CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

Similar documents
Earthing Principles. Symmetra PX 250/500 kw

Guidance for Low Voltage Electrical Installations

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines.

CHAPTER 6 GUIDELINES ON DESIGN OF ELECTRICAL INSTALLATION

Effective discrimination of protective devices

IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 717 MOBILE OR TRANSPORTABLE UNITS

ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

The Management of Electrical Safety in Quarries, Associated Plant and Equipment

SLOVAK UNIVERSITY OF TECHNOLOGY Faculty of Material Science and Technology in Trnava ELECTRICAL ENGINEERING AND ELECTRONICS.

On-Site Guide (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011)

Unified requirements for systems with voltages above 1 kv up to 15 kv

Welcome. Requirements for erecting EV Charging Facilities

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP)

ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

3 o/c 2 An area or temporary structure used for display, marketing or sales is defined as a a booth b a stand c an exhibition d a show.

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 2

Low Voltage Power Supplies in Electrified Areas

Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation

EARTHING YOUR QUESTIONS ANSWERED

Renewable sources of electricity a brief overview

ES5 Security Theory/Regulations Answer Schedule

Engineering Recommendation P26

Guidelines for connection of generators:

WIRING MATTERS SEPTEMBER 2018

SELECT MEMBERSHIP NUMBER Full Installation 75% new and 25% alteration to exsisting

ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET

Louisville Gas and Electric Company

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

045 : 2000 CEB STANDARD

Key elements of the AS3000 Wiring standards and some of the recent changes.

A. Submit manufacturer's literature and technical data before starting work.

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Voltage limiting device HVL

Underground Distribution Construction Manual

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

Umatilla Electric Cooperative Net Metering Rules

Reviewed: DD Month University Code of Practice for Electrical Safety. PART B - Design and Construction of Electrical Equipment within the University

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

Net +Plus Connection Code

CHAPTER 4 PROTECTION REQUIREMENTS

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

SINGLE PHASE WIRING SPECIFICATIONS

Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation Edition DRAFT

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

ELECTRICAL INSTALLER THEORY EXAMINATION 21 June 2014 QUESTION AND ANSWER BOOKLET

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

37-SDMS-04 SPECIFICATIONS FOR INTERFACE LOW VOLTAGE MAIN CIRCUIT BREAKERS

CHAPTER 2: ELECTRICAL SAFETY

Level 3 Award in the Requirements for Electrical Installations BS 7671:2018 ( )

BS : C&G 2382 Outcomes 4

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6

REFERENCE CP_TSSPEC_138 0 DATE: JUNE 2006 PAGE: 1 OF 17 TITLE SPECIFICATION FOR POLE- MOUNTED AUTO-RECLOSERS TABLE OF CONTENTS

Marina Bay Sands Guidelines for Electrical and Wiring Service

Electrical. Earthing & Bonding. Installation Techniques. Learning Notes MODULE 2.2 UNIT PHASE:2

Fuses still the best form of overload protection

ELECTRICIAN S THEORY EXAMINATION 19 June 2010 QUESTION AND ANSWER BOOKLET

CHAPTER V RESIDENTIAL WIRING

THREE PHASE WIRING SPECIFICATIONS

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

Switchgear and Distribution Systems for Engineers and Technicians

Equipotential Bonding of Rail Vehicles to Running Rail Potential

EMPAC Metal enclosed capacitor bank for wind applications

Technical Requirements for Renewable Energy Power System

EDS FUSE RATINGS AT DISTRIBUTION SUBSTATIONS

Voltage limiting device HVL

QUALITY ASSURANCE & DOCUMENTATION

University of Houston Master Construction Specifications Insert Project Name

Pretest Module 29 High Voltage Unit 1

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Element C8.3 Installation, Use and Inspection of Electrical Systems

FUSES. Safety through quality

Sentry Technical. Miniature Circuit Breakers (MCBs) Standards and approvals. Description. Technical specification

SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS)

STANDARD TECHNIQUE : SD5P/2

DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5

ELECTRICIANS REGULATIONS EXAMINATION 30 June 2012 QUESTION AND ANSWER BOOKLET

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers

Company Directive STANDARD TECHNIQUE: SD4O/1. Standard HV Connection Arrangements

1. General Requirements

Major changes within the New 18 th Edition Wiring Regulations announced by The IET

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

The Impact of the 18 th edition (BS 7671:2018)

ELECTRICIAN S THEORY EXAMINATION 20 June 2015 QUESTION AND ANSWER BOOKLET

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

FINAL-ER 42 Electrician Regulations Answer Schedule

33kV Connection up to 90MVA

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Power systems Protection course

NEC REQUIREMENTS FOR GENERATORS

The impact of the 18 th Edition (BS 7671:2018) Sections 722, 753 and [new] 730

RESIDUAL CURRENT CIRCUIT BREAKER

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

017: 1998 CEB STANDARD RING MAIN UNIT CEYLON ELECTRICITY BOARD SRI LANKA

MEDIUM VOLTAGE PRODUCTS. Fault Current Limiters I S. -limiter and FC-Protector The worldʼs fastest switching devices

Design considerations for generator set mounted paralleling breakers

Transcription:

CLP POWER HONG KONG LIMITED SUPPLY March 2001

ADVISORY SERVICE Advice concerning matters relating to the supply of electricity may be obtained free of charge from the Company. OTHER COMPANY PUBLICATIONS In addition to the Supply Rules, printed leaflets on various specialised topics may be obtained from the Company on request. HEAD OFFICE 147 Argyle Street, Kowloon GENERAL ENQUIRIES Telephone : 2678 8111 CUSTOMER ACCOUNT ENQUIRIES Telephone : 2678 2678 EMERGENCY SERVICE (24 hours) Telephone : 2728 8333 INTERNET http://www.clpgroup.com All CLP Power staff visiting Customers' premises on official duties must produce their Employee Identity Cards. Each card displays the name and a photograph of the bearer. Please check before allowing entry to your premises. In case of doubt, ring the CLP Power Emergency Service immediately on telephone number 2728 8333

3 0 0 Customer Installation Interface And Other Requirements 301 Customer's Main Switch A main switch is, in general, required to be installed for an Installation such that by operating the main switch the Supply to the entire Installation can be switched on and off as necessary. 1. A Customer's main switch or circuit breaker shall be provided for every Customer's Installation which shall interrupt all live conductors of the Installation. The main switch or circuit breaker shall be readily accessible to the Customer and shall incorporate:- (a) means of isolation and switching; (b) means of protection against over-current; and (c) means of protection against earth leakage. Where a Customer's main switch or circuit breaker is connected directly to the Company's HV or LV transformer or switchgear, its overcurrent and earth fault protection shall discriminate with the Company's relevant high voltage protection settings. For a 3-phase 4-wire Supply, a linked switch or linked circuit breaker may be arranged to disconnect the phase conductors only. In such case a link shall be inserted in the neutral conductor and securely fixed by bolts or screws. 2. The means of isolation and switching shall be:- (a) a device selected and installed in such a way as to prevent unintentional reclosure; (b) capable of cutting off the full load current of the whole installation from Supply; and (c) provided with clearly and reliably indicated ON & OFF positions. 3. The means of protection against overcurrent shall be a device capable of breaking (and for circuit breakers, making) any overcurrent up to and including the prospective short circuit current at the point where the device is installed. Such a device may be a circuit breaker incorporating overload release, or fuses or a circuit breaker in conjunction with fuses. Where Supply is taken directly from the Company's transformer, the main switch or circuit - 27 -

breaker shall have an adequate short-circuit breaking capacity. It shall be 40kA at low voltage (For High Voltage Supply, please refer to Rule 207). The incoming terminals of the main switch or circuit breaker shall be suitable for terminating and receiving the Company's Supply cables. The neutral conductor shall have a cross-sectional area not less than that of the phase conductor. 4. The means of protection against earth leakage shall be by earthed equipotential bonding and automatic disconnection of Supply. The characteristics of the protective device for automatic disconnection and the earth fault loop impedance at the main switch shall be co-ordinated so that disconnection is achieved within 5 seconds during an earth fault. Reference shall be made to the time-current characteristics of the protective device supplied by the manufacturer to achieve this objective. 5. Where a Customer's Installation comprises installations in two or more buildings, means of local isolation complying with Rule 301.2 shall be provided in each building. 6. A circuit breaker used to receive Supply direct from the Company's transformer or switchgear shall normally be of the draw-out type. A fixed type circuit breaker may be used in conjunction with an isolator provided it is mechanically interlocked with the isolator. For high voltage Installations, additional facilities are required to lock off the circuit breaker at an isolated or earthed position. 7. Where the Supply is to be taken from more than one transformer, interconnection facilities between the main incoming circuit breakers must be provided. All incoming and interconnection circuit breakers shall be of the 4-pole type interrupting all live conductors and mechanically and electrically interlocked to prevent the Company's transformers from operating in parallel. Where standby generation is installed, an electrically and mechanically interlocked 4-pole change-over device shall be used for interconnection between the normal and standby sources to ensure that neutral imbalance and fault currents return to the correct source of Supply. 8. A schematic wiring diagram showing the main distribution system shall be displayed near the main switch. - 28 -

9. Where the Customer's Installation is supplied from the Company's overhead line system, the Installation shall be protected against earth leakage by a Residual Current Device (RCD). 10. Instantaneous type RCD shall not be used as protective device to afford protection against earth leakage for rising mains or circuits providing electricity Supply to multi-customer's installations. 302 Customer's Installation 1. In multi-customer premises no part of the communal Installation shall pass through any individual Customer's unit within the building. 2. Rising Mains Installation (a) Any building of more than four floors including the ground floor shall be provided with 3-phase electrical rising mains with a 3-phase tee-off at each floor unless otherwise agreed by the Company. (b) The design of the rising mains Installation shall be agreed by the Company. (c) Separate riser earthing conductors shall be provided to earth all units therein. The minimum cross-sectional area of riser earthing conductor shall be 70mm 2 for copper and 150mm 2 for aluminium. (d) The Customer's main connection between the Company's meter and the Customer's main switch shall be installed and maintained by the Customer and shall be not less that 4mm 2 stranded copper conductors. The neutral conductor shall have a cross-sectional area not less than that of the phase conductor unless otherwise accepted by the Company. (e) In multi-customer premises a device capable of both isolating and switching the full load current of the whole Installation shall be provided for each Customer at a position immediately before the Company's meter. For a single-phase Installation this device shall be of doublepole type interrupting all live conductors. 3. Electro-magnetic Field (EMF) Shielding and Surge proof supply equipment. Customers are recommended to install their own EMF Shielding and Surge proof equipment to protect their own sensitive equipment. The Company may offer advice to Customers on these issues. - 29 -

303 Electric Motor Installation 1. Low Voltage Induction Motors (a) The choice of motor size and maximum acceptable starting current shall be in accordance with the following table :- Supply Motor Size (M) No. of Phases Maximum Starting Current Arrangement in Kilowatts ( in Multiple of Full Load Current ) From Company's Overhead Line System From Company's Non-Overhead Line System M 1.5 1-phase 6 1.5 < M < 3.8 3-phase 6 3.8 M 11 3-phase 2.5 M 2.2 1-phase 6 2.2 < M < 11 3-phase 6 11 M 55 3-phase 2.5 (b) The Customer shall ensure that motors exceeding the sizes listed above shall not cause voltage fluctuation outside the limits set out in Rule 220.1. (c) Motors that do not comply with the stipulations set out above shall not be connected to the supply system without the prior written agreement of the Company. 2. Synchronous Motors and High Voltage Motors Synchronous motors and high voltage motors shall only be installed by special arrangement with the Company. 304 Earthing 1. In every Installation the Customer is required to provide his own earthing system by which the exposed conductive parts of the Installation are connected to earth. 2. The earth electrodes of the Customer's earthing system shall be installed within Customer's own property. The material used and the construction of the earth electrodes should be such as to withstand damage due to corrosion and passage of earth fault currents. The following types of earth electrodes are acceptable:- - 30 -

(a) earth rods or pipes; (b) earth tapes or wires; (c) earth plates; (d) metallic reinforcement of concrete, including sheet piles. The metalwork of gas and water services shall not be used as an earth electrode. 4. Where the Supply is taken direct from the Company's transformer or via an underground cable having exposed conductive parts, the Company may allow the Customer to provide a bonding conductor between his main earthing terminal and the Company's transformer earth or the metallic sheath of service cable. The size of the bonding conductor, if allowed, should not be less than 70mm 2 copper equivalent. However, in measuring the earth fault loop impedance or testing the operation of protective devices, the said bonding conductor must be disconnected. 305 Installation and Testing of Customer's Installation 1. All Installations connected to, or intended to be connected to, the Company's Supply must comply with the requirements of these Supply Rules, the Electricity (Wiring) Regulations and other relevant Government Ordinances and Regulations. 2. It is required by law that the owner of an Installation employs a Registered Electrical Worker (REW) of a Registered Electrical Contractor (REC) to inspect and test his Installations. An appropriate Work Completion Certificate (WCC) shall be issued to the owner by the REC upon completion of the appropriate tests and inspections. 3. It is required by law that Installation owners as mentioned in Code 20 of the COP for the Electricity (Wiring) Regulations shall have their Installations inspected, tested and certified at least either every one or five years as laid down in Regulation 20 of the Electricity (Wiring) Regulations. - 31 -