch shall be located adjacent to utility meters and shall be of the visible break type in a metal enclosure which can be secured by a padlock. The disconnect switch shall be accessible to utility personnel at all times. (b) The requirement in subsection (2)(a) above may be waived by the utility if: (i) applicant provides interconnection equipment that applicant can demonstrate, to the satisfaction of the utility, performs physical disconnection of the generating equipment supply internally: and (ii) applicant agrees that its service may be disconnected entirely if generating equipment must be physically disconnected for any reason. (c) The utility shall have the right to disconnect the generating facility at the disconnect switch under the following circumstances: when necessary to maintain safe electrical operating conditions; if the generating facility does not meet required standards; if the generating facility at any time adversely affects or endangers any person, the property of any person, the utility s operation of its

electric system or the quality of the utility s service to other customers; or failure of the owner of record, as filed with the utility, to notify the utility of a sale or transfer of the generator, interconnection facilities or the premises on which the generator is located. (d) Nominal voltage and phase configuration of applicant s generating facility must be compatible to the utility system at the point of common coupling. (e) Applicant must provide evidence that its generation will never result in reverse current flow through the utility s network protectors. All instances of interconnection to secondary spot distribution networks shall require review and written pre-approval by the utility. Interconnection to distribution secondary grid networks is not allowed. Closed transition transfer switches are not allowed in secondary network distribution systems. 3 Specific applicable to all inverter-based interconnections. Any inverter-based generating facility desiring to interconnect with the utility s electric system or modify an existing interconnection must meet the technical specifications, in their most current approved version, as set forth below. (a) IEEE Standard 1547-2003, Standard for Interconnecting Distributed Resources with Electric Power Systems. (b) UL Standard 1741, Inverters, Converters, and Controllers for use in Independent Power systems, Equipment must be UL listed. (c) IEEE Standard 929-2000, IEEE Recommended Practice for Utility Interface of Photovoltaic (PV) Systems. 4 Requirements applicable to all non-inverter-based interconnections. Non-inverter based interconnection requests may require more detailed review, testing, and approval by the utility, at applicant cost, of the equipment proposed to be installed to ensure compliance with applicable technical specifications, in their most current approved version, including: (a) IEEE Standard 1547-2003, Standard for Interconnecting Distributed Resources with Electric Power Systems. (b) ANSI Standard C37.90, IEEE Standard for Relays and Relay Systems Associated with Electric Power Apparatus. (c) Applicants proposing such interconnection may also be required to submit a power factor mitigation plan for utility review and approval. Chapter 4 Application for Interconnection 1 When an applicant requests interconnection from the utility, the applicant shall be responsible for conforming to the rules and regulations that are in effect. The applicant seeking to interconnect a generating facility under these rules must fill out and submit a

signed application form. Information must be accurate, complete and approved by the utility prior to installing the generating facility. 2 Application fees. The utility requires a non-refundable interconnection application fee of $100.00, with payment for the net meter 3 Application evaluation. All generating interconnection requests pursuant to this chapter will be reviewed by the utility for compliance with these rules. If the utility in its sole discretion find that the application does not comply with this chapter, the utility may reject the application. If the utility rejects the application it shall provide the applicant with written notification stating its reasons for rejecting the application. Chapter 5 Special Conditions. 1 The customer shall pay for the net energy used in accordance with the following formula: (a) (b) (c) The customer shall pay for all electric energy supplied by the city to the customer in any billing period in excess of the amount of electric energy produced by the customer on the premises which is fed back into the city s electric distribution system during that same billing period. The customer shall receive a credit for all electrical energy produced by the customer on the premises which is fed back into the city s electrical distribution system during a billing period in excess of the amount of electric energy supplied by the city during that billing period, with such credit applied to the customer s future bills, except that any electric energy credit balance remaining in favor of the customer under the provisions of this subsection at the time of their April billing each year shall be zeroed out with no further liability to the city and no credit to the customer for said balance. In the event the customer terminates service under this electric service schedule, any electric energy credit balance in favor of the customer under the provisions of this subsection of this section shall be forfeited. The city will not make cash payment to customers based on their participation in the Net Metering Pilot Program for energy produced by the customer whish is fed into the city s electric distribution system. 2 The price for electric energy provided to, or credited to, a customer participating in the Net Metering Program shall be the price charged by the city under the provisions of the electric service schedule for which the customer receives service absent this electric service Net Metering Program. 3 The Net Metering Program billing adjustment only applies to charges for energy. Participating customers are subject to all other charges, rates, terms and conditions of the

electric service schedule under which the customer receives service except as expressly altered by this electric service Net Metering Program. 4 The customer will release to City all renewable energy credits (RECs), solar renewable-energy credits (S-RECs), or other renewable attributes as appropriate based on actual on-site electric generation from the Renewable Resource. 5 The customer shall be responsible for any damage caused by the customergenerating facility to the City s distribution system and/or neighboring services. The customer shall be responsible for the installation and maintenance of applicable protection equipment, and for nay damage caused by improper application, maintenance of faulty equipment. Payson City shall not be liable directly or indirectly for permitting or continuing to allow an attachment of a net metering facility or for the acts or omissions of the customer-generator that cause loss or injury, including death, to any third party. Signature of Applicant Date