GE Programmable Control Products. PACSystems* RX3i Rackless Energy Pack IC695ACC403 Quick Start Guide. GFK-3000 December 2016

Similar documents
GE Fanuc IC694TBB132. Rx3i PacSystem

Installing and Removing Power Supplies

Discrete Output Modules IC697MDL753

Field Replacement of Fluorescent Power Supply in L-858 Signature Series Sign

Solenoid Valve Output Module IC693MDL760 Product Description

Steering Angle Sensor (SAS) Replacement on Vehicles Equipped with Electronic Stability Control (ESC)

Ford Mustang CH

Switch Installation. Preparing for Installation. Warnings CHAPTER

Installing Power Components

RoadRelay 4. Installation Guide

DIAGNOSIS AND TESTING

Installation Instructions

Removing and installing dash panel insert

Eaton Battery Charger Module Models ASY-0652 and ASY-0675 User s Guide

Flex Amplifiers Installation Instructions

Digital/Analog Amplifiers Installation Instructions

R and R Meritor WABCO Enhanced Easy-Stop Trailer ABS Replacement Kits for Easy-Stop ECU/Modulator Valve Assembly Part Number

Installation Guide Smart-UPS On-Line SRT1000/1500 UXI-NCLI, SRT1000/1500 UXI-LI, Tower/Rack-Mount

Smart Wi-Fi Sprinkler Timer and Flow Meters

Installation and Operation Manual Back-UPS BX800CI-ZA/BX1100CI-ZA

Owner s Manual Dual Planetary Gearmotor Auto Programming Slim Rack Slide Out System

DIAGNOSIS AND TESTING

Prestige Series Edge-Lit LED Sign IMPORTANT SAFEGUARDS READ AND FOLLOW ALL SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS

FUSES AND RELAYS FUSES AND RELAYS GENERAL OVERVIEW AND OPERATION PROCESS 1. GENERAL INFORMATION...

Tooling Assistance Center


ROADRELAY 5 Installation Guide

User Manual Back-UPS BC500-RS, BC650-RS 650 VA 230 V

CLA-VAL e-drive-34. User Manual. Motorised Pilots. CLA-VAL Europe LIN072UE - 04/16

ADDRESSABLE SELF TESTING NON MAINTAINED SPOT LIGHT EMERGENCY LUMINAIRES WITH 1 WHITE POWER LED

IBT Series Square Drive Torque Wrenches

Safe & Secure Series Electric Actuator with Internal Battery Back-up Installation, Operation & Maintenance Manual

ComfortPoint Programmable Lon, VAV/Unitary Controllers

Installation Guide Roll Stand Kit for Philips MP20/30 Monitor

Power Distribution Panel User s Guide

Owner s Manual Electric Swivel

Pneumatic Control Module User s Guide

CIRRUS AIRPLANE MAINTENANCE MANUAL

Sivoia QS Wireless Drapery Lite System

RotoTract Remote Racking Operating Manual

Heavy Duty Miniature Quick-Change Applicator (Side-Feed Type) with Mechanical or Air Feed Systems

WF3132 User s Manual. AC rev D

Expansion Signal (XSIG) Card Installation Instructions

BAPI-Stat 4 Room Humidity Sensor (BA/ B4 -H200 Series)

DMR 3005 WM ONE ZONE WIRELESS DIMMER RECEIVER

FB1100/FB1200 Flow Computer Battery Field Replacement Guide

HexPro Series Low Profile Wrenches

CP /240-MC4 User Manual

Installation Guide Smart-UPS On-Line SRT1000/SRT1500 XLA Tower/Rack-Mount

Whizbang Jr. Installation Instructions

Series 70 24V On/Off Electric Actuator Operation and Maintenance Manual


Owner s Manual Dual Planetary Gearmotor Slim Rack Slide Out System

Eazipole Cordless. Installation & Set Up Instructions. Electric Blinds & Curtains

Idle Timer Controller - ITC Freightliner MT45 Contact InterMotive for additional vehicle applications

Getting Started With Your System

Please read BOTH these Installation Instructions and the General Towing Instructions before attempting to install or operate this equipment.

User Manual. Solar Charge Controller 3KW

Installation and Programming Manual Part: Building Network Interface Card Product: 4100ES

Flight Systems. Replacement for KASSEC DESCRIPTION

J3C-H Nm Smart Electric Valve Actuator

SYSTEM # Installation Instructions for: CHEVY & GMC 1500 TRUCKS & SUVs with 4.8 / 5.3 / 6.0 / 6.2L Engines Page 1 of 7

Installation Instructions

* * APPLICABLE MODELS: 2014 > Mazda 3

Your Global Flow Control Partner. Series 70 24V On/Off Electric Actuator Operation and Maintenance Manual

The 4HR-UPS 220V ac output is provided via a Pure Sine Wave inverter, allowing it to be backed up by 2x 12V standby batteries.

Power Switching Devices

* * APPLICABLE MODELS: 2014 > Mazda 6

INSTALLATION. **Microprocessor Status LED:

xtablet T7000 Vehicle Mount Kit

M-5230-V6 Mustang V6 Dual Exhaust Kit INSTRUCTION SHEET

RAM-Type Interface for Embedded User Flash Memory

Note: Read this manual carefully before installing the operator and place this installation manual in an accessible place near the operator.

Cover. L5v2 Plug-In Conversion Module(PCM) Diagnostic Trouble Codes

Factory Packaged Controls. OE (AAON Part No. V12090) MODGAS-X Controller Field Technical Guide

* * APPLICABLE MODELS: 2017 > CX-5

Issue 2.0 December EPAS Midi User Manual EPAS35

J3C-L Nm Smart Electric Valve Actuator Failsafe Function Type: J3C Model: L140-BSR

Serena Remote Controlled Shades

Back-UPS 650 VA 230 V with AVR (BX650CI-ZA)

Mania EF1 user manual

Handy Lift LT Owners Manual

SYSTEM # Installation Instructions for: CHEVY & GMC 1500 TRUCKS & SUVs with 4.8 / 5.3 / 6.0 / 6.2L Engines

VersaPoint* I/O System

SmartOnline S3MX Series 3-Phase 380/400/415V 60kVA 54kW On-Line Double-Conversion UPS

Spyder BACnet Programmable Controllers

EPAS Desktop Pro Software User Manual

Carousel Unit User Manual Replacing the Check Stand Motor

JUL 17 Rev M

TERMINATOR User Manual

PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS. v1.1 Revised Nov 29, 2016

BX4330 Acclaim Tow Bar Operator Manual & Installation Instructions

DIN Rail UPS Model: DIN-UPS Installation/Operation Manual

SSX40 Ship to Shore Spreader

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

PRODUCT MANUAL Gecko Wireless One Zone LED Dimmer and Receiver

J&M Stainless Steel Teflon Brake Lines - Front (94-98 Cobra)

TPM Fuse Panel Installation Guide. Document INS-727XXXXXXX This manual covers the following part numbers- Trimm 727XXXXXXX Family

WARNING Acura MDX Installation Instructions BX1015. Serial Number

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

Transcription:

GE Programmable Control Products PACSystems* RX3i Rackless Energy Pack IC695ACC403 Quick Start Guide GFK-3000 December 2016

Contents 1 Overview... 2 2 Hardware Installation... 3 2.1 Mounting the Energy Pack on a DIN Rail 3 2.2 Panel-Mounting the Energy Pack... 4 3 Cable Connections... 5 3.1 Connect Input Power to Energy Pack... 6 3.2 Connecting the Energy Pack to the Controller... 7 4 Grounding... 8 5 Initial Power-up... 9 6 LED and Status Indications... 10 6.1 LED Indications: Special Cases... 11 6.2 Energy Pack Status Bit Operation... 11 7 Replacing the CapPack Module... 12 8 Firmware Updates... 13 8.1 LED Indications for Firmware Updates.. 13 9 Additional Information... 14 GFK-3000 December 2016 1

1 Overview An Energy Pack is used in conjunction with a Controller to preserve user memory in the Controller during power fluctuations or outages. If system power is lost, the Energy Pack maintains power long enough for a Controller to write its user memory contents to non-volatile memory. When system power is restored, the user memory is restored if the Controller is configured to power up from RAM. Figure 1: Interconnect Wiring Diagram 2 IC695ACC403 Quick Start Guide GFK-3000

Ordering Information IC695ACC403 IC695ACC413 IC695CBL003 2 Hardware Installation Energy Pack. Includes base, CapPack module and Energy Pack to Controller cable. Replacement CapPack module. Replacement 0.6m (24 ) Energy Pack to Controller cable. The Energy Pack can be mounted on a standard EN50022 DIN rail or an equipment panel. It is designed to be mounted adjacent to the Controller and connected to the Controller using the provided cable (IC695CBL003). Heat dissipation: When mounting the Energy Pack, allow a minimum clearance of 25.4mm (1 inch) on all four sides of the unit (right, left, top and the bottom). 2.1 Mounting the Energy Pack on a DIN Rail The Energy Pack snaps easily onto the DIN rail. No tools are required. 1) Incline Energy Pack so that top edge of plastic recess (Figure 2) engages top of DIN rail 2) Swivel the Energy Pack so that bottom springloaded plastic clip engages bottom of DIN rail. 3) Listen for click as plastic clip springs back, securing the Energy Pack onto the DIN rail. GFK-3000 December 2016 3

Figure 2: Snap Mount to DIN Rail 2.2 Panel-Mounting the Energy Pack Recommended fasteners: Four M4-0.7 machine screws with minimum length of 25mm (or 8-32, 1 min. length) and nuts. CAUTION Over tightening the mounting screws could crack the plastic housing. 4 IC695ACC403 Quick Start Guide GFK-3000

3 Cable Connections Figure 3: Input Power and Output Power /Control Connections GFK-3000 December 2016 5

3.1 Connect Input Power to Energy Pack IMPORTANT Before connecting input power, see complete installation instructions in the PACSystems Controllers: Battery and Energy Pack Manual, GFK-2741E or later. You will need: A 24Vdc, 72W SELV power supply A power cord with 18 AWG (0.82mm 2 ) copper wires An 18 AWG (0.82mm 2 ) copper wire for frame ground An input power terminal block provided (Weidmuller part number 1748010000) A small flat-head screwdriver (such as a 1.4mm jeweler s screwdriver) 1. Using the power cord, connect the power supply output to the Energy Pack s input power terminal block. To insert the wires in the power terminal block connector, you may need to use the small screwdriver to release the spring clamp on the terminal block. Recommended wire stripping length is 7mm (0.28 in). 6 IC695ACC403 Quick Start Guide GFK-3000

Figure 4: Energy Pack Input Power Mating Connector (bottom view) 2. Insert the plug into the Energy Pack s Input Power connector and securely tighten the attaching screws. 3.2 Connecting the Energy Pack to the Controller With power to the system turned off, use the supplied cable (IC695CBL003) to connect the output of the Energy Pack (green connector) to the 24Vdc input on the Controller (3-pin green connector) and to the serial communication link (using the 5-pin green connector). Refer to Figure 5. GFK-3000 December 2016 7

4 Grounding Proper grounding of this device is essential. All ground wires must be as short as possible and terminated at the same grounding point. Figure 5: Frame Ground Connection 8 IC695ACC403 Quick Start Guide GFK-3000

5 Initial Power-up When 24Vdc power is first applied to the Energy Pack, the power-up process goes through the following steps: 1. The IN LED turns on green. 2. The Energy Pack performs a self-diagnostic test. If this test passes, output power to the Controller is turned on and the OUT LED turns on green. 3. Charging of the CapPack begins and the STAT LED blinks green. 4. When charging of the CapPack is complete, the STAT LED turns on solid green and the Energy Pack signals to the controller that it can start run-time operation. The Controller will not start running its application until the Energy Pack signals that it is fully charged. Figure 6: LEDs on CAP Pack GFK-3000 December 2016 9

6 LED and Status Indications The LEDs on the Energy Pack indicate its status. LED LEDState Energy Pack Status IN STAT OUT Green, solid Red, solid Off Green, blinking Green, solid Amber, blinking Red, blinking Red, solid Off Green, solid Red, solid Off Input power is applied and within the specified range. Input power is outside the specified range. Input power is not applied. CapPack Charging in progress. No faults. CapPack is fully charged and no faults. CapPack is nearing end-of-life. The CapPack must be replaced soon. Backup is still guaranteed. Internal fault: Cycle power to the Energy Pack. If this does not clear the fault, contact Technical Support and replace the Energy Pack. CapPack has reached end-of-life. Replace the CapPack. Backup is not guaranteed. No power applied. Output power is within the specified range. Output power is present but outside spec. Output power is not present. 10 IC695ACC403 Quick Start Guide GFK-3000

6.1 LED Indications: Special Cases All LEDs blinking in unison: See Firmware Updates, page 13. 6.2 Energy Pack Status Bit Operation As shown in the table below, a CPU application program can automatically monitor the status of the attached Energy Pack via %S0014 (PLC_BAT) and %SA0011 (LOW_BAT). For more details, refer to the chapter on Diagnostics in PACSystems RX7i and RX3i CPU Programmer s Reference Manual, GFK-2950. PLC_BAT LOW_BAT Energy Pack Status (%S0014) (%SA0011) 0 0 Energy Pack connected and operational (may be charging) 1 1 Energy Pack not connected or has failed 0 1 Energy Pack is nearing its end-of-life and should be replaced. GFK-3000 December 2016 11

7 Replacing the CapPack Module The CapPack can be removed and replaced while power is applied to the Energy Pack (hot swapped.) CAUTION When hot swapping CapPacks, do not cycle power until the new CapPack is fully charged and operational. Cycling power before the STAT LED on the CapPack is solid green can result in Controller memory not being preserved. Do not hot remove/insert the CapPack during the firmware update process. 1. Loosen the four screws on the CapPack and carefully pull the CapPack off the base. 2. Install the new CapPack on the base, first engaging the module-to-base connectors and then pressing the CapPack into place. CAUTION Over tightening the mounting screws could crack the plastic housing. 3. Use the four screws provided to secure the CapPack to the base. 4. When the CapPack is first inserted, the STAT LED blinks green while the CapPack is charging. Do not remove power to the 12 IC695ACC403 Quick Start Guide GFK-3000

Energy Pack while the CapPack is charging because this could result in Controller memory not being preserved. The Energy Pack LEDs and the Controller status bits indicate when charging is complete and the Energy Pack is ready to support backup. 5. To remove a Failed Battery fault and clear the battery status bits, clear the Controller fault table. For details on status bit operation, refer to the PACSystems RX7i and RX3i CPU Reference Manual, GFK-2222 (rev. Y or later). 8 Firmware Updates The firmware for the Energy Pack is automatically updated by the Controller. At power-up, the Controller checks the version of Energy Pack firmware to verify compatibility with the Controller firmware. If an update is needed, the Controller performs it automatically. 8.1 LED Indications for Firmware Updates Firmware Update Mode Failed to Load Firmware All three LEDs blink green All three LEDs blink red GFK-3000 December 2016 13

9 Additional Information PACSystems RX7i and RX3i CPU Reference Manual, GFK-2222Y or later PACSystems Controllers: Battery and Energy Pack Manual, GFK-2741E or later PACSystems RX3i / Series 90-30 Installation and Maintenance Requirements, GFK-2975 For user manuals, product updates and other information go to the Support website, www.geautomation.com and refer to Controllers and IO, RX3i Rackless Controllers. 14 IC695ACC403 Quick Start Guide GFK-3000

GE Contact Information Americas: 1-800-433-2682 or 1-434-978-5100 Global regional phone numbers are available on our web site www.geautomation.com 2016 General Electric Company. All Rights Reserved *Trademark of General Electric Company and/or its subsidiaries. All other trademarks are property of their respective holders. GFK-3000