Dual-Feed 600A Load Center Frame Power :: 600CB10 and 600CB12 User Manual

Similar documents
Dual-Feed 600A Load Center Frame

Demarcation Fuse/Circuit Breaker Alarm Panel 125DM08. Installation Guide

Demarcation Fuse Alarm Panel

50A Dual-Feed 5/5 GMT Total Front Access Fuse Panel

Dual-Feed 200A 4/5 TPA/GMT Fuse Alarm Panel. Model Installation Guide

Dual 100A 4/4-KLM & 4/4-GMT Fuse Panel. Model N Installation Guide

100A Universal Voltage Dual-Feed GMT Fuse Panels Power :: HPGMT10xx and HPGMT15 Installation Guide

nrgsmart Power Distribution Remote Monitoring

Installation Manual. AC Edge. Split Phase 60 A (6/6) AC Power Distribution Unit. AC Edge. Model AC60DF 6/6 Part#

:: :: TFD4 :: TFD6

Application Note. Best Solutions for Managing High-Current Power Distribution

Dual-Feed 600A 8-Circuit Breaker/TPC/TFD Load Center With 5 GMTs

FUSE PANEL. Technical Practice N N-L33 10/10 GMT Front Access NEBS Level 3 Certified

FUSE PANEL Technical Practice N N-L34 20/20 GMT (23 panel) NEBS Level 3 Certified

TPM Fuse Panel Installation Guide. Document INS-727XXXXXXX This manual covers the following part numbers- Trimm 727XXXXXXX Family

FUSE PANEL Technical Practice FDP /10 GMT NEBS Level 3 Certified

TPM/GMT Panel Installation Guide

Noran Tel. FUSE PANEL Technical Practice N21C110-NCY 5/5 GMT (20Amp GMT) NEBS Level 3 Certified

Noran Tel. Fuse Panel Technical Practice N NCY 4/4TPA & 6/6 GMT NEBS Level 3 Certified

GMT Fuse Panel Installation Guide

Total Front Access Wall Mount Fuse Panel Installation Guide. Document INS This manual covers the following part numbers

PowerWorx Power Distribution Products Select Series Circuit Breaker for ±24 or ±48 Vdc User Manual

Low-Current 20/20 GMT Series Fuse Panels Models & Installation Guide

Installing Power Components

100A/60A Universal Voltage GMT Fuse Panels With Enhanced Power/Fuse & Bay Alarms Power :: HPGMTXX & GMTXX Installation Guide

Westell FUSE PANEL. Technical Practice N Position Type VDC Floating

PowerWorx GMT Series Power Distribution Panel Uninterrupted (C-Source) Power User Manual

Noran Tel. a subsidiary of Westell Inc. Fuse Panel Technical Practice NPGMT /10 GMT NEBS Level 3 Verified

Power :: 8 x 1000A Battery Distribution Fuse Bay with nrgsmart Remote Monitoring Installation Guide

Shelf 19 version) (Expansion Shelf 19 version) (Main Shelf 23 version) (Expansion Shelf 23 version)

PowerWorx DSX Series GMT Fuse Panel User Manual

FUSE PANEL Technical Practice FDP /20 GMT NEBS Level 3 Certified

OPERATING MANUAL BDP600 UNIVERSAL BATTERY DISTRIBUTION PANEL

FUSE PANEL. NTI-N NC(Y)/M3 NEBS Level 3 Certified NTI NCD(Y)/M3 Standard Panel with Diodes

High Frequency SineWave Guardian TM

DS1 Plug-In Digital Signal Cross-Connect (PIX-DSX-1) 19-Inch Shelf Kit Installation Instructions

PEC 5068 BDFB 1-10 Loads, 500A Max/Load -48V, 2000A Max Load/Bay

Fuse / Circuit Breaker Panels

Matrix APAX. 380V-415V 50Hz TECHNICAL REFERENCE MANUAL

NTK599BAE5 and NTK599BGE5 Breaker Interface Panel (BIP) Installation Manual

Secondary DC Distribution E R P R P I 2. Technical Reference Guide

Secondary DC Distribution

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING

INSTALL INSTRUCTIONS DC C-EV. Installation Instructions: DC C-EV.

REFERENCE MANUAL FORM: MX-TRM-E REL REV MTE

M T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING

Raritan PX. Power Cord Installation Guide. Safety Guidelines. Safety Instructions

Installing the Switch Chassis

5067 Mini BDFB / BDCBB

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

ACSI MODEL 1406BB-04-AO POWER SUPPLY INSTALLATION INSTRUCTIONS

miconverter 18-Module Rack-Mount Power Chassis User Manual 38 Tesla, Irvine, CA USA Phone: (949) ; Fax: (949) Page 12

Connecting to DC Power

User Manual. Solar Charge Controller 3KW

SAVE THESE INSTRUCTIONS

USER MANUAL 6 Position Front Connect Rack for TD Series Modules with 16 Channel Modular Front Panel TDP

M T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation

Installation and Operations Manual

Power and Cooling. Chassis Power System

1370 DC Loop Contactors and Lug Kits

USER MANUAL 6 Position Powered Rack for TD Series Modules TDR 01 AC

NetSure 5100 ORDERING GUIDE. 48V & 24V DC Power System (40 A to 600 A)

JAE Series. Magnetic Circuit Protectors. Introduction Poles Configurations Operating Characteristics Delay Curves Decision Tables

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces.

F-Series. Circuit Breaker

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase

GE FANUC Parts. VersaPoint Power Terminal. Segment Terminal Fused, with Diagnostics 24VDC IC220PWR013. Features. Ordering Information

DC Distribution Panel User Guide # S

F-Series. Circuit Breaker

Quick Start Guide TS 910 & TS 920

SECTION MOTOR CONTROL

User Manual Solar Charge Controller 3KW

M T E C o r p o r a t i o n. dv/dt Filter. Series A VAC USER MANUAL PART NO. INSTR REL MTE Corporation

6170 Shiloh Road Alpharetta, Georgia (770) FAX (770) Toll Free

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

ARCHITECTURAL CONTROL SYSTEMS, INCORPORATED ST. LOUIS, MISSOURI

RCS1000 Data Sheet. RCS1000 Series Controllable Circuit Breaker Panel

Dimensions 12/800N 12/1200N D. DC to AC Power Inverters. OWNERS MANUAL for Models: OWNERS MANUAL April ISO 9001:2000 Certified Company

REMOTE POWERING Central Energy System ( HUB )

Installation Guide Smart-UPS On-Line SRT1000/1500 UXI-NCLI, SRT1000/1500 UXI-LI, Tower/Rack-Mount

AP/UP, AP/MIL Series Magnetic Circuit Protectors

DP140e. Installation & Operations Manual

Unity Low Voltage Disconnect & Monitor

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

PEC 827E. 120 VAC AC Distribution Shelf. Critical Power Product Manual

These devices meet the requirements of OSHA 29 CFR (b)(1)(ii) and OSHA 29 CFR (a) (2)(ii)(G). Airpax LEL series

Product Manual Select Code Comcode Issue 9 September Secondary DC Power Distribution Bay H

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

Installation Instructions

NT1-200, NT1-200/296 Battery Backup. NT1-200 Add-on Battery. Installation Instructions. Specifications. NT1-200, NT1-200/296 Battery Backup

Dual-Lite Trident TRF 40 Wide Battery Cabinet 20-40kVA Systems USER MANUAL

Electrobar FS Conductor Bar System

PowerOhm Installation Manual for BM R Series Braking Modules

Company Switch Installation Instructions and User Manual

MTE SERIES RLW. World REACTORS USER MANUAL PART NO. INSTR 030 REL MTE Corporation

MAPNET II Transceiver Installation Instructions

GVX BATTERY CABINET. Installation documents. for. Electrical integration. Battery installation. Shipping and onsite installation

INSTALLATION. **Microprocessor Status LED:

Raidtec 20-Inch Rack Mount Guide Version 1.0

Transcription:

Power :: 600CB10 and 600CB12 User Manual 600CB10 - Front View 600CB10-C - Rear View Applies to : 600CB10 :: 600CB10-C :: 600CB10-VL :: 600CB10-CL :: 600CB12 :: 600CB12-C :: 600CB12-VL :: 600CB12-CL

Table of Contents 1.1 Overview...1 1.2 Installation Guidelines...2 1.3 Specifi cations...2 1.4 Installation Instructions... 4 1.5 Parts & Accessories...13 1.6 Interconnections... 15 1.7 Drawings... 16 List of Figures Figure 1-600CB10, 19" 10/10 Position Load Center Frame...1 Figure 2 - Installing Load Straps...5 Figure 3 - Alarm Board Location (bottom view of Side A)... 5 Figure 4 - Alarm Board Jumper Settings... 6 Figure 5 - Alarm Wiring...6 Figure 6 - Rack Mounting...7 Figure 7 - Ground Lug Connection... 8 Figure 8 - Input Lugs...9 Figure 9 - LED Panel... 9 Figure 10 - Output Lug Connections...10 Figure 11 - Installing Circuit Breakers... 11 Figure 12 - Installing Fuse Holders and Fuses...11 List of Tables Table 1 - Circuit breakers, fuses, fuse holders and load strap kits... 13 Table 2 - Input power lugs... 14 Table 3 - Ground and circuit breaker output lugs... 14 ii

1.1 Overview Telect s dual-feed 600A per feed load center frames provide high-capacity, -48V and ±24V power protection for secondary power distribution and data and communications equipment. Telect s load center frames are also ideal for primary distribution in small central offices and at remote sites. Models 600CB10 and 600CB12 are open-frame chassis providing excellent heat dissipation and overhead access to the load center s BATT and RTN terminals, vertical inputs. Models 600CB10 and 600CB12 are white, 2RU, and fit racks with either EIA or WECO spacing. Model 600CB10 contains 10 interrupter positions on each side and fits a 19-in. rack (an adapter kit can be purchased separately to mount the 600CB10 in a 23" rack). Model 600CB12 has 12 interrupter positions on each side and fits a 23-in. rack. Figure 1-600CB10, 19" 10/10 Position Load Center Frame Both accommodate AIRPAX -style LEL or Carling CA1 circuit breakers or fuses (TPC/TPW and TPS/TLS) in single- through quad-pole confi gurations. Each circuit breaker or fuse pole position accommodates a bullet-style, plug-in circuit breaker or fuse holder up to 100A. With double-pole circuit breakers or TPW fuses, the maximum output load can be up to 200A. With the triple-pole circuit breakers the maximum load is 250A and with quad-pole circuit breakers the maximum load is 400A. Sides A and B are electrically isolated except for the alarm card, which contains power, fuse and bay status relays with dry, Form-C contacts. The contacts are connected to wire-wrap pins to switch on external power to visual/ audio external alarms. The alarm card also controls the three dual-color LEDs on the front panel. All input, output, and alarm terminals are within the open-frame chassis. All BATT and RTN inputs, outputs, and ground accommodate dual-hole lugs. Input and output terminals are studs and the ground terminals are bolt connections at the sides of the load center near the rear corners. Only one ground connection is required. Fuses, fuse holders, and circuit breakers are sold separately. Also sold separately are single-, double-, triple-, and quad-pole straps for the output of the breakers or fuses. These copper straps bridge the output of the fuse holders or circuit breakers to the output studs. See telect.com to order breakers, fuses, fuse holders, and load straps. The 600CB10-C and 600CB12-C provide horizonal inputs and a cover. The 600CB10-CL and 600CB12-CL also provide horizontal inputs, a cover and single-pole load straps pre-installed into the panel. The 600CB10-VL and 600CB12-VL provide vertical inputs as well as single-pole load straps pre-installed into the panel. 1

1.2 Installation Guidelines Elevated Operating Ambient - If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than the room ambient. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (Tma) specified by the manufacturer. Reduced Air Flow - Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised. Mechanical Loading - Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading. Circuit Overloading - Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern. Reliable Earthing - Reliable earthing of rack-mounted equipment should be maintained. Particular attention should be given to supply connections other than direct connections to the branch circuit (e.g. use of power strips). Disconnect Device - A readily available disconnect device shall be incorporated in the building installation wiring. 1.3 Specifications Inputs: Specifications: Voltage range (nominal voltage) ±21.6V to ±30V (nominal ±24 VDC) -40V to -60V (nominal -48 VDC) Max. input load rating 600A per side at max. operating ambient of 49 C (120 F) Short circuit withstand rating 5000A Nominal power loss at full load Less than 75W per side @ 28,800W full load per side (600A x 48V) Percentage of full power dissipation at nominal voltage Less than 1% Max. input interrupt device 750A Input terminal studs (with nuts, flat washers, and spring washers) for dual-hole compression lugs Two pairs of 3/8-16 studs on 1-in. centers per terminal [max. lug width of 1.94-in. (49.2 mm)] per pair. Torque nut (using 9/16-in. or 15 mm wrench) to 150-in./lb. (~17 N m), max. Input wire size #1 AWG to 750 MCM Grounding: Specifications: Earth GND terminal bolts (with washers) for dual-hole compression lug Two pair of 1/4-20 threaded holes on 5/8-in. centers. Torque bolts (using 7/16-in. or 12 mm wrench) to 50-in./lb. (5.5 N m), max. Ground wire size #2 AWG (min.) for any input interrupt device 400A or more 2

Outputs: Max. output circuit breaker or fuse holder Max. output load - continuous Minimum short circuit interrupt rating Max. total output load Output terminal studs (with KEPS nuts and washers) for dual-hole compression lugs Output wire size Circuit breakers* Fuses and fuse holders Alarms: Alarm relay contacts Max. alarm card power rating Alarm wire size Alarm terminals Dimensions: 600CB10 width (all models) 600CB12 width (all models) Specifications: Single-pole: 100A; Double-pole: 175A Single-pole: 80A; Double-pole: 140A 5000A 550A per side 1/4-20 studs on 5/8-in. centers [max. lug width of 0.625-in (15.8 mm) for a BATT terminal and 0.70 (17.7 mm) for a RTN terminal]. Torque bolts (using 7/16-in. or 12 mm wrench) to a 50-in./lb. (5.5 N m), max. #10 AWG (min.) for a 25A single-pole interrupter to #2 AWG (min.) for a 100A single-pole interrupter #2 AWG (min.) for double-pole interrupters from 100 to 175A 2/0 AWG (min.) for triple-pole interrupters 4/0 AWG (min.) for quad-pole interrupters AIRPAX -style LEL or Carling-style CA1** TFD fuse holders for single-pole TLS or TPS fuses TPC DC-BBE-3 fuse holders for single-pole TPC fuses TPW fuse holders for double-pole TPC fuses Specifications: 2A @ 30 VDC; 0.6A @ 60 VDC @24V: 103 ma (2.47W); @48V: 128 ma (6.14W) #24 AWG, typical (#26 to #20 AWG) Wire wrap Specifications: 19-in. (483 mm) 23-in. (584 mm) Height Depth Dimensions: Weight, without packaging and accessories Weight, shipping Environment: Operating temperature Humidity Compliance: 3.5-in. (88 mm) 12-in. (305 mm) Specifications: 600CB10: 18 lbs. (8.2 kg); 600CB12: 22 lbs. (10 kg) 600CB10-xL: 21 lbs. (9.5 kg); 600CB12-xL: 25 lbs. (11.3 kg) 600CB12: 25 lbs. (11 kg); 600CB12: 30 lbs. (14 kg) 600CB12-xL: 28 lbs. (12.7 kg); 600CB12-xL: 33 lbs. (15 kg) Specifications: -10 C (14 F) to 55 C (131 F) 90% and non-condensing Specifications: UL Recognized, NEBS Level 3 * Telect suggests you avoid using different types of circuit breakers or fuses in the same load center. Alarm contacts may vary among interrupter manufacturers and may incapacitate the alarm system. ** Circuit breakers for this load center are designed and manufactured by Airpax Corporation and Carling Industries to meet Telect s specifi cations. Order circuit breakers only from Telect. 3

! ALERT ALERT! Only qualified technicians may install and maintain this product. Verify all connections meet requirements specified in local electric codes or operating company guidelines before supplying power. Protect this equipment with a fuse or breaker sufficient to interrupt power levels specified. Install this product in locations accessible only to qualified personnel. The panel weighs more than 35 lbs. (~16 kg); two persons may be required for handling and installing the Load Center Frame. 1.4 Installation Instructions Please read these instructions carefully before beginning installation. If assistance is required, call Technical Support at 888-821-4856, or 509-921-6161, or e-mail getinfo@telect.com. Telect is not liable for shipping damage. If damaged, notify the carrier and call Telect s Customer Service Department at 800-551-4567, or 509-926-6000 for further recourse. Telect recommends that you install load straps before installing the load center on the rack. Also, install load straps now for future add-on loads. Inspect equipment after unpacking and compare it to the packing list. Immediately report any shipping damage, defects, or missing parts to Telect at 800-551-4567. Keep all documentation that comes with your shipment. 1. Assign interrupter positions and install load straps for those positions before installing the load center in a rack as follows: a. Choose interrupter positions for breakers or fuses. You may mix interrupter ratings and single- and multi-pole interrupters in the same load center. Telect recommends not mixing fuses with circuit breakers. Avoid mixing non-mid-trip and mid-trip breakers. Avoid mixing TLS/TPS with TPC fuses. (TLS and TPS fuses are compatible but made by different manufacturers.) Do not use multiple, single-pole breakers or fuses with multi-pole load straps. b. Record interrupter position(s) and amperage of each intended interrupter. To mitigate heat build up caused by heavy loads >100A, plan a space on one side those interrupters. c. Remove bottom screw holding circuit breaker cover to selected interrupter positions. Refer to Figure 2. Retain screw and cover if you intend to use circuit breakers. Retain screw but discard cover if you intend to use fuses. Remove corresponding screw in plastic load-strap support. Slip receptacle(s) of load strap into plastic load strap receptacle holder and fasten with screw removed in the previous step. 4

Figure 2 - Installing Load Straps 2. Turn over the load center and check the jumper settings on the alarm board located on the underside of the chassis. Refer to Figures 3 and 4. The jumpers are set up for REC-4 (non-mid-trip) circuit breakers and fuses. If you plan on using RLS-4 mid-trip circuit breakers, change the jumper setting as indicated. Alarm Board Jumpers (6) Figure 3 - Alarm Board Location (bottom view of side A) 5

From the factory, jumpers are set for REC-4 (non-mid-trip) circuit breakers and fuses. REC-4 CBs & Fuses RLS-4 Mid-Trip CBs Figure 4 - Alarm Board Jumper Settings 3. If you intend to install alarm wiring for load center and/or bay alarms, consider doing so now before installing the load center in the rack. The alarm terminal is located near the top center of the load center. Refer to Figure 5. a. If you intend the alarm wires to exit at the back of the rack, don t forget to feed alarm wiring from the back to the front of the rack before wire wrapping the alarm pins. b. It is possible to use a short, manual wire-wrap tool to install alarm wiring after securing the load center to the rack. If you intend to use a power or larger manual wire-wrap tool, you must install alarm wiring now. B PWR NO B PWR C B PWR NC CB-F NO CB-F C CB-F NC A PWR NO A PWR C A PWR NC FRONT OF LOAD CENTER MINOR NC MAJOR NO MAJOR C MAJOR NC LEGEND MINOR ACT NC = NORMALLY CLOSED MJR/MNR REF C = COMMON NO = NORMALLY OPEN MAJOR ACT CB = CIRCUIT BREAKER MINOR NO F = FUSE ACT = ACTIVATE MINOR C REF = REFERENCE Figure 5 - Alarm Wiring 6

4. Locate an unused rack position and mount the load center using at least two sets of fasteners per side, as shown in Figure 6. Mount the panel as high as possible on the rack, leaving at least 1RU of access space above the load center. Tighten screws to 35-in./lb. (4.29 N m). Telect recommends using a seismic rack for best rigidity. Figure 6 - Rack Mounting! WARNING WARNING! Failure to properly ground this equipment can create hazardous conditions to installation personnel and to the equipment. 7

! ALERT ALERT! Only use components and crimping tools approved by agencies or certifying bodies recognized in your country or region such as Underwriter s Laboratories (UL), TUV, etc. 5. Use an approved crimping tool to attach approved, dual-hole compression lug onto suitable grounding wire. (Size of ground depends on input interruption device.) 6. If required, lightly coat anti-oxidant on lug and grounding surface on side of panel. Connect the lug using 1/4-20 bolts, flat washers, and split washer provided, as shown in Figure 7. Tighten the bolt to 50-in./lb. (5.5 N m). Figure 7 - Ground Lug Connection! WARNING WARNING! Before connecting input power cables, make sure input power to the panel is turned off. 7. Make sure input power is off before connecting this panel s input cables to PDU or battery. 8. For input wiring, crimp dual-hole compression lugs onto #1 AWG to 750 MCM copper wires. The choice of input wiring depends on the following criteria: Input interrupt device rating affects size of input wiring. Ambient operating temperature affects the type of input wire insulation. Use the table on the following page to choose the correct temperature-rated input wires. For further information, consult the National Electrical Code (NEC). 8

Ambient Operating Temperature Range Max. Current Rating Per Side Min. Cable Insulation Temperature Rating -5 to 49 C (23 to 120 F) 600A 75 C (167 F) 49 to 55 C (120 to 131 F) 550A 75 C (167 F) 49 to 55 C (120 to 131 F) 600A 90 C (194 F) 9. Insulate the lug barrels with UL94 V-0 rated heat shrink tubing. 10. Clean terminals and lugs with a non-abrasive, non-mettalic pad. 11. If required, lightly coat anti-oxidant on lugs and input BATT and RTN terminals, and then connect lugs to input terminals, as shown in Figure 8. Tighten lugs to 150-in./lb. (~17 N m), max. Side A Input RTN Side A Input BATT Figure 8 - Input Lugs 12. Make sure the breaker or fuse holder positions are either empty, off, or contain dummy fuses (phoney, inoperative, all-plastic slugs). 13. Enable the fuse or breaker at primary distribution unit or battery (750A max.) to turn on Feed A to Side A of load center and then check voltage and polarity at input connectors of the panel. Verify the following: A PWR LED on front of panel turns green. B PWR LED turns red. 14. With A PWR LED green (normal operation) - but with B PWR LED red (off or failure operation) - test A PWR relay and contact alarm terminal: Expect continuity (0Ω) between Terminals C and NC. Expect an open circuit ( Ω) between Terminals C and NO. BAY ALM A PWR/ ALM B PWR/ ALM 100A MAX PER POLE A INPUT BUS 600A B + - 48 24 V- - - Figure 9 - LED Panel 9

15. Also, test fuse alarm relay contacts at CB-F alarm terminals. Expect continuity (0Ω) between Terminals C and NC. Expect an open circuit ( Ω) between Terminals C and NO. 16. Repeat Steps 13 and 14 to power up Side B. A PWR and B PWR LEDs must both be green. 17. Make sure input power is off again before installing output wiring to this device. 18. For output wiring, crimp dual-hole lugs onto one end of #10 to #2/0 AWG copper output wires, as required by NEC. (Work with one output wire at a time.) 19. Insulate lug barrels with UL94 V-0 rated heat shrink tubing. 20. Clean the panel terminal and lugs with non-abrasive, non-metallic pad. 21. If required, lightly coat anti-oxidant on lugs and output BATT and RTN terminals, and then connect lugs to terminals, as shown in Figure 10. (NEC specifies only one lug and load at each output terminal.) Tighten nuts to no more than 50-in./lb. (5.6 N m), max., and then connect other end of output wire to load. 22. Install circuit breakers or fuses, as shown in Figures 11 and 12. a. Use screws provided with circuit breaker or fuse holder to attach cover to breaker or holder. (Use the cover removed previously for circuit breakers. The fuse holder requires a cover.) b. Insert a breaker in the load center frame. ("Line" is on top. Breaker is "upside down" so ON toggle is up.) Or, insert holder in load center frame ("Load" is on top). c. Fasten the cover to the load center using the screw previously removed with the cover in Step 1. d. If applicable, install fuse. Figure 10 - Output Lug Connections 10

Single-Pole Breaker Double-Pole Breaker Figure 11 - Installing Circuit Breakers TPC Fuse Holder TPC Fuse Figure 12 - Installing Fuse Holders and Fuses 23. With the output loads (devices fed by this load center) disabled, re-enable fuses or breakers at primary distribution unit or battery. 24. If applicable, switch circuit breakers ON and then check voltage and polarity at loads. 11

25. If possible, either replace one of the functioning fuses with a blown fuse or switch OFF breaker. For a load center with fuses or non-mid-trip circuit breakers, the applicable ALM LED will turn red. For a load center with mid-trip breakers, the applicable ALM LED will remain green. 26. Check the CB-F alarm terminals. For a load center with fuses or non-mid-trip circuit breakers, expect the following: An open circuit ( Ω) between Terminals C and NC Continuity (0Ω) between Terminals C and NO. 27. For a load center with mid-trip breakers, expect the following: Continuity (0Ω) between Terminals C and NC An open circuit ( Ω) between Terminals C and NO. 28. Re-install operable fuses or switch ON breakers before proceeding. 29. Record circuit assignments in accordance with operating company procedures and guidelines. 30. Lastly, enable equipment loads one at a time to verify proper operation of loads. 12

1.5 Parts & Accessories The following tables list optional and replacement items for the load center. For wire sizing and labeling, please refer to Wire Sizing & Label Convention (Telect part number 117995) included with your load center. Order parts and accessories online at telect.com.! ALERT ALERT! Use only UL-listed or UL-recognized component secondary protection devices. Steps for configuring a panel: 1. Choose vertical or horizontal input 2. Determine the quantity of load connections required (one load connection per populated fuse or circuit breaker position 3. Choose multi-pole connections if required 4. Select circuit breakers or fuses If fuses, choose TPC or TFD holders If circuit breakers (or fuse holders), select quantity equal to number of load connections Select circuit breaker or fuse amperage values Panel 600A Dual-feed 10/10 load center frame, vertical inputs 600A Dual-feed 10/10 load center frame, hoirzontal inputs 600A Dual-feed 10/10 load center frame, vertical, loaded 600A Dual-feed 10/10 load center frame, horizontal, loaded 600A Dual-feed 12/12 load center frame, vertical inputs 600A Dual-feed 12/12 load center frame, horizontal inputs 600A Dual-feed 12/12 load center frame, vertical, loaded 600A Dual-feed 12/12 load center frame, horizontal, loaded Part Number 600CB10 600CB10-C 600CB10-VL 600CB10-CL 600CB12 600CB12-C 600CB12-VL 600CB12-CL Adapter kit to mount 600CB10 in a 23" rack 02117-02+746 Adapter kit for double-pole input 1 600CB1X-2FA Single-pole Breakers Part Number Multi-pole Breakers Part Number 30A 116671 125A (2-pole) 134634 40A 116672 150A (2-pole) 134635 50A 116673 175A (2-pole) 135921 60A 118160 200A (3-pole) 134636 70A 118161 225A (3-pole) 134637 80A 118162 250A (3-pole) 134638 90A 118163 400A (4-pole) 143962 100A 118159 Adapter 2 (1" C-C) 600CB08-RPK Fuses TPC TPS TLS 25A 125441 130476 N/A 30A 125442 130478 N/A 40A 125443 130482 N/A 50A 125444 130484 N/A 60A 125445 130486 N/A 70A N/A 130488 N/A 75A 125446 N/A N/A 80A N/A N/A 140640 90A 1254477 N/A 140641 100A 125448 N/A 140642 125A 125449 N/A 140644 TPC fuse holder 3 129347 TFD fuse holder (for TPS/TLS fuses) 3 129816 Fuse holder cover 4 600CBXX-CFK Load Connections Single-pole Double-pole Triple-pole Four-pole Part Number 600CB1X-1PK 600CB1X-2PK 600CB1X-3PK 600CB1X-4PK 1 Two kits are required for dual feed inputs. 2 Required when using the 600CB1X-3PK or 600CB1X-4PK. 3 Holder kits contain fuse holder, cover, and fasteners. 4 Load connection kits contain receptacle, strap assembly, and lug fasteners. 13

! ALERT ALERT! Only use components and crimping tools approved by agencies or certifying bodies recognized in your country or region such as Underwriter s Laboratories (UL), TUV, etc. Table 2 - Input power lugs T&B 54216 (Die code 76) Burndy YA322TC38 (Die code 19) Panduit LCD400-38D-6 (Die code 76) 400 MCM 500 MCM 750 MCM 777.7 MCM 54218 (Die code 87) YA342TC38 (Die code 20) LCD500-38D-6 (Die code 87) -- -- YA392NT38 (Die code 24) LCDN750-38D-6 (Die code 106) YA44L-2NT38-FX (Die code L115) -- Table 3 - Ground and circuit breaker output lugs (1/4-in. dual-holes on 5/8-in. centers, uninsulated) T&B 542040410 (Die code 21) Burndy YA8CL-2TC14 (Die code 49) Panduit LCD8-14A-L (Die code 21) #8 AWG #6 AWG #4 AWG #2 AWG #2/0 AWG 54205 (Die code 24) YA6CL-2L (Die code 7) LCD6-14A-L (Die code 24) 54206 (Die code 29) YA4C-2L (Die code 8) LCD4-14A-L (Die code 29) 54207 (Die code 33) YA2CL-2TC14 (Die code 10) LCD2-14A-Q (Die code 33) -- YA26L2NT14 (Die code 13) LCDN2/0-14A-X (Die code 45) 14

1.6 Interconnections C GND C GND INPUT A 600A MAX RETURN A 1 2 3 4 5 6 OUTPUT A 7 8 9 10 BAY ALM A PWR/ ALM B PWR/ ALM ALARM PCB B PWR NO B PWR C B PWR NC CB-F NO CB-F C MINOR ACT MJR/MNR REF MAJOR ACT MINOR NO MINOR C 100A MAX PER POLE CB-F NC A PWR NO MINOR NC MAJOR NO A INPUT BUS 600A B + - 48 24 V- - - A PWR C A PWR NC MAJOR C MAJOR NC 1 2 3 4 5 6 OUTPUT B 7 8 9 10 RETURN B INPUT B 600A MAX C GND C GND 15

1.7 Drawings NOTES 1. Dimensions are in in. [mm]. 2. Breakers/Fuses sold separately. 3. Breaker/Fuse line straps sold separately. 4. Max lug width for input BATT and RTN is ~50 mm (~2 in.) 1.00 [25.4] 1.00 [25.4] 3 8-16 x 1 1 4 in. Stud, Nut, Lock Washer, & Flat Washer 3 8-16 x 1 1 4 in. Stud, Nut, Lock Washer, & Flat Washer 3.47 [88.1] 0.625 [15.9] ¼-20 x ¾ in. Stud, KEPS Nut, & Washer REAR VIEW (ROTATED) ¼-20 x 1 in. Stud, KEPS Nut, & Washer 0.69 [17.5], Max. Lug Width 0.625 [15.9] RTN A BUS RTN B BUS ¼-20 x ¾ in. RTN A Input Terminal (See Note 4.) BATT A Input Terminal RTN B Input Terminal (See Note 4.) BATT B Input Terminal BATT A BUS BATT B BUS 12.00 [304.8] 12.61 [320.3] 0.73 [18.5] 600CB10 19.00 [482.6] 18.31 [465.1] 17.00 [431.8] TOP VIEW 600CB12 23.00 [584.2] 22.31 [566.7] 21.00 [533.4] 9 10 11 12 9 10 11 12 3.00 [76.2] BAY ALM A PWR/ ALM B PWR/ ALM 100A MAX PER POLE INPUT BUS A 600A B + - 48 24 V- - - 1.25 [31.8] 1.75 [44.5] 0.50 [12.7] FRONT VIEW Telect assumes no liability for the application or use of these products. Neither does Telect convey any license under its patent rights or the patent rights of others. This document and the products described herein are subject to change without notice. 16

600CB12-CL - Top View 600CB12-VL - Top View 17

This page intentionally left blank. 18