LED LINEAR INSTALLATION GUIDE RED 20L VER /13/

Similar documents
2 4 L R I G I D L E D L E D S I M U L AT E D N E O N I N S TA L L AT I O N G U I D E MANUAL FOR 48 SYSTEM ADVANCE POWER SUPPLY ONLY!

LED LINEAR AMBER 20L INSTALLATION GUIDE /01/16 VER. 1.0 CERTIFIED SAFETY US CA

STREET WRAP INSTALLATION GUIDE

P-LED.com (325) INSTALLATION GUIDE

SloanLED THINLED. Constant Current. Installation Guide

Motorized Skylight Installation Instructions

Hummer H up A Hummer H3T up A. 3-5 Hours INSTALLATION GUIDE INSTALLATION TIME SKILL LEVEL.

Technical Installation Manual

Installation Instructions: HYPERION R-Lite SYSTEM

INSTALLATION GUIDES OUTDOOR LIVING

SloanLED LEDStripe Installation Guide SloanLED (888) 747-4LED

SolarSheat Wall Installation Manual

E E VDC COOLEDGE TILE INTERIOR INSTALLATION INSTRUCTIONS. Caution: Observe precautions for handling electrostatic sensitive devices.

SolarSheat Wall Installation Manual

INSTALLATION INSTRUCTIONS

Installation Guide Current Ford F-250 & Ford F-350 Super Duty. Product Code: 109 & 119

Cellular Shades MOTORIZED SHADE Top Down - Bottom Up. Installation & Care Instructions

INSTALLATION INSTRUCTIONS

PONTIAC FIREBIRD

Installation Instructions: ACCENT SYSTEM

The Gallery System DIRECTIONS. Components of the System

Window Regulator: Service and Repair Front Door Trim. Armrests. With Power Windows. Front Door Arm Rest. Remove or Disconnect

Mahindra Pikup (2009 Production Onwards)

Installation Instructions: ACCENT HIGH OUTPUT SYSTEM

with Touch & Go Feature

EVANNEX Rear Lighted T for Tesla Model X

Deuce/Ace Installation Instructions

SALEEN SPEEDLAB BOOST AND WATER TEMPERATURE GAUGE POD KIT

WARNING. Tools: 1. Wire Strippers 2. Screw Driver or Rivet Gun 3. Tape Measure 4. Drill. Components: AWG (0.82mm) Wire-UL Approved

THE SERIES-E POWR Slider

iphone 5s Front Panel Replacement

WARNING. Important Notice

Application Note. Atlas RS-3 Tsunami Digital Sound Decoder Installation Notes

A B C D E F. Tools Required (supplied by others)

GENUINE PARTS INSTALLATION INSTRUCTIONS

CHEVY MONTE CARLO. Two Panel Sequential LED Tail Light Kit Installation Guide

UT ASSEMBLY REQUIREMENTS. *Torque all T-bolt nuts to foot pounds.

OPTIMAX RADIANT FIELD RETROFIT INSTRUCTIONS

Dual Roller Fascia Coupled FlexShades Assembly and Installation Instructions

HP-2 / HP-6 Direct Installation Instructions Overview

Installation Instructions Studio Makeup Station

SAM Series 2-Wire and 3-Wire Clock

COLD WEATHER START KIT Platinum Mini Split

#GL18006-L2 Honda Gold Wing 1800 & F6B models - All Years Lower Cowl LED Driving Lights INSTALLATION INSTRUCTIONS

Current Range Rover Sport STRUT Collection Installation Manual

401B/1KDB CoolRite/FreezeRite Installation Manual I003

Hummer H up A Hummer H3T up A

Honeycomb Shades Skylight

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

A B C D E F. b.tools Required (supplied by others) 3/16" Drill Bit 3/8" Wrench Phillips Head Screwdriver

Air Conditioner for M915 A0/A1 Truck

Cetra Assembly Instructions

2010 to 2013 Toyota 4runner Rear bumper installation instructions:

JODALE PERRY. Parts List & Mounting Instructions. Jacobsen HR9016 JDP BUILT FOR LIFE

PN R CHEVY CAMARO w/reverse Two panel Sequential LED Taillight kit installation guide. Kit Contents:

Installation Instructions Table of Contents

Solstice Electric Fryers SE Series Service Manual

INSTALLATION INSTRUCTIONS

Wildcat System Instructions

Motivia Motorization

INSTALLATION INSTRUCTIONS FOR SOLID VENT KIT PART NUMBER

C15C C15C. Page 1 of 20

Tonneau Cover Fitting Instructions Ford PX Ranger XL Dual Cab With HeadBoard June Current

Installation Instructions QUICKSILVER CONSOLE SHIFTER Fits: Chevelle / El Camino

Installation instruction do88 performance Intercooler for Volvo S60/V60 T6 MY10-

Lexus ES Fine Mesh and Adaptive Cruise Control Fine Mesh Grilles Upper and Lower Replacements

Here I Will Explain How To Install Recon Cab Lights In A 3rd Gen Dodge Ram.

STEP BY STEP INSTALLATION INSTRUCTIONS. Pleated Shades. Standard Control, Top Down/Bottom Up & Standard 2-on-1

LPE C5 Battery Relocation Kit

Roll Bar (MMRB-6.1 to -6.7)

LGT-311L Bumper LED Light Kit EZ-Go RXV Installation Instructions

Installation Instructions

Drag Race Roll Bar (MMRB-6, -7)

Hospital Grade Laminar Flow Common Plenum Ceiling System

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

2. With the rear door open remove pull-style clip from the passenger side just below the door latch.

Round or Square Type Low-Profile Housing with Toroidal Transformer for Flangeless Trims E3_LF-HDSM-WR_ 1.0

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL MOONEY M20 SERIES & M22 STC NO. SA4342NM NOTE: READ THESE DIRECTIONS BEFORE STARTING!

SS1135HF Jeep KJ Cherokee CRDI4 2.8Litre-I4 Diesel Engine

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

Installation Instructions. QuickSilver Shifter. Fits: GM, Ford, Chrysler Transmissions See Application Guide for Specific Applications Part # 80683

Written By: Sam Lionheart

HUMMER H A. 3-5 Hours INSTALLATION GUIDE INSTALLATION TIME SKILL LEVEL. 4= Experienced TOOLS REQUIRED APPLICATION MODEL YR PART #

CENTER BELT SYSTEM INSTALLATION INSTRUCTIONS CARCG121220

VW Surface-Mount Strain Gauge

INTERCOOLER UPGRADE INSTALLATION INSTRUCTIONS PART NUMBER D


WET WALL. EvApORATIvE COOLINg SySTEm. 10" x 8" Tee INSTALLATION INSTRUCTIONS

Front Fog Lamp Package Installation

Plexineon Installation Manual

B o d y S t r u c t u r e

Installation Instructions

Curt Mfg. Trailer Hitch and Hoppy Wiring Kit Installation Instructions

INSTALLATION GUIDE STANDARD PRODUCT CODES:

Wiring the 2016 FRC Control System

INTERCOOLER UPGRADE INSTALLATION INSTRUCTIONS PART NUMBER D

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

Round or Square Type Non-IC Adjustable Housing with Toroidal Transformer for Flangeless Trims E3_L_-HANM_ 1.7

INSTALLATION INSTRUCTIONS DOCUMENT REVISION : /17/2014

Lower Radiator Grill Debris Shield

Transcription:

LED LINEAR INSTALLATION GUIDE RED 20L VER. 1.0 3/13/17 918.622.4978 www.lektroninc.com sales@lektroninc.com

GETTING STARTED CONTENTS Following these few simple steps will ensure a successful installation each time. Remember: No more than 64 boards per transformer. Getting Started, Component Identification & Required Tools SECTION 1. Read ALL instructions, before starting installation. 2. Inspect the boxes for damage and check the parts against the supplied parts list. PAGE 1. 64 Board Track Bracket Layout... 2 2. Installing Track into Brackets... 3 NOTE: Report damaged parts or shortages immediately to prevent job slowdown/ stoppage to 1-800-634-4059 ext. 0 3. Custom Cut to Fit End of Runs & Corners... 4 3. Refer to attached provided print and confirm job measurements. 4. Layout your job on paper, making note of transformer placement. Transformers can be placed at the end of runs or side by side to power allowable linear footage in each direction. 4. Track on an Incline... 5 5. Frame Border Installation... 6 6. Connecting Transformers... 7 NOTE: If job measurements do not correspond to provided drawing, call Lektron Immediately at 1-800-634-4059. 7. Testing Each Section... 8 COMPONENT IDENTIFICATION & REQUIRED TOOLS Materials Electrical Lens (Leon)... Polypropylene, UV and impact resistant Input... 120 VAC Lens Lens (Laser)... Polycarbonate, UV and impact resistant Power Rating... 100 VA Clip... Steel Maximum Load... 64 12 Boards 20L LEDs Rain Shield Profile Dimensions (in.)... Leon 2.00 x 1.70, Laser 1.70 x 1.70 (In a Single Direction) Leon Tube w/ Clips LEON LASER Current at Max. Load....55A 1.38" LEDs 1.69" LED Specifications LEON The LEDS come pre-installed in the 20 Lamp LASER & LEON System. 185-5049 185-0030 185-0154 J-BOX #10 x 3 PAN HEAD SCREW STRAIN RELIEF 185-5009 185-0007 PLTC CABLE #10-16 x 3/4 TEK SCREW W/ NEOPRENE WASHER 12 LED boards pull close to the same voltage as shorter break-apart boards. Maximum of 3-3 Boards per circuit. No more than 64 boards on a circuit. Do not connect more than one transformer per circuit. 185-9005 185-0055 LEON RAINSHIELD COUPLING VERTICAL ANGLE BRACKET LLS/LSN Required Tools 185-0062 LEON ENDCAP 185-0054 3.6 6L BREAK-APART BOARD 185-5023 BLUE WIRE NUT 185-0068 *WIRE HOLE BRACKET 25 Measuring Tape 100 Measuring Tape Framing Square Square - (1 ) Portable Rechargable Drill 5/16 Hexbit and unibit Masonry bits (if brick wall) Extension Cord Sawzall or Compound Saw *MOUNTING BRACKET 100W 25V LOW VOLTAGE TRANSFORMER = 190-5533 LASER RAINSHIELD COUPLING 12 20 LAMP MAIN BOARD 185-1976 Philips Advance SAFETY US CA Output... 25 VAC LASER STRIP 1.41" CERTIFIED Housing... PVC, UV and impact resistant 185-0059 LASER ENDCAP CAULK Carpenter Pencil Caulk Gun Box Knife Wire Strippers Wire Snips Laser Tool or Chalk Line Substitute Fasteners for the Application if Applicable Page 1

64 BOARD TRACK MOUNTING BRACKET LAYOUT SEC. 1 1. Using a chalk line, gauge, laser level, or other means to be certain run is straight, marking locations for brackets Lens 2. Border / perimeter of sign cabinets should always have orientation of Laser/Leon housing raised lip outboard on vertical or diagonal. Orient brackets so that the drain holes will be on the bottom side of the horizontal runs. LEDs Rain Shield 3. Install mounting brackets, 6 per 8 section including shared brackets. Use pre-drilled wire hole mounting brackets at transformer locations. NOTE: This is correct Bracket orientation Lens LEDs NOTE: Track sections share a bracket at the ends to keep ends together and straight there MUST BE A SPACE left between 8 plastic track sections (NOT LEDS) of 3/16 Tip: Install end bracket after housing has been installed into previous brackets by sliding over end to ensure bracket is centered between sections. Place mounting brackets 3 on center from corners 120 Vac 64 Boards or Less 8 Boards or Less 120 Vac 64 Boards or Less 8 Boards or Less 120 Vac 120 Vac 32 Boards or Less 8 Boards or Less 32 Boards or Less 64 Boards or Less 8 Boards or Less NOTE: MAXIMUM 64 BOARDS PER TRANSFORMER. SHOWN 3 CONFIGURATIONS. Page 2

INSTALLING TRACK INTO MOUNTING BRACKETS SEC. 2 1. Connect wires from one section to another using pre-installed molex connectors or wire nut connectors provided. WIRE NUT CONNECTION MOLEX CONNECTION (PLUG AND PLAY ON EACH 8' SECTION) 2. Before hanging sections that have the power cable placed between cut a small notch with dikes or other tool in the back of both housing sections to allow room for cable. NOTCH WIRE HOLE BRACKET 3. Lay the section being added on the mounting brackets. After making wire connections tuck the wires and connectors BEHIND LED circuit boards, Caulk Notch. 4. Insert the top edge into the top bracket latch. Push the track housing in and roll top track housing into mounting bracket bottom point. See diagram top right. 5. Bring sections close together by pushing sections together until LED circuit boards come together but leaving a 3/16 Approx. expansion gap between plastic track sections. Leave no gaps in the LEDs. 6. Install an End Cap at the beginning and end of runs with caulk provided. Caulk on top side only, so water will drain out. 7. Finish by sliding a Coupling Rain Shield under the mounting bracket latch, over both sections. Use a small amount of silicone on one side of rain shield to hold on if necessary. 8. Use a small screw driver to gently pry up the Bracket Latch to insert Rain Shield under latch making certain it is firmly attached. Insert top, Bracket Latch Raised Portion Roll into bottom point of track housing DO NOT HIT LENS TO INSTALL TRACK! This will permanently damage the lens. Caulk Under Rain Shield Fascia Screw 3/16 Approx. expansion gap between plastic track sections NOT LEDs. Coupling Rain Shield Laser Rain Shield Leon Rain Shield Caulk Top & Corners End Caps Page 3

CUSTOM CUT TO FIT END OF RUNS & CORNERS End of A Run 1. Remove LEDs before cutting the track, by sliding boards out one. 2. Measure, mark and cut track to required length. Use a fine a blade. 3. Add drain holes in the center of the cut piece of track before reinstalling LED. 4. Reinstall full 12 LED boards until less than 12 of space remains. Make-up remaining space with 3.66 boards. 5. Trim LED light board length at wire connections only. Leave the longest wire length possible DO NOT CUT 1 FOOT LED CIRCUIT BOARDS! Horizontal Corners Outside Corner Inside Corner 1/4" Gap for expansion Track Bracket Low Voltage Cable Screw End Cap with hole drilled for cable attach with adhesive provided SEC. 3 These corners are square cut and overlap slightly to give a continuous look at a distance and allow for thermal expansion. 6. Connect 3.66 boards with wire nuts when less than one foot is needed to fill housing with lights. Do not connect more than three of the 3.66 LED light boards together. NOTE: 3-⅔ boards can be broken in half at the break-line to make a 1-⅞ board. Discard the half that has no wires. LEAVE NO GAPS BETWEEN BOARDS! Break Line Track Bracket 1/4" Gap for expansion End Cap with hole drilled for cable attach with adhesive provided Low Voltage Cable Screw 7. Slide LEDs into the Track. 8. Shortened Track is now ready for installation. VERY IMPORTANT: Discard Corner Connections HINT: THREAD END CAPS ONTO PLTC CABLE BEFORE WIRE CONNECTIONS BACK TO BACK Insulate or remove unused wires at end of run to prevent shorting. Do not connect wires together or to next circuit. 7.00 PLTC CABLE Page 4

MOUNTING TRACK ON AN INCLINE When mounting track on an incline or vertically, two things must be prevented. First, the track must be kept from sliding down, while still allowing for expansion/contraction with temperature changes. Second, water must be sealed out since it will run down the top of the track. SEC. 4 Caulk above (or crimp) ONE bracket towards the middle of each of the rest of the tracks to prevent it from sliding while still allowing it to expand and contract. Seal the rain shield to the upper track to keep water from penetrating. Do NOT seal the rain shield to the lower track since the tracks will expand/ contract. Coupling Rain Shield Drill 2 holes in the end cap to allow water to escape. Page 5

FRAME BORDER INSTALLATION EXAMPLE: 104 x 196 SEC. 5 Top Left, Top View Detail 19.25 Max. Between Brackets 3" Eq. Eq. Eq. Eq. Eq. 3" Bottom Right, Side View Detail Screw Always End Caps, ensure drain attach with holes are on provided caulk. bottom side. Add holes to the center of a run less than 8 ft. Cable Hole Bracket Low Voltage Cable Angle Brackets below vertical runs to prevent sliding 1/4 Gap for expansion End Cap attach with caulk provided Track Bracket Always seal drain holes with caulk on verticals when present. Drain Holes Bottom Left Detail 19.25 Max. Between Brackets Bottom Right Detail, Profile View Drain Holes Should Always be on Bottom or Face Down! Add Drain Holes on Bottom vertical runs. Caulk End Cap & Notch V-Notch 1/4 Gap Typ. for expansion Caulk Under Rain Shield Use a screwdriver if needed to insert rain shield into the bracket. Angle Bracket Drain Holes PLTC Cable Page 6

CONNECTING TRANSFORMERS VERY IMPORTANT: Make sure you are using the correct transformer and LED configuration! Connecting boards to the wrong transformer could result in damage. Configuration #1 32 Boards or Less 32 Boards or Less SEC. 6 Transformer Wiring 185-1976 Philips Advance 100W 25V LOW VOLTAGE TRANSFORMER The LED Configuration is for the 20L Power Cable Strain Relief Fitting Connect Blue, Red and Yellow low voltage wires from transformers Connect Black and White wires from transformers to 120 VAC NOTE: Any primary voltage supply greater than 120, STOP call Lektron at 918-622-4978 1. Attach J-Boxes with supplied screws to available support member. 2. Attach Transformers inside of J-Boxes. 3. Install Strain Relief for low voltage wire. 4. Drill 1/2 hole through the fascia. A conduit fitting can be installed so that conduit can be used. 5. Insert low voltage wire into the hole and connect to LED. Fill hole with silicone sealant. NOTE: One transformer per 64 boards maximum or less. No less than 8 boards per transformer. J-Box Secondary 25 VAC Low Voltage (OUT) Configuration #2 32 Boards or Less Power Supply Primary 120 VAC (IN) To Primary White = Neutral Black = Positive 32 Boards or Less Provided Weather Resistant J-Box Fascia DO NOT CONNECT 120 VOLTS TO LEDs. LEDs are 24 VAC only! 64 Boards or Less 64 Boards or Less VERY IMPORTANT: KEEP LOW VOLTAGE CIRCUITS ELECTRICALLY SEPARATE, DO NOT CONNECT TRANSFORMERS OR LEDs FROM DIFFERENT 64 BOARD CIRCUITS TOGETHER OR CONNECT MORE THAN 64 BOARDS TO A TRANSFORMER! Page 7

TESTING EACH SECTION SEC. 7 IMPORTANT: DO NOT SKIP THIS STEP! ALWAYS CHECK ALL LED LIGHTS BEFORE CONTINUING. 1. Using the installed transformers, supply power to the LED light chains by connecting a temporary 120V connection to the black and white wires on the transformer to power the LED lights. REMEMBER: BLACK AND WHITE WIRES ARE FOR 120V POWER IN YELLOW AND BLUE ARE FOR LOW-VOLTAGE POWER OUT. DO NOT APPLY 120V TO THE BLUE OR YELLOW WIRES OR DIRECTLY TO THE LED LIGHT BOARDS 2. Check to see if all LEDs are lit and working correcting. 3. If a board or section does not light up, is damaged, etc., disconnect power and check connections or replace a board by splicing in another. Page 8

sales@lektroninc.com 918.622.4978 www.lektroninc.com