LVPS Replacement Instruction Sheet

Similar documents
Coolant Refill Instruction Sheet

Upgrading the Boxer LAD blower module

Light Engine Duct Upgrade Instruction Sheet

3/8 Universal Joint Phillips Head Screwdriver

RMK HANDLEBAR KIT P/N ; ; APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

THIS GUIDE IS INTENDED FOR DEALERS AND SOLAR COMFORT TECHNICIANS ONLY AND IS NOT MEANT OR INTENDED TO BE REPRODUCED OR DISTRIBUTED TO THE CONSUMER

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installing the Boxer fan upgrade kit

Generator, removing and

LOW, MID, HIGH RISE PRO-TAPER HANDLEBAR WITH HEATED GRIPS KIT

INSTALLATION INSTRUCTIONS

Lamp House with 2.5 kw lamp

INSTALLATION INSTRUCTIONS

CP2000 Ballast - Replacing Thyristor Instruction Sheet

INSTALLATION INSTRUCTIONS

1999 Volkswagen New Beetle GL

Intake Installation Instructions P/N 9046 (red filter) - P/N 9046B (blue filter) P/N 9046K (black filter)

INSTALLATION INSTRUCTIONS

5 Removal and replacement

Replacing the T320 Cooling System Components. Replacing a T320 Fan Tray. Removing a T320 Front Fan Tray

MAZDASPEED3 Intercooler Instructions

BEFORE BEGINNING INSTALLATION

P/N Rev 01 04/14-1- NOTE: If you are ordering hinges for your rear doors, order and/or

INSTALLATION INSTRUCTIONS

Installation Instructions

2-row and All-row systems included.

Signal Mirror Installation Instructions

Coil Spring Conversion Kit

Parts & Module Replacement

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CATCH CAN KIT

PRELIMINARY INSTALLATION INSTRUCTIONS. PARTS LIST Bass Speaker System Attachment Kit (sold separately) P/N 08B54-SNA-100.

INSTALLATION INSTRUCTIONS

Arrington Performance 67 Motorsports Drive Martinsville, VA 24112

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Feeder Circuit Breaker Units Secure Support Pan and Change Door Latch

INSTALLATION INSTRUCTIONS

Installing the Switch

Mustang 5.0L Cold Air Intake Installation Instructions P/N:

INSTALLATION INSTRUCTIONS

TOYOTA 4RUNNER CROSS BARS Preparation

Motorola Moto Z Force Droid Battery

SE400-M3-MMO-100/(U)SLQ-32A(V)3 WARNING. b. Engage swingbolts 3A11H9 with SRU front panel support hooks H1 and tighten nuts on swingbolts.

N/S= Not Shown Bold = Part available for purchase. Italic = Part not available for purchase, listed and shown for reference only.

TESLA MODEL S REAR UNDER SPOILER & DIFFUSER SYSTEM

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Ref Qty Part Description Part Number -1- Kit ( ) Contents:

INSTALLATION INSTRUCTIONS

Installation Guide. Heater Interface Cable for Mass Sensitive Detector Accessory G1590A

M7 R52S & R53 Cold Air Intake Installation Guide 53-3M7301

INSTALLATION INSTRUCTIONS

Part Number: TAV-713 TOYOTA AVALON LED DRL

DASH AUDIO KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev 01 04/16 Page 1 of 6. Verify accessory fitment at Polaris.com.

850 TETHER SWITCH KIT

Cab Kit Installation Instructions

ELECRAFT KX3 Application Note

TOYOTA PRIUS C FOG LIGHT (Halogen & LED)

SCION tc FOG LIGHT. Part Number: STC-312 / STC-812

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

TOYOTA SIENNA FOG LIGHT (Halogen & LED)

INSTALLATION INSTRUCTIONS

SCION xa 2004 FOG LIGHT Section I Installation Preparation. Part Number: General Applicability

TOYOTA TUNDRA COLD AIR INTAKE Preparation SEQUOIA

DOOR KIT P/N , APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

H15P. Toyota Hilux A-DECK Dual Cab

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Part Number: TAV-713. Kit Contents Item # Quantity Reqd. Description 1 2 DRL s bezels w/led DRL. Hardware Bag Contents.

INSTALLATION INSTRUCTIONS JEEP 2011-UP JK SECURITY FULL CONSOLE #274

Safe-T-element Installation Instructions

INSTALLATION INSTRUCTIONS

LI-ION BATTERY UPFIT KIT

COBB SPORT SPRINGS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Perfect Performance Products, LLC

160S Rewind Option Kit Installation Instructions

INSTALLATION MANUAL. For: ACURA NSX

INSTALLATION INSTRUCTIONS

PowerFlex DC Drive - Frame C Field SCR Module

SCION xb PERFORMANCE AIR INTAKE Section I Installation Preparation 2.4L I-4

INSTALLATION INSTRUCTIONS

Front seats. Special tools and equipment. VAS 5094 airbag adapter. Connecting page 72-9.

(1) Remote Control with (2) AAA Batteries

INSTALLATION INSTRUCTIONS

R8 Exhaust Installation Guidelines

Cold Air Intake Installation Instructions

INSTALLATION INSTRUCTIONS

These instructions were written for reference only and the use of a factory service manual is recommended.

COBB Tuning MAZDASPEED6 SF Intake System. Install Instructions

Installation Instructions : AUDI Gen 2 RS3/TTRS: Page 1

Transcription:

LVPS Replacement Instruction Sheet INTRODUCTION Use the following instructions when replacing the Astec Low Voltage Power Supply (LVPS) in CP2000-ZX (116-001101-03/04, 116-001113-01, 116-001124-01) or CP2000-M/MR (119-001101-02, 119-001101-03) projectors. KIT REQUIRED 003-120488-01 LVPS Service Kit (includes low voltage power supply, AC harness for ZX (001-111092-01), AC harness for M/MR (001-110858-01), DC harness (001-111081-01), 1/8 plastic slot driver, instructions) TOOLS REQUIRED CP2000-ZX: Phillips #3, #2 (long stem) 1/8 plastic slot driver (for LVPS POT adjustments in CP2000-ZX projectors) CP2000-M: Phillips#1, #2 (long stem, and 4 ) SAFETY AND WARNING GUIDELINES HIGH VOLTAGES MAY BE EXPOSED: Always power down and disconnect power sources prior to servicing. Once the projector is powered down, allow the cooling fans to automatically turn OFF before disconnecting from AC and opening the projector. Depending on your projector model this can take 10-15 minutes. QUALIFIED SERVICE TECHNICIANS REQUIRED: All module replacement procedures must be performed by qualified service technicians. NON-INSULATED DANGEROUS VOLTAGES MAY BE EXPOSED: Always disconnect from AC prior to disassembly. OBSERVE ALL ELECTROSTATIC PRECAUTIONS: Use a grounded wrist strap when handling electronic assemblies. Never operate the projector (or the fans) without all the covers installed. LVPS Replacement Instruction Sheet 1 of 11

INSTRUCTIONS FOR CP2000-ZX 1. Ensure power to the projector is OFF. 2. At the wall breaker, set the main AC circuit breaker to OFF. 3. Remove the LVPS/Ballast cover (Figure 1): a. Loosen the 3 captive screws securing the cover to the chassis. b. Lift the cover enough to clear the tabs at the bottom and remove. Figure 1 4. Remove the EMI shield (Figure 2): a. Loosen the 2 screws securing the shield to the frame. Remove shield to access harness connections to the LVPS. Figure 2 2 of 11 LVPS Replacement Instruction Sheet

5. Disconnect the DC harness (P1) from the Motherboard. (Figure 3) Figure 3 6. Disconnect the signal connection from the AC end of the LVPS, and the three signal harnesses (+3.3V, +5V and +12V) from the DC end. (Figure 4) 7. Remove the AC relay cover. 8. Disconnect the four AC harnesses from the AC relay (4, #2 Phillips screws). (Figure 5) 9. Disconnect ground. Figure 4 Figure 5 LVPS Replacement Instruction Sheet 3 of 11

10. Remove 4, #3 Phillips screws securing the LVPS module to the vertical plate. (Figure 6) Figure 6 11. Before installing the new LVPS, remove the AC harness and connect the loose AC harness labeled P/N 001-111092-01 from the kit. This AC harness is specific for CP2000-ZX. 12. Continue replacing the LVPS by following instructions in reverse. Refer to the Interconnect drawing provided with your projector when reconnecting harnesses. Pay particular attention to the connection of the +3.3V and the +12V signal harnesses. These are critical connections that if not done correctly can lead to LVPS damage. To adjust LVPS voltage rails: Use the non-conductive plastic slot driver provided in the service kit when adjusting the LVPS voltage rails on the CP2000-ZX LVPS. LVPS rail adjustment must be performed by qualified service technician. 1. Remove the LVPS/ballast side cover. 2. Adjust POT s to 3.366 +/-0.003v and 5.110v +/-0.003v. Observe the CDP to see the adjustment value of the rails. Figure 7 4 of 11 LVPS Replacement Instruction Sheet

FOR CP2000-M 1. Ensure power to the projector is OFF. 2. Remove top lid. (Figure 8) 3. Remove the 13 screws securing the high security cover. Remove cover (Figure 9) Figure 8 Figure 9 4. If your projector is manufactured early 2009, continue with Steps 5-9. If your projector is manufactured late July 2009, continue with Step 10. These units have longer LVDS cables which allow the connections to the FFIB to remain intact. LVPS Replacement Instruction Sheet 5 of 11

5. Remove the 4 screws securing the small plate on top of the cardcage. Remove the plate. (Figure 10) Figure 10 6. Disconnect power harnesses J7, J8 and J9 from the FPGA Formatter Interface Board (FFIB). Note: The FFIB is located in the top slot of the cardcage. 7. Remove clips securing power harnesses. (Figure 11) 8. Disconnect the 6 LVDS harnesses from the FFIB. 9. Disconnect the CDP power harness. Figure 11 6 of 11 LVPS Replacement Instruction Sheet

10. Remove the intake duct (Figure 12): a. Remove 3 screws from the corners of the intake duct. b. Remove the duct by pulling it up and out. Figure 12 11. Remove the air filter cover (Figure 13): a. Loosen the 2 captive screws at the bottom of the filter cover. b. Pull the cover up and remove. Figure 13 12. Loosen 2 thumbscrews on the cardcage. (Figure 14) Figure 14 LVPS Replacement Instruction Sheet 7 of 11

13. Remove 6, #1 Phillips screws on the cardcage front plate. (Figure 15) 14. Slide the cardcage out a few centimeters, then re-tighten the 2 thumbscrews on the cardcage (Figure 14) to prevent the cardcage from sliding all the way out. Figure 15 15. Disconnect DC power P1 and P35 on the Motherboard. 16. Disconnect the inline connection to the voltage adjustment harness. 17. Disconnect the signal connection from the AC end of the LVPS, and the two signal harnesses (+3.3V,+5V) from the DC end. (Figure 16) Figure 16 18. Using a long stem #2 Phillips screwdriver, loosen the 2 thumbscrews on each side of the LVPS (behind the cardcage). 19. Open the rear lamp door. 8 of 11 LVPS Replacement Instruction Sheet

20. Remove the exhaust panel (Figure 17): a. Remove 2 screws from each corner of the panel. b. Using a 4mm Allen key, remove 5 socket head cap screws along the bottom edge of the panel. c. Pull the skin forward and out. Figure 17 21. Disconnect the two harnesses (brown -SW1 and blue - SW2) from the AC selector switch. (Figure 18) Figure 18 22. Remove the 10mm nut from the GRN terminal and disconnect. (Figure 19) Figure 19 LVPS Replacement Instruction Sheet 9 of 11

23. Disconnect the lamp exhaust thermal harness. (Figure 20) 24. Remove 3 screws from the lamp exhaust duct. Remove duct. 25. Remove 2 screws and loosen the thumbscrew from the liquid cooling module. Pull the liquid cooling module up slightly and slide it out enough to gain access to the LVPS plate cover. (Figure 21) Figure 20 Figure 21 10 of 11 LVPS Replacement Instruction Sheet

26. Using a long stem #2 Phillips screwdriver, remove 2 screws and PEM nut from the LVPS plate cover. Remove cover. Using caution not to catch any harnesses on the opposite end, slowly pull the LVPS out of the compartment. (Figure 22) Figure 22 27. Remove 4 screws from the LVPS cover. 28. When replacing, repeat instructions in reverse. Refer to the Interconnect drawing provided with your projector when reconnecting harnesses. NOTE: The AC harness for the CP2000-M already comes connected to the LVPS. It is labeled 001-110858-01. To adjust LVPS voltage rails: LVPS rail adjustment must be performed by qualified service technician. 1. Remove the air filter cover (and filter). 2. Adjust POT s to 3.366 +/-0.003v and 5.110v +/-0.003. Observe the CDP to see the adjustment value of the rails. (Figure 23) Figure 23 LVPS Replacement Instruction Sheet 11 of 11