Balancing Mechanism and Connect and Manage Constraint Payments to Windfarms

Similar documents
Feed in Tariffs. What is the feed-in tariff? Guaranteed for 25 years - by the UK Government. How do I claim the feed-in tariff?

SSE Guide to the Energy Industry. Guide

FOR IMMEDIATE RELEASE

Your guide to. Third Party Costs

4-6 October 2016 The NEC, Birmingham, UK. cleanenergylive.co.uk

Creating A Greener Energy Future For the Commonwealth. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics.

FOR IMMEDIATE RELEASE

Fuel Mix Disclosure 2016

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Monthly Market Detail - June 2018 Single Family Homes Miami-Dade County

Monthly Market Detail - June 2018 Townhouses and Condos Miami-Dade County

Summary Statistics. Closed Sales. Paid in Cash. Median Sale Price. Average Sale Price. Dollar Volume. Median Percent of Original List Price Received

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017

Customers with solar PV units in NSW producing and consuming electricity

UNLOCKING VALUE: MICROGRIDS AND STAND ALONE SYSTEMS

FOR IMMEDIATE RELEASE

Cost Reflective Tariffs

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015

Generation Connections

Origin Solar Presentation

FOR IMMEDIATE RELEASE

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.

Robert L. Mitchell CEO and Co-Founder Atlantic Wind Connection

AN OUTLINE HISTORY OF DANISH WIND TURBINE PRODUCTION: Output and Longevity from 1977 to 2014.

Proposed Dounreay - Mybster 275 kv / 132 kv

FOR IMMEDIATE RELEASE

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

Customers with solar PV units in NSW producing and consuming electricity

Electricity Transmission network charging

FOR IMMEDIATE RELEASE

Click to edit Master title style

Handout Homework page 1 of 6. JEE 4360 Energy Alternatives Handout (HO) Homework Problems

GRID CONSTRAINT: OPTIONS FOR PROJECT DEVELOPMENT

Generation Connections Industry Workshop 2017

Final report. Solar feed-in tariff report

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

Controlling weather-dependent renewable electricity production with blockchain

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

Lingering Effects of Truckers Strike Impact Planting Plans

Indicative Gas Transportation Charges from 1 April 2012 for East of England, London, North West and West Midlands Distribution Networks

Market Drivers for Battery Storage

Contents. Solar Select TM Frequently Asked Questions

Electricity Operational Forum

JEA Distributed Generation Policy Effective April 1, 2018

Final Report. Solar feed in tariff for regional Queensland for

The postcode lottery in energy profits

EROAD HALF YEAR 2018 ANNOUNCEMENT AND UPDATE 28 November 2017 EROAD achieves record sales in New Zealand and US markets

Marine Current Turbines

Green Drive Nov 2020

UPPER CUMBERLAND ELECTRIC MEMBERSHIP CORPORATION. RESIDENTIAL RATE--SCHEDULE RS (March 2019) Availability. Character of Service.

Take a fresh look at solar things you should consider when purchasing a solar system

In Bulgaria by. Continental Wind Bulgaria EOOD

Inventory Levels - All Prices. Inventory Levels - By Price Range

Modernising the Great Western railway

The Isle of Gigha Flow Battery Project

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1

Superseding Revised Sheet No. 63 REVISED SHEET NO. 63 Effective March 1, 2011 Effective September 1, 2012 ENERGY COST ADJUSTMENT CLAUSE

University of Alberta

SSE Airtricity Your bill explained:

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Pedro Nunes. July 2016

OVERVIEW OF UNIFORM TRANSMISSION RATES

ROMPCO 120 ( GTA1 ) 2013 (2013 Q2)

Meter Insights for Downtown Store

Monthly Hog Market Update United States Hog Production

Introduction to Charging: Which Parties Pay Which Charges?

FOR IMMEDIATE RELEASE

Incentives and Opportunities Signalled by Transmission Charges in Scotland. Iain Wright 03 September 2018

Case study: Utility-scale battery for balancing power in Germany

Utility Operator Model

Michigan Renewable Energy Case Study

Everybody talks about the weather, but nobody ever does anything about it. Mark Twain

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Non-BM Balancing Services Volumes and Expenditure

SSEFITAPP 2012_08_07 v2.1. FeeD-In TArIFF APPlICATIon ForM

Charging Delivery Body. 29 th January 2018

The Gambia National Forum on

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

POWER SYSTEM INCIDENT REPORT NORTHERN POWER STATION STABILISER OUTAGE APRIL AND MAY 2010

Storage in the energy market

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

March 17, To: Nelson Hydro Customers

Opportunities for Solar following the UK Solar Strategy

AGM PRESENTATION LONDON, 10 TH SEPTEMBER 2013

Eyre Peninsula electricity supply options investigation

THE PUBLIC UTILITIES BOARD ACT April 22, Graham F. J. Lane, C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B.

What exactly are next-generation meters?

Electricity Trends in Pennsylvania

Net Metering Policy Framework. July 2015

Village of West Dundee Electric Aggregation Program

Tax benefits for ultra low emission vehicles

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014

Statement of Expected Price Trends

PV in Japan and Utility s activities

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

THE PUBLIC SERVICE COMMISSION OF MARYLAND

Transcription:

Balancing Mechanism and Connect and Manage Constraint Payments to Windfarms Briefing Note (Prepared 5 th November 2013, updated 3 rd January 2014) Introduction National Grid (NG) balances supply and demand for electrical power through the Balancing Mechanism (BM). The daytime/night-time, weekday/weekend, summer/winter etc fluctuations are largely self-regulated, which means that if there is to be no demand then the electricity is not generated. NG does the fine tuning second by second by asking for more or less generation and paying for it, or compensating for the generator s losses when it has to shut down. The compensation is best explained by the Renewable Energy Foundation (REF) here: http://www.ref.org.uk/energy-data/notes-on-wind-farm-constraint-payments In summary, all constrained off generators are paid for the electricity they have been prevented from selling. In the case of oil, coal or gas, the generators give NG a rebate for the saving on fuel. In the case of wind, the generators lose their Renewable Obligation Certificate (ROC) and Climate Change Levy Exemption (CCLE) and need to be compensated for that loss. That is only fair and reasonable. In practice, because wind energy is the most expensive to constrain off, NG never chooses voluntarily to constrain off wind energy for routine balancing of the grid. In practice, it is only constrained off if NG has no other option. Why constrain output? Wind generated electricity needs to be constrained off if: there is no available capacity on the transmission system or there is insufficient demand An example This is easily illustrated by considering the transmission system north of Inverness. All electricity consumed north of Inverness either comes through the Grid bottleneck at Beauly, is generated by hydro, or is generated by wind. The transmission was designed to supply: a small scattered population the industrial area around Invergordon Dounreay and to collect electricity from the hydro schemes and Dounreay when it operated. At periods of low demand and high wind the overall output north of Beauly exceeds the capacity of the transmission system. In low demand periods it is unlikely that hydro will be operational but if it is, once it is constrained off the only other option to maintain grid security is to constrain 1

off wind. This puts the windfarm owners in a strong negotiating position, allowing them to ask for payment in excess of the total value of the ROC and CCLE, which for illustration is in the order of 50 per MWh. Note that in addition to compensation for the loss of the ROC and the CCLE, the windfarm is still paid for the electricity it did not generate as well. For a period, operators were able to demand extravagant sums in compensation ( 981 was the highest payment for 50 worth of loss). Last autumn the rules were changed to supposedly prevent excess profit being made, but even then the average payment on (for example) Sunday 3 rd October was 84/MWh, with the highest being 149/MWh. When challenged, Government, the wind industry and even OFGEM point to the greater payments made to other forms of generation. That is certainly true, but the other generators receive their payments as part of the necessary balancing of the grid, whereas wind operators get much higher payments to avoid the instability of the grid created by the wind plants themselves. It should also be noted that in the run up to a wind generation constraint, conventional generation will also have been constrained off to allow the rising wind generated energy on to the grid, thereby compounding the cost of constraints overall. The situation described in the Highlands north of Beauly is replicated at the Scottish Border and also deeper into the North of England. The cross border connection has been uprated from about 2GW to about 3GW capacity, but constraints continue to rise in frequency, and therefore in overall cost. Note that from time to time a constraint in Caithness can be caused by lack of transmission capacity at the Border or even further south. In a properly engineered and managed transmission system, generators would only be connected after the transmission capacity was in place, but our Governments have changed that through the Connect and Manage Scheme. Connect and Manage This is the introduction to National Grid s Quarterly Report on the Connect and Manage scheme for the period ending 30 th June 2013: http://www.nationalgrid.com/nr/rdonlyres/093614c6-e56b-43c6-bae0-4b8cbb5fe0d2/61872/connectandmanagequarterlyreport010413to300613v10.pdf It says, in part: 1.1 Background to Connect & Manage (C&M) Following consultation on models for improving grid access, the Department of Energy and ClimateChange (DECC) introduced the enduring C&M regime in July 2010 with an implementation date of 11 August 2010. Under this access regime, generators are offered connection dates based on the time taken to complete a project s enabling works, i.e. ahead of the completion of anywider transmission system reinforcements required under the security standards. Connecting generators ahead of the completion of wider works may result in additional constraints on the National Electricity TransmissionSystem. Under the C&M regime any costs arising from the management of these constraintsare socialised. 2

Definitions of highlighted phrases as I understand them Enabling works - work under the control of the developer including getting cables to a connection point Wider transmission system reinforcements - work required to upgrade the National Grid to be able to take the new generation and to meet established security of supply requirements costs arising from the management of these constraints - payment to wind farms to stop generating and to maintain grid security standards are socialised - spread across all Grid users, who in turn spread them across their customers An article in the Telegraph on 4 th November 2013 printed a quote from NG as follows: A National Grid spokesman said constraint payments to wind farm companies totalled 7 million in 2012/13, adding that this represented only four per cent of the 170 million given to all electricity generators. Jenny Hogan, spokeswoman for Scottish Renewables had a letter in the Herald on 5 th November 2013 in which she says: According to National Grid, from April, 2012 to March, 2013 it cost 169.6m to constrain all types of electricity generators from the grid. During the same period, the cost of constraining wind farms was 7.16m. REF publish data http://www.ref.org.uk/constraints/index.php obtained from NG of constraint payments made to windfarms under the Balancing Mechanism, but other commercially confidential arrangements also exist http://www.ref.org.uk/press-releases/249-ref-calls-fortransparency-over-secret-wind-power-constraint-payments. Ms Hogan s letter refers to a sum of 7.16m in 2012/13. REF s figure for that period is 4.06m, the difference presumably being the commercially confidential payments. If on any given day the demand and availability of transmission capacity and production of electricity by wind is such that wind has to be constrained off, then on any future date if the same circumstances apply the same amount of wind generation has to be constrained off along with the equivalent value of all other generation which has been added in the interim, be it wind or solar panel. This situation will persist until such a time that 110bn worth of transmission reinforcement, to be unlocked by the Westminster Energy Bill, is completed. Example: Say a windfarm of 20 turbines is constrained off for eight hours on Day 1, Year 1. Its operators build an extension of say another 20 turbines which opens in Year 2. Once again, by reason of the demand/supply requirements, it has to be constrained off. This time, the constraint payment is made for 40 turbines not to generate. It is worth noting that Whitelee Windfarm (the largest in Europe), for example, was connected eight years before the transmission system, which ought to have been in place in a properly ordered world, was complete. 3

Whitelee Windfarm has received 4,944,429 in constraint payments to date (November 2013). It follows that constraint payments will continue to rise steeply until transmission is constructed, or sanity returns. The following is an analysis of yearly totals taken from REF s data: Year (April to March) Cost MWh Average Price /MWh pre 1/4/11 174,128 975 179 20/11/12 14,762,568 69,274 213 20/12/13 4,055,220 35,594 114 2013(to 5 th Nov) 27,026,009 309,321 87 Totals 46,017,925 415,164 111 Of the 46m paid to date, 27m has been incurred since 1 st April 2013. National Grid has forecast payments for constraints of between 11m and 18m for the whole of 2013/14. 895,226 was paid out over the three days between 1 st to 3 rd November 2013. 5 th November 2013 4

Additional Material, added on 3 rd January 2014 Important Note Figures reported by REF above are constraint payments made under the Balancing Mechanism and include some of those payments made under Connect and Manage. The two are not to be confused. Payments under Connect and Manage are made exclusively to those generators connected under the scheme. Up to 30 th June 2013 payments were made exclusively to onshore wind plants but the scheme applies to all forms of generation which NG has contracted to connect in advance of transmission upgrades being completed. For example, early marine energy development in the Pentland Firth is almost certainly included and will attract C & M payments for a period. The astonishing fact is disclosed (see Table 6.1.2 below from page 13 of National Grid s Quarterly Report ending June 2013 into the Connect and Manage Regime) that National Grid has entered into contracts to allow generators with a capacity of 36.5GW to connect to the transmission system on average five years before that system is capable of handling the generation. 5

Extract from Table 6.1.2 * * * * * * # # On the basis of the NG figures, which show that 13 projects with a connected capacity of 600MW* generated 17m of constraint payments in the three months ending 30 th June 2013, what total value of constraint payments can we expect from a contracted connection of 36.5GW on average five years#ahead of the system being capable of transmission? A simplistic calculation is (36,500MW/600MW) x 17m x 20 quarters = 20,700,000,000 ( 20.7bn). There is not, so far, any other calculation to dispute this. That s TWENTY POINT SEVEN BILLION POUNDS. 2. Updated analysis of yearly wind constraint payments taken from REF Data Year (April to March) Cost MWh Average Price /MWh pre 1/4/11 174,128 975 179 2011/12 14,762,568 69,274 213 2012/13 4,055,220 35,594 114 2013 ( To31 st Dec) 32,640,557 379,124 94 Totals 51,632,473 484,967 106 (my calc) 6

3. Whitelee Wind Farm As of 31 st December 2013, Whitelee Wind Farm has received 8,332,942 in constraint payments. Stuart Young 3rd January 2014 7