Unpack. Left Handing (L) the Operator. StrongArmPark DC Breakaway Bracket Installation Video

Similar documents
Quick Start Guide SlideSmart DC HD25, HD30

Installation Instructions

MODEL D-SBG Single Arm Barrier Gate Operator

WedgeSmart. Installation Instructions. Surface mount parking wedge with electromechanical barrier arm operator and Smart DC Controller

MODEL D-WBG Wishbone Arm Barrier Gate Operator

PowerMaster MODEL MBG. Installation Manual U L R UL 325 AND UL 991 LISTED MEDIUM DUTY BARRIER GATE OPERATOR TABLE OF CONTENTS

APOLLO Gate Operators, Inc.

Instruction Manual for the. E-SL 450 Series

Bracket and Clamps, Wood Bracket, Breakaway Arm, StrongArm DOT. Bracket and Yoke, Non Counterweight Type. Bracket and Yoke, Counterweight Type

Automatic Transfer Switch FT-10 Network Control Communications Module (CCM-T) Kit

PLASTIC FOLDING ARM KIT This kit is designed for the 1600 model barrier gate operators only. Recommended for low headroom applications.

Generator Set Applications FT-10 Network Control Communications Module (CCM-G) Kit

650 Series Cargo Van Lift Mounting Instructions Ford Transit (Standard Roof) 2015-Present

INSTALLATION M ANUAL

HYPPOETL HYPPO DUALETL 12 VOLT DC Swing Gate Operator

MODEL WBG WISHBONE BARRIER GATE OPERATOR

Gate Operators, Inc. Model 7100UL Residential & Medium Duty Commercial Slide Gate Operator INSTALLATION MANUAL

APOLLO Gate Operators, Inc.

INSTALLATION MANUAL ELECTRIC DOUBLE OVEN RANGE

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present

Installation/Owner s Manual 1603

MODEL MSW Medium Duty Swing Gate Operator

Requirements LEO Power Operator Installation Instructions Patents: 5,881,497; 7,316,096; 7,484,333 CAUTION CAUTION WARNING

Safety Installation Information Single Gate Opener Parts List...4. Dual Gate Opener Parts List...5. Technical Specifications & Features...

Owner s Manual. Model 9310 Vehicular Slide Gate Operator

Owner s Manual. Model 9150 Vehicular Slide Gate Operator

Owner s Manual. Model 9300 Vehicular Slide Gate Operator

ChargePoint Gateway Installation Instructions

Owner s Manual. Models 6050 and 6100 Vehicular Swing Gate Operators

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL

Senior Swing Control Box. Table of Contents

Requirements LEO Power Operator Installation Instructions Patents: 5,881,497; 7,316,096; 7,484,333 CAUTION CAUTION WARNING

Optimal Series. Automatic Transfer Switch. Installation and User Manual for the OPT2225 Automatic Transfer Switch. Full Version

RAMSET RAM

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

HDSLG 1000 Heavy Duty Vehicular Slide Gate Operator

SKC400U SLIDING GATE OPENER OWNER S MANUAL

SELF DRILL SCREWS FILLER STRIP

#366. Gate Operator Pre-Installation and Site Planning. Introduction

AUTOMATIC GATE OPENER

poollux Power plx-pw60 & plx-pw100

Model ET 5000W Operation and Service Manual

* * E996L Series. E996L for Rim/Vertical. E996L for Mortise CAUTION

Rated for use on 110/120VAC 60Hz and 220/240VAC 60Hz applications

INSTALLATION, OPERATION, SERVICE & REPAIR PARTS MANUAL FOR

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

SYMBOL LEGEND DANGER WARNING NOTE THIS INDICATES DANGER TO THE LIFE AND HEALTH OF THE USER IS APPROPRIATE PRECAUTIONS ARE NOT TAKEN

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks Fleetside 4-door Chevy & GMC Trucks T-100

Installation/Owner s Manual 1601 / 1602

Owner s Manual. Overhead Gate Operator. Copyright 2015 DoorKing, Inc. All rights reserved. REV SENSE OPEN GATE FORCED NO NC

General Applicability: KIA Sorento. Issues Current Kit does not allow for CAN DATA remote access

Installation and Maintenance Manual

Rated for use on 110/120VAC 60Hz and 220/240VAC 60Hz applications

CM5100 COMPUTER MANAGED CYLINDRICAL LOCK HARD-WIRED (FSE/FSA) INSTALLATION MANUAL

HIGH SPEED SLIDING GATE OPENER

Part Diagrams. HydraSwing 40/40F Actuator. Part Name Part Number HydraSwing Models (current) Mount, Gate. Valve, Brake. Pin, Cylinder.

Owner s Manual. Series 6300 Vehicular Swing Gate Operators

Model 1550 Single Swing Gate Model 1650 Dual Swing Gate

INSTALLATION AND OWNER S MANUAL

Vehicular Swing Gate Operator. Nice. Titan 912L. The Titan 912L Gate Operator is intended for use with vehicular swing

MODEL SG & DSG Slide Gate Operator UL 325 and UL 991 Listed

Linear Actuator Swing Gate Operator Installation Manual Model # LA405-24

Intelli-Park Series Barrier Arms. Intelli-Park 9. Intelli-Park 14. Intelli-Park 18. Intelli-Park 32

Installation/Owner s Manual 1601 / 1602

LGT-312L E-Z-Go TXT Light Bar Bumper Kit Installation Instructions

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

NEW! radio receiver now included

M670/M680BD MAGNALOCK SERIES Installation Instructions

IVTM Installation Manual

Model 1100B CHG Terminator. Installation Instructions

ACCUVALVE MODEL AVC6000 SUBMITTAL MATERIALS MODEL CODE. AccuValve Model AVC6000 AVC6 - - DWG. NO: REVISION: REV. DATE:

Installation/Owners Manual PATRIOT RSL Vehicular Slide Gate Operator Heavy Duty Battery Powered Solar or AC Charged

Easy/Tran TF STANDBY POWER FURNACE SWITCH TOOLS NEEDED FOR INSTALLATION. PARTS LIST for Easy / Tran TF FURNACE TRANSFER SWITCH

High Frequency SineWave Guardian TM

Sentinel Field Satellite Controller

Sliding Gate Opener User s Manual

MICROGUARD 500 EXTENSION REEL TRAINING MANUAL. Greer Company. Greer Company Crane Systems 1 OF18

Installation/Owner s Manual Series 9500

PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide

GATE STAR 6000 Model GS Heavy Duty Commercial Vehicular Swing Gate Operator

Installation/Owner s Manual Series 9000

TOYOTA RAV4 w/smart 2009 TVIP V4 PREPARATION

GENERAL SAFETY... 3 PARTS LIST...

INSTALLATION GUIDE Table of Contents

ACSI MODEL 1440 POWER SUPPLY INSTALLATION INSTRUCTIONS

LGT-306L / LB Club Car Precedent LED Light Bar Bumper Kit Installation Instructions

INSTALLATION MANUAL. Melink Corporation (513) Revision

Parking Gate INSTALLATION AND OPERATION MANUAL

PowerMaster Model SG

MODELS DSH/KSH/DSV/KSV R-410A LOW-AMBIENT KIT

Installation/Owner s Manual 1601 / 1602

Alliance Towel Dispensing System. Operation Manual

FOR CLASS I, II, III, IV VEHICULAR GATE OPERATORS

CM52 Network Protector with Arc Flash Reduction Module

Photoelectric. Sensors Invisible Light Beam Protection Area

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL

RAMSET

Owner s Manual. Model 9100 Vehicular Slide Gate Operator

Transcription:

DC Left Handing (L) Standard. Factory ships left handing operator. NOTE: If your site requires right handing, place the order with your distributor as a StrongArmPark DC with right handing. Handing changes can be completed in the field, but it requires additional time and effort. See page 3. Quick Start Steps Batteries Keyed latch Drive Belt cover Breakaway fasteners Torque to 15 in-lb. Top cover HyProtect Breakaway Arm Mount Each bolt is secured with an aluminum lock washer and nylon hex nut. Torque to 15 in-lb. See page 4. Arm Length Fasteners Applies to: < / = 10 ft (3 m) 2 nylon bolts Low wind < 10 ft 1 nylon bolt High wind > / = 10 ft and 1 steel bolt Low wind > 10 ft 2 steel bolts* High wind *NOTE: Be aware, when using two steel bolts, that the arm may bend before the nylon nuts fail which voids the Warranty. To retrofit StrongArmPark DC with the breakaway bracket containing the magnetic switch and arm light harness, order: MX4050 Breakaway Arm Assembly kit. Attachment Plate changes depending on arm material End cap Knob Barrier Arm Spring assembly (StrongArmPark DC 14) Smart DC Controller Front access panel Chassis StrongArmPark DC Breakaway Bracket Installation Video Tensioning nuts To review the installation video, scan the QR code with your cell phone or click on the following link: http://bit.ly/breakawayinstall Unpack the Operator

1 Site Planning & Operator Installation Arm Length C/L Arm length is measured from edge of operator. StrongArmPark DC 10: Up to 10 ft (3 m) StrongArmPark DC 14: 10 to 14 ft (3 to 4.3 m) with spring assist. NOTE: Articulating arm options shown below are available. Contact HySecurity Sales. 41 in (104 cm) 35 in (89 cm) Tools Needed: Standard hex key set Standard socket set Crescent wrench Wire stripper Concrete drill Articulating Arm Option: Clearance Requirements 11⅛ in (29 cm) 14⅞ in (38 cm) 5½ inch (14 cm) 7 ft Option: 7 ft (228 cm) vehicular clearance [8 ft barrier arm length, ] 8 ft Option: 8 ft (244 cm) clearance [10 ft barrier arm length, ] 9 ft Option: 9 ft (274 cm) clearance [11 ft barrier arm length, ] Earth ground IMPORTANT: When installing the operator be sure to comply with all local government regulations and codes and read the Important Safety Instructions found in the manual. 2 in (5 cm) minimum conduit height Base of chassis Concrete pad Grade Turn OFF AC power at the source DANGER (circuit breaker panel) before installing the operator. Follow facility Lock Out/ Tag Out procedures. Make sure both the DC and AC power switches on the Control Box are in the OFF position. Consult local codes for proper depth The potential for lightning discharge exists with all DANGER gates, fences and gate operators. National Electric Code (NEC) requires a separate earth ground in addition to the required equipment ground. A local earth ground also serves to protect the electronic controls. Extra conduit (Dual or Sequenced Gate wires) Route 6 AWG ground wire (maximum length 3 ft, 91 cm) through conduit & attach to ground lug. Grade level High voltage wires Low voltage/ Communication wires Vehicle Loop control wires 19 in (48 cm) NOTE: To reduce electrical interference, run high voltage and low voltage through separate conduits. 19 in (48 cm) Page 2 MX3651-01 Rev. C StrongArmPark DC Quick Start Steps www.hysecurity.com 2017

MX000316 MX000316 2 Review Handing and Install the Chassis Left Handing (L) Standard, Factory Default Right Handing (R) Front access panel To take full advantage of the break away feature, the front access panel must face oncoming traffic. Changes to operator handing in the field, must also be addressed in the Installer Menu. SH R (RIGHT) GATE HANDING Smart DC Controller STOP MENU RESET in 30 cm Remove Top Cover Attach Drive 7½ in (19 cm) CONDUIT CUT-OUT ⅝ inch slots (16 mm) Use ½ x 3½ inch concrete anchors Warning Label Place on front access panel facing incoming traffic. Required for UL 325 compliance. Belt Cover Be sure to CAUTION secure the belt cover with the fasteners provided. If the belt cover is not installed, a potential risk of injury exists. Mounting Template Cut out Mounting Template Cut out the base template on the shipping box and use it to mark the mounting locations on the concrete pad. KEEP CLEAR AUTOS ONLY No Pedestrians No Motorcycles No Bicycles Moving Arm Can Cause Serious Injury or Death Arm may move at any time without warning. Do not let children operate the gate or play in the gate area. THIS GATE IS FOR VEHICLES ONLY. All pedestrians, bicycles and motorcycles must use a separate entrance. Read the owners manual and safety instructions. Anchor bolt, washer, and nut (4x) KEEP CLEAR AUTOS ONLY No Pedestrians No Motorcycles No Bicycles Moving Arm Can Cause Serious Injury or Death Arm may move at any time without warning. Do not let children operate the gate or play in the gate area. THIS GATE IS FOR VEHICLES ONLY. All pedestrians, bicycles and motorcycles must use a separate entrance. Read the owners manual and safety instructions. Warning Label Place on side panel facing incoming traffic. Required for UL 325 compliance. Concrete pad Install the Chassis Remove front access panel. Earth ground Grade level To easily access and wrench-tighten the anchor bolts, swing the base panel open (or remove it). Conduit NOTE: The spring tension on StrongArmPark DC14, should be adjusted BEFORE fastening the operator to the concrete pad. The proximity of the conduit to the adjustment nut at the base of the spring makes it difficult to wrench-tighten. Grounding rod depth per local code www.hysecurity.com 2017 StrongArmPark DC Quick Start Steps MX3651-01 Rev. C Page 3

3 Install the Barrier Arm Install the HyProtect Breakaway Arm Mount Left Hand Operator (shown) Standard shipment is L (left handing) NOTE: For articulating arm assembly, see the instructions shipped with the articulating arm or view online with a registered account. To review the installation video, click on the youtube video location: https://youtu.be/adtwnycc-nu 1 Make sure AC and DC power switches are in the OFF position. DC power switch Physical Stop Bracket 2 Connect the red battery wire. (Refer to step 4 in the Installation Instructions.) HOLD toggle switch Display 3 Press the DC switch ON and toggle HOLD switch to Hold Open. Tools Required AC power switch Physical Stop Bracket fasteners (4x) Utility knife Standard socket set Standard hex key set HYSECURITY GATE STOP MENU RESET 5 Warning Labels UL 325 compliance requires placement on both sides of barrier arm. Remove Physical Stop Bracket (4 fasteners) WARNING WARNING WARNING AUTOS/TRUCKS ONLY VOITURES/CAMIONS UNIQUEMENT SOLO AUTOMÓVILES/CAMIONES Stay away from barrier arm Do not let children operate drop zone. Arm may move the barrier arm or play in at any time without prior the area. warning. Moving arm can cause All pedestrians, bicycles, vehicle damage, serious motorcycles, and trailers injury, or death. must use a separate entrance. Read the owner s manual and safety instructions. Veuillez lire le manuel d utilisation et les instructions de sécurité. Lea el manual del usuario y las instrucciones de seguridad. 4 After GATE appears on the display, turn the DC power switch OFF. 6 Position Breakaway Arm Bracket so the clamp opening faces up. Spline collar bolt & nut NOTICE: See chart on the cover page for fastener selections. If possible, remove the barrier arm when high wind warnings are in effect. 7 Slide the clamp onto the drive shaft. Align gear teeth as you slide clamp against chassis. NOTE: You may need to loosen the spline collar bolt & nut to position the clamp. Retighten when spline is properly set. 8 Secure clamp to drive shaft using the fasteners provided. NOTE: Follow the video to feed wire harness through chassis, assemble barrier arm, connect lighting, magnetic switch and program the gate operator. Page 4 MX3651-01 Rev. C StrongArmPark DC Quick Start Steps www.hysecurity.com 2017

4 Verify Power is OFF, and then Connect AC Wires Turn Power OFF Control Box Turn OFF AC power at the source (circuit breaker panel) before accessing the wires in the junction box. Follow facility Lock Out/Tag out procedures. Make sure both the DC and AC power switches are in the OFF position. DANGER DC power switch disconnects motor and battery. Connect Red Battery Wire Place the power switches in the OFF position. AC power switch disconnects incoming AC power to the operator. DO NOT connect the 115VAC service outlet to 208 or 230VAC power supply wires! To use the 115VAC service outlet on a 208 or 230VAC installation, the electrician needs to run an extra neutral wire to the operator from the power source and wire the service outlet per code. WARNING Toggle switch: Hold locks barrier arm in the open position. AUTO Normal Operation. Service Outlet 115VAC only Hold ignores all commands and inputs. Secures barrier arm in a closed position. 115VAC wires for the Service Outlet High Voltage Cover (junction box) and label 115 1Ø SERV ICE 115 VA OUTLET C, 15A Voltage selector switch is factory set to 115V. NOTE: If power input is 208/230V, move the switch so 230V appears and change the label on the junction box. COPPER USE ONLY TO RS WITH CONDUC RE RATING TU RA A TEMPE 75 C OF AT LEAST NFIGURED FACTORY CO Connect AC Power Wiring 1. Unscrew the two Phillips-head screws and remove the high voltage cover. 2. Connect the AC power and ground wires with wire nuts. If running 115VAC, also connect the Service Outlet wires. 3. Replace high voltage cover and secure with screws removed in step 1. CAUTION Wiring of gate operators must conform to NEC standards and comply with all local codes. www.hysecurity.com 2017 When connecting to 208/230VAC power, the voltage selector switch on the AC power board must be moved to the 230V position or damage to the operator will occur and void the Warranty. The label on the high voltage cover must be changed to state 230V. CAUTION StrongArmPark DC Quick Start Steps MX3651-01 Rev. C Page 5

USER2 5 Connect Accessories All accessories require a minimum of two connections on the Smart DC Controller: A device input A Common Bus Terminal () NOTE: Other devices may require more connections or configurations. For example, the Fire Department (EMERG ) input requires a +24 volt input. The connection must be activated by changing the setting through the Installer Menu. UL 325-2016 updates describing installation of external entrapment protection sensors can be found the Programming & Operations Manual. Two power supplies (2 terminals each) are available for peripheral connections: & VDC 24VAC 24VAC VDC VDC Older Smart DC Controller boards may have 24VAC spades. Do not connect accessories to 24VAC. NOTE: Each power supply (and its corresponding terminals) can be used in any combination to draw the available 1A maximum. Parking Site Use The label for the Smart DC Controller accommodates arming loops and establishes which open commands need to be wired for vehicle counts (transient, special, and tenant user types ). The software identifies the access control inputs and uses the arming loops to control relay and network outputs. NOTE: The most current software must be loaded on your Smart DC Controller. Access controls MON TERMINALS (Ex. Card reader, keypad) TRANSIENT USER SPECIAL USER TENANT USER SPARE SENSOR 3 BLOCK INNER ARMING OUTER ARMING STOP RADIO PARTIAL SENSOR 1 SENSOR 3 BLOCK IN OBS OUT OBS CENTER SENSOR 2 SENSOR + 24 V EMERG SHOW LEDs VDC VDC Radio receiver Red LED heart beat indicates processor is working. Press bu on to light ac ve inputs. A B DUAL GATE RS-232 +24V S1 USER RELAY 1 Electro-mechanical RADIO OPTIONS Mul -colored LED indicates power and gate status. Ethernet expansion DC NO USER RELAY 2 Solid state USB PORT INSIDE (Inner Arming Loop) OUTSIDE (Outer Arming Loop) CENTER RS-485 MUNICATION Arm light connections Hy5B Not to Scale NOTE: For breakaway magnetic switch wiring, review the installation instructions shipped with the breakaway arm bracket. Page 6 MX3651-01 Rev. C StrongArmPark DC Quick Start Steps www.hysecurity.com 2017

6 Turn ON Power, Level Arm & Connect Lights When both DC & AC power switches are in the OFF position and you turn them ON, the operator initiates a target search and the barrier arm travels open. No physical limit switches exist. The open and close limits are established by sensing the arm position. Even if AC power is lost and the batteries are fully drained, the limits remain intact. The only exception occurs when factory defaults are reinstated or the Smart DC Controller is replaced. For more information, refer to the StrongArmPark DC Programming and Operations Manual. Level the Arm & Adjust Physical Stops The limits are factory set at 90 and, if adjustments are needed, level the arm using the following procedures: Physical stops (bumpers) Access the Installer Menu to re-establish Learn Limit (LL) mode Adjust the physical stops (bumpers) Physical stop levers To level the arm or change the degree of angle, bumpers can be adjusted up or down using a ¼ hex key and ¾ open end wrench. At full Open or Close, the physical stop lever should lightly contact its physical stop (bumper). To make adjustments to the arm position, the operator needs to be in Learn Limits mode. Setting the Spring on the StrongArmPark DC 14 Arm Length Spring Setting (H) 10 - ft (3.6 m) 3.5 inches (89 mm) - 13 ft (4 m) 3 inches (76 mm) 13-14 ft (4.3 m) 2.5 inches (63 mm) NOTE: If the arm length is less than 10 ft (3.3 m), disconnect the spring from the physical stop lever. Spring is pre-tensioned for a 10 to ft barrier arm (3.6 m). Adjust spring tension by turning the adjusting nut. NOTE: If you need to change a StrongArmPark DC 14 handing in the field, it requires moving the spring s eyebolt to the opposite physical stop lever. Refer to StrongArmPark DC Programming and Operations Manual. H Learn Limits Mode Establish limit settings. HYSECURITY GATE D 1. Start at a gate status display. STOP MENU RESET 2. Press MENU, twice. 3. At the TIMER display, simultaneously press and release CT 0 (OFF) the and RESET buttons. TIMER 4. At the LL 0 display, press SELECT and change the display to 1 using STOP MENU RESET the NEXT button. Press SELECT again and the LEARN display appears. LL 1 (ON) LEARN LIMIT 5. Hold the button until the arm reaches the desired open STOP MENU RESET limit. Release the button. NOTE: Too far open or close? Press the opposing function button to reverse direction. LEARN DEGS: +XXX.X 6. To preserve the limit setting, STOP MENU RESET press STOP twice. LEARN appears on the display. 7. Hold the button until the LEARN arm travels to full close. Release DEGS: - XXX.X the button. 8. To preserve, press STOP twice. 9. Cycle the operator (Open/Close) several times. PREV NEXT STOP SELECT MENU RESET 10. If needed, adjust the bumpers so they contact the levers. www.hysecurity.com 2017 StrongArmPark DC Quick Start Steps MX3651-01 Rev. C Page 7

USER2 7 Connect Arm Lights to Smart DC Controller Review the installation video at the following youtube location: https://youtu.be/adtwnycc-nu In a short 8 minutes, the installation video shows you how to: Install the breakaway arm bracket Connect the magnetic kill switch Connect the arm lighting and feed wire through the chassis to the controller (5:50 min) Program the controller, Installer Menu settings R2 User Relay 2 and BA Breakaway switch. 1. Attach the end of the wire harness (on outside of chassis) to the LED light connector on the arm. The wire harness connector is keyed. Be sure to properly seat the connectors before threading close. 2. Secure the harness to the chassis with the strain relief bushing. 3. Connect the one wire lead to the power supply terminal. 4. Connect the other wire lead to the NO terminal on User 2 Relay. 5. Turn on both AC and DC power switches. Arm will cycle to search for the target home position. 6. When the arm has stopped moving, access the Installer Menu. 7. Set User Relay 2 logic function to one of the following: R2 27 : LED lights remain on throughout arm travel and turn off when open limit is reached. R2 28 : LED lights flash throughout arm travel and turn off when open limit is reached. NOTE: Both selections will turn off the lights, which preserves battery life, in the event of AC power loss. 8. To turn on the magnetic proximity switch in the breakaway arm assembly, navigate to BA in the Installer Menu. 9. Select BA and change the menu item to 1. 10. Exit the Installer menu mode by pressing Menu and return to run mode. CAUTION If User Relay 2 is being used for accessory devices, you can connect the LED lighting wires directly to and. Take note that this type of connection does not turn off the arm lights in the event of AC power loss and will drain the batteries quickly. Complete the Install DC Power Switch AC Power Switch LED Arm light connector Wire harness connector Connect Arm Light Cables Factory installed magnet (kill switch) MX3764 & MX3763 Breakaway bracket MX3680 Refer to the installation manual to configure User and Installer Menu options such as gate speed, Close Timer, relay functionality, etc. When the operator is functioning properly, replace the operator s covers and secure the key latch. Review the Important Safety Instructions and the proper use of the barrier arm with the end user. Position WARNING labels per UL 325. Take photos of the barrier arm installation site. Connect Wire Leads for lights and Breakaway bracket Kill switch Configure the Installer Menu: Relay 2 Logic Page 8 MX3651-01 Rev. C StrongArmPark DC Quick Start Steps www.hysecurity.com 2017 SENSOR 2 SENSOR 3 SENSOR 1 Connections to Controller Female Quick Connects: User2 Relay (NO) & + Spade connections: & SENSOR 3 Connect to & STOP RADIO PARTIAL EYE EYE BLOCK IN OBS OUT OBS CENTER EDGE EYE + 24 V EMERG SHOW LEDs +24V VDC VDC +24V Wire Harness Breakaway fasteners Wire ties Shown separated for reference only Spade connections B A DUAL GATE +24V USER RELAY 1 Electro-mechanical S 1 DC NO USER RELAY 2 Solid state R2 28 FLASH AC RELAY 2 LOGIC STOP MENU RESET BA 0 (ON) BREAK-AWAY USED STOP MENU RESET Program Breakaway switch, if needed