Montour No. 10 (Bob Ciminel 2012)

Similar documents
Westland No. 1 Mine (Bob Ciminel 2012)

Montour No. 4 (Bob Ciminel 2012)

Scott Mine (Bob Ciminel ) Montour Railroad Milepost 6. Montour Trail Milepost 5

Morris Mine (Bob Ciminel 2012)

Partridge Mine (Bob Ciminel 2012)

GUIDE TO COAL MINES Mines Served by BNSF Railway

Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado

DIRECTORY OF COAL MINES IN ILLINOIS

August 22 nd, Highwall Mining in India: extending mineable reserves a presentation for CMPDI.

MEMOIRS 1974 MEMOIRS Bird, R.H Notes on the Rockley Mine Memoirs NCMRS, Vol.2 No.4, pp Published by the

Point Fire Case Study student handout (adapted from PMS 419, BLM Engine Operator Training)

ASHPRINGTON ROAD Part 1

The Winona Railroad. Presentation at Three Rivers Railroad Heritage Council Meeting Baker Street Station Fort Wayne, Indiana May 18, 2008

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

David W. Salter Collection

WEST VIRGINIA OFFICE OF MINERS HEALTH, SAFETY AND TRAINING REPORT OF FATALITY FEBURARY 14, 2013 CONSOLIDATION COAL COMPANY LOVERIDGE MINE

Coal-Mining. By: Lakyn Wallace

David W. Salter Collection

Existing Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.

Powder River Basin. Page 3

Study Report. McCredie-Overton Transmission Line Right-of-Way Analysis. City of Columbia, Missouri. prepared for the (S49)

LONE MOUNTAIN PROCESSING, INC. CLOVER FORK NO. 1 Holmes Mill, KY JUNE 16, 2010

Miamisburg, Ohio Train Derailment

Could also be a Near Hit

Oxide Film Arrester An Overview By Jonathan Woodworth

MID-MEETING FIELD TRIP FOR ALL Tuesday, June 11, Half-Day Field Trip: Homestake Open Cut and Sanford Underground Research Facility

Layout Track Plans. All Rights Reserved.

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

Mining the Past Powering the Future

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)

20compressed.pdf Additional Material: GVHC Library File 49

CNG FUELING STATION INITIAL STUDY FULLERTON JOINT UNION HIGH SCHOOL DISTRICT. Appendices

PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014

Poster book. by Marvin T. Broyhill. Copyright All rights reserved. May not be used in whole or in part without prior written consent.

Red Arrow Lines photograph collection

158 PURDUE ENGINEERING EXTENSION DEPARTMENT

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

BNSF 2185, an END GP 38, was doing flat switching in the Yard during our visit.

Box 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description

LAWYERS' CREEK, HOLBEACH

Former Yreka Western No. 19 Arrives at Age of Steam Roundhouse

Baltimore & Ohio 1926 freight car fleet

New Mexico Geological Society

Section Operations Section Organizational Guidance

PRESS RELEASE Tahoe Fire and Fuels Team

SIGN PLACEMENT CONDITIONS AND REQUIREMENTS

TABLE OF CONTENTS SECTION TITLE PAGE NUMBER

Glencore Xstrata Westside Story Mine Closure and Rehabilitation. Neil Rae Operations Manager

Appendix G Aquilla Lake Pool Rise Recreational Resources

PRESS RELEASE Tahoe Fire and Fuels Team

Quarterly Stakeholder Call

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

CTA Capital Construction Update December 12, 2006

CWS CFB Suffield SIRC

Guide to the Pittsburgh Locomotive and Car Works Collection

The $600 Million Rebirth of San Diego Trolley

Lines West Buckeye Region Newsletter

ON THE ROAD TO DALAT

West Virginia Office of Miners Health, Safety and Training. May 17, Report of a Fatality by Fall to a Lower Level Liberty Processing

Information Meeting Transfer Station Options. September 30, 2014

SEPTA Public Open House. FY 2018 Capital Budget Development January 24, 2017

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT

Preserving Railroad History along the Donner Pass Route. A Tale of Two Locomotives (and Their Donner Route Connections)

STH 60 Northern Reliever Route Feasibility Study Report

Purpose and Need Report

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

When I did reach the facility, a train was sitting on track 3 just having completed loading.

Soldier Summit + Salt Lake City Route Extension Scenario Pack 01

SAMPLE PAGE. Trains Express Lapbook. Any Age. A Journey Through Learning

11/4/11. Between 1860 and ,000 patents were issued for new inventions By 1900, Americans standard of living was among the highest in the world

The Dash 9 Locomotive Pack

Scratchbuilding PRR Class Gd, Gn and Gg Wooden Hoppers By David J. Vinci

Energy Technical Memorandum

Transportation Effects of Consolidation September 21, 2016

SEPTA Public Open House. FY 2019 Capital Budget Development January 24, 2018

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA

Tehachapi Renewable Transmission Project 3.1 OVERVIEW OF PROPOSED PROJECT

Soybean Farming Pays the BILLS

August 14, 2003 Outage Sequence of Events U.S./Canada Power Outage Task Force September 12, 2003

Welcome Wagons WW ton Mineral (2 & 4 shoe brake)

126m strike length vein averaging 42.37g/t gold

Rehabilitation Techniques to Improve Long-term Performance of Highway-Railway At-Grade Crossings

Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation

Expanding Capacity for the Northeast Corridor The Gateway Program

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

The Run Ozaukee 2018

The following section summarises the present conditions related to transportation for the proposed development of the Matimba B Power Station:

BRIDGE CRANE

EMF Readings in Tollgate Crossing community Robert L. Vaessen - 22 Dec 2016

FINAL UTILITY REPORT Eastcreek Farm Thornton, CO

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

David W. Salter Collection

2 FOREWORD. 2.1 Description of Mine 2.2 Report Preparation Process 2.3 General Acknowledgements

The minimum number of accessory off-street parking spaces. shall conform to the requirements of the Table of General

MIFACE INVESTIGATION: #03MI067

350 International Atlas of Lunar Exploration

Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016

EXCEPTION TO STANDARDS REPORT

Transcription:

Montour No. 10 (Bob Ciminel 2012) As we continue eastward from Montour No. 4, we reach Library Junction at Mile post 35.08. The west leg of the wye takes us onto the Library Branch. After crossing Library Viaduct we reach Montour No. 10 Mine at the bottom of the hill on the north side of Brownsville Road. Montour No. 10 is another mine with a long and varied history that came to a close in 1979. The mine started life under a different name that coincided with the completion of the B&O s Pittsburgh-Wheeling route through Broughton in 1883. Shortly after the line opened, the Keeling Coal Company began developing the Lick Run Mine in the coal outcrop on the west side of the B&O line going down Lick Run to Snowden. Lick Run Mine operated under Keeling s ownership until 1901 when the Pittsburgh Coal Company took over most of the small mining operations in western Pennsylvania. The Coal Company operated the mine until 1919 when it opened the new Montour No. 10 Mine in Library after the Montour Railroad completed the Library Branch in 1918. Lick Run Mine s coal reserves were assigned to Montour No. 10 and became the Lick Run Section of No. 10 Mine. Before moving on to the details about Montour No. 10, we close the history of the Lick Run Mine on a sad note. In the spring of 1930, a farmer was burning a pile of brush in a sinkhole on his property. Unfortunately, the sinkhole was a collapsed section of the original workings of Lick Run Mine and the brush ignited the coal remaining in the pillars that after the mine was abandoned. The fire spread to adjoining farms and the farmer became so distraught that several weeks later he tied explosives around his waist and blew himself up near the sinkhole. The fire smoldered for 14 more years before the Bureau of Mines began efforts to extinguish the fire using barriers and excavating the burning coal. A map of the mine fire is included in this article. Montour No. 10 was unique among the mines along the Montour Railroad because it mined both sides of the Pittsburgh Seam along Piney Creek valley. Montour No. 10 was on the western edge of the Amity Anticline (a subterranean hill) and the Pittsburgh Seam rose from 860 feet above sea level at the mine's western boundary to over 1,050 at its eastern boundary. The Montour No. 10 tipple was built over the railroad right-of-way at 860 feet above sea level, but the coal seam was 140 feet above the valley. This difference in elevation required the mine trains to travel on trestles to reach the tipple. It also allowed water to drain from the mine instead of being pumped. The valley formed by the McMurray Syncline and the hill formed by the Amity Anticline are why Montour No. 4 was a shaft mine and Montour No. 10 was a drift mine although they mined the same coal seam and abutted each other.

The following table lists some events that occurred while Montour No. 10 was in operation: Oct. 1941 Oct. 1944 May 1976 A fire occurred two miles inside when a roof fall dropped a trolley wire on to a loaded coal car. Fire fighters took four hours getting into the fire area and sealed the entry to extinguish the fire. The fire resulted in the layoff of 780 men. A wildcat strike idled 740 men with a loss of 3,700 ton a day of coal production A 10-foot wide, 40-foot deep sinkhole opened in a parking lot at South Park when a section of roof collapsed in No. 10 mine. 1957 Montour No. 10 closed. 1970 Montour No. 10 reopened because of demand for low-sulfur coal. Estimated 3.5 million tons of coal remaining, good for 3 to 6 years of operation. July 1979 Aug. 1979 Dec. 1979 Montour No. 10 put in standby status, 111 miners laid off. Montour No. 10 reopened. Montour No. 10 closed and sealed. Production numbers for Montour No. 10 are impressive, with an average of over 4,000 tons per day between 1931 and 1944. Year Tons Days Worked Employees 1931 1,220,448 226 865 1932 958,123 229 980 1934 1,025,530 237 931 1936 1,105,939 245 941 1944 1,020,739 299 734 1972 281,053 120 1974 321,186 1975 316,182 1977 260,152 1978 284,987 133 1979 241,000 133 The maps and images below illustrate some of the history of Montour No. 10 Mine.

This Google Earth image shows some of the remaining features of Montour No. 10 Mine.

This 1906 topographic map shows the Library area before the Montour Railroad Library Branch was completed. The Charleroi interurban line is now used by the Port Authority of Allegheny County s Light Rail System (T) Blue Line from Pittsburgh. Library is the last stop on the route.

This topographic map shows the two drift entries and waste tramway used by Montour No. 10. The north entry is located below the word Library. The south entry is located along Cardox Road and is labeled Mine.

This photograph from 1922 shows the electrical substation at Montour No. 10 and was used to illustrate how many mines were switching to purchased power from the local utility instead of generating it on-site. The Pittsburgh Coal Company was a major investor in the West Penn Power Company and converted all of its mines to off-site power. The transmission lines the Coal Company had originally installed between its mines (many mines received power from adjacent mines) were sold to West Penn Power.

This 1946 aerial photo was taken by the Pittsburgh & Lake Erie Railroad after it became a 50% owner of the Montour Railroad along with the PRR. The view is toward the southeast and shows the mine tracks curving around the hill to reach the southern portion of the mine. The dumping station on the waste pile is also visible. Note the pile of mine props and mine cars in the lower left and the tracks coming from the northern entry at center left. The additional coal processing section on the right side of the tipple was the Champion No. 3 cleaning plant.

This 1938 aerial photo shows the tipple and mine tracks for No. 10 along with the various miners village associated with the mine. Note the strings of hopper cars in the empty yard waiting to be loaded.

Montour No. 10 was close when this 1957 photo was taken (no coal cars in either yard), but was obviously not abandoned because the tipple was not razed. The coal cleaning plant has also been removed from the western side of the tipple.

The mine is still closed in the this 1967 photo, and it looks as though they are scavenging waste rock from the southern section of the old mine dump.

This 1930s era mine map shows the extent of the southern section of Montour No. 10. Recall that the northern section was mining coal in the old Lick Run Mine area.

This larger map shows the northern section of Montour No. 10. The heavy black line is the barrier pillar between Montour No. 10 and Coverdale No. 8 Mine on the northwest and Pittsburgh Terminal No. 4 Mine on the northeast.

This diagram shows the overburden and strata above No. 10 mine. The average depth was about 230 feet from the bottom of the coal seam to the surface. However, as stated earlier, there was a point beneath South Park where the seam was only 40 feet below the surface. The 5.5-foot Pittsburgh coal was what the miners at No. 10 were after.

This diagram shows the mining layout at No. 10. Four face entries were driven in a north-south direction. Butt entries were driven in an east-west direction to create blocks of coal 300 feet wide and 2,000 feet long. Rooms 15 feet wide were then driven along the east-west axis to remove the coal. Once the rooms were mined, the pillars were extracted in a diagonal direction leaving a rib about 950 feet long.

This is the pumping station for the Montour No. 10 Mine treatment plant off of Cardox Road. About 20% of Montour No. 10 is flooded, with the water level in the mine being maintained by the Hahn AMD plant along Chartiers Creek.

This map shows the Lick Run Section of Montour No. 10 near Broughton. The Lick Run Mine fire began about ½ mile north of the U.S. Bureau of Mines Experimental Station.