CHEMICAL MIXING SYSTEM OPERATING AND INSTALLATION INSTRUCTIONS

Similar documents
Installation Instructions: Side Delivery Units BDS-2555

Hose Reel Kit for Multi-Pro 1200 and 1250 Sprayers. Installation Instructions. Form No Model No Serial No.

LGT-306L / LB Club Car Precedent LED Light Bar Bumper Kit Installation Instructions

Air Conditioner for M915 A0/A1 Truck

INSTALLATION OVERVIEW: Connector, 7-pin. Clips w/plastic Ties. Plastic Ties. Connector, 52-pin. Step 22 a) Step 21 a) Step 23. Step 24.

Assembly Instructions

Hose Reel Kit for Workman 200 Spray Systems. Installation Instructions. Form No Rev A. Model No Serial No.

DASH AUDIO KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev 01 04/16 Page 1 of 6. Verify accessory fitment at Polaris.com.

TOYOTA CAMRY FOG LIGHT (Halogen and LED) Part Number: TCA-312 / TCA-812

INSTALLATION INSTRUCTIONS

INSTALLATION & OWNER S MANUAL

INSTALLATION INSTRUCTIONS

Kit. Hydraulic Kit Installation Guide REV B Table 1 Component List. Item Component Part Number Qty

SCION FR-S FOG LIGHTS

Accessory Fuse Block. Please read this entire manual before proceeding with installation.

Kit. Hydraulic Kit Installation Guide REV A. Item Component Part Number Qty

LGT-311L Bumper LED Light Kit EZ-Go RXV Installation Instructions

Tools Needed for Mounting Cleá Filling Station

Installation Instructions for Swing Mount System

INSTRUCTION, GPT HAND PUMP KIT INSTALLATION GPT KIT P/N

INSTRUCTION, GPT HOSE RETROFIT KIT

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

INSTALLATION INSTRUCTIONS TRAILER HITCH MAIN HARNESS KIT

INSTALLATION INSTRUCTIONS

TOYOTA CAMRY FOG LIGHT

INSTRUCTION, GPTLR POWER DOWN HAND PUMP KIT

SCION xb 2004 SECURITY (V5) Section I Installation Preparation. Part Number:

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

LGT-312L E-Z-Go TXT Light Bar Bumper Kit Installation Instructions

INSTRUCTION, GPT LOW VOLTAGE THERMAL SWITCH (LVTS) INSTALLATION KIT P/N

BD Dual Transmission Cooler Dodge (68RFE, 518, 47RH, 47RE & 48RE) Ford (5R110) & Chevy (Allison 1000) Transmissions

LEXUS GX TOWING HITCH Preparation

Supply Valve Replacement

GENUINE PARTS INSTALLATION INSTRUCTIONS

INSTRUCTION BULLETIN

TOYOTA PRIUS C FOG LIGHT (Halogen & LED)

INSTALLATION INSTRUCTIONS

GENUINE PARTS INSTALLATION INSTRUCTIONS

TOOLS REQUIRED: Panel Removal Tool Phillips Screwdriver 10mm Nut Driver Ratchet 10mm Socket 7mm Wrench 7mm Nut Driver Straight Screwdriver

Installation Instructions for Key Switch SNOWRATOR

TOYOTA COROLLA ILLUMINATED DOOR SILLS Preparation

INSTALLATION INSTRUCTIONS FUEL SURGE TANK KIT

Cavitron G139 Scaler 360 Replacement Kit Installation Guide (for Procenter 12:00 Delivery Units)

L/6.7L DODGE CUMMINS

INSTALLATION INSTRUCTIONS

* * APPLICABLE MODELS: 2014 > Mazda 3

LED Fog Light. Conflicts Note: 1832, 1852, 1856, 1872, General Applicability Fits Models

INSTALLATION INSTRUCTIONS

LED Fog Light. Conflicts Note: 1226, General Applicability Fits Models Additional Items Required For Installation

TOYOTA TACOMA LED DRL. Part Number: TTA-712

Harley Davidson V-Rod Models

Replacing the Gear Drive Motor Assembly and GFCI Module for Operation with the Chain Drive Motor Assembly

INSTALLATION INSTRUCTIONS

LEXUS GS 350/450h ILLUMINATED DOOR SILLS Preparation

Part Number: TRA-316/TRA-816

L/6.7L DODGE CUMMINS

Part Number: TTU-BGB14-DRL TTU-BGP14-DRL

INSTALLATION INSTRUCTIONS

Rear Vision System Liftgate Emblem Camera for Aftermarket Display Ford Flex (Kit part number )

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

INSTRUCTION, LVTS KIT, GPTLR KIT P/N

3.1 DISPENSER BLACK SHADOW SERIES. Tools Needed for Mounting SCS Dispenser Hammer

Part Number: STC-501. Hardware Bag Contents. General Applicability. Conflicts. Date: SCION tc LED DRL in FOG LIGHT HOUSING

ENCORE S20/L20. Parts and Service Manual. Section II (74836B) CLARKE TECHNOLOGY Operator's Manual - Encore S20/L20 Page -17-

SCION xd INTERIOR LIGHTING UPGRADE Preparation

INSTRUCTION, CURRENT GPT HOSE RETROFIT KIT

RMK HANDLEBAR KIT P/N ; ; APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

TOYOTA HIGHLANDER RUNNING BOARD HIGHLANDER HV Preparation

INSTALLATION INSTRUCTIONS

INSTALLATION AND PARTS MANUAL

Adjustable Light Kits E-Z-Go TXT All Models Installation Instructions

INSTALLATION INSTRUCTIONS

TOYOTA COROLLA LED DRL eyebrow. Part Number: TCO-DRL

INSTALLATION INSTRUCTIONS

Kit. Hydraulic Kit Installation Guide REV A Item Component Part Number Qty

INSTALLATION INSTRUCTIONS

TOYOTA COROLLA L, LE FOG LIGHT (Halogen and LED) Part Number: TCO-314 / TCO-814

RT1 DUAL OUTLET SLIP-ON EXHAUST HONDA CBR600RR Rev B

* * APPLICABLE MODELS: 2014 > Mazda 6

GENUINE PARTS INSTALLATION INSTRUCTIONS

INSTRUCTION, GPT HAND PUMP KIT (BUCHER PUMP) INSTALLATION

TOYOTA SIENNA FOG LIGHT (Halogen & LED)

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SALEEN SPEEDLAB BOOST AND WATER TEMPERATURE GAUGE POD KIT

INSTALLATION INSTRUCTIONS

NATURAL GAS / LP REMOTE KIT & REMOTE DETERGENT KIT

GENUINE PARTS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

TOYOTA RAV FOG LIGHT KIT Preparation

CS7000 EFI EXHAUST SYSTEM KIT CS7000 CARBURETED EXHAUST SYSTEM KIT

SINGLE ACCENT LIGHT KIT

TOYOTA PRIUS FOG LIGHT (Halogen or LED)

SCION xa 2004 SECURITY WITH RKE (V3) Section I Installation Preparation

INSTALLATION INSTRUCTIONS

Service Procedure COL-211

INSTALLATION INSTRUCTIONS

CONTENTS TOOLS REQUIRED:

Conflicts: Vehicles without a sunroof Vehicles with a single sunroof

Part Number: TTA-2N1. Hardware Bag Contents. General Applicability SR5, TRD Sport, TRD Off-Road, Limited

Transcription:

Chemical Mixing System Operating and Installation Instructions for Focus II Mid-Size Walk-Behind Kit #11363A CHEMICAL MIXING SYSTEM OPERATING AND INSTALLATION INSTRUCTIONS TOOLS REQUIRED: Phillips Screwdriver Utility Knife Tape Measure 3 / 32 Flat Blade Screw Driver 17 mm Wrench Side Cutting Pliers 8 mm Wrench CAUTION: Do not operate the chemical pump dry. If the chemical container is empty, make sure the chemical control is in the off position. This system is designed to automatically mix the cleaning chemical from the manufacturer s container into the water from the the system. The system can accept either round or rectangular containers. The control knob is used to select the desired ratio according to the recommendation of the chemical manufacturer and the application requirements. The ratio settings are shown in Figure A. BLUE 1 oz/gal 1:128.8% YELLOW 2 oz/gal 1:64 1.6% RED 3 oz/gal 1:43 2.3% GREEN ½ oz/gal 1:256.4% OFF FIGURE A Instruction Sheet 71490A Rev. B Clarke 5/08 revised 1/15

CHEMICAL MIXING SYSTEM INSTRUCTIONS (Kit Drawing is on Page 5, Fig. G. Refer to this drawing for # items in the following instructions) 1. Completely drain the recovery tank. 2. Turn the machine on and lower the head using the one touch button. 3. With head lowered turn the machine off using the key switch. 4. Turn the solution tank valve to the closed position. 5. Disconnect the main power plug. 6. Remove and set aside the four bolts retaining the handle assembly. Slide the assembly backwards being careful not to damage or put strain on the existing harness wires. 7. Install the chemical module (item 17) in the location indicated by the arrow pointing up in fi gure B using two of 8-32 screws (item 12) provided with the kit. 8. Trim the instrument panel decal to expose the opening for the potentiometer as shown in fi gure C. Attach the potentiometer in the chemical harness to this opening using the star washer and nut on the shaft. 9. Attach the ten pin connector on the harness to the chemical module. Now route the red, gray, green and brown wires through the opening into the battery compartment. Figure B 10. Connect the brown and black wires labeled Freq Sw to each other on rotary brush head machines. Do not connect the wires on cylindrical or BOOST head machines. 11. Remove the red wire from the traverse controller. Attach the red wire from the chemical system harness to the terminal on the traverse controller. Attach the removed red wire to the open terminal on the red wire of the chemical system harness. Repeat the process with the black wire on the traverse controller and chemical system harness. The location of these connections is indicated by the arrows pointing down in fi gure B. Figure C 12. Reattach the handle assembly using the four bolts set aside in step 6. Page 2 Clarke Instruction Sheet 71490A

13. Rotate the potentiometer shaft counterclockwise until it stops. Slide the adjustment knob (item 16) onto the potentiometer shaft and tighten the set screw with the line on the knob pointing to the OFF position on the label. 14. Remove the two bolts, shown in fi gure D, from the solenoid valve. Remove the solenoid valve from the frame. 15. Remove the solution hose from the valve. 16. Cut hose 2 ¾ inch measured from the solution valve. Cut and discard ¾ inch from the other hose to allow clearance for the reducing tee (item 10). 17. Loosely place a clamp (item 11) over the solution hose coming from the tank and then insert the reducing tee (item 10) into the solution hose. Figure D 18. Loosely place 2 clamps (item 11) on each of the cut sections of hose then insert the reducing tee between the two. 19. Remove the green wire from the solution valve and attach the green wire from the chemical harness to the solution valve. Attach the green wire that was removed to the piggyback terminal on the chemical harness. Follow the same procedure for the orange wires. 20. Replace the solenoid valve in the frame using the bolts removed in step 14, rotate the reducing tee so the 3/8 inch diameter barb is facing the front of the machine and tighten the hose clamps. 21. Assemble the cap adapter, hoses, pump, and check valve (items 3, 4, 5, 7, 8 and 9) as shown in fi gure G. Route the hoses through the machine and secure with wire ties. 22 Assemble the chemical pump heat sink (item 6) to the chemical bottle bracket (item 1) using the two 8-32 screws (item 12) provided in the kit. 23. Remove the bolt and washer indicated in fi gure E. Place the chemical bottle support in the orientation shown and secure using the previously removed bolt and the M-4 screw, lock washer and washer (items 13, 14, and 18) provided in the kit. Apply the chemical settings label (item 19) as shown. Figure FE Instruction Sheet 71490A Clarke Page 3

24. Insert the chemical pump (item 5) into the heat sink (item 6) and secure with a wire tie as shown in fi gure F. Attach the red and gray wires from the chemical harness to the side terminals leaving the top terminal open as shown. Secure the wires and tubes as shown. 25. Place the bottle insert (item 2) into the chemical bottle and place the bottle into the opening in the bracket. Screw the cap adapter attached to the previously installed tubes onto the chemical bottle. 26. Reconnect the main power connector and turn the solution valve to the open position. Figure F 27. Fill the solution tank with water and the machine is ready to operate with the new chemical mixing system. Chemical Mixing System Electrical Schematic Freq. Switch (Note:) Connect these wires on Rotary Machines ONLY. Page 4 Clarke Instruction Sheet 71490A

revised 1/2015 Figure G Ref. for pages 2-4 Ref # Part No. Description Qty 1 Ref. Cleaning Solution Bottle 1 2 Ref. From Frame Asm. 1 3 Ref. Valve From Frame Asm. 1 4 722030 Clamp, Hose 2 5 964002 Screw, M4-.7 x 16MM PH 1 6 980621 Washer, External Tooth Lock 1 7 980982 Washer, #10 SAE Flat 1 8 39725A Hose, 1/4 ID x 15.25 Clear 1 9# 39726A Hose, 1/4 ID x 5.50 Clear 1 10 39727A Hose, 3/8 x 11.5 Clear 1 11 40850A Module, Chemical 1 12 41084A Harness, Chemical 1 13 53186A Tie, Wire (not illustrated) 10 Ref # Part No. Description Qty 14 53719A Valve, Check 1 15 53721A Pump, Chemical 1 16 53736A Knob, Adjustment 1 17 87618A Washer, Flat 2 18 54778A Adapter, Cap 38MM 1 19 61772A Bracket, Pump 1 20 61954B Support, Bottle 1 21 71489A Label, Chemical Settings 1 22 85614A Screw, 8-32 x 3/4 PH 4 23 88644A Tee, Reducing 3/8 to 1/2 1 24 9097023000 Adaptor (For Sutter box) 1 # = Revised or new since last update Instruction Sheet 71490A Clarke Page 5