Installation Manual v1.2: LLY / LBZ/LMM Twin CP3 Kit GM Duramax. Please read all instructions before installation.

Similar documents
Installation Manual v1.1: ATS Twin CP3 Kit GM LB7 Duramax. Please read all instructions before installing the ATS Twin CP3 Kit

Installation Manual v1.4: ATS Twin CP3 Kit 2001 GM LB7 Duramax. Please read all instructions before installing the ATS Twin CP3 Kit

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 6.7L

Installation Manual v2.2: Twin CP3 Fuel Injection Kit Dodge 5.9L

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 5.9L

Installation Manual v1.0: Force Cool Kit Dodge with NV4500/NV4500HD/NV5600 Manual Transmissions. Please read all instructions before installation.

Installation Manual v1.0: : Pulse Flow Exhaust Manifolds 2006 LBZ Duramax 6.6L EGR Equipped Vehicles

Figure 1 - Kit Contents

Installation Manual v1.0: Code Blocker Electronics Kit GM LBZ Duramax. Please read all instructions before installation.

Installation Manual v1.0: 10-Digit P/N: Aurora 3000 Turbo System L Powerstroke Ford

Installation Manual v1.1: Piece Pulse Flow Exhaust Manifold, Stock Replacement L Cummins

Installation Manual v1.0: MST Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

Installation Manual v1.3: 2-Piece Exhaust Manifold Dodge 5.9L. Please read all instructions before installation.

Installation Manual v1.0: P/N 202-A Aurora 3000/5000 Compound Turbo Kit Dodge Cummins 5.9

05/03/ INST. Ford 6.0L Aurora Turbo Installation v Ford 6.0L Powerstroke

Installation Manual v1.2: Ford Sub Zero Intercooler L Ford Trucks. Please read all instructions before installation.

Cut zip ties and remove 2 plastic wiring harness brackets.

Cut zip ties and remove 2 plastic wiring harness brackets.

Installation Manual v1.1: The ATS Arc-flow Intake Manifold Dodge-Cummins 5.9. Please read all instructions before installation.

advanced FLOW engineering Instruction Manual P/N:

BD Venom Dual Fuel F O R D 6. 7 L P O W E R S T R O K E Installation Instructions

BD Venom Dual Fuel F O R D 6. 7 L P O W E R S T R O K E Installation Instructions

Installation Manual v1.0: Aurora Plus Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

Included parts: 1 - New Bosch CP3 Pump 1 - HSM Pulley 1 - Serpentine Belt 1 - Pump Bracket/ Hardware STEP 1

2/10/ INST

BLACKBIRD INSTALLATION SUPPLEMENT

2/10/ INST

Installation Manual v1.0: Dodge 68RFE Automatic Transmission. Please read all instructions before the installation of the ATS Co-Pilot

Installation Manual v1.0: The Torque Pro Propane Injection System GM. Please read all instructions before installation.

INSTALLATION INSTRUCTIONS CATCH CAN KIT

INSTALLATION INSTRUCTIONS AIR/OIL SEPARATOR KIT

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi Document# Support:

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi Document# Support:

2017+ L5P Duramax 3 ½ Down Pipe & EGR Fix Kit

INSTALLATION INSTRUCTIONS CATCH CAN KIT

12/05/2012 Lockup Co-Pilot Instructions INST. Installation Manual v1.6: Dodge 68RFE Automatic Transmission

Included parts: 1 - New Bosch CP3 Pump 1 - HSM Pulley 1 - Serpentine Belt 1 - Pump Brackets/Hardware

Scion FR-S ZN6. GTX2867R Gen2 (Internal Wastegate) Installation Instructions GPP P/N #

INSTALLATION INSTRUCTIONS DUAL OIL CATCH CAN KIT

DURAMAX LML EGR DELETE

Ford 6.0L Regulated Return Kit

STEP 1 Disconnect the negative terminal from both batteries.

Installation Instructions

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi

Shotgun Single Barrel HPFP install guide

All cores due 30 days after invoice date - no credit after 60 days.

GM ALLISON 5 SPEED LCT-1000/2000/2400 CO-PILOT PARTS LIST

PRODUCT SAFETY NOTICE

Installation Instructions PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION

05-08 GT. Hellion Power Systems Mustang Kit Instructions

Injectors-Chips-Clutches-Transmissions-Turbos-Engines-Fuel Systems

Single Barrel Shotgun HPFP Install Guide

All cores due 30 days after invoice date - no credit after 60 days.

Duramax Lift Pump Kit 9-11 PSI Installation Instructions P/N# D

Instant Chat off the main page of Or simply call our tech team at

INSTALLATION INSTRUCTIONS CATCH CAN KIT

Xtreme Air Command. Step 1 Prepare the components. Step 2 Select a mounting location. Parts list

Instant Chat off the main page of Or simply call our tech team at

DURAMAX LMM EGR DELETE

Installation Manual v1.0: RPM Governor Spring Installation Dodge. Please read all instructions before installation.

INSTALL MANUAL D o d g e 1 2 v 6 B T A PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

DURAMAX LBZ EGR DELETE

BLACKBIRD INSTALLATION SUPPLEMENT

3 October 2016 PN# V Dodge Twin Turbo Kit (I-00274) ½ D o d g e 2 4 v I S B

Light Duty Electronic Air Command

18SP680Rev3 EPA04 MBE 4000 Car Hauler Low Pressure Fuel Lines

Phone Fax

APS F-Body Twin Pump Fuel Supply System - APSGMF-FSS/01

INSTALLATION INSTRUCTIONS

2015+ dodge charger dedicated fuel system

Long Tube Header Installation PNs , 17276

Complete Holley Mid-Mount Accessory Drive Kit

Installation Instructions for: TOYOTA 4.5L SUPERCHARGER SYSTEM

Always wear safety glasses when working on your vehicle.

Duramax LMM EGR Delete With Intake Tube

4 December 2017 PN# , , Dodge 6.7L Rumble B SXE (I-00400) 1. BD Rumble B SXE. D o d g e 6. 7 L H P C R Installation Instructions

PRODUCT SAFETY NOTICE DEALER/INSTALLER NOTICE

INSTALLATION MANUAL P2068. Level of Difficulty. Parts List. Product Image. Notes and Maintenance. Tools Required. Easy

INSTALLATION INSTRUCTIONS

Powerstroke EGR Delete A B C

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V. Extended Capacity Replacement Tank for Diesel Chevrolet / GMC Trucks

6945 (12v) 6944 (24V) installation instructions

INSTALLATION INSTRUCTIONS

advanced FLOW engineering Instruction Manual P/N: Make: Dodge Model: 2500 / 3500 Year: Engine: I-6 5.9L (td)

Heavy Duty Air Command

Procharger Stage II Intercooled Supercharger System (11-14 GT)

INSTALLATION & OWNER S MANUAL

Complete Holley Mid-Mount Accessory Drive Kit

GM 6.6L (LLY, LZB, LMM) Duramax Positive Air Shutoff 2.5 CAC TUBES

AIR CONTROL ACCESSORY KIT

97-02 JEEP TJ BODY LIFT KIT INSTRUCTIONS

INSTALLATION INSTRUCTIONS

2006-UP GM ALLISON 6 SPEED LCT-1000/2000/2400 CO-PILOT Parts list

C40008 & C40009 EXHAUST BRAKES

INSTALLATION INSTRUCTIONS FUEL SURGE TANK KIT

Front Drive System - Big Block Chevy Installation Instructions Big Block Chevy with AC & with PS

1996 Aerostar/Ranger/Explorer

INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL. Level of Difficulty. Parts List. Product Image. Tools Required. Notes and Maintenance. Torque Specifications.

System # V INTERNATIONAL , 4400 SERIES DT466

Transcription:

03/24/09 701-900-4290 - INST Installation Manual v1.2: LLY / LBZ/LMM Twin CP3 Kit 04.5-07.5 GM Duramax Please read all instructions before installation. This kit is not emissions legal in California. Kit is legal only on race vehicles that will not be used on public highways. Note: DO NOT remove any high pressure fittings from the pump. Doing so can result in damage to the internal components. Figure 1: Complete LLY / LBZ Twin CP3 Kit 1. Please make sure no parts are missing out of the LLY / LBZ / LMM Twin CP3 Kit. The junction block (item 20 in Figure 1) will have different fittings attached as noted in the parts list. A complete corresponding list of parts can be found on pages 15 and 16. 2. Disconnect both negative (-) battery terminals. 3. Remove the upper section of the fan shroud and remove the fan to gain access to the belt and idler pulley. 1

03/24/09 701-900-4290 - INST 4. Remove the serpentine belt by releasing the belt tensioner. 5. Remove the backside idler pulley shown in Figure 2. Relocate the Idler Pulley to this Location Remove the Backside Idler Pulley Figure 2: Backside Idler Pulley Location 6. Relocate the backside idler pulley to the mount under the AC compressor shown in Figure 2. 7. Find the glow plug controller (GPC) located towards the rear of the driver s side of the engine, Figure 3. Disconnect the two connectors. Using a 10mm socket, remove two 6mm bolts that hold the GPC to the bracket. Remove the GPC. Remove (2) 6mm bolts Pull Out Slide to Remove GPC Connector Figure 3: GPC Location and Connector 2

03/24/09 701-900-4290 - INST 8. Remove the GPC bracket using a 12mm socket. On the LBZ there are three 8mm bolts that hold the bracket onto the valve cover, Figure 4. Once removed, discard the bracket. Remove 3 Bolts, 2 in Front and 1 in rear Figure 4: GPC Bracket 9. On the LLY engines the GPC bracket is fixed to the valve cover with two 8mm bolts. Remove the two 6mm bolts that hold the GPC to the bracket and the two bolts that hold the bracket to the valve cover, Figure 5. Discard the bracket. GPC on LLY Engines Figure 5: GPC Location for 04.5-06 LLY Engines 3

03/24/09 701-900-4290 - INST 10. With the GPC and bracket out of the way, the relief plug in the rear of the fuel rail can be accessed. The plug requires an 18mm socket, Figure 5. A six-point socket will minimize the risk of rounding the hex plug. Use a ½ drive ratchet to break the plug free. Make sure the socket is straight before applying force on the ratchet. CAUTION: The relief plug is very tight. Damaging the relief plug will require the fuel rail to be removed from the vehicle. If the plug cannot be removed with the rail out of the vehicle, the fuel rail with have to be replaced. ATS will not provide a replacement fuel rail. Factory Rubber Return Line Remove Fuel Rail Relief Valve Plug Figure 6: Fuel Rail Relief Plug 11. Once the rail relief plug is removed, install the supplied high-pressure rail fitting as shown in the picture below. Apply a liberal amount of Teflon sealant to the threads on the high-pressure fitting. Only apply the sealant to the threads that will contact the rail, Figure 7. High-Pressure Fitting Installed Apply Teflon Sealant to this Portion of Threads Figure 7: High-Pressure Fitting Installation 4

03/24/09 701-900-4290 - INST 12. Install the junction block bracket, Figure 1, #6 using two 8mm X 1.25 X 16mm bolts supplied in the kit. Do not use the factory bolts previously removed. The factory bolts are too long and will damage the valve cover. Figure 8: Junction Block Bracket Installed 13. Install the junction block and the short high-pressure fuel line. Orient the junction block so the smaller plug faces the firewall. Connect the short high-pressure line to the rail and the junction block, Figure 9. The junction block has a relief valve already installed to replace the system relief that was removed in step 10. Wrench Access for Line Fitting Small Plug Towards Firewall Figure 9: Junction Block Installed 14. Tighten the fittings on the short high-pressure line by inserting a ¾ wrench in front of the junction block bracket, Figure 9. 5

03/24/09 701-900-4290 - INST 15. Remove the factory rubber return line shown above in Figures 6 and 7. Retain the factory hose clamps. Push on the supplied 5/16 fuel line and secure with one factory spring clamp (or the supplied clamp). The rail port can be left open. The fitting installed in step 11 seals off this port from the inside of the rail. Sealed off Port Figure 10: Return Line Ports 16. Cut the 5/16 fuel line to run to the barbed fitting on the junction block. Connect the fitting to the tee on the end of the junction block, Figure 11. Use factory hose clamp (or supplied clamp) to ensure a good seal. Return Line Updated Junction Block Fittings Figure 11: Rail Return Line Installed 6

03/24/09 701-900-4290 - INST 17. Using the three 8mm X 1.5 X 50 socket cap bolts, washers and flange nuts install the pump on the pump-mounting bracket. The pump should be clocked on the bracket so the fittings are facing upwards. Using the three 10mm bolts and washers, install the bracket and pump on the engine mounts located next to the A/C compressor, Figure 12. Supply Fitting Return Port A/C Compressor Mount Power Steering Pump Figure 12: Correct Pump and Bracket Installation 18. Install the long high-pressure line (Figure 1, #19) from the pump to the junction block, Figure 13 (RED). Route the line under the crankcase vent and turbo housing. Following the rail to the junction block. Install the 26 steel braided fuel line from the pump return port to the open port on the junction block tee, Figure 13 (BLUE). Use Zip-Ties to secure lines. The top engine harness connector will interfere with the high-pressure line; remove the fastener that holds the connector to the bracket. Relocate the connector by drilling a new hole in the bracket or securing with zip-ties. Use Zip-Ties to Secure the Return Line to the High-Pressure Line Harness Connector Figure 13: Return and High-Psi Line Installed 7

03/24/09 701-900-4290 - INST NOTE: If the tamper evident pain on the rear port high pressure fitting is broken, ATS will NOT warranty the pump. 19. Be sure to route all steel braided lines away from rubber hoses or aluminum tubing. The vibration from the engine will cause the steel braiding to wear through any soft material. Routing the return line under the junction block bracket will help minimize the risk of leaks caused by wear. 20. Using two 8mm flange nuts install one of the GPC brackets included in the kit onto the studs passing through the junction block. The bracket, labeled #4 in Figure 1, should be used on LBZ engines. The bracket, labeled #5 in Figure 1, should be used on LLY engines. When the new GPC bracket is mounted on the junction block, fastened the GPC to the bracket using two 6mm X 1.25 X 18 bolts. Reconnect the harness to the GPC, Figures 14 and 15. Figure 14: GPC Bracket and GPC Installed on LLY Figure 15: GPC Bracket and GPC Installed on LBZ 8

03/24/09 701-900-4290 - INST 21. Find the factory fuel supply line from the filter housing located on the passenger side of the engine, Figure 16. Fuel Supply From Filter Fuel Supply Rail Figure 16: Factory Fuel Supply Line 22. Remove the fuel supply line located in the previous step. Use the ½ black fuel line supplied in the kit to share the fuel supply between the pumps. Cut a 2.5 section and push in one of the ½ barb fittings supplied in the kit (Figure 1 #12). Using the factory spring clamp connect the opposite end of the 2.5 line to the fuel supply rail. Thread the supplied 6 Tee (Figure 1 #11) into the open end of the barbed fitting. Use the remaining ½ fuel line and barbed fitting to connect the opposite end of the 6 Tee to the fuel filter housing, Figure 17. Install the 34 steel braided line from the supply fitting on the pump to the supply 6 Tee. Figure 17: Fuel Supply Tee Installed 9

03/24/09 701-900-4290 - INST 23. Unplug the fuel regulator connector on the factory CP3 pump located in the valley behind the thermostat housing. Removing the alternator will provide more access to the connector, Figure 18. Factory CP3 Pressure Regulator Connector Figure 18: Factory CP3 Pressure Regulator Location 24. On the wiring harness provided in the kit there are four wire groups that extend out from the controller: one black lead with a ring terminal, one red lead with a fuse and a ring terminal, one lead with a single male two-pin connector, and one lead with a female and a male two-pin connector. Connect the female connector on the ATS Twin CP3 electronics to the harness to the connector that was disconnected in step 23. Connect the male connector to the factory pressure regulator. Connect the remaining two-pin male connector to the regulator on the new CP3 pump. Connect to Factory CP3 Pump Connect to Engine Harness Connect to Second CP3 Pump Figure 19: ATS Twin CP3 Harness Connections 25. Connect the 10mm ring terminal on the red lead to the (+) 12V power terminal in the red box labeled (+) Battery located on the driver s side of 10

03/24/09 701-900-4290 - INST the engine. To power the CP3 electronics a 7.5 Amp fuse must be installed in the fuse holder. Connect Red Lead with Inline Fuse Here Figure 20: CP3 Harness (+) 12V Power Connection 26. Connect the ring terminal of the black lead to the (-) ground terminal on the firewall. Use zip-ties to secure the wires away from heat sources and sharp edges. Ground Connection Figure 21: CP3 Harness (-) Ground Connection 27. If the power and ground leads are not connected as suggested above make sure the alternate source provides power when engaging the starter. If power is not supplied during startup, then extreme rail pressure will result. High rail pressure can cause starting failures. 28. Reinstall the alternator. 11

03/24/09 701-900-4290 - INST 29. Install the ATS pulley and pulley nut on the second CP3 pump. Torque the pulley nut to 52 ft-lbs. Figure 22: ATS Pulley Mounted on Pump 30. Install the belt provided in the kit using the routing shown in Figure 23. Tensioner Housing Idler Pulley Relocated in Step #6 Figure 23: Belt Routing for ATS Twin CP3 Kit 12

03/24/09 701-900-4290 - INST 31. If the belt touches the tensioner housing, use a ½ drive ratchet to turn the tensioner out against the belt until the belt stretches enough to clear the tensioner housing. After approximately 100 miles or so the belt may stretch enough to cause the tensioner to clatter. If the belt stretches to this point, install the larger idler pulley provided in the kit to remove the slack in the serpentine system. Make sure the two washers are used with the large idler pulley to ensure proper belt alignment. 32. Reinstall the fan and fan shroud. 33. Reinstall any parts or components removed to gain access during the installation. 34. Reconnect the (-) negative battery terminals. 35. Turn key to the ON position without starting the vehicle. Check for fuel leaks. If no leaks are present then start vehicle. Check for fuel leaks. If no leaks are present drive throughout the throttle range. Check for fuel leaks. If no leaks are present the installation is complete. 13

03/24/09 701-900-4290 - INST Have Any Questions? Thank you for purchasing the Twin CP3 kit for LLY/LBZ. Please check our website at http://www.atsdiesel.com for technical support and other performance products such as the 5-Star torque converter, ATS High Performance Valve Body and ATS High Performance Transmission along with our full line of power enhancers. Please call or e-mail our Technical Service Department, 8:00am to 5:30pm Mountain Standard Time, Monday through Friday. Contact Information Toll Free: 800-949-6002 Local: 303-431-7973 Fax: 303-431-0135 Website: www.atsdiesel.com Email: info@atsdiesel.com We strive to make our instructions as clear and complete as possible. To achieve this, our instructions are under constant construction. We encourage you to visit our Technical Support Website (http://www.atsdiesel.com/atswebsite/technical.asp) to check for the most upto-date manuals and diagrams as well as other information. If you have any suggestions as to how we can improve this installation manual, let us know at mailto:suggestions@atsdiesel.com. 14

03/24/09 701-900-4290 - INST Bill of Materials 1. LBZ Twin CP3 Injection Pump 701-030-4290 (2) 12mm to 6 Fittings 7400-6-12 (1) Rear Port High Pressure Fitting 701-002-1000 (1) High Pressure Port Plug 701-026-1000 (1) Injection Pump 97361315 2. (1) ATS CP3 Pump Mounting Bracket 701-013-4248 3. (1) ATS CP3 Pump Pulley 701-014-4248 4. (1) ATS LBZ GPC Bracket 701-022-4308 5. (1) ATS LLY GPC Bracket 701-022-4290 6. (1) ATS Junction Block Mounting Bracket 701-015-4290 7. (36 ) Section of ½ Fuel Line 821FR-8 8. (1) ATS Secondary (Short) High Pressure Line 701-016-4290 9. (1) ATS Pulley Nut CP3 Pump 701-017-1000 10. Obsolete 11. (1) 6 Tee Male/Male/Male 6JTX-S 12. (2) ½ Barbed to 6 Female Fitting 701-004-1000 13. Obsolete 14. (1) ATS LLY / LBZ High Pressure Rail Fitting 701-005-4290 15. (1) Large Backside Idler Pulley 3C3Z-8678-BB (2) 3/8 Flat Washers (included for spacing) 16. (1) Steel Braided Supply Line 701-023-4290 17. (1) Steel Braided Return Line 701-025-4290 18. (1) ATS Twin CP3 Electronic Controller Harness 701-019-4248 19. (1) ATS High Pressure Line 701-011-4290 15

03/24/09 701-900-4290 - INST 20. High Pressure Junction Block with Relief 701-018-4290 (1) High Pressure Relief Junction Block 97208076 (1) High Pressure Cap and Ball installed (1) High Pressure Sensor Plug installed (1) 16mm Return Banjo 701-034-4290 (1) 16mm Banjo Seal 97250485 (1) 16mm Banjo Bolt AM-10 (1) 12mm to 6 Fitting 7400-6-12 (1) 12mm to 5/16 Barbed Fitting (2) 5/8 Hose Clamp 5324K14 (1) 12mm Copper Sealing Washer 853009-12 21. Section of Rubber Fuel Line (24 ) 5/16 Fuel Line 22. Hardware Kit 701-001-4290 (3) 8mm X 1.25 X 50 Socket Head Cap Screw (5) 8mm X 1.25 Flange Nuts (3) 8mm Flat Washers (2) 6mm X 1.0 X 12 Hex Head Flange Bolts (2) 8mm X 1.25 X 16 Hex Head Flange Bolts (2) 10mm X 1.5 X 65 Hex Head Bolts (1) 10mm X 1.5 X 80 Hex Head Bolt (3) 10mm Flat Washers 23. (1) Serpentine Belt 701-033-4248 Not Pictured: 24. (12) 7.5 Zip-Ties 25. (2) 5/8 Hose Clamps 26. Section of Velcro to Attach Controller 27. Instruction Manual 701-900-4290 INST 28. ATS Warranty www.atsdiesel.com/warranty Note: Item 20; High Pressure Junction Block with Relief changed to simplify installation. The parts listed replaced the 16mm to JIC-6 fitting, -6 Tee Male/Female/Male, 3/8 Fuel Line and the 5/16 to 3/8 Rubber Line Adapter found in v1.0. If you need these parts or additional assistance, please refer to page 14 of this manual for contact information. 16