Boliden Mine Automation

Similar documents
Jose Moschioni, ABB Mining Sweden, 2016 ABB Mine to Market How to improve efficiency and safety. ABB Group February 19, 2016 Slide 1

Q3 Interim Report 2016

The Mine of the Future. Trends

The Mine of the Future Current Mine Automation Trends

Sustainable Intelligent Mining Systems. World Class Demonstrations. Morgan Rody

Mine Safety 101. A Complete Solution to Lost Persons Detection (LPD) in Underground Mining

Building on success - growing the Pilbara. Greg Lilleyman President, Pilbara Operations

Q Interim Report

Automation in Mining. Underground mining automation project Mark Yseboodt Chile November siemens.com/mining. Restricted Siemens AG 2016

Abstract. General N BANDA

Underground Rock Excavation. Lars Engström

Collision Avoidance Systems

Underground mining seminar

Siemens Power Rectifiers powering your industrial copper and zinc electrolysis siemens.com/mining

SANDVIK DT922i THE ULTIMATE ALL-ROUNDER

Industrial Technique. Fredrik Möller, Business Area President. Capital Markets Day, November 30, 2005

A strategic investment in Zimbabwe

Technology That Transforms. High-Performance Engines For Mining Equipment.

Application of Surface Miner today and future development

OPENING REMARKS BY SASOL S CHIEF EXECUTIVE OFFICER, DAVID E. CONSTABLE INAUGURATION OF THE THUBELISHA SHAFT, TWISTDRAAI COLLIERY

Pyhäsalmi Mine - History, Present and Future

Is there an alternative solution?

Haul & Load Practical Cost Reduction Volvo Construction Equipment

News article on BHP s View on Copper Demand and the EV Market

Selection of Shaft Hoisting or Decline Trucking for Underground Mines

BULK MATERIAL HANDLING SYSTEM

WashTec AG Baader Bank Investment Conference Karoline Kalb WashTec AG

Introducing Implats. Investor Presentation

Technology Innovation in the Mining Sector. October, 2018

Strategic Plan

The art of making an entrance

Intelligent Transportation Systems. Secure solutions for smart roads and connected highways. Brochure Intelligent Transportation Systems

Autonomous Driving. AT VOLVO CARS Jonas Ekmark Manager Innovations, Volvo Car Group

Volvo Group presentation

ABB in primary aluminium From mine to market

PRESENTATION OF NITROERG S.A. Seminar: Polish Contribution to the EU Raw Materials Initiative Brussels, 6th November, 2017

Occupational Exposures, Monitoring and Control Initiatives in Swedish Mines MDEC 2001

mining sector and look to grow our business through strategic investments and co-operation agreements leveraging off our existing infrastructure.

Sandvik DX series Get it straight

Your application, our mobility. Do you need mobility to enable your application?

Managing Director & Country Manager Namibia. SVP, Exploration

POLISH POTENTIAL TO SUPPORT AUSTRALIAN MINING AND ENERGY PROJECTS

Guidelines for Battery Electric Vehicles in the Underground - Mine Design

COMMITTED TO YOUR SUCCESS. Cat Recycling and Waste Solutions

Workplace Charging Challenge: part of the EV Everywhere Grand Challenge

ZT Disk Drive Replacement Solutions

RowaTrain Self-driving trackless supply logistic system

HERA PROJECT UPDATE. Loading concentrate boxes at the Hera Mine Site

MEETING 21 ST CENTURY TRANSPORTATION CHALLENGES: Entering New Era of Redefining Mobility. SUSAN MARLOW, GISP Principal at Stantec MAPPS President

MacKellar EPSA Capability Statement

BERNSTEIN STRATEGIC DECISIONS CONFERENCE 2018

Biofuels & Bioenergy in NZ

Kathrine Wilson-Ellis Strategic Safety Team. Phil Proctor Future Technologies

Optimising the Mining Fleet Series Part 5: The Optimised Fleet in Action

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY & HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

Buzwagi - Site Presentation. March 2014

WELCOME Open House on Parking

MindSphere The IoT operating system for smart cities. Hakan Olcay, Energy Efficiency Coordinator at Siemens

Evonik Corporate Venturing. Dr. Jürgen Finke Ecosummit 2012, Neuss November 14, 2012

Quarterly Stakeholder Call

ASX/MEDIA RELEASE 5 February 2010 DIAMOND CORE TESTWORK CONFIRMS POTENTIAL FOR HIGH GRADE DIRECT REDUCTION IRON CONCENTRATE AT BEYONDIE IRON PROJECT

First in Mind First in Choice. Capital Markets Day 2006 Gunnar Brock, President and CEO

Sandvik DP series Unleash the power

THINK LABEL UPM RAFLATAC IN BRIEF

TECHNOLOGY ADVANCEMENTS AT KITTILÄ MINE

DOUBLING OUR SALES IN NORTH AMERICA IN 5 YEARS

Smart ORL The future of urban sustainability. Chris Castro, LEED GA, CPB Director of Sustainability, Co-chair of Smart Cities

Automotive. Ugo Carena Corporate Vice President APG. Field Trip London, May 23rd

EMPACK MECHELEN, 11 OCTOBER 2017, STAF SEURINCK, ABB BENELUX Upcoming digital solutions and services.

AT A GLANCE GRID /2014

In FY2016 the Group produced million ounces of PGMs, including ounces of platinum.

Share with the GHSEA. Smart Energy Initiatives. Collaboration and a partner eco-system to achieve results

Highwall Mining System

IN SPRINTS TOWARDS AUTONOMOUS DRIVING. BMW GROUP TECHNOLOGY WORKSHOPS. December 2017

Benefits of an M2M platform over 6LoWPAN for Smart Cities

ASMI 2016 Year in Review

ABB DRIVES SERVICE. Optimize your wind economy. Wind Converter Services

AUTONOMOUS VEHICLES When will they get here? Copper Strategy Success Seminar. The Future of Work. 29th September 2016 MARK BORLACE

A Vision for Highway Automation

Keep your trucks moving

Sustainable Mobility Project 2.0 Project Overview. Sustainable Mobility Project 2.0 Mobilitätsbeirat Hamburg 01. July 2015

Autonomous Mobile Robots (AMR s) Olaf Zalmstra

The Bergen region is at the forefront of developing smart transport solutions

INFORMATION TECHNOLOGY - The Nervous System of the Smart City

MKIII Primary Gyratory

Newmont USA Ltd. Genesis Mine June 6, 2009

Intelligent Traffic Systems

Simba S7. Rugged rig with smart design and increased automation made for tight, tough conditions

By Jesse Morton, Technical Writer

Sandvik UH440i & US440i

3 pillars to achieve independent power and sustainable well being Power beyond our wildest dreams

PORTUGUESE NETWORK FOR C-ITS

The Futran System: Breeding the paradigm shift. Andries Louw: Futran Limited and Podcars Africa

RENAULT 2016 DRIVE THE CHANGE

Singapore Electric Vehicles Private Limited ( Part of Si2i Ltd SGX listed) 08 NOVEMBER 2017

MENNEKES has the energy and the connections to create unique solutions for you worldwide.

Building smart transport in Moscow

ARM COPPER Francois Uys, Chief Executive

The Aachen Approach on E-Mobility

BUILDING REFERENCES IN INDIA

Transcription:

Boliden Mine Automation Staffan Sandström Technology Director Boliden Mines 1

Boliden produces metals for modern life Boliden is a leading metals company with a commitment to sustainable development The company s core competence is within the fields of exploration, mining, smelting and metals recycling Six mining areas and five smelters Balanced metal mix Zinc and copper Precious metals, lead, nickel as by-metals Revenues 40 BSEK Approx. 5,000 employees 2

World-class productivity 4 40 Garpenberg 35 Aitik Tonnes per man hour 3 2 1 Tara Tonnes per man hour 30 25 20 15 10 5 0 0 1 2 3 4 5 6 Million tonnes milled per year 0 0 20 40 60 80 100 120 140 Million tonnes milled per year Source: Wood Mackenzie, 2016. Graph to the right includes open pit and mines with mix open pit-underground 3

Mine Automation - The short story The main goals are to improve Productivity and Utilization Mine safety Whats the problem? The face utilization UG 25% In open pit is utilization up to 80%

Improved Productivity 1 2 3 4 Productivity can be improved on many levels and the first 3 we are familiar with Improved ways of working Better performance on unit level Optimization on system level Now we can add a fourth level The combination of IoT and Big Data

1 Improved ways of working - Mine Operation Centre MOC is a good example on how more data can be used to improve productivity by transparency. Transparency -> better decisions

2 Better Performance on unit level - Volvo claims: 50% cost reduction on transports Transport cost today: 1/3 Labour cost 1/3 Fuel 1/3 Capex etc 50% cost reduction is quite a lot given the fact that the labour cost for the driver is 33% Volvos calculation is based on lower fuel consumption, higher payload with no cabin and less maintenace needed.

3 Optimization on System level Imagine a remotely controlled wheel loader, loading an autonomous truck when the mine is empty due to blasting. A good example on how to improve the utilization on both the machines as well as on the production faces.

4 IoT and Big Data On the right hand side you see a picture of the 3D model the truck creates to navigate in the mine. If we combine the laser scanner data from all machines it would be possible to create a perfect 3D model. It could detect rock fall, failing air tubes, identify failing rock bolts etc. a lot of value could be created from data created for another purpose.

Mine Automation Program Production control MOC Autonomous machines Maintenance Infrastructure - WLAN, Position The Mine Automation Program is organized in four Focus Areas. The Focus Areas share the common responsibility for Mine Safety. 10

Infrastructure - Enabling automation Communication backbone in the mine IP telephony Positioning services Production IT services 11

The Hardware -Main players 12 Access points Switches WLAN Controllers WLAN Management systems WiFi antennas, (encapsulating access points) UPS system (Batteri backup min 4 hours operation) IP Telephony & Radio (also used as positioning tag for people) WLAN tag (used for positioning mobile machines)

Production Control Short tem scheduling weeks ahead supported by automated scheduling tools Short interval control based on TOC Production analysis Production apps for real time reporting/status of ongoing activities Production apps for information, schedules, statistics, admin accessible for everyone in the mine 13

Autonumous machines Autonomous haulage & Loaders Autonomous drills and bolter remotely supervised Charging, scaling and shotcrete robotics Continuous miners 14

Maintenance Availability and reliability more important when equipment is remote controlled Communication infrastructure will enable monitoring equipment health in real-time Remote support will improve response time when failures occurs 15

How to reach the vision? Our partners are the key to success. When you look at our roadmap, never forget that it is our partners that are doing the bigger part of the investment. 16

Technological Development and Automation History Today Future Handheld Mechanisation Automation Coordinated Automation In the Beginning Autonomous traffic Hammer & Sledge Handheld pneumatic hammer, sledge and dynamite Mechanisation Hydraulics Control systems Energy Automation LHD Long hole drills Communication Safety Regulation Coordination IoT Control centre 17

Communication and Information network WLAN & Mobilaris & VoIP Kristineberg, Renström, Kankberg 2017/18 Tara WLAN & Mobilaris Garpenberg (2017 100%) Garpenberg open stope coverage Strategical development Ericson High precision position 5G in Kankberg 18

Autonomous Machines open Pit Today Test Autonuomous Pit Viper Near future Autonomous drilling in Aitik and Kevitsa Remote bench scaling and cleaning Autonomous stockpile loaders Autonomous haulage truck 19

Autonomous Machines Underground Today Autonuomous LHD (Garpenberg Mine, Tara Mines) Simba, Video remote (Garpenberg Mine, Tara Mines) Near future Autonomous haul trucks underground Autonuomous battery LHD with autonomous charging Video-remote controlled autonomous tunnel drills, bolters Continuous miners Future Autonumous combo drill & charge and scale & shotcrete units Short distance remote operated scalers & shotcrete units 20

Thank you! 21