PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

Use of Manbox. To identify and formalise the risks and control processes involved in use of personnel in workboxes.

PROCEDURE. Revision: 1. Author: D Steel CONTENTS

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

MAINTENANCE WORK INSTRUCTION. Mech OFF Replace Head Pulley CVXXX

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

Safelift Overhead Runway Beams & Rolling Beam Cranes

Element C7.2 Lifting Work Equipment

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Position Paper. Telehandler Use: Lifting Suspended Loads

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT

Technical test - Theory. No. Question Answers Max. Mark

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

NRCT NATIONAL RIGGING & CRANE TRAINING LLC. Contact : CONSTRUCTION-INDUSTRIAL-SAFETY SERVICES

CPCS renewal test factsheet

Notice to all Users of the Weigh Northland Gantries

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

INSPECTIONS TESTING TRAINING & REPAIRS

FROM THE SEA TO THE LANDS. OUR WORKS DOCK TO SOLVE YOUR NEEDS

CRANE & HOIST SAFETY PROGRAM

LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK

Technical Test Theory Lorry Loader A36

Vehicle Operation Procedure HSE

LINK-BELT MODEL HTC-8675LB - 75 TON CAPACITY 48 7" (.80m) 41 0" /8" (3.52m) /16" (2.02m) /4" (.34m) 25" 11 0" (.

CPCS renewal test factsheet

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional vessels ships

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Technical specification for NDC 40 NO Rescue Boat Davit

OVERHEAD & GANTRY CRANE / RIGGING

Crane & Hoist Safety Guidelines

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

Technical specification for NDA 40 NO Rescue Boat Davit

Lifting Capacities Telescopic Boom All Terrain Crane ATC ton (118 metric ton) Link Belt

Slinger/signaller Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations 1998 Regulation 9

CPCS renewal test factsheet

British Columbia - Colombie-Britannique. Aerial Lift - Appareil de Levage

Chicago Crane Operators Examination Study Guide

RATED CAPACITY PC - D28 TIDD PC25 RATED CAPACITY MANUAL PC - D28 OCTOBER 2013 REV A PC25

SHIP CRANES / WIRES PROBLEMS AND THEIR PREVENTION. Presented by Captain Paul Walton Director, Marine Consultant, LOC Hong Kong

Control, Safe Use and Operation of Road-Rail Plant

LEVEL 1 MOBILE CRANE THEORY EXAM PRACTICE QUESTIONS

FAR FROM THE COASTS, CLOSE TO THE BEST CHOICE YOU EVER MADE

truck crane 140 tons link-belt htc-3140lb BOOM LENGTHS: 42 to 195 ft JIB LENGTHS: 38 to 109 ft JIB OFFSETS:

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

Liftcrane Boom Capacities 999 SERIES 2. Manitowoc Cranes, Inc.

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional ships

Pandan Terminal. Site Requirements.

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSION DREDGERSAND MUD BARGES SECTION 3 HULL EQUIPMENT CHAPTERS APPROACH

JEFFERSON JOBOY. 27 November 2018

Health, Safety, Security and Environment

Load capacity charts

Series 1400 Hydraulic Crane 33 Ton Load Ratings

Element 3: Musculoskeletal Hazards and Risk Control

Series 1400A Hydraulic Crane 33 Ton

Technical data Hydraulic crawler crane HS 895 HD

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

Responsible Unit: Facilities Management

Powered Industrial Vehicle Policy

AURELIA LTD A59 EXCAVATOR 360 ABOVE 10 TONNES INC LIFTING TECHNICAL TEST THEORY CPCS Issue 09-Jul-2012

36CSR27 TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS

Recover Light Vehicles Using Advanced Winching Techniques

دبي لحلول االستشعار. Active Load Brochure Load Cells

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Ultrasonic Thickness Measurements Shipboard Manuals Condition Surveys Ship Studies

CRANES. 2. What effect can blocking have on your crane and equipment?

RTC 8050 Series II. 50 ton (45.36 metric tons) Telescopic Boom Rough Terrain Crane

ST. VINCENT AND THE GRENADINES

Doc #: 2100-AD Revision: - 4 Meter White Spot Panel Replacement. Author(s): David Sprayberry, Larry Reddell, Tammie Lavoie, Miranda Saucedo

Series 1300A Hydraulic Crane 30 Ton Load Ratings

ISO Quality Standards

LOAD CHART & RIGGING PRACTICE EXERCISES

Crane Safety Resource Guide P AGE 1

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal

Technical test - Theory. Appointed Person A61. No. Question Answers Max. Mark

ABS Guide for Certification of Lifting Appliances 2016: Focus on machinery

NZQA registered unit standard 9076 version 4 Page 1 of 5

Cranes and Crane Operators and Construction Work

Jersey Harbour Authority Maritime House, St Helier, Jersey, JE1 1HB Tel: +44 (0) Website:

WIELAND-DAVCO CORPORATION CRITICAL LIFT PERMIT. Subcontractor: Subcontractor Lift Supervisor: (This individual must be present during the lift)

LIFTING DEVICES AND LIFTING EQUIPMENT - USE AT INOVYN

Network Safeworking Rules and Procedures

Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit

GUIDELINES FOR THE APPROVAL OF TOWING VESSELS

For sales use only CRANE RATING MANUAL. RTC-8090 Series II 5 - Section Boom. Not for crane operations SERIAL NUMBER: XXXX-XXXX

CPCS renewal test factsheet

CPCS renewal test factsheet

Ladder Use in Construction Guideline

General Instructions and Inspection Instructions for Crane

Technical data Hydraulic crawler crane HS 885 HD

Series 1300 Hydraulic Crane 30 Ton Load Ratings

Techcrane International, LLC

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

CRANE RATING MANUAL HTC

CRANE, HOIST AND SLING SAFETY PROGRAM

ST. VINCENT AND THE GRENADINES

Transcription:

PTW CHECKLIST - NO. 30 Title: Lifting Operations Involving Crane or Gantry Offshore Owner: Capability Coordinator Approver: Capability Coordinator Permit No.: Max Validity Period: 5 yrs Date: Latest Rev Date Details Authorised By 15.0 Jan 2016 Full revision S Elliott 15.1 Feb 2017 Pg 3 Drum lifter chain sets S Elliott 15.2 Aug 2017 Added Lifting Plan cover sheet requirement M.Birdsall Other Checklists That May Be Relevant: 56, 57 HRA Checklists: REFERENCE DOCUMENTATION The Shell document, Manage Logistics Lifting and Hoisting Standard HSE EP2005-0264 defines the standard for lifting and hoisting within STL. This checklist is derived from this standard. Adverse Weather Working Guidelines Doc ID PRD-ACT03-003 Charterer s Instructions to Owners and Masters of Vessels - Includes Installation Data Cards, Checklist Support Vessel/Installation operations checklist and Bulk Transfer Checklists. PRIOR TO PERMIT ISSUE: Before any lifting commences, the correct class of lift is to be identified. The persons designated to the following positions are to be identified for all classes of lift and made known to all involved with the lift. They shall also hold the appropriate competencies as listed at the bottom of this checklist: PICOL* (Person In Charge Of the Lift) Name: Competent Rigger/Slinger * Name Competent Dogman/Banksman * Name: Crane Driver Name: * May be same person NOTES: 1 All lifts will usually be a 3 person activity i.e. Crane Operator, Dogman & Assistant. For minor lifts the 3 rd person may not be required and is at the discretion of the PI 2 This checklist does not cover drilling top drive systems, helicopter lifting operations or marine towing. 3 Nothing in this checklist shall be deemed as relieving any person from complying with the requirements of the STL Lifting & Hoisting Management Manual DOC ID 9131538 and the OSH Approved Code of Practice (ACOP) for Load-Lifting Rigging. 4 Containers will normally be bottom lifted using appropriate container lifting lugs and equipment. Where this is not possible and access to the top lifting points is required, Work at Height procedures shall apply. Printed on: 15 September 2017 Page 1 of 5

LIFT CLASSIFICATIONS (Routine, Non-Routine, & Complex Lifts) COMPLEX LIFT Are these lifts over live plant designated by Operations (ROS/PI) as high risk? Does lift exceed 90% of the crane Safe Working Load (SWL) at the working Radius? Does lift exceed 20 tonnes in gross weight? Does lift exceed 10 tonnes in gross weight and requires rigging up on site using non dedicated rigging equipment? Is any load to be transferred from one lifting appliance to another? Is load to be lowered or lifted from a Confined Space? Is the lifting of personnel or use of Man-Riding winches involved? Does the lift require two or more cranes or lifting appliances to place/remove the object to be lifted? Is the Centre of Gravity (COG) of the lift difficult to estimate, i.e. not below the lifting point, or the load can rotate or overturn? Are unusual rigging or lifting arrangements being used? Is the load weight unknown or unable to be accurately estimated? If the answer is No to all the above, proceed with a Non-Routine Lift. Nominate Operations Representative: Name An approved Lift Plan is appended to the permit This includes Lifting Plan cover sheet, drawings/sketches detailing the crane location, the load, lifting arcs and angles, the crane safe load charts and load lay down point. Specific lifting equipment shall also be listed and certificates supplied. NON-ROUTINE LIFT Are lifts over or within 5m of live plant designated by Ops (ROS/PI) as low risk? Is there limited head-room or restricted access? The load is very long, an awkward shape, or liable to be affected by wind. If the answer is yes to any of the above, proceed as a Non-Routine Lift. If the answer is No to all the above, proceed with a Routine Lift. Nominate Area Operations Representative (if required by the PI): Name A lifting procedure reviewed by the PICOL and a Lift Plan is appended to Permit. This includes Lifting Plan cover sheet, drawings of the crane location, the load, lifting arcs and angles, the crane safe load charts and load lay down point. All lifting equipment required for the lift is listed with minimum capacity specified (Note: SO numbers and certificates not required). ROUTINE LIFT Any lift in non process areas or in a process area with perimeter of load more than 5 metres to adjacent live plant and equipment Load has known weight, known COG and standard rigging arrangements The load is <90% of the normal operating parameters of the crane. If the answer is yes to all of the above, proceed as a Routine Lift. NOTE: A Lift Plan is not required for Routine lifts. Detail to be included in JHA. Printed on: 15 September 2017 Page 2 of 5

PREPARATION FOR ALL CLASSES OF LIFTS - PRIOR TO PERMIT ISSUE: PI or AT have confirmed requirements for plant isolation / protection PRIOR TO COMMENCING TASK: PICOL to confirm the following: Lift is ready to proceed in compliance with the lift plan where applicable. The methods of rigging, suspension, attaching/detaching and load stability have all been determined. All lifts can be carried out within the crane and rigging rated capacity. Crane checks including limit alarms and safe load indicators have been checked and are functioning where appropriate. The initial and final load positions have been identified, with obstructions (light poles, scaffold, cable racks etc) being brought to the attention of the crane drivers and noted on the JHA. This is to be discussed in the toolbox talk. The PICOL shall ensure that the lifting operation is safely within the limit outlined in the Adverse Weather Guide PRD-ACT03-003. List maximum wind speed: If the scope or conditions changes, the lift shall be aborted, the PI / Engineer shall be informed, Lift procedures and JHA revised, and a new toolbox talk held. Signalling methods and communications agreed using a sole designated radio channel when the load is unsighted by the crane driver All rigging equipment i.e.: slings, shackles, lever blocks, chain blocks, turfers etc have been inspected and are within certification date. Tag lines are to be used wherever possible to ensure control over the load is maintained and to prevent load spin. Loads are not left suspended when the crane is unattended. Prior to the use of lifting lugs on manway flange closures, hatches or motors, Visual checks have been carried out by a Facilities Inspector or Mechanical Engineer. Has the weather forecast, venting and flaring operations been considered and discussed with the PI. Drum lifter chain sets that attach on the drum rim, are not to be used to transfer loads between decks, over process or walkways. The lift area has been roped off and/or signs and barriers are erected to warn personnel in adjacent areas. When operating in the vicinity of wellheads, ensure nothing can fall through hatches and impact on wells. Printed on: 15 September 2017 Page 3 of 5

Additional for Working Supply Boat: Is a Deck Cargo Plan required for separation of installation s cargo, urgent dangerous goods, bulk commodities, special handling or heavy lifts? Appendix 11 of Charterer's Instructions to Owners and Masters of Vessels - Deck Cargo Plan. Ensure all back loading cargo is stowed and secured correctly inside containers and baskets. All container doors are closed, locking pins inserted fully and security seals in place. Ensure load checked for insecure objects that have potential to fall. All documentation eg: cargo manifests/dangerous goods declarations completed. Ensure sufficient tag lines available for all lifts and a suitable tag line fitted to the crane leader. Check to ensure all lifting shackles are correctly pinned and/or moused prior to lifting. Immediately prior to working the supply boats, ensure Mipeg is switched to dynamic and appropriate sea state selected. Additional for Bunkering Bulk Supplies: Determine the amount of diesel/water/glycol to be bunkered and list the transfer volumes: Confirm the Bulk Transfer Checklist EP2005-0262-TO-83 has been completed. NOTE: The crane operator shall rack the crane and exit the cab prior to helicopter arrival or as advised by the Helicopter Landing Officer (HLO). He must not resume crane operations until advised by the HLO that the helicopter is clear of the installation. The only exception is when the crane is holding the Well-services lubricator, attached to a well. In this case the crane driver (having confirmed the crane is braked) will remain immediately outside the crane cab during the helicopter operations on the platform. Printed on: 15 September 2017 Page 4 of 5

Position/Role Person-in-charge of lift (PICOL) Required Competencies And Qualifications (Unit Standards) Must hold NZQA Unit Standard: 3789 Sling regular loads and communicate during crane operations Competency held by (insert name) Person-in-charge of lift (PICOL) For Complex Lift Dogman/Banksman/Rigger/ Slinger Must hold Unit Standard 3789, and at least one of the following: 3799 Plan and direct complex lifting operations 9561 Manage the lifting and placing of complex loads on a petrochemical offshore installation National Certificate Intermediate Rigging Level-3 which includes Unit Standards 4214, 4215 & 4216 Must hold at least one the following NZQA Unit Standards or STL approved equivalents: 26350 Use common rigging equipment to lift and move loads 9559 Sling routine loads and communicate during crane operations in a petrochemical workplace 3789 - Sling regular loads and communicate during crane operations Crane Operator Offshore Have passed a offshore crane operator course from an STL approved training facility, appropriate to the type and capacity of crane they will be required to operate For lifts on the platform, must hold one of the following NZQA Unit Standards or STL approved equivalent: 9563 Operate, lift and place loads with a platform crane on a petrochemical offshore installation 9564 Lift & place loads between a petrochemical chemical offshore installation and a supply boat using a platform crane For lifts between the platform and the supply boat, must hold the following NZQA Unit Standard or STL approved equivalent: 9564 Lift & place loads between a petrochemical chemical offshore installation and a supply boat using a platform crane (NOTE 3 year validity) Overhead Gantry Crane Operator (>10 tonne SWL) Must have passed an overhead crane operator training course appropriate for the equipment being used or have been assessed in the use of the equipment by an independent party and hold the following Unit Standards 3800 Operate a pendant controlled overhead crane and lift and place regular loads Printed on: 15 September 2017 Page 5 of 5