StorEdge Solar and Energy Storage System Review

Similar documents
STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

* Protected from tools and particles greater than 2.5 millimeters * Protected form low pressure water jets from any direction

Your home and business energy independance. Energy Bundle CA5000TPV-3D

The StorEdge Solution. Enabling Energy Independence

The StorEdge Solution

SOLAREDGE S STOREDGE SOLUTION

MERU Solar Off-Grid Inverters

3 Phase Power Systems - Designed for Canada

SolarEdge Single Phase StorEdge Inverter for Europe, APAC & South Africa

Residential SolarEdge StorEdge

Custom Power Solar Radian Battery Energy Storage System

SolarEdge. StorEdge Solution Applications. Connection and Configuration Guide. For North America Version 1.0

StorEdge TM Solution Applications with the StorEdge Interface and LG Chem Batteries Connection and Configuration (Europe, APAC, South Africa)

SolarEdge. StorEdge Solution Applications. Connection and Configuration Guide. For Europe, APAC & South Africa Version 1.1

StorEdge TM Solution Applications with the StorEdge Interface and LG Chem Batteries Connection and Configuration (Europe, APAC, South Africa)

Energy Storage System for Home

Energy Storage System for Home. High Efficiency - Peak efficiency 97.3% Bi-directional DC-DC converter

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase

StorEdge Wiring Guide & On Site Checklist - Europe, Australia & South Africa

Solar Technology & Applications Overview. Alexander Wolf Frankensolar Americas Mike Jeffrey Guillevin Greentech

SOL-ARK 8K. More Affordable: 5-15% less solar panels & 5-20% less batteries than others! World s Most Efficient Battery Inverter

Delta All-In-One Storage solutions

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

Pika Energy Island Made in America

MAKING PV SYSTEMS SMARTER. SolarEdge Residential Offering for Installers

Delta All in One Storage Solutions

SOL-ARK 8K We guarantee it s the most effcient & affordable Multi-Mode Inverter in its class

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation

TECHNICAL PAPER ON SOLAR PV INSTALLATION & DESIGN AT IIT BHUBANESWAR

MAKING SOLAR SYSTEMS SMARTER PANEL TO GRID SOLUTIONS FROM A GLOBAL LEADER IN SOLAR TECHNOLOGY

ENERGY SOLUTIONS RESIDENTIAL STORAGE BATTERY SYSTEM

Description Sets the priority for the AC source (AC1 or AC2) for qualification and transfer.

L kw Distributed Energy Storage System Unit (SU50)

Application. Battery. Public Grid GS HYBRID INVERTER

Sunny Tripower CORE1.

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation

Micro3 Grid Tied Residential Package

CHANGE YOUR ENERGY CHARGE YOUR LIFE

Definitions. Scope. Customer Generation Interconnection Requirements

Using Inverter Input Modes for Smart Grid Management

Solar Freedom Package - Starter Kit Grid-Interconnected Solar System with Battery Storage

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Using Inverter Input Modes for Smart Grid Management

@SOLAXEUROPE /SOLAXEUROPE /SOLAXPOWER

The Energy Detective

SmartOnline SUT Series 3-Phase 208/120V 220/127V 30kVA 30kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

SmartOnline SUT Series 3-Phase 208/120V 220/127V 20kVA 20kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Residential Energy Storage System SH 5K

Ampd Silo. Energy Storage System. Maintenance-free Li-ion energy storage for mission critical backup. Power to Empower

MAKING PV SYSTEMS SMARTER

Arial Regular 25pt. Learn Solar Installation From the Pros!

MAKING SOLAR SYSTEMS SMARTER

Minnesota Dept. of Commerce, Division of Energy Resources. Distributed Generation Workshop Interconnection Standards

Magellan Utility Scale Energy Storage


MAKING SOLAR SYSTEMS SMARTER

Operation Manual Pika Islanding Inverter X7602/X Part of the Pika Energy Island M

Residential Solar + Storage Backup Power Solutions. T.J. Merrill We power what s next

Tesla Powerpacks enable cost effective Microgrids to accelerate the world s transition to sustainable energy

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Illuminator Series CR NEMA 3R

ASC SWITCHBOARD DATA SHEET

Installation Guide Smart-UPS On-Line SRT1000/1500 UXI-NCLI, SRT1000/1500 UXI-LI, Tower/Rack-Mount

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

ALZ Electrical Solar Consumer Guide

Steca Elektronik SOLARIX PLI

ENERGY SOLUTIONS RESIDENTIAL STORAGE BATTERY SYSTEM

Phoenix Multi Inverter/Chargers

SolarMax MT A series A reliable solution for commercial PV applications

Questions Section: Do you have questions that aren't covered? Please contact us!

Off Grid Residential Package 1.0KW

OPTIMIZING COMMERCIAL SOLAR

TED 5000 USER MANUAL

672W Off Grid Residential Package

Solar Seminar. July 21st, Barry Cinnamon

HOW TO USE H5000B TO RUN 5KW OF ENPHASE M250 OFF-GRID

ABB central inverters ULTRA-750/1100/ kW to 1560kW

Installation Manual Pika Islanding Inverter X7601/X7602/X Part of the Pika Energy Island M

Harnessing Solar Power for greener earth and better tomorrow. Renewable Energy for Business-Critical Continuity TM

The microinverter The latest in solar technology

EON Model EL3 Three Phase Centralized Emergency Lighting Inverter. General Specification 10KW 33KW Systems

Solar inverter From Wikipedia, the free encyclopedia

Residential Energy Storage System SH5K PV ESS

Christopher LaForge. IREC Certified Master Trainer. NABCEP Certified Photovoltaic Installation Professional - Emeritus

Development of Power Conditioner with a Lithium Ion Battery

EON Model EL3 Three Phase Centralized Emergency Lighting Inverter. General Specification 40KW 55KW Systems

Safe, reliable, long lasting Lithium Iron Phosphate battery. Next generation capture and release technology. Increased efficiency for greater savings

Catch Eco Range : Technical Specification Sheet

SimpliPhi Power PHI Battery

MODEL 422 Submersible Pump Controller

Enphase M215 PRODUCTIVE SIMPLE RELIABLE. Enphase Microinverters

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

ENGINEERING SPECIFICATION

Microgrids Outback Power Technologies

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Transcription:

StorEdge Solar and Energy Storage System Review About this Review Barry Cinnamon and his team at Cinnamon Solar and Spice Solar have scheduled a series of hands-on reviews of commercially available residential battery storage systems. Reviews are based on the installation and usage of each system using commercially available products and software, provided by manufacturers. The intent is to provide useful real-world experiences to installers, home owners and manufacturers as Behind the Meter (BTM) battery storage systems and accessories become more popular. To access the installation details and photos for this review, general information about battery storage, and ongoing review updates, go to www.spicesolar.com/resourses/storage. StorEdge Solar and Energy Storage Overview StorEdge, from SolarEdge, is a grid tied solar inverter coupled with a battery storage system interface compatible with multiple DC battery systems. StorEdge currently supports the LG Chem RESU10 and Tesla PowerWall; other battery subsystems will be added. The StorEdge 7.6kw inverter functions virtually identically to the standard SolarEdge 7.6 kw inverter, simplifying installations for solar contractors already experienced with SolarEdge s DC optimizer design. StorEdge is DC coupled, connecting directly to either a PV array or battery or both enabling operation in grid-tie mode and backup power mode. The StorEdge system in this review was installed and configured using the LG Chem RESU10 battery subsystem.

The StorEdge system is ideal for customers who want to store locally generated solar energy or inexpensive grid energy so that this energy can be consumed during peak electric periods, thereby reducing electricity energy charges. Key features of the StorEdge system are that various third-party battery subsystems can be connected, the system can be configured to provide emergency backup power, and the system has a number of configuration options to handle the wide range of net metering and grid interconnection requirements in the U.S. and other countries. Many solar contractors are familiar with SolarEdge inverters and optimizers, simplifying design, installation and configuration work for the StorEdge system. In the standard SolarEdge 7.6 kw system the bottom section of the inverter assembly includes the PV DC disconnect, terminals for the DC connection to the PV array and terminals for the AC connection to the grid. In the StorEdge system this bottom section, called the Backup Unit, also contains an AC loads breaker, AC loads bypass switch, battery input, battery communications terminals, AC output to the backup loads, meter communications terminals, auto transformer terminals, fuses and a standard 9 volt lithium battery for dark start capability. This Backup Unit also provides 240 volt 60 Hz reference power and relays so that the system can operate in backup mode in the event of a utility power interruption. SolarEdge provides comprehensive documentation, maintains a customer support hotline M-F from 6 AM to 5 PM PST, and provides a cloud-based monitoring platform that is easy for both contractors and customers to access. SolarEdge is an established solar equipment supplier with a reputation for delivering good product and service quality. Applications Supported Optimized self-consumption of solar generation Time of use bill management (electricity usage time-shifting) Power export limiting Demand charge reduction (peak demand shaving) Backup power Off-grid operation Equipment Installed and Tested: Product Part Number Cost StorEdge 7.6 kw 1-Ph Grid Tied Battery Storage SE7600A-USS20NNB2 $2,600 Inverter with Revenue Grade Meter StorEdge Consumption Meter with Enclosure SE-MTR240-2-400-S1 $480 StorEdge Auto-Transformer SEAUTO-TX-5000 $260 StorEdge GSM Modem w/sim 12 yr plan SE-GSM-R12-US-S2 $650 SolarEdge Monitoring Platform (website) SolarEdge Optimizers (one per panel) 100 Amp Backup Subpanel (with breakers) $100 LG Chem RESU10H Battery Pack $5,500 Total for Battery Equipment $9,590 Installation Labor Cost Time Estimate (hours) Cost @$80/hr (2) Design 4 $320 Installation 10 $800 Configuration 2 $160 Totals 16 $1,280 (2) Not including overhead, sales and permitting StorEdge System Review 9-5-2017 Page 2

StorEdge Solar and Energy Storage System Review Documentation, Training and Support The StorEdge system is feature-rich, supporting a wide range of operating modes, grid integration capabilities, and backup power configuration options. As such, SolarEdge has done a good job providing comprehensive and readable documentation for their StorEdge inverter, including peripheral components used with the system (Consumption Meter, AutoTransformer, etc.). SolarEdge provides regular contractor training at regional solar and storage events, training with affiliated distributors, as well as scheduled and on-demand webinars. LG Chem provides documentation, training and support for their battery system, as well as integration support from SolarEdge. Shipping and Transportation Contractors must be aware of the special shipping requirements that apply to large battery storage systems. In particular, DOT Hazmat Training is required for all personnel handling Lithium Ion battery systems that weigh more than 50 pounds. Most common carriers can meet these requirements, including FedEx and UPS. Contractors must make sure their staff are properly trained when handling large batteries such as the LG-Chem RESU10H. Note that these battery subsystems are very heavy and may require a heavy-duty hand truck (ideally with a vertical lift) so that the battery can be safely transported to the installation site and mounted on a wall. Design and Engineering One or two batteries can be connected to each StorEdge 7.6kw inverter. For most small homes with a 4 kw PV system a single LG Chem 10 kwh battery would be sufficient to optimize self-consumption of their solar power. In this 4kw system example a 10 kwh battery would be able to store about 70% of the average daily energy generated by the PV system. This 10 kwh capacity would also be sufficient to power critical loads in a home for one or two days. Larger homes with higher evening energy consumption levels or extensive critical loads would benefit from additional battery storage. During backup operation the system can provide 5,000 watts of continuous power from the battery, with a 6,600 watt surge. Note that this power and surge capability is generally insufficient to operate central AC systems or large loads (such as an electric dryer). Because of the maximum power limitations inherent with all battery backup systems, customers who want to power their entire home -- including AC and large appliances -- will generally be better served with a whole house generator. Permitting for the StorEdge system is similar to a standard PV installation -- plus whatever additional requirements that may apply by the jurisdiction for battery storage. Local utilities may also require additional safety or set-point configuration changes so that the battery storage system meets their interconnection requirements. Finally, rebate administrators (such as California SGIP) will often have additional application and operating characteristic requirements. Installation Details Test Site Conditions: Commercial building with 3 phase 208 service 10 60-cell solar panels with SolarEdge optimizers As with other SolarEdge inverters, the StorEdge inverter is mounted on the wall with a bracket, connected to the AC service panel and PV panels (equipped with optimizers). Additional electrical components included a single 40-amp dual pole breaker in the main service panel, the SolarEdge Autotransfomer (necessary for backup power operation), communication wire for the temperature sensor in the auto transformer, SolarEdge Electricity Meter and communication wire, a critical load subpanel, LG Chem RESU10H Battery, and communication wire to the battery. For this 208 volt three phase commercial electrical service a transformer was also installed to achieve the 240 volts necessary for the StorEdge inverter. SolarEdge s Cellular monitoring was used for this installation. The cellular SIM card is mounted within the inverter, and a cellular antenna is mounted externally on the inverter housing (note that this higher data rate cellular modem is different than the standard SolarEdge cellular modem). Instead of the cellular connection, Ethernet or Zigbee communications from the inverter to the customer s internet service is an alternative. Since the maximum output from the inverter and battery is limited to 5,000 watts, a critical load subpanel

(or backup panel) is necessary. Critical load circuits (such as refrigerators, important lighting, furnace, hot water heater and entertainment necessities) must be moved from breakers in the main service panel to breakers in the critical load subpanel. This critical load subpanel is then fed from the inverter. In the event of a grid failure the inverter will resume powering these critical loads after a delay of about 5 seconds (not instantaneously as with an uninterruptible power supply). StorEdge System with LG Chem Battery The SolarEdge Electricity Meter was mounted adjacent to the service panel for the building. Two Consumption Metering current transducers (CTs) were installed on two of the three incoming AC power legs L1 and L2 so that net building energy usage could be monitored. The meter was connected to a circuit breaker making sure that L1 and L2 corresponded to the same legs as those on the CTs. A CAT5 cable was connected to the meter communications pins in the inverter. SolarEdge Electricity Meter Two Consumption Metering Current Transducers in Service Panel StorEdge System Review 9-5-2017 Page 4

Configuration of the system was completed by setting the appropriate DIP switches on the Inverter and Backup Unit. Additional configuration options were completed using the menu button below the inverter to navigate through the settings menus. Once cellular communications to the SolarEdge Monitoring Platform was completed the performance of the system could be viewed remotely, including total building consumption, solar production, selfconsumption, power import from the utility, power export to the utility and battery status. System operating profiles can be set by the contractor on the SolarEdge Monitoring Platform. These profiles can establish optimal charge/discharge times so that customers can charge from PV or the grid when rates are low, and discharge the battery to the home when rates are high. SolarEdge Monitoring Platform Operation and Maintenance Operation is completely automatic once the system is installed and configured. In the event of a grid failure, the backup subpanel will be energized by the inverter and battery within about 5 seconds. Contractors have visibility into the performance of individual solar panels, as well as certain operating characteristics of the inverter and battery. Once communications are established, SolarEdge support has access to virtually all software-configurable settings of the inverter. Conclusion SolarEdge has an excellent track record for releasing stable, well-engineered and documented products. Because many contractors are already familiar with SolarEdge inverters and optimizers, installation ease of the basic PV system is fairly straightforward. SolarEdge has done a commendable job integrating PV with battery storage; nevertheless the additional work related to installing any system with battery backup power and building consumption monitoring should not be underestimated: third party battery subsystems StorEdge System Review 9-5-2017 Page 5

are relatively large and heavy; additional communications wires must be installed to the battery, autotransformer and electricity meter; more complicated setup and configuration is necessary compared to a simple PV system; and a backup loads subpanel must be wired based on the customer s needs for emergency power. We expect that the StorEdge Solar and Energy Storage System will be one of the more reliable and userfriendly systems on the market. The fact that this system is designed to be compatible with multiple battery subsystems gives contractors a choice in system design much as they have a choice when selecting solar panels. The complete system s price point is realistic based on the capacity of the inverter, battery and configuration options. Specifications Output - AC (Loads/Grid) Rated AC Power Output 7,600 VA Maximum AC Power Output 8,350 VA AC Output Voltage 240 VAC (211-264) AC Frequency 60 Hz (59.3-60.5) Maximum Output Current 32 A Power Factor >0.99 (adjustable 0.9 leading, 0.9 lagging) Typical Nighttime Power Consumption <5 watts Output AC (Backup Power) Rated AC Power Output 5,000 VA Maximum AC Power Output 6,600 VA AC Output Voltage (L-L) 240 VAC (211-264) AC Output Voltage (L-N) 120 VAC (105-132) Nominal Frequency 60 Hz (55-65) Maximum Output Current - Backup 21 A Maximum Output Current Per Phase 25 A Power Factor 0.2 leading, 0.2 lagging Automatic Switchover Time <2 seconds Typical Nighttime Power Consumption <5 watts Input DC (PV and Battery) Transformer-less, Ungrounded yes Max Input Voltage 500 V Nominal DC Input Voltage 400 V Reverse Polarity Protection Ground-Fault Isolation Detection 600 kohm Sensitivity Maximum Inverter Efficiency 98% CEC Weighted Efficiency 97.5% Input DC (PV) Maximum DC Power (STC) Maximum Input Current 2-pole Disconnection 10,250 Watts 23 Amps Input DC (Battery) Supported Battery Types LG Chem RESU10H Number of Batteries per Inverter 2 Continuous Power 3,300/5,000 Watts (Low/High Power StorEdge System Review 9-5-2017 Page 6

Peak Power Max Input Current DC Fuses on Plus and Minus Version) 5,000/7,000 Watts (Low/High Power Version) 8.5/17.5 Amps (Low/High Power Version) 12/25 Amps (Low/High Power Version) Additional Features Supported Communication Interfaces Battery Power Supply Revenue Grade Data, ANSI C12.1 Integrated AC, DC and Communications Unit AC Disconnect Manual Inverter Bypass Switch DC Voltage Rapid Shutdown (PV and Battery) Auto-transformer thermal protection RS485 for battery, RS485, Ethernet, ZigBee (optional), 12v/53W Optional, according to NEC 2014 and 2017 690.12 StorEdge System Review 9-5-2017 Page 7