EFFECTIVE CNG HANDLING & LOGISTICS FOR INDUSTRIES (AN INDONESIAN CASE STUDY)

Similar documents
INDONE IA CA E ON UTILIZING CNG FOR INDU TRIE AND INDU TRIAL E TATE

Hien Ly s qualifications and gas utility experience Updated 10 May 2014

Mr. Punnachai Footrakul. Vice President, NGV Marketing Department PTT Public Company Limited, Thailand 3 December, 2014

Stronger Fundamental and Excellent Growth


FutureMetrics LLC. 8 Airport Road Bethel, ME 04217, USA. Cheap Natural Gas will be Good for the Wood-to-Energy Sector!

RNG Production for Vehicle Fuel. April 4, 2018

Healthier Net Profit under Stronger IDR

FY2017 Results. February 26, 2018

Small GTL A New Midstream Opportunity

Tribal Transit Presentation. April 2011

INCREASING SALES FOR MINING RELATED BUSINESS

Hubungi Kami : Study on Prospect and Market Opportunity of OIL & NATURAL GAS in Indonesia, Please send us. copy(ies) Position :

1H 2003 Financial Results (US GAAP)

Group Results 6 months ended 30th June. Net revenue 88,208 92,505 (5) Net income* 7,116 8,052 (12) Net earnings per share (12)

OUR WAY UPLIFTING. Arkansas CNG: August 16, 2012

Billy Malone DeKalb County Sanitation Sanitation Director SWANA TDIBR-Landfills

The Group is expected to continue benefiting from stable coal prices, but in the car market, competitive pressures are likely to intensify.

CNG Fueling Infrastructure and Site Planning Considerations. for P3NGV June 2013

9M 2003 Financial Results (US GAAP)

PT Astra International Tbk 2018 Third Quarter Financial Statements

PT Astra International Tbk 2017 Full Year Financial Statements

BIOGAS ASIA PACIFIC FORUM 2015 THE MOBILE PIPELINE. TC Goh, Regional Sales Director Asia Pacific

PT Astra International Tbk 2011 Full Year Financial Statements

2015 Interim Results Announcement

Utilization of DME as Alternative Fuel : Prospect and Challenge in Indonesia

The best way to deliver compressed natural gas

Gas Compression Implementation: Economic Systems Comparison. Josh Malouf Energy Transfer Technologies, L.P.

WHO IS PERTAMINA? AUGUST 2016

PT Indosat Tbk 1H 2014 Results

The Direction of Renewable Energy

Lessons from Indonesia

PT Astra International Tbk 2011 Third Quarter Financial Statements

PT Astra International Tbk 2012 Half Year Financial Statements

The Performance of Year 2017

Natural Gas Fleets. Robert K. Hall Gladstein, Neandross & Associates. August 25, l

Energy Security Challenges In Indonesia

SS GEN-02 Business Focus with Simulation

Natural Gas as a Transportation Fuel: Benefits, Challenges, and Implementation

Technologies & Economics

2017 Rp bn. Net revenue 150, , Net income* 14,184 11, Net earnings per share As at 30th September 2017 Rp bn

Indraprastha Gas Limited

Report, construction machinery can be produced, and some of these products are exported.

EnerSea Transport LLC

TECHNICAL BULLETIN SELECTING THE RIGHT COMPRESSOR, STORAGE SYSTEM AND COMPONENTS FOR YOUR CNG REFUELING STATION


The best way to deliver compressed natural gas

Office of House Republican Whip, Stan Saylor

PETROBRAS ARGENTINA S.A.

BlueScope Steel Limited Consolidated Financial Headlines

Paieška Paieška Paieška. Pt nusantara > >

(1) Current State and Issues of the Electricity Sector in Indonesia

Ready Reckoner Snapshot of India s Oil & Gas data March, 2014 Petroleum Planning & Analysis Cell

CNG Fueling Appliances for Natural Gas Vehicles

April Título da apresentação DD.MM.AAAA

Solutions for Flaring & Venting CNG Marine Transportation. Paul BRITTON

ALTERNATIVE ENERGIES AND IMPACT ON STATION OF THE FUTURE. Edouard BOURDIN

Empresa Nacional del Petróleo 1Q 2013 Results

Annual KRTA Report for the Year 2016

Compressed Natural Gas (CNG) Infrastructure Update. Ian Skelton Director, Natural Gas Vehicles

GE Unconventional Natural Gas Infrastructure Solutions

PT Astra International Tbk 2014 Third Quarter Financial Statements

BMW GROUP QUARTERLY REPORT. TO 30 SEPTEMBER 2014

Investor Presentation June, 2014

2010 Interim Results Presentation. August 23, 2010 Hong Kong

Item

Sinopec Corp. Q Results Announcement. 29 October 2010

FISCAL YEAR MARCH 2018 FIRST HALF FINANCIAL RESULTS

CONSOLIDATED FINANCIAL RESULTS OF THE UNIMOT GROUP 3Q 2017

3Q 2016 Analyst Presentation

PEC is continuously experiencing growth in its service territory. Weather and member growth are primary drivers for increased kwh sales.

A CO2-fund for the transport industry: The case of Norway

2014 Gas/Electric Partnership

Modular GTL Industry Approved & Operating

Successfully switching to CNG buses in Verona

PAKISTAN ENERGY CONFERENCE 2016

PERSPECTIVES FOR THE BRAZILIAN REFINING INDUSTRY

Preface Who Should Read This Book 3 Organization and Content 4 Acknowledgments 5 Contacting the Author 5 About the Author 5

Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS

2016 Annual Results Presentation. March 15, 2017

CNG STATION PLANNING & DESIGN CONSIDERATIONS

Analysis of Operating Results and Financial Status

FISCAL YEAR ENDED MARCH 2011 FINANCIAL RESULTS

Date/Time : 10/08/ :58. PTT : Management's discussion and Analysis Q2/07. PTT Public Co., Ltd.

OSEA DELEGATES MARKET BRIEFING Tuesday, 29 th November Oil And Gas Sector In Indonesia

FISCAL YEAR MARCH 2018 FIRST QUARTER FINANCIAL RESULTS

We have grown to be North America s leading supplier of CNG refueling equipment for natural gas vehicles by providing reliable and innovative systems.

NATURAL GAS PRICES COMPARED TO LIQUID FUELS AND ELECTRIC ENERGY

February Annual Results February 13, 2008

PROTELINDO PT. SARANA MENARA NUSANTARA, Tbk. (TOWR) Indonesia s Premier Tower Company 1Q 2015 Results Presentation

Maputo, Mozambique

Acomprehensive analysis was necessary to

SGT5-2000E Latest Service Improvements for Optimized Operations, Maintenance and LNG Fuel Conversion Upgrade Grit Hennig

RESULTS FOR Q ANALYST TELECONFERENCE

Unlocking Private Sector Financing for Alternative Fuel Vehicles and Fueling Infrastructure

CORPORATE PRESENTATION. Non Deal Roadshow February 2018 STRONGER FACING CHALLENGES

WORLD ENERGY LIMITED CNG

ELECTRONIC FAN REGULATORS

Q1 Report Joakim Olsson CEO and President April 23, Innovative Vehicle Technology

Emerging Technologies

Transcription:

EFFECTIVE CNG HANDLING & LOGISTICS FOR INDUSTRIES (AN INDONESIAN CASE STUDY) Presented by Robbi R. Sukardi, Secretary General APCNGI Ho Chi Minh, Vietnam, 01-03 August 2012

Background behind the growth of CNG for Industrial in Indonesia

(1). INDONESIA S CONDITION Indonesian dependency on oil fuel, as we re NO LONGER a Nett Oil Exporter Country; Huge potential gas reserve, with proven reserve of 94,78 TCF and potential reserve of 87.73 TCF, Indonesia is considered as country with largest natural gas reserve; Limited pipeline infrastructure; LNG is NOT yet available for domestic use; Government program to reduce emission level and increase the monetization of stranded gas. Industrial gas demand exceeds supply due to lack of pipeline infrastructure. Many stranded small scale gas reserves. CNG as another means of gas transportation aside from conventional pipeline and LNG

(2). VOLUME With CNG bulk sale selling can reach your economies of scale of the CNG Station.

SAMPLE PARAMETERS OF A CNG MOTHER STATION Large Size Category CNG Station Parameters Minimum Capital Expenditure Capacity Compressors minimum 2,000m3/hr CNG Main Equipments $ 1,883,770 Capacity Compressors maximum 4,000m3/hr Pipeline Construction $ 154,000 - # of compresion stages 4stages Civil Construction $ 550,000 - Minimum Power Capacity 1MW Land Lease 5 years $ 525,000 Size of Land is below 3,000m2 Approvals & Certifications $ 90,000 Unit Nozzels Filling is minimum 6units.. Total Minimum Capex $ 3,202,770 Storage Tank Capacity at Site 2,000m3 Gas Dryer Systems 2units Monthly Operational Expense High Pressure Piping Lengths 200meters Maintenance Equipments $ 11,887 VAT taxes, Import Tax 19.0% Power Usage $ 15,429 Minimum Operational Time 18hours Man Power & GA $ 8,000 Total Minimum Monthly Opex $ 35,316 Capital Structure Requirements Large Size CNG Stations Capex $ 3,202,770 Interest During Construction $ 112,097 Working Capital Gas $ 1,080,777 Working Capital Operation $ 70,631 Total Funds Required $ 4,466,275. Cost of Fund & IRR Requirements Cost of Debt 13%annual Maximum Debt Maturity 5.00 years Corporate Tax Rate 20% Cost of Equity 26%annual Minimum IRR 20%. Debt 40%$ 1,786,510 Equity 60%$ 2,679,765 Total 100%$ 4,466,275. Required Minimum Cash Received $ 117,733 / month Operation Cost $ 35,316 Required Minimum Cash Received $ 117,733 Monthly Minimum Cost Coverage $ 153,049

COST STRUCTURE TO CLOSED OUT YOUR REQUIRED RETURN ON INVESTMENT Minimum Volume Sale per Day (m3) 36,000 Minimum Volume Sale per Month (m3) 1,080,000 Minimum CNG Station Margin $ 0.14 Cost of Pipeline Gas $ 0.25 Cost of CNG at Station $ 0.39 VAT 10%$ 0.04 Net Price of CNG at CNG Station $ 0.43 EQUIVALENT TO MMBTU Minimum CNG Station Margin $ 3.80 Cost of Pipeline Gas $ 6.70 Cost of CNG at Station $ 10.50 VAT 10%$ 1.05 Net Price of CNG at CNG Station $ 11.54 Maximum Volume Sale per Day (m3) 72,000 Maximum Volume Sale per Month 2,160,000 Minimum CNG Station Margin $ 0.07 / m3 Cost of Pipeline Gas $ 0.25 / m3 Cost of CNG at Station $ 0.32 / m3 VAT $ 0.03 / m3 Net Price of CNG at CNG Station $ 0.35 / m3 EQUIVALENT TO MMBTU Minimum CNG Station Margin $ 1.90 / mmbtu Cost of Pipeline Gas $ 6.70 / mmbtu Cost of CNG at Station $ 8.60 / mmbtu VAT $ 0.86 / mmbtu Net Price of CNG at CNG Station $ 9.46 / mmbtu

: Cost of Running Your Stations $0.50 $0.45 $0.40 Target Sale Price at Mother Stations $0.35 $0.30 $0.25 $0.20 $0.15 $0.10 $0.05 $- Volume m3/month 1,080,000 1,200,000 1,320,000 1,440,000 1,560,000 1,680,000 1,800,000 1,920,000 2,040,000 2,160,000 Economical CNG Station Margin $ 0.14 $ 0.13 $ 0.12 $ 0.11 $ 0.10 $ 0.09 $ 0.09 $ 0.08 $ 0.08 $ 0.07 Assumption Pipeline Gas $ 0.25 $ 0.25 $ 0.25 $ 0.25 $ 0.25 $ 0.25 $ 0.25 $ 0.25 $ 0.25 $ 0.25 Sale Price before VAT at Station $ 0.39 $ 0.38 $ 0.37 $ 0.36 $ 0.35 $ 0.34 $ 0.34 $ 0.33 $ 0.33 $ 0.32 VAT 10% $ 0.04 $ 0.04 $ 0.04 $ 0.04 $ 0.03 $ 0.03 $ 0.03 $ 0.03 $ 0.03 $ 0.03 Sale Price of CNG at Station $ 0.43 $ 0.42 $ 0.40 $ 0.39 $ 0.38 $ 0.38 $ 0.37 $ 0.36 $ 0.36 $ 0.35

Well Head Gas Plant Metering System Gas Upstream Infrastructure NGV Customers Gas Downstream Infrastructure Gas Customers / Daughter Stations Gas Customers / Factories

(3). COMMERCIALLY MORE PROFITABLE The competitor in selling CNG to industries in Indonesia are other fuel energy that are more expensive.

THE PRICE DEVIATION BETWEEN GAS AND OTHER FUEL IN INDONESIA Fuel unit Heating Value Price Btu/unit kcal/unit US$/MMBTU KEROSENE Liter 35,079 8,840 32.94 GASOLINE Liter 33,000 8,316 28.00 HSD Liter 35,964 9,063 23.06 MFO Liter 36,786 9,270 19.76 HFO Liter 38,754 9,766 21.41 LPG Kg 44,524 11,220 21.97 NG Pipeline (PT. PGN price Jakarta) m3 36,798 8,919 8.90 NG Pipeline (PT. PGN price Surabaya) m3 37,257 9,031 9.10 NG Pipeline (PT. PGN price Medan) m3 37,257 9,031 10.00 CNG at Mother Station (FOB Price) m3 35,526 9,224 10.50 CNG transported to Customer < 100 km m3 35,526 9,224 15.00 CNG transported to Customer > 100 km m3 35,526 9,224 18.00 CNG Price

$ 5 -$ 6 / mmbtu + $ 3 -$ 4 / mmbtu + $ 2 -$ 4 / mmbtu + $ 2 -$ 4 / mmbtu = $ XX / mmbtu Natural Gas Supplier Natural Gas Pipeline CNG On-line Station CNG Trucking Fleets Industrial Gas Customers / Factories

KEY SUCCESS FACTORS FOR EFFECTIVE CNG HANDLING & LOGISTICS FOR INDUSTRIES IN INDONESIA

UNDERSTAND YOUR INDUSTRIAL CUSTOMER NEEDS Gas energy consumption rate per month, days, and hourly per cubic meters. The distance between the industrial customer to the CNG Mother Station. The traffic and road condition to the industrial customer from the CNG Mother Station. The CNG carrier and Pressure Reduction System must be tailored made toward the Industrial need and specific surrounding area to avoid miscalculation of an over investment or a too highly operating cost

Kilometers distance and ease of traffic Interval [? ] time [? ] filling per day MOTHER STATION CNG CASCADE CYLINDER FILLING CNG CASCADE CYLINDER DOWNLOADING AT INDUSTRY INDUSTRY CUSTOMERS CAPEX: CNG Station Land OPEX : Gas supply Workers Depreciation of the Station CAPEX: Storage Cylinder (type I, II, III, or IV) Truck Trailer (10 ft, 20 ft, or 40 ft Module truck carrier) OPEX : Compressed Natural Gas Supply (if bought FOB) Transportation cost (travel distance for fuel and operating costs) Depreciation of your assets CAPEX: Site Development RegulatorsSystem\ New Piping ( if needed ) CNG PROVIDER CUSTOMERS

Volume btu Sale per month : equivalento to : or equivalento to : Distance from Station to Customers : Minimum Number of GTM Skids Required: Gas Required / Day - Minimum per hour - Maximum per hour Gas PRODUCTION - NET Hours Production Conversion Factor Gas PRODUCTION - NET Compression Capacity at CNG Station Distance roundtrip Speed of HVD for delivery mmbtu m3 monthly M3 daily km units MMBtu / Day MMBtu / Day m3 / hour m3/mmbtu m3 m3/hour km km/hour customer GTM Type (Capacity m3) 10/20/40 ft Number of GTM Required units xxx Designing and custom made, if necessary, toward the customer gas requirement consumption and road conditions.

Typical Industrial Daughter Station Equipment

COMPRESSOR PIPELINE METERING SYSTEM DRYER BY PASS SYSTEM COMPRESSOR DISPENSER #1 DISPENSER #2 DISPENSER #3 STORAGE CYLINDER FILL POINT #1

CAREFULL ON CONVERSION DEVIATION AND DISTRIBUTION LOSSES GAS PGN MMBTU TURBIN METER EVC MICRO MOTION M3 PLE COMPRESSOR TURBIN METER

LaporanKomposisiPGN BULAN : RATA RATA APRIL 2012 KOMPOSISI APRIL GAS RATA RATA C1 89.2493 C2 3.4380 C3 1.2903 N - C4 0.2884 I - C4 0.3293 N - C5 0.1451 I - C5 0.0881 N - C6 0.1807 N - C7 0.0067 N - C8 0.0034 N - C9 0.0008 N2 0.5381 CO2 4.4411 H2O 0.0006 H2S 0.0001 TOTAL 100.000 S.G 0.6467 GHV 1038.1113

Methane : CH4 89.2% Base Temperature : C 27.0 : K 300.0 PJBG PGN & PENGUJIAN : F 80.6 Standard Temperature : C 15.6 : K 288.6 CNG Equipment Standards : F 60.0 1 BTU : Kkal 0.2520 Compressibility Factor : Z 0.99798 at PGN 27 C 1 SCF : Z 35.3147 M3 1 BTU / Scf : Kkal / m3 8.5596 at PGN 27 C 8.8990 Standard Specific Gravity Nat Gas : SpGr 0.64675 PGN APRIL 2012 Specific Gravity Nat Gas : SpGr 0.67239 standard Real Gross Heating Value : BTU/CF 1038.111 PGN APRIL 2012 1.0 : MMBTU 8,885.8 kkal/m3 (Base) 1.0 : MMBTU 28.36 m3 (Base) Density of Gas Standard at Avg. Temperature Air Density at 0 C : Sm3 1.286 Air Density at 27 C : Sm2 1.170 Air Density at 30 C : Sm3 1.158 Air Density at 35 C : Sm3 1.140 Gas Density at 0 C : Kg/m3 0.7566 Air Pressure : Mpa 101,325 Avg. Temperature @ Cust : Celcius 27.00 Air Density at X Celcius : kg/m3 1.16988 Gas Density pada suhu : Kg/m3 0.6467 MASS FLOW METER KG TO M3 1.5462 HEATING VALUE FUEL UNIT Btu/UNIT kcal/unit KEROSENE Liter 35,079 8,840 GASOLINE Liter 33,000 8,316 HSD Liter 35,964 9,063 MFO Liter 36,786 9,270 LPG Kg 44,524 11,220 CNG m3 36,607 9,224 1 m3 is equal to Btu/Unit LSP 1.1093 1 LSP is equal to Btu/Unit M3 0.9015

CNG INDUSTRIES PROVIDERS IN INDONESIA

AREA OF OPERATIONS

INDUSTRIAL CNG MARKET PLAYERS PT. CITRA NUSANTARA GEMILANG 3,5 mmscfd capacity Mother Station Supplied by PT. Pertamina Gas contract amounted to 3,5 mmsfdand all already sold to industrial customers. PT. BERKAH MIRZA INSANI 3,0 mmscfd capacity Mother Station Supplied by PT. Perusahaan Gas Negara Gas contract amounted to 2,5 mmsfdand all already sold to industrial customers. PT. PETROSS GAS 1 mmscfd capacity Mother Station Supplied by PT. Perusahaan Gas Negara Gas contract amounted to 0,7 mmsfdand sold to the Bus Transjakarta market. PT. T ENERGY 1,5 mmscfd capacity Mother Station Supplied by PT. Perusahaan Gas Negara Gas contract amounted to 0,5 mmsfdand 0,5 sold to the Bus Transjakarta market & industrial PT. IEV 3,5 mmscfd capacity Mother Station Supplied by PT. OdiraGas Gas contract amounted to 3,5 mmsfdand all already sold to industrial customers. PT. CIPTA NIAGA GAS 4,0 mmscfd capacity Mother Station Supplied by PT. Perusahaan Gas Negara Gas contract amounted to 2,5 mmsfdand all already sold to industrial customers.

AREA OF OPERATIONS

CHALLENGES IN CNG INDUSTRIAL (a case of stranded gas)

CNG Mother Station is located at desa Kalidawir, Sidoarjo, East Java. 6 DIA FLOWLINE TGA-2 WELL TGA-5 WELL TGA-1 WELL KALIDAWIR CNG MOTHER STATION TGA GAS PLANT

LAPINDO/INDOGAS TGA #5 WELL AVAILABILITY TO SUPPLY 3,0 BBTU/DAY LAPINDO gas contain energy : is equivalent to 1 ltr of Solar : is equivalent to kkallevel of : is equivalent to m3 gas of : 1.011,9 btu/scfm 36,171 scfm 9.004,8 kkal/m3 1,024 m3

THE SURROUNDING AREA OF THE NATURAL GAS RESERVE WELL HEAD

THANK YOU Asosiasi Perusahaan CNG Indonesia (APCNGI) Secretariat Office Address: GrahaCNG. JL. TebetTimurdalamII No. 35 Jakarta 12820. Indonesia Telp.: +62-21-8319878; Fax: +62-21-8291391 Website: www.apcngi.org PT. RAJA RAFA SAMUDRA Jl. PertaniRaya No. 18 Kav. A Duren Tiga, Pancoran.Jakarta Selatan Phone: 021-7990467. Fax: 021-79109902 email: robbi_sukardi@rajarafasamudra.com Website: www.rajarafasamudra.com