Ameren Missouri Project Review
Central Region: Ameren Missouri Ameren Missouri has a total of 10 project proposals that are recommended for moving to Appendix A or Appendix B in MTEP13 Four (4) project proposals are recommended for moving to Appendix A in MTEP13 2 Baseline Reliability 2 Other Of those four projects: 2 project proposals have estimated cost greater than (or equal to) $5M 2 project proposals have estimated cost between $1M and $5M Six (6) project proposals s are recommended e for moving to Appendix B in MTEP13 3
MTEP13 Central SPM #2 Projects Moving to Appendix A in MTEP13 4
AmerenMO: P3699 Bland 345/138 kv Substation Install new 345/138 kv, 560 MVA transformer at Bland Substation Install 138 kv bus at Bland Substation Split Tegeler-Osage 138 kv line into a Tegeler- Bland 138 kv line and a Bland-Osage 138 kv line. Expected In Service Date: 12/1/2015 Estimated Cost: $13,780,000 The status of this project has changed since the first SPM, where it was presented as an Appendix B project
AmerenMO: P3699 System Needs: Outage of Gray Summit 138 kv 1-2 Bus-Tie (NERC Category C2 event) would cause Wildwood-Gray Summit lines to be loaded to about 108% of summer emergency rating in 2015 summer Target Appendix: A in MTEP13 Preliminary Project Type: Baseline Reliability (Cost Shared) The status of this project has changed since the first SPM, where it was presented as an Appendix B project 6
AmerenMO: P2998 Overton Substation Transformer Replacement Replace the existing 300 MVA, 345/161 kv transformer with a 560 MVA unit. Expected In Service Date: 6/1/2014 Estimated Cost: $7,128,000
AmerenMO: P2998 System Needs: For an outage of Thomas Hill- Kingdom City 345 kv Line with Thomas Hill #3 generation offline (NERC Category C3 event), the existing transformers would be overloaded Loading as high h as 120% during contingency Target Appendix: A in MTEP13 Preliminary Project Type: Other Reliability (TBD) 8
AmerenMO: P4062 Osage Substation Transformer Replacement Replace the 2-100 MVA 161/138 kv transformers with a 300 MVA unit. Expected In Service Date: 6/1/2014 Estimated Cost: $1,965,000
AmerenMO: P4062 System Needs: For an outage of Montgomery-Overton-5 345 kv Line with Thomas Hill #3 generation offline (NERC Category C3 event), the existing transformers would be loaded to about 104% of their rating (TO study) Target Appendix: A in MTEP13 Preliminary Project Type: Other Reliability (Not Cost Shared) 10
AmerenMO: P3693 Mauer Lake 161 kv Breaker Install a 161 kv breaker on the Missouri City line terminal, with a minimum current carrying capability of 1200 A. Expected In Service Date: 6/1/2013 Estimated Cost: $1,793,000
AmerenMO: P3693 System Needs: Low voltages on the 161 kv and 69 kv at Maurer Lake for an outage of the Missouri City- Maurer Lake 161 kv line (NERC Category B event) Voltage low of 0.91 per unit at Excelsior Springs161 kv bus, assume lower downline at Maurer Lake bus, which is not modeled but equivalized at Excelsior Springs Target Appendix: A in MTEP13 Preliminary Project Type: Baseline Reliability (Not Cost Shared) 12
MTEP13 Central SPM #2 Projects Moving to Appendix B in MTEP13 13
AmerenMO: P2996 Montgomery-Spencer Creek-Sub T 345 kv Line Upgrade Install new structures on 187 miles between Montgomery Hills and Spencer Creek to allow for 110 degree C operation. Expected In Service Date: 12/1/2014 Estimated Cost: under development System Needs: Age and condition of existing structures. Alternatives: None Target Appendix: B in MTEP13 Preliminary Project Type: Other (Condition) 14
AmerenMO: P4075 Sioux-Huster-3 138 kv Reconductor Reconductor 5.9 miles of ACSR conductor with conductor capable of carrying 1600 A under summer emergency conditions. Replace 1200 A terminal equipment (disconnect switches, CT's, bus conductor) at Huster with equipment capable of carrying 1600 A or better. Expected In Service Date: 6/1/2020 Estimated Cost: $5,900,000 System Needs: For an outage of Sioux-Belleau-6 345 kv Line with Callaway generation offline, the existing conductor would be loaded to about 104% of its rating in 2021 summer case, with 1- in-10 load levels. Target Appendix: B in MTEP13 Preliminary Project Type: Other Reliability
Projects Moving to Appendix B Less than $5M Target Appendix PrjID Project Name Project Description B in MTEP13 4067 Meramec Watson 2 138 kv Line Reconductoring Reconductor 3.7 miles of 795 kcmil AA conductor between Watson Substation and the Mackenzie Switch Rack with conductor capable of carrying 1200 A under summer emergency conditions. Expected ISD Estimated Cost System Need 1 Jun 18 $2,107,484 C3: Existing conductor would be loaded to 123.6% of its 233 MVA rating for the coincident outage of the Central Watson 1 and Baumgartner Watson 1 138 kv Lines, based on 2011 analysis. Possible loss of Watson Substation load should this line trip. B in MTEP13 4064 Maurer Lake 161 kv Capacitor Bank Install 30 Mvar, 161 kv capacitor bank and PCB. B in MTEP13 4065 Pike Substation Transformer Reconnectiion Reconnect Pike 161 69 kv Transformer #1 to 161 kv Bus #1. B in MTEP13 4077 Rush Joachim 2 345 kv Position Upgrade Rush Island 345 kv Switchyard Upgrade the Rush Island terminal of the Rush Island Joachim 2 345 kv line to a minimum of 2500 A capability by replacing the 2000 A wavetrap and reconnecting the 2000:5A CTs to 2500:5A. 1 Jun 15 $1,250,000 Need voltage support to Maurer Lake for the outage of the Missouri City Maurer Lake 161 kv Line. Maurer Lake 161 kv voltage would be about 87% in 2016 summer following the line outage, based on 2011 analysis. 1 Jun 14 $100,000 Voltage support to Pike area in response to outage of Pike Bus Tie Breaker #16082 or Pike Peno Creek outage. Pike 161 kv voltage would be 94% in 2016 summer following these outages or an outage to Pike Dundee 3 with Peno Creek generation offline, based on 2011 analysis. 1 Jun 17 $100,000 Maintain import capability into Ameren Missouri.
The following list of projects are in the MISO planning database, but are not currently scheduled to change appendices. These are provided for informational purposes. Projects Currently in Appendix B and C 17
Projects Currently in Appendix B and C (cont.) Expected Appendix PrjID Project Name Project Description ISD Estimated Cost System Need B 2774 Adair Wind Farm Connect Wind Farm at Adair Substation 1 Nov 20 G578 generator connection. (In suspension) C 3870 MTEP11 TCFS Flowgate C Option 6 Baldwin Grand Tower NW Cape 345 kv; Grand Tower EW Frankfurt 345kV; Grand Tower Joppa 345kV; Norris Albion 345kV; Baldwin 345/138kV Xfmr 1 Jan 17 $392,500,000 MTEP11 Top Congested Flowgate Study: Relieves projected contingency overload on Fredericktown Fredericktown Tap 161kV line C 3871 MTEP11 TCFS Flowgate C Option 7 Baldwin Grand Tower NW Cape 345 kv; Norris Albion 345kV; Baldwin 345/138kV Xfmr C 3866 MTEP11 TCFS Flowgate C Option 2 Baldwin Grand Tower NW Cape 345 kv; Grand Tower 345/138kV Xfmr 1 Jun 99 1 Jun 99 $212,500,000 MTEP11 Top Congested Flowgate Study: Relieves projected contingency overload on Fredericktown Fredericktown Tap 161kV line $162,500,000 MTEP11 Top Congested Flowgate Study: Relieves projected contingency overload on Fredericktown Fredericktown Tap 161kV line C 3868 MTEP11 TCFS Flowgate C Option 4 Grand Tower Joppa 345kV line 1 Jun 99 $100,000,000000 000 MTEP11 Top Congested Flowgate Study: Relieves projected contingency overload on Fredericktown Fredericktown Tap 161kV line C 3867 MTEP11 TCFS Flowgate C Option 3 Grand Tower EW Frankfurt 345kV line 1 Jun 99 $80,000,000 MTEP11 Top Congested Flowgate Study: Relieves projected contingency overload on Fredericktown Fredericktown Tap 161kV line C 3869 MTEP11 TCFS Flowgate C Option 5 Norris City Albion 345kV line 1 Jun 99 $50,000,000 MTEP11 Top Congested Flowgate Study: Relieves projected contingency overload on Fredericktown Fredericktown Tap 161kV line
Projects Currently in Appendix B and C (cont.) Appendix PrjID Project Name Project Description C 3025 Rivermines N. Farmington Second 138 Rivermines N. Farmington 138 kv Line kv Line Construct a second 5.5 mile 138 kv line. Expected ISD Estimated Cost System Need 1 Jun 19 $7,500,000 Avoid loss of North Farmington load for outage of existing Rivermines N. Farmington 138 kv (Category B event) 1 Jun 16 $6,600,000 Performance/ Reliability Issue; Re evaluating project scope in light of projected load growth in area C 2993 Dupo Ferry Buck Knob Reconductoring Dupo Ferry Buck Knob 138 kv Line 1 Jun 16 $6 600 000 Performance/ Reliability Issue; Re evaluating Replace 22 mi. of 2 300 ACSR with maximum size conductor existing towers will support. C 3865 MTEP11 TCFS Flowgate C Option 1 Upgrade Fredericktown Fredericktown Tap 161kV to 297 MVA C 2990 Conway Tyson 3 and 4 Increase Ground Clearance Conway Tyson 3 and 4 138 kv Increase ground clearance on Tyson Orchard Gardens sections (7 miles) C 2298 AECI Enon 345/161 kv Substation Install 2 345 kv Breakers on incoming 345 kv lines 1 Jun 99 $3,900,000 MTEP11 Top Congested Flowgate Study: Relieves projected contingency overload on Fredericktown Fredericktown Tap 161kV line 1 Jun 22 $700,000 Category C3 line + gen (coincident outage of Mason Wildwood 2 138 kv with Meramec gen #4) 1 Jun 99 $0 Upgrade to reduce extent of outage for Belleau 345 kv Breaker V31 failure to reduce loading on Warrenton Big Creek 161 kv line. 1 Jun 99 $0 Upgrade substation capacity to handle loading for outage of Kelso Lutesville 345 kv line outage with Callaway generation offline (Category C3). Need contingent upon non Ameren load located in Northwest Kentucky 1 Jun 99 $0 Gen. Related voltage support during pump conditions? C 2292 Kelso 345/161 kv Substation ti Replace 336 MVA, 345/161 kv 1 J 99 $0 U d b t ti it t h dl l di f Transformer with 450 MVA Transformer C 2987 Taum Sauk Capacitor Banks Taum Sauk 138 kv Capacitor Banks 2 30 Mvar banks; 2 138 kv synchronous PCBs.
Projects Currently in Appendix B and C (cont.) Appendix PrjID Project Name Project Description C 3000 Miller Substation Transformer Addition Miller 138/161 kv Substation Install a new 300 MVA 138/161 kv transformer to convert Miller Zion line to 161 kv operation and increase voltage support to Jefferson City, Missouri area. C 3008 Overton Capacitor Bank Overton 161 kv Capacitor Bank 1 90 Mvar capacitor bank, 1 161 kv synchronous PCB, 1 161 kv reactor. C 3027 Campbell Substation 2nd. 345/138 kv Campbell 345/138 kv Substation 2nd Transformer 560 MVA transformer; New 12.8 mi. Roxford Campbell 345 kv 3000 A summer emergency capability line; 2 345 kv PCBs (1 Campbell, 1 Roxford); 1 138 kv PCB @ Campbell. C 3028 Campbell Euclid Page 138 kv Line Campbell Euclid Page 138 kv Line Rebuild Rebuild 5.25 mi. double circuit 138 kv 2000 A SE capability. 3 138 kv PCBs (2 Campbell, 1 Page). Operate Euclid 138 kv Bus Tie normally closed. C 3031 Page Area 345/138 kv Substation Page Area 345/138 kv Substation 2 560 MVA transformers. 9 138 kv PCBs: 2 transformer, 1 bus tie, 6 line (2 Warson, 2 Page, 2 Hunter). Expected ISD Estimated Cost System Need 1 Jun 99 $0 Enhance support to Jefferson City area 1 Jun 99 $0 System Upgrade voltage support to Booneville area 1 Jun 99 $0 System Upgrade 1 Jun 99 $0 System Upgrade, Relief for Mason 345/138 kv Xfmrs, Reinforcement for Callaway 2, retirement of Meramec generation 1 Jun 99 $0 System Upgrade, Relief for Mason 345/138 kv Xfmrs, Reinforcement for Callaway 2
Projects Currently in Appendix B and C (cont.) Appendix PrjID Project Name Project Description C 3032 Campbell Page Mason 345 kv Line Campbell Page Mason 345 kv Line New 16.5 mi. 3000 A summer emergency capability line, plus reutilization of 14.5 miles of existing Page Sioux 4 at 345 kv. Expected ISD Estimated Cost System Need 1 Jun 99 $0 Relief for Mason 345/138 kv Xfmrs (Category C3 contingency events line + generator outages) C 3034 Loose Creek Kingdom City 345 kv Line Loose Creek Kingdom City 345 kv Line 1 Jun 99 $0 Transfer Capability; Callaway 2 Outlet New 25 mile 345 kv, 3000 A line. 2 345 kv PCBs at Loose Creek, 2 345 kv PCBs at Kingdom City.. C 3038 Loose Creek Barnett Windsor Pleasant Loose Creek Barnett Windsor Pleasant 1 Jun 99 $0 Transfer capability, access to renewables Hill 345 kv Line Hill 345 kv Line New 138 mile 345 kv, 3000 A line. 560 MVA, 345/161 kv transformer at Barnett Substation. 345 kv PCBs: 2 at Loose Creek, 2 at Barnett, 2 at Windsor, 2 at Pleasant Hill. C 3042 Palmyra Tap Thomas Hill Fairport 345 kv Palmyra Tap Thomas Hill Fairport New 1 Jun 99 $0 Transfer capability; Wind Integration Line 122 mile 345 kv, 3000 A line. 345 kv PCBs: 2 at Palmyra, 2 at Thomas Hill, 2 at Fairport. C 3045 St. Francois Fletcher 345 kv Line St. Francois Fletcher 345 kv Line New 1 Jun 99 $0 Transfer capability 48 mi. 3000 A SE capability. 345 kv terminals at St. Francois & Fletcher. Install WAMS PMU at St. Francois on new line terminal.
Projects Currently in Appendix B and C (cont.) Appendix PrjID Project Name Project Description Expected ISD Estimated Cost System Need C 3171 West Adair Fairport 345 kv Line New 113 mile 345 kv, 3000 A line 1 Jun 99 $0 Renewables Integration C 3173 Fairport Palmyra Tap 765 kv Line New 176 mile 765 kv, approx. 4000 A line 1 Jun 99 $0 Renewables Integration C 3174 Palmyra Tap 765/345 kv Substation New 2250 MVA, 765/345 kv Substation 1 Jun 99 $0 Renewables Integration C 3179 Palmyra Tap Montgomery 765 kv Line New 68 mile 765 kv, approx. 4000 A line 1 Jun 99 $0 Renewables Integration C 3180 Montgomery 765/345 kv Substation New 2250 MVA, 765/345 kv Substation 1 Jun 99 $0 Renewables Integration C 3181 Montgomery St. Francois 765 kv Line New 104 mile 765 kv, approx. 4000 A line 1 Jun 99 $0 Renewables Integration C 3182 St. Francois Grand Tower 765 kv Line New 63 mile 765 kv, approx. 4000 A line 1 Jun 99 $0 Renewables Integration C 3187 St. Francois 765/345 kv Substation New 2250 MVA, 765/345 kv Substation 1 Jun 99 $0 Renewables Integration
City of Columbia, MO (CWLD) No projects currently in the planning database for CWLD 23
Contact Information William Kenney WKenney@misoenergy.orgorg Michael Dantzler MDantzler@misoenergy.org 24