Hva er utsiktene for flytende vindturbiner til havs? Klimafrokost, Bergen 15/2-2017 Simen Moxnes, Statoil Classification: Internal Statoil ASA 20 januar 2017
Build a profitable renewables business Develop new lower-carbon business opportunities for Statoil s core products OFFSHORE WIND NCS CO2 STORAGE CO2 use /IOR SOLAR ENERGY STORAGE 2 Classification: Internal HYDROGEN 20 januar 2017 Statoil ASA
Statoil and offshore wind Playing to our strengths Complex projects Marine operations O&M & HSE ability Leading floating tech. Offshore wind projects currently in progress delivering >1100 MW Additional 4800 MW consented / ~5 mill. homes Hywind demo Sheringham Shoal Dudgeon Hywind pilot Arkona North West Europe Dogger Bank Japan United States Hywind large scale Attractive market Attractive risk/return Predictable revenue OECD countries High entry barriers In operation In operation In development In development Consented 2.3 MW 317 MW 402 MW 30 MW 385 MW 4 x 1200 MW 2009-2012- 2017 2017 2019 2020- * All capacity figures on 100% basis Masdar 25% share New York Licens 3 Classification: Internal 20 januar 2017 Statoil ASA
Vanndyp nær noen av verdens viktige energimarkeder North sea Norway and UK US, Atlantic and Pacific coast and Great Lakes Japan and Korea Iberian Peninsula and Mediterranean Sea 4 Classification: Internal 20 januar 2017 Statoil ASA
The Hywind Concept Proven technology in a new setting Simple spar-type substructure Standard offshore wind turbine Conventional 3-line mooring system Blade pitch control system for motion damping Suitable for harsh conditions Demo Pilot Park Large parks 5 Classification: Internal 20 januar 2017 Statoil ASA
Hywind Demo Experience Excellent HSE record - No serious incidents Produced 55 GWh since start-up in 2009 Production as good as or better than other 2.3 MW Siemens wind power turbines Experienced storms with wind speed over 44 m/s and maximum wave height of 19 m Verification of system integrity in operational mode 6 Classification: Internal 20 januar 2017 Statoil ASA
Realising the Hywind Scotland pilot park Investing around NOK 2 billion Partner: Masdar 25% 60-70% cost reduction from the Hywind Demo project in Norway Powering ~20,000 UK homes Installed capacity: 30 MW Water depth: 95-120 m Avg. wind speed: 10.1 m/s Area: ~4 km 2 Average wave height: 1.8 m Export cable length: ~30 km Operational base: Peterhead Start power production: 2017 7 Classification: Internal 20 januar 2017 Statoil ASA
Oppskalering 2,3 -> 6 MW 8 Classification: Internal 20 januar 2017 Statoil ASA
1st Substructure (HS 3) in full length at Assembly Area 9 Classification: Internal 20 januar 2017 Statoil ASA
Challenges - Bringing down the cost Cost reduction of 40-50% by 2030 a realistic target LCOE (NB: Illustrative) Base case Operations Yield Substructure Supply chain Infra-structure Installation WTG Target 2020 Target 2030 10 Classification: Internal 20 januar 2017 Statoil ASA
Piloting Batwind concept for Hywind Floating Wind + Storage + Grid ü Increase the value of floating wind ü Start developing new business models around storage in Statoil Capture wind overshoots Ability to store excess electricity for sale when capacity is free 1 Reduce balancing cost Counter impact of wind forecasting errors 2 Increase power market value 3 Deliver power system services 4 Capture price peaks through arbitrage Provide frequency reserve response and other ancillary services 11 Classification: Internal 20 januar 2017 Statoil ASA
The future for floating offshore windpower Large resource potential Hywind is the most mature concept Statoil is an experienced developer with a strong financial position Target markets for the next step 12 Classification: Internal 20 januar 2017 Statoil ASA
www.statoil.com Statoil ASA This presentation, including the contents and arrangement of the contents of each individual page or the collection of the pages, are owned by Statoil. Copyright to all material including, but not limited to, written material, photographs, drawings, images, tables and data remains the property of Statoil. All rights reserved. Any other kind of use, reproduction, translation, adaption, arrangement, any other alteration, distribution or storage of this presentation, in whole or in part, without the prior written permission of Statoil is prohibited. The information contained in this presentation may not be accurate, up to date or applicable to the circumstances of any particular case, despite our efforts. Statoil cannot accept any liability for any inaccuracies or omissions.