LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.

Similar documents
STANDARD DRAWING INDEX

Plan Check Policies and Guidelines

City of Houston Fondren Road Paving and Drainage

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

CONCEPTUAL ENGINEERING REPORT

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Plan Check Policies and Guidelines

Utility work, road construction substantially done on Fourth Street

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Revised Evaluation Scores. System Preservation

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Purpose of Tonight s Meeting

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

I-405 Sepulveda Pass Improvements Project

City of Lafayette Staff Report Circulation Commission

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

IMPROVEMENT CONCEPTS

Capital Improvement Plan Review

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

2.0 Development Driveways. Movin Out June 2017

FOR SALE OR LEASE PORTLAND PORTAL INDUSTRIAL CENTER - PHASE II SITE. NE 172nd Place & NE 170th Place, Gresham, Oregon

DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS

Parking Areas and Driveways for Single and Two Family Dwellings

Standards for Design and Construction

Lacey Gateway Residential Phase 1

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS

MO 370 Interchange Ramp at Salt River Road - Phase 1

Loop 375 Border Highway West Extension Project

10-10 TEMPORARY PARKING PROHIBITION FOR SNOW PLOWING AND REMOVAL. Brighton Avenue Both Between Route NJ 71 (Norwood Avenue) and Railroad Avenue.

STREET IMPROVEMENTS PROPOSAL BID ITEMS

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

MGM SPRINGFIELD OFF-SITE MITIGATION - 9/25/17 TO 10/6/17 WORK HOURS: 7:00 AM TO 3:30 PM


Sherman Oaks Community Traffic Plan

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

U:\0-PROJECT\Groton - sidewalk\main STREET\MAIN ST CONST-PLAN.dwg, 4/26/ :07:22 AM, AutoCAD PDF (General Documentation).pc3

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

Brent Spence Bridge Design Exceptions - Alternative I

V. DEVELOPMENT OF CONCEPTS

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018

ALEXANDRIA, VIRGINIA PRINCE ST. SUITE 114. ADG, INC. COPYRIGHT c. PH

Expo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015

District 2 Projects Scheduled for award during the period from 06/19/17 to 06/18/18 Sorted by PID

engineering phase and during the procurement of design build contracts.

FREQUENTLY ASKED QUESTIONS

CHAPTER 9 PARKING REGULATIONS (SEE CHAPTER 7 FOR DEFINITIONS, SCOPE AND APPLICATION RELATING TO THIS CHAPTER)

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

Local Public Agency Obligated Projects SFY 2018

Public Works. Capital Projects FY

Peachtree Streetscape Atlanta, Georgia

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

CITY OF VANCOUVER ADMINISTRATIVE REPORT

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

2011 LOCAL STREET IMPROVEMENTS

Charter Bus Staging and Pick-Up

Project Book Worksheet for Cost Estimation

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018

TITLE VII: TRAFFIC CODE 70. GENERAL PROVISIONS 71. TRAFFIC REGULATIONS 72. PARKING REGULATIONS 73. TRAFFIC SCHEDULES 74.

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Traffic Engineering Study

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

4 Circulation & Transportation

Appendix G Aquilla Lake Pool Rise Recreational Resources

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

11004 CHAPEL HILL ROAD PRE-LEASING SHOPS ±1,200 SF TO 20,000 SF MORRISVILLE, NC PROVIDENCE PLACE NEW WAKE TECH CAMPUS (UNDER CONSTRUCTION)

S. WEST STREET EXTENSION ALTERNATIVES STUDY

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

GATTIS SCHOOL RD / SH 130 SUBDIVISION

I-225 Rail Line Iliff and Florida Stations Information Meeting

CITY OF STEVENS POINT AGENDA

This corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.

FREQUENTLY ASKED QUESTIONS

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017

UBC Watermain as shown on Sheet 202 : Sub total 97,050

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

DRIVEWAY/SIDEWALK PERMIT APPLICATION

CTA Blue Line Study Area

Shroyer Road Safety Study

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Task 5.1: Existing Conditions Review and Analysis

HSR Vancouver WA to Camas Commuter Des, by R.N.

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

Committee Report. Transportation Committee. Business Item No

Transcription:

0 5 10 Feet

15 MATCHLINE DELMAR BLVD. STA. 18+50.00 LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY MATCHLINE DELMAR BLVD. STA. 13+00.00 END NSTRUCTION 54.76 LT. MATCH EXISTING SIDEWALK PROPOSED CURB RAMP TYPE 4 20 20 STEEL VER +82.43-41.03 MHFO 6" GRANITE CURB 6" GRANITE CURB TRAF. AL MHE SGT. MIKE KING BLVD. 6" VCP +16.08-36.93 1 SAW CUT AL POST FULL DEPTH NCRETE REPLACEMENT MATCH EXISTING NCRETE CROSSWALK END FULL-DEPTH PAVEMENT RENSTRUCTION, STA. 13+85.06 (DELMAR) EXISTING NCRETE SIDEWALK (L.I.P.) PROPOSED TRUNCATED DOMES +49.61-26.21 +55.12-14.82 6 RAD. EXIST. R/W NCRETE PAVEMENT PAVERS KINGSLAND AVE. STATION STOP, SEE STATION STOP DETAILS EXIST. R/W 4" MOUNTABLE +07.48 EB/WB NCRETE CURB -15.11 LOOP TROLLEY SEE TRACK PLANS DELMAR BLVD. NCRETE REPLACEMENT (TYP.) 2 +68.24-15.58 NCRETE TRACK SLAB SEE TRACK PLANS MHE KINGSLAND AVE. 8" VCP KINGSLAND AVE. 8" VCP MHE WB LOOP TROLLEY EB LOOP TROLLEY 8" VCP DATE DESCRIPTION DATE PREPARED 6/23/2014 ROUTE STATE MO SHEET NO. CV2.2 CITY ST. LOUIS JOB NO. NTRACT ID. PROJECT NO. BRIDGE NO. East-West Gateway Council of Governments One Memorial Dr., Ste 1600 St. Louis, MO 63102 phone: (314) 421-4220 or (618) 274-2750 NOTE: 1. SEE CIVIL DETAIL SHEETS CV2.1-CV2.2 FR CURB RAMP DETAILS. 2. SEE CIVIL DETAIL SHEETS CV2.3-CV2.10 FOR ADDITIONAL ROUNDABOUT INFORMATION. 3. SEE WARPING PLAN SHEETS CV4.1-CV4.10 FOR WARPING DIAGRAMS. 4. SEE SHEETS CV2.30-CV2.36 FOR ADDITIONAL DETAIL 5. SEE LIGHTING, LANDSCAPE, UTILITY, AND DRAINAGE PLANS FOR ADDITIONAL DETAIL. BM-250 ELEVATION 537.74 CUT CROSS IN THE SIDEWALK AT THE NORTHWESTERN INTERSECTION OF DELMAR BOULEVARD AND HARVARD AVENUE, SET JUST SOUTH OF STEPS. 0 20 SCALE 40 60 CIVIL NSTRUCTION PLAN SHEET 2 OF 22 REV. c:\pw_workdir\ch2mhill_tbg\jhoffma5\dms94930\xxx_pl_02_i20_433544.dgn 7:56:20 6/24/2014

8" VCP DETAIL A 3 (TYP) R 1 (TYP) 1 MATCHLINE DELMAR BLVD. STA. 18+50.00 EXIST. R/W 7 (TYP) DELMAR BLVD. 3 20 3. SEE WARPING PLAN SHEETS CV4.1-CV4.10 FOR WARPING DIAGRAMS. 2. SEE CIVIL DETAIL SHEETS CV2.3-CV2.10 FOR ADDITIONAL ROUNDABOUT INFORMATION. 1. SEE CIVIL DETAIL SHEETS CV2.1-CV2.2 FR CURB RAMP DETAILS. NOTE: +64.91-25.04 +68.34-21.60 SEE DETAIL A 6" NCRETE RAISED MEDIAN FOR O.C.S. POLE +73.20-25.05 +69.75-21.59 EB LOOP TROLLEY NCRETE REPLACEMENT (TYP) 27" BRK VCP 12" 27" BRK WB LOOP TROLLEY LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY NCRETE PAVEMENT c:\pw_workdir\ch2mhill_tbg\jhoffma5\dms94930\xxx_pl_03_i20_433544.dgn 7:56:41 6/24/2014 SCALE 0 20 40 60 CIVIL NSTRUCTION PLAN SHEET 3 OF 22 3 MATCHLINE DELMAR BLVD. STA. 24+00.00 DATE DESCRIPTION East-West Gateway Council of Governments One Memorial Dr., Ste 1600 St. Louis, MO 63102 phone: (314) 421-4220 or (618) 274-2750 SEE TRACK PLANS +30.22-1.50 NCRETE TRACK SLAB MHE VER STEEL EXIST. R/W BRIDGE NO. PROJECT NO. NTRACT ID. JOB NO. ST. LOUIS CITY CV2.3 SHEET NO. MO ROUTE STATE 6/23/2014 DATE PREPARED REV.

PP PP UGSIG 15" VCP UGSIG 12" RCP PP DRAINAGE PLANS MATCHLINE DELMAR BLVD. STA. 24+00.00 FOR DRAINAGE, SEE PAVEMENT REPLACEMENT UGSIG BOL. 25 WITH DELMAR BOULEVARD AND MEHLVILLE AVENUE. PARKING LOT ENTRANCE OPPOSITE THE INTERSECTION CUT CROSS ON THE WESTERN SIDE OF THE BM-201 ELEVATION 513.71 LELAND AVE. UGSIG UGSIG AL POST DELMAR BLVD. 12" RCP MHW UGSIG UGSIG LELAND AVE. NOTE: 1. SEE CIVIL DETAIL SHEETS CV2.1-CV2.2 FR CURB RAMP DETAILS. 2. SEE CIVIL DETAIL SHEETS CV2.3-CV2.10 FOR ADDITIONAL ROUNDABOUT INFORMATION. 3. SEE WARPING PLAN SHEETS CV4.1-CV4.10 FOR WARPING DIAGRAMS. END NSTRUCTION 55.33 LT. LELAND AVE. WEST STATION STOP, SEE STATION STOP DETAILS +61.58-23.10 +14.19 25.66 PROPOSED CURB EXIST. R/W RAMP TYPE 2 END NSTRUCTION 46.17 LT. LELAND AVE. EAST STATION STOP, SEE STATION STOP DETAILS END NSTRUCTION 53.03 RT. 12" RCP MELVILLE AVE. 6" CPP 3 +38.61-1.50 +21.89 31.98 AL POST c:\pw_workdir\ch2mhill_tbg\jhoffma5\dms94930\xxx_pl_04_i20_433544.dgn 7:56:59 6/24/2014 SCALE 0 20 40 60 CIVIL NSTRUCTION PLAN SHEET 4 OF 22 12" PVC STUMP WB LOOP TROLLEY EB LOOP TROLLEY TO MATCHLINE DELMAR BLVD. STA. 29+50.00 NCRETE TRACK SLAB SEE TRACK PLANS NCRETE REPLACEMENT (TYP) EXIST. R/W DATE DESCRIPTION East-West Gateway Council of Governments One Memorial Dr., Ste 1600 St. Louis, MO 63102 phone: (314) 421-4220 or (618) 274-2750 BRIDGE NO. PROJECT NO. NTRACT ID. JOB NO. ST. LOUIS CITY CV2.4 SHEET NO. MO ROUTE STATE NCRETE PAVEMENT 6/23/2014 DATE PREPARED 2" MILL AND OVERLAY FULL DEPTH PAVEMENT LEGEND REV.

12" RCP 21" VCP 21" VCP 21" VCP MATCHLINE DELMAR BLVD. STA. 29+50.00 UGSIG UGSIG 30" VCP MHE POST AL UGSIG 12" PVC 30" VCP VAULTS WATER 30 WESTGATE AVE 3. SEE WARPING PLAN SHEETS CV4.1-CV4.10 FOR WARPING DIAGRAMS. 2. SEE CIVIL DETAIL SHEETS CV2.3-CV2.10 FOR ADDITIONAL ROUNDABOUT INFORMATION. 1. SEE CIVIL DETAIL SHEETS CV2.1-CV2.2 FR CURB RAMP DETAILS. NOTE: c:\pw_workdir\ch2mhill_tbg\jhoffma5\dms94930\xxx_pl_05_i20_433544.dgn 7:57:17 6/24/2014 SCALE 0 20 40 60 CIVIL NSTRUCTION PLAN SHEET 5 OF 22 EXIST. R/W MHU VER STEEL POST NCRETE TRACK SLAB SEE TRACK PLANS EB LOOP TROLLEY 3 MATCHLINE DELMAR BLVD. STA. 35+00.00 DELMAR BLVD WB LOOP TROLLEY +99.35-1.50 POLE VAULT WATER NCRETE EXIST. R/W REPLACEMENT (TYP) DATE DESCRIPTION East-West Gateway Council of Governments One Memorial Dr., Ste 1600 St. Louis, MO 63102 phone: (314) 421-4220 or (618) 274-2750 35 BRIDGE NO. PROJECT NO. NTRACT ID. JOB NO. ST. LOUIS CITY CV2.5 SHEET NO. MO ROUTE STATE NCRETE PAVEMENT 6/23/2014 DATE PREPARED 2" MILL AND OVERLAY FULL DEPTH PAVEMENT LEGEND REV.

21" VCP 24" VCP DRAINAGE PLANS MATCHLINE DELMAR BLVD. STA. 35+00.00 LIMIT AVE FOR DRAINAGE, SEE PAVEMENT REPLACEMENT STOP DETAILS RAMP TYPE 1 SEE STATION PROPOSED CURB STATION STOP, LIMIT AVE. EAST DRAINAGE PLANS TYPE 1 FOR DRAINAGE, SEE CURB RAMP 31.05 RT. PAVEMENT REPLACEMENT PROPOSED END NSTRUCTION VER STEEL 8" PVC 8" PVC 29.90 +94.37 EB LOOP TROLLEY MHU 16.88 3 +80.59-14.91 +80.18-1.50 +00.85 WB LOOP TROLLEY RAMP TYPE 1 PROPOSED CURB STATION STOP DETAILS STATION STOP, SEE LIMIT AVE. WEST 35 TYPE S CURB UNIVERSITY CITY CITY OF SAINT LOUIS 3. SEE WARPING PLAN SHEETS CV4.1-CV4.10 FOR WARPING DIAGRAMS. 2. SEE CIVIL DETAIL SHEETS CV2.3-CV2.10 FOR ADDITIONAL ROUNDABOUT INFORMATION. 1. SEE CIVIL DETAIL SHEETS CV2.1-CV2.2 FR CURB RAMP DETAILS. NOTE: c:\pw_workdir\ch2mhill_tbg\jhoffma5\dms94930\xxx_pl_06_i20_433544.dgn 7:57:35 6/24/2014 SCALE 0 20 40 60 CIVIL NSTRUCTION PLAN SHEET 6 OF 22 NCRETE EXIST. R/W REPLACEMENT (TYP) MHU 24" VCP 2 x 3 BRK EGG NCRETE TRACK SLAB SEE TRACK PLANS MHE MATCHLINE DELMAR BLVD. STA. 40+50.00 DATE DESCRIPTION East-West Gateway Council of Governments One Memorial Dr., Ste 1600 St. Louis, MO 63102 phone: (314) 421-4220 or (618) 274-2750 MHW DELMAR BLVD +46.43 32.89 MHE TYPE 1 CURB RAMP EXIST. R/W PROPOSED EASTGATE AVE 40 BRIDGE NO. PROJECT NO. NTRACT ID. JOB NO. ST. LOUIS CITY CV2.6 SHEET NO. MO ROUTE STATE NCRETE PAVING 6/23/2014 DATE PREPARED 2" MILL AND OVERLAY FULL DEPTH PAVEMENT NSTRUCTION LEGEND REV.