LOW IR SWITCH 1 SERIL NUMBER MODEL NO. SHUNT TRIP CONTROL YES INTERRUPT CPCITY OTHER RTING CLSS INTERRUPT RTING OTHER GROUND FULT RELY PICKUP RNGE TIME DELY RNGE PICKUP SETTING TIME DELY SETTING OTHER VISUL & MECHNICL INSPECTION INSPECT YSICL & MECHNICL INSPECT NCHORGE, LIGNMENT & CLERNCES INSPECT GROUNDING PERFORM S-FOUND TESTS IF REQUIRED CLEN UNIT VERIFY BLDE LIGNMENT & PENETRTION VERIFY TRVEL STOPS & MECHNICL OPERTION VERIFY FUSE S & S VERIFY FUSE HOLDER SUPPORT INSPECT BOLTED ELECTRICL CONNECTIONS FOR HIGH RESISTNCE WITH ONE OF: LOW RESISTNCE OHMMETER CLIBRTED TORQUE WRENCH THERMOGRIC SURVEY TEST INTERLOCKING SYSTEMS FOR OPERTION & SEQUENCING INSPECT INSULTING SSEMBLIES VERIFY LL INDICTING & CONTROL DEVICES LUBRICTE MOVING CURRENT-CRRYING PRTS LUBRICTE MOVING & SLIDING SURFCES VERIFY HETER OPERTION ELECTRICL TESTS BOLTED CONNECTIONS FUSE FUSE HOLDER CONTCT RESISTNCE MESUREMENTS LINE LOD m Ω m Ω S FOUND S LEFT S FOUND S LEFT S FOUND S LEFT INSULTION RESISTNCE TEST RESULTS 10 KVDC GROUND FULT (P1-P2) (P2-P3) (P1-P3) PICKUP M Ω TIMING M Ω M Ω CONTROL WIRING M Ω 15510, REVISED 5/26/2010
LODBREK DISCONNECT TEST 2 SERIL NO. MPERES INTERRUPTING RTING OPERTING MECHNISM GE B.I.L. RTING kv MOMENTRY FULT CLOSING MPS OTHER HOLDER MX. MPS REFILL ELEMENT CT. NO. TCC NO. kv NMEPLTE VS. DRWING/SPEC. YSICL/MECHNICL VERIFY PPROPRITE LUBRICTION BLDE LIGNMENT/PENETRTION INDICTION / CONTROL DEVICES BLDE TRVEL STOPS SE BRRIER INSTLLTION MECHNICL OPERTION FUSE RTINGS VS. DRWINGS INSULTION TEST TEMPERTURE CORRECTION FCTOR TO, TCF INSULTION TESTS (P1-P2) (P2-P3) (P1-P3) LINE TO FRME CONTCT RESISTNCE MICRO-OHMS RDG. RCING CONTCT WIPE - INCHES MIN CONTCT WIPE - INCHES FUSE RESISTNCE - MICRO-OHMS MIN CONTCT GP - INCHES OPENING SPEED (ft/sec) MIN CONTCT TRVEL INCHES - CLOSING SPEED (ft/sec) 29000, REVISED 8/23/2013
DISCONNECT SELECTOR SWITCH 3 SERIL NO. MPERES INTERRUPTING RTING OPERTING MECHNISM GE B.I.L. RTING MOMENTRY FULT CLOSING MPS OTHER HOLDER MX. MPS REFILL ELEMENT CT. NO. TCC NO. kv NMEPLTE VS. DRWING/SPEC. YSICL/MECHNICL VERIFY PPROPRITE LUBRICTION BLDE LIGNMENT/PENETRTION INDICTION / CONTROL DEVICES BLDE TRVEL STOPS SE BRRIER INSTLLTION MECHNICL OPERTION FUSE RTINGS VS. DRWINGS INSULTION TEST TEMPERTURE CORRECTION FCTOR TO, TCF MEGOHMS (P1-P2) MEGOHMS (P2-P3) MEGOHMS (P1-P3) INSULTION TESTS B B B B B B LINE TO FRME RES. MICRO-OHMS RESISTNCE FUSE RES. MICRO-OHMS CLOSE/OPEN SPEED (ft/sec) B B B B B B RCING CONTCT WIPE (inches) MIN CONTCT WIPE (inches) MIN CONTCT GP (inches) MIN CONTCT TRVEL (inches) 29100, REVISED 8/23/2013
FUSED DISCONNECT INSPECTION & TEST 4 SERIES MX. VOLTS NMEPLTE VS. DRWING/SPEC. YSICL/MECHNICL VERIFY PPROPRITE LUBRICTION BLDE LIGNMENT/PENETRTION INDICTION / CONTROL DEVICES BLDE TRVEL STOPS SE BRRIER INSTLLTION MECHNICL OPERTION FUSE RTINGS VS. DRWINGS INSULTION TEST TEMPERTURE CORRECTION FCTOR TO, TCF TEST RESULTS CONTCT RESISTNCE MICRO-OHMS SE SE B SE C RESISTNCE - MICRO-OHMS B C -GND INSULTION RESISTNCE - MEGOHMS B-GND C-GND -B -C B-C CTUL SHDING INDICTES TEMPERTURE CORRECTED TO 15601, REVISED 8/23/2013
BOLTED PRESSURE SWITCH TEST 5 MODEL NO. SERIL NUMBER SHUNT TRIP YES NO CONTROL GROUND FULT RELY PICKUP RNGE TIME DELY RNGE PICKUP SETTING TIME DELY SETTING CONTCT FINGERS MIN CONTCTS RCING CONTCTS CLEN/LUBE RC CHUTES OPERTING MECHNISM CONTCT SEQUENCE GROUND CONNECTION UXILIRY DEVICES CLEN/LUBE GROUND FULT RELY TESTED / CLIBRTED YES NO INSULTION TEST TEMPERTURE CORRECTION FCTOR TO, TCF INSULTION RESISTNCE (P1-P2) INSULTION RESISTNCE TEST RESULTS - MEGOHMS (P2-P3) (P1-P3) LINE TO FRME RCING CONTCT WIPE MIN CONTCT WIPE MIN CONTCT GP MIN CONTCT TRVEL (LL MESUREMENTS IN INCHES ) CONTCT RESISTNCE - MICRO-OHMS FUSE RESISTNCE - MICRO-OHMS CONTROL WIRING - MEGOHMS 15500, REVISED 8/23/2013