Installation, Operating and Maintenance Manual

Similar documents
Model 550 Series Vibration Switches

SmartBob AO. BinMaster: Division of Garner Industries 7201 N. 98th St., Lincoln, NE

IMI vibration switch USER MANUAL INSTALLATION - OPERATION - MAINTENANCE

TRAC-3 TENSION READOUT AND CONTROL

Model APS 3B Snow and Ice Melting Control

PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS. v1.1 Revised Nov 29, 2016

AGV5-1, AGV5-2 FORM AGV5 OM 11-02

1100 Series Piston Type Differential Pressure Gauges

Installation Guide Smart-UPS On-Line SRT1000/1500 UXI-NCLI, SRT1000/1500 UXI-LI, Tower/Rack-Mount

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference.

SOLAR LIGHTING CONTROLLER SUNLIGHT MODELS INCLUDED IN THIS MANUAL SL-10 SL-10-24V SL-20 SL-20-24V

CALTRAP INSTALLATION AND OPERATIONS MANUAL

Service and Parts Manual. NO LONGER IN PRODUCTION Some service parts may not be available for this product. Otolaryngology Chair.

Installation Operation Maintenance ADDENDUM

Flight Systems. Replacement for KASSEC DESCRIPTION

Cougar B Series Electric Vibrators 3 Frame

Senior Swing Control Box. Table of Contents

Some service parts may not be available for this product!

CIRCLE SEAL CONTROLS

TABLE OF CONTENTS GENERAL SPECIFICATIONS... 3 SAFETY SUMMARY INTRODUCTION INSTALLATION Location and Mounting Input

On all settings above 100 horsepower the following precautions should be observed:

BMRX Series ROTARY LEVEL CONTROL

Installation, Operation & Maintenance Instructions

Rack Mount Power Supplies

OPERATING MANUAL Digital Diesel Control Remote control panel for WhisperPower generator sets

User Manual JS-ICON. 624 ARCH Dimmer Rack. JOHNSON SYSTEMS INC. Spring

Shock/Vibration Control Switches

Installation Instructions

ARCHITECTURAL CONTROL SYSTEMS, INCORPORATED ST. LOUIS, MISSOURI

3 Phase Smart Controller

BMRX Series Rotary Level Indicator

EC-3000/3400 Solid State Rotary Cam Limit Switch Installation/Operation Manual

Electric Actuator Instructions

: 660 N. For material handling and clamping of small workpieces. CKZT25 -X2797 (Base Type) Power Clamp Cylinder INFORMATION. ø

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG

Optimal Series. Automatic Transfer Switch. Installation and User Manual for the OPT2225 Automatic Transfer Switch. Full Version

Abstract. GLV Systems Test Plan 1

C.E. Niehoff & Co. N1601, N1602, N1603, and N1604 Alternator Troubleshooting Guide NOTICE. Hazard Definitions. Battery Charge Volt and Amp Values

SERVICE MANUAL (INTERNATIONAL)

QS20.241, QS C1

Cougar D and U Series Electric Vibrators

AC Rectifiers for use with Armature Actuated Brakes. Product Overview. Full Wave. Half Wave. Combination Full and Half Wave. TOR-AC Full and Half Wave

Solenoid Valve Output Module IC693MDL760 Product Description

GTFM IV. Operation / Installation Manual. Gas Turbine Flow Monitor. Computer Weld Technology, Inc. Manual Part Number: A8M5010 Revised: June 26, 2008

model ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

ACSI MODEL 1406BB-04-AO POWER SUPPLY INSTALLATION INSTRUCTIONS

PBA Series Prelube Controls

Cougar B Series Electric Vibrators 4 Frame

SERVICE MANUAL (DOMESTIC & INTERNATIONAL)

Rosemount 8750WA Magnetic Flowmeter System For Water and Wastewater Industries

Installation and Service Instructions for 87,000 & 87,100 Series Self-Adjust Brakes (rev. B)

EM 101 EM EM EM GENERAL INFORMATION. SPECIFICATIONS MATERIALS Wetted Materials - FLOW RANGE

ABB ! CAUTION. Type KRV Directional Overcurrent Relay E 1.0 APPLICATION 2.0 CONSTRUCTION AND OPERATION. Instruction Leaflet

User Manual Solar Charge Controller 3KW

POWER PINNER HAND WELDER 7200 OPERATOR S MANUAL

LNG Screw Down Non-Return Valve Installation, Operation and Maintenance Manual

BITZER Capacity Controller for CSH Compressors Temperature Sensor

The JR Linear Drive System

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2

Installation Guide Smart-UPS On-Line SRT1000/SRT1500 XLA Tower/Rack-Mount

MODEL 660 AUTOMATIC FASTENING CENTER OPERATOR S MANUAL

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

ELECTRIC ACTUATOR 94OE IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

ACSI MODEL 1440 POWER SUPPLY INSTALLATION INSTRUCTIONS

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

Trailer Axle Beam Replacement SERVICE MANUAL

ADVANCED PID TROUBLESHOOTING

WATERFLUX 3070 Quick Start

The galvanic separation of the primary or actuating circuit and the load circuits

Series 110 MK III, Series 187 MK II and MK III, Series 250 MK II, MK III, and RAST 5 & 7

OPERATION AND MAINTENANCE MANUAL

INSTALLATION and OPERATION BALL DISPENSER MODEL NOS: BD-001 THRU BD-004, BD-010, BD-011

RE-PR3-E-86&105 3-Phase Panel Mount 86 and 105kW

PRYCO, INC. P. O. BOX 108 Mechanicsburg, IL OPERATIONS AND MAINTENANCE MANUAL For PUMP SETS

KENCO ENGINEERING COMPANY

Application Engineering

User Manual. T6 Tachometer. Online: Telephone: P.O. Box St. Petersburg, Florida 33736

OEM Manual. 4042SA Leak Detecting Spill Alarm Instruction manual

Automatic Transfer Switch FT-10 Network Control Communications Module (CCM-T) Kit

Operations Manual. Zero Speed Switch Sensor Model ZS09P

Dycon D2430 EN54-4 Fire Alarm Power Supply Series

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG CEG

92-00 Civic/ Integra/ Del Sol/ Accord/ CRX

7281-EA/ET INSTRUCTIONS

KD1E Range Potential Indicators

Application Engineering

GENSET CONTROL MODULE A121A / A241A

Models- 8105, Commercial Vacuums. Product Information Product Dimensions. Important Safety Instructions

LIPPERTCOMPONENTS, INC.

Bray Series 70 Electric Actuator. Basic Product/Sales School

PFadvantage MF 6850/6855; Ideal 9080/9090

Submersible Pumps Model ST4125D Model ST6125D

HexPro Series Low Profile Wrenches

Kit No Please read these instructions completely before proceeding with installation. Air Spring Kit Parts List. Attaching Hardware

Induction Power Supplies


VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines

CIRCLE SEAL CONTROLS

Kwikee # Series Step OWNER'S MANUAL ( )

Service Instructions. V-9-D Vibrator

Transcription:

DOCUMENT # BASTD1007 Installation, Operating and Maintenance Manual 1. Technical Note - Hopper Hammer Initial Settings Pages 7 and 8 of the Hopper Hammer Models PASTD583-2 & PASTD978 Installation, Operating and Maintenance Manual discuss the switch settings. The PASTD978 Hopper Hammers ship set to 4444. Most likely a setting of 5555 could be a normal setting. This equates to 90ms ON TIME for medium to medium high impact, one rap per second for 5 seconds with a 5 second dwell before it starts over. This will be adjusted as necessary at install time. Once installed if the impacts don t seem to be enough then the switches can be adjusted to something like 3 raps/sec for On Time of 1-2 seconds and a 3-5 second dwell (Off Time). This would be 5625 on the switches. Changing the Impact switch to 6 raises the time to 100ms which is Heavy Rapping. You can only use this setting if you reduce the Frequency (raps/second) and On Time and insure that there is enough Off Time to allow the coil to cool down. *Please note that the Hopper Hammers should not be run in the heavy rapping setting for a period greater than 24 hrs. at a time. Doing so will void the warranty.* Setting the switches is done during startup. We can t know what the final settings will be until all the hardware is installed and we see how efficiently the penetration hardware transmits the rapping energy to the screen. 2. Overview The Hopper Hammer is a self-contained electromechanical device that dislodges collected material from the inside walls of hoppers, bins, chutes, bunkers, etc. by delivering discrete impacts of variable intensity to the outside wall of the structure. The Hopper Hammer can be installed in areas where the ambient continuous air temperature does not exceed 70 C (160 F) and the surface temperature of the striking surface does not exceed 120 C (250 F). If the surface temperature exceeds a continuous 120 C, then a thermal isolation mount must be included in the installation. Page 1 of 15

3. Components The standard A.V.C. Specialists Hopper Hammer, Part Number PASTD583-2, consists of the following components A. Hopper Rapper, Model SR-A1, Part Number PASDT726. B. Safety Chain with Clamp C. Single Rapper Control, Model Series 303 The Model PASTD978 Hopper Hammer consists of the model PASTD101 Shaft Mount SR-A1 rapper, safety chain and M303 Single Rapper Control. 4. Installation A. Installing Hopper Hammer on Striking Surface In order to optimize the transmission of energy to the wall of the vessel being rapped, the Hopper Hammer must bolted to an existing striking surface when used as a hopper rapper. The use of Grade 8 or 9, ½ bolts with flat washers, lock washers and lock nuts. After a few days of operation all nuts should be checked for tightness. If the Hopper Hammer is to be used to rap internals of the precipitator using tapered adapter it is important to insure that the safety chain holds it in place while it is rapping for the first several cycles. This will allow the tapered connection to snug and bond. Page 2 of 15

The use of the Hopper Hammer Surface Mount (PASTD802) or similar item is recommended to distribute the impact energy over a large area of the surface to be rapped is recommend. If the temperature of the surface to be rapped exceeds 120 C, then the use of a High-Temperature Isolator (FASTD794-4.5) or similar item is required. A safety chain is provided for those installations where the Hopper Hammer might be installed over a walkway or personnel area. The safety chain clamp should be placed as close as possible to the strike end of the Hopper Rapper. The other end of the chain should be fastened to a structure member above the rapper with a minimum of slack. B. Installing the Single Rapper Control i. Power Connection A 120 or 240 VAC, 50/60 Hz, 10A, single phase source of power is required to operate the Hopper Hammer. The power source is attached through the conduit hub to the 120VAC. 240VAC may be connected to the Model 303 SRC and will determine the voltage and frequency (50 Hz or 60Hz) and automatically adjust to the power supplied to operate the Hopper Hammer. The two power wires that project from the SRC are terminated on the power input terminals of the rapper. Also the green ground wire from the Single Rapper Control (SRC) is terminated on the ground tab of the rapper. Caution Do not attach the input power to the switch connection. Applying power at this point will destroy the SRC and void any warranties. Page 3 of 15

Use the drawing below as reference for field wiring the Hopper Hammer: Due to vibration, motor lead type wire should be used for all wiring with a minimum of 41 strands. ii. Switch Block Connection (Remote Switch) The wiring of the switch block will determine the MODE of operation of the Hopper Hammer DEMAND MODE If Demand Mode is selected, then a pair of isolated wires must be brought out from the controller terminals marked with the Switch Symbol to isolated user switch contacts. The switch signal is a 10VDC, 0.1A generated by the SRC. The Hopper Hammer will only operate when the switch is closed. AUTOMATIC MODE If Automatic Mode is selected, simply connected a jumper across the control terminals marked with the Switch Symbol. The Hopper Hammer will operate continuously and alternate between RUNTIME and INTERVAL. Because of vibration, all wiring shall be of motor quality and the screw connections must be firmly tightened. After the electrical connections have been made, attach the SRC to the rapper case with the case clamp. To ensure weatherproof integrity, the rubber gasket must be in place Page 4 of 15

and the case clamp must be firmly tightened. Be sure the case clamp lock nut is snugly installed. The clamp bolt/nut should be torqued to 18 ft-lbs and the lock nut tightly secured to insure the SRC does not come loose during operation. Once switch settings are complete the cap and gasket should be mounted on the top of the SRC using the clamp torqued to 15 ft-lb. This will insure a good seal to keep contaminants out of the SRC enclosure. NOTE: At field installation insure that the clamp bolts are physically down underneath the rapper assembly to insure water or debris does not collect and potentially create a problem. Installation of Model PASTD978 with tapered base: Since this model does not have nuts and bolts to hold it to the mating tapered shaft the installation requires at least two persons to (1) hold the rapper onto the male taper while (2) the other installs the safety chain such that it is welded snugly (no sag) to the support member above, so that it is pulling the Hopper Hammer onto the mating shaft. Once power is applied and the rapper runs a few cycles it will snug itself onto the mating taper and you will note a small amount of sag in the safety chain. 5. Operating Settings, Indicators and Special Features The Model 303, Single Rapper Control (PASDT980) has four thumb-wheel switches on the control panel for selecting operating settings: A. IMPACT Controls how hard the rapper hits and whether the control starts with Run Time or Interval Time. B. RUNTIME Controls how long the rapper will rap in seconds. C. INTERVAL Controls the rest time (recycle interval) in minutes, or fraction thereof, before beginning the next RUNTIME. D. RAPS/SECOND Sets the Rate of Impacts per Second during the RUNTIME E. TEST Pressing this button will cause the Hopper Hammer to operate once at the selected IMPACT, RAPS/SECOND and RUNTIME. F. Power Switch Power On or Off. Page 5 of 15

G. Indicating LEDs i. Red (Steady) Power ON. ii. Red (Flashing) Rapping. iii. Amber Overcurrent, will automatically reset and operate at the next RUNTIME. iv. Blue Over-temperature, resets automatically when temp is in range. H. Features i. Overcurrent There is a current sensor on the output line. If there is a current draw greater than 20 amps peak, the control will cease operation and illuminate the AMBER LED. At the beginning of the next RUNTIME, the Overcurrent will automatically reset and operate the rapper. ii. Overtemp. If the internal temperature of the control exceeds 165 F (74 C) the control will stop its output until the temperature drops below that temperature. It will illuminate the Blue LED. Page 6 of 15

6. Parameters The basic rule of thumb is to rap just hard enough to dislodge the dust, just often enough to prevent deterioration of the collection efficiency of the precipitator fields and minimize both instantaneous (puffing) and total outlet emissions. Set switches accordingly. The Hopper Hammer cannot be operated with high impact settings for more than 24 hours. This is a theoretical maximum as it is not a good idea to continuously rap at a high impact due to the potential of damaging the hopper/screen/electrode that it is attached to. If these conditions are not met the warranty will be voided. A. IMPACT Impact energy is adjustable in 8 distinct values. Settings from 1-8 increases the impact strength and, upon initiation of operation the Hopper Hammer, will start with RUNTIME then operate the INTERVAL. Settings from 9-16 are increasing impacts but upon initiation will start the INTERVAL before the RUNTIME. The settings required to achieve maximum impact will vary slightly due to local power sources. A mid-range setting of 4 or 5 (12-13) normally gives good results. B. RUNTIME RUNTIME is adjustable from 1 to 16 seconds. During the RUNTIME period, the rapper will operate at the selected IMPACT and RAPS/SECONDS. At the end of the RUNTIME, the SRC will begin a new INTERVAL. Hopper Hammer operation only is only enabled while the switch contact closure is maintained. If the switch closure is interrupted, the rapper will stop until the switch setting is again closed. Pressing the TEST button will cause a single RUNTIME operation. C. INTERVAL Interval is adjustable in sixteen discrete steps with a multiplier provided by the setting of the RAPS/SECOND switch. The base line for the switch settings is 1 to 16 minutes. The minute value is multiplied by a factor from the RAPS/SECOND of 1/2, 1, 2 or 5 (see the RAPS/SECOND Switch Table). Hopper Hammer operation only is only enabled while the switch contact closure is maintained D. RAPS/SECOND RAPS/SECOND or frequency will cause impacts of the hammer at a different rates during the RUNTIME. Four rates are available 1 rap per second, 3 raps per second, 5 raps per second or Sweep rate. Sweep will operate Hopper Hammer at 1 impact the first second of operation, then 3 raps the during the 2nd second of operation and then 5 raps during the 3rd second of operation and then the Sweep will continue to repeat. Page 7 of 15

7. Additional Information A. The power switch must be on for the control to operate. B. Pressing the TEST button will cause a single operation of the RUNTIME C. The SRC has no user-serviceable parts. Disassembly of the Model 303 Single Rapper Control voids all warranties. 8. Important Information The Model 300 Single Rapper Control has been designed to offer considerable flexibility under a wide range of operating conditions. This flexibility makes it possible to select settings that can damage either the control or the rapper or both. A. Impact The control has been designed to deliver maximum impact with a less than optimum power source. As a result, the maximum impact setting of 9 is not necessarily required to achieve maximum impact. IF THE RAPPER IS DRIVEN Page 8 of 15

TOO HARD, IT WILL CAUSE THE HAMMER TO TOP OUT. That is the hammer will hit the top of its chamber on the up-stroke. This condition can be detected audibly by the sound of a double hit, once at the top, and once as the hammer hits the strike area of the shaft mount. Topping out can cause the rapper to draw extra current and can also damage the control. IT IS IMPORTANT THAT THE IMPACT SETTING BE REDUCED TO A SETTING WHERE NO DOUBLE HIT IS HEARD. This does not reduce the maximum impact delivered by the rapper. B. Continuous Operation in Automatic Mode. 9. Maintenance The Hopper Hammer is designed to operate continuously but is limited to a duty cycle of 10% or less. If short Intervals are selected 30 seconds to 2 minutes then the RUNTIME duration should be limited. The Hopper Hammer provides long-life operation with a minimum of maintenance. The hammer of the Hopper Rapper is sealed in a contaminant free cylinder that allows hammer movement with a minimum of wear from abrasive materials. A. After Initial Operation Approximately one week regular operation, tighten all attachment bolts. B. Two Years. Every two years, the rapper should be disassembled at the lower clamp to remove and examine the moving parts (Refer to parts assembly drawing, page 10). Replace the hammer rings, spring or rubber bumper if sign of excessive wear are evident. 10. Remote Wiring Example The standard SRC wiring diagram is as follows, also shown in section 3B: TO REMOTE CONTACT Page 9 of 15

The two terminals designated for Remote Enable/Disable are wired as follows: As you can see in this figure the contacts can be wired to a switch or to remote relay contacts that are energized closed when the outlet of the hopper is open or the rotary valve is running. When the contact is open the Hopper Hammer is disabled. Page 10 of 15

Model PASTD978 Hopper Hammer with Tapered Mount Page 11 of 15

NOTES 1. WEIGHT = 54 LBS 2. P/N = PASTD583 1/2" CONDUIT CONNECTOR HUB-50 19 7 8 " 29 1 2 " REVISIONS B. NEW SRC DESIGN A. INITIAL RELEASE. DATE SPECIALISTS, INC. BY 08-02-13 M.G.N. 9/16" Dia. 4 Plcs. 6" 4 1 2 " 1 Ø3" 2 " 4 1 2 " 6" TITLE HOPPER HAMMER, WITH STANDARD SURFACE MOUNT SHEET OF DWG.NO. 1 1 MA011014 REV. B Model PASTD583-2 Standard Hopper Hammer with 6 Flange Mount Page 12 of 15

1 2 SR-A1 SOLENOID RAPPER ASSEMBLY P/N PASTD726 3 ITEM DESCRIPTION PART NO. 4 A. COMPLETE RAPPER PASTD726 5 B. COMPLETE RAPPER LESS SHAFT MOUNT PASTD565 1. CAP FESTD108-8 2. CLAMP ASSEMBLY AESTD112-2 2 3. CAP GASKET FESTD109-6 6 4. CONDUIT HUB FITTING HUB-50 5. ENCASED MAGNETIC ASSEMBLY PASTD550 7 6. SPRING (HORIZONTAL) FESTD108-13 8 7. RUBBER BUMPER FESTD109-5 8. HAMMER FESTD109-1 9 9. HAMMER RING FESTD108-10 10. HOPPER RAPPER MOUNT FASTD669 10 Page 13 of 15

9 Ø 16 " 8 PLCS Page 14 of 15

A REV. STANDARD HOPPER SURFACE MOUNT FASTD802 TITLE OF DWG.NO. 1 1 3.5 SHEET SPECIALISTS, INC. 01-28-02 BY M.G.N. 4.5 DATE 4.5 6.0 24.0 REVISIONS A. 020502, RELEASE 6.0 2.0 NOTES 1. ALL DIMENSIONS ARE IN INCHES. 2. REMOVE ALL BURS AND SHARP EDGES. 3. APPROX. WT. 30 LBS. Page 15 of 15