INOVA HIGHTECH Ltd. MEP 002/003 Auto Starter Manual

Similar documents
Power Operated Retrofit Kit for Manual Door 230 VAC or 440/480 VAC 50/60 Hz Installation and Setup Manual

Therm-L-Tec Building Systems LLC. Therm-L-Tech. Power Operated Retrofit Kit 230 VAC or 440/480 VAC 50/60 Hz Installation and Setup Manual

R820 REV2 SERIES SCR POWER CONTROLS NOVEMBER 2017

SECOND GENERATION Use this guide with unit serial number prefix beginning with BWF using Terra Power separator.

GPU Equipment Operating Instructions Table of Contents

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version

Power Distribution System User s Manual. Model: PDS-100

GCU-10. Automatic Engine Control Unit Operators Manual

Wiring diagrams on page 29 are for reference only. For detailed vehicle wiring refer to Navistar documents.

MODULATING SERVICE ELECTRIC ACTUATORS OPERATION AND MAINTENANCE MANUAL COMMERCIAL AND INDUSTRIAL VALVES AND AUTOMATION

Installation and Operations Manual

Third Generation NITE Phoenix

Designed for ease of integration with automation systems

XCITE Owner s Manual. Reso-not TM Damping System XCITE 1502C HYDRAULIC POWER SUPPLY

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

TABLE OF CONTENTS INTRODUCTION 3. INSTALLATION PROCEDURES Air Conditioner Location 4. A/C Ducting Installation 5

PAGE Both power cords must be connected & powered to operate the E-TES 120.

INSTALLATION INSTRUCTIONS

Uninterruptible Power System

SERVICE MANUAL (DOMESTIC & INTERNATIONAL)

Application Engineering

ESC2301. Universal Electronic Governor Controller Operation Manual

GTWY605 Fast Idle, Shift Interlock, I/O Chevy 610 Van - 6.0L and 6.6L Engines Contact InterMotive for additional vehicle applications.

ECU-02 Ver2.1 Automatic Engine Control Unit Operators Manual

Troubleshooting Guide

AVR Hybrid Universal Analog Digital Voltage Regulator Operation Manual

PRODUCT SAFETY NOTICE

T-Dolly Troubleshooting Guide

MAGNAMAX DVR DIGITAL VOLTAGE REGULATOR

IMI vibration switch USER MANUAL INSTALLATION - OPERATION - MAINTENANCE

3143 Production Drive Fairfeild, Ohio Model HA-45. Installation and Service Manual

BRIVIS DUCTED INVERTER SERVICE MANUAL DRCi

EG3000. Generator Electronic Governor Controller Operation Manual

Section 3 Technical Information

OPEN/CLOSE SERVICE ELECTRIC ACTUATORS OPERATION AND MAINTENANCE MANUAL COMMERCIAL AND INDUSTRIAL VALVES AND AUTOMATION

Portable Generator Familiarization & Troubleshooting Guide Section 3 Generator Diagnostics and Adjustments

TABLE OF CONTENTS INTRODUCTION.. 3. A/C Ducting Installation. Power Kit Installation (Batteries)...5 OPERATION MANUAL 7-8 TOOLS LIST..

N1387 Series Troubleshooting Guide for N Alternators

GSC300. Auto Start Engine Controller. Installation and User Manual for the GSC300 Auto Start Engine Controller. Full Version

Grid Heater Starting Aid (T000)

ECT Display Driver Installation for AP2 Module

Technical Information and Diagnostic Guide RestStar Use this guide with 5700XE RestStar Unit. Western Star 5700XE.

GTWY515, GTWY516* Fast Idle, Shift Interlock, I/O Ford Transit Introduction

ES52. Auto Start Engine Controller. Full Version. Installation and User Manual for the ES52 Auto Start Engine Controller.

GTWY505 Fast Idle, Shift Interlock, I/O Ford E-Series

GSC300 Auto Start Engine Controller

SECTION 3.00 WARNING WARNING ENGINE STARTUP AND SHUTDOWN PRESTART INSPECTION

Application Engineering

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

ADVR-12. Hybrid Universal Analog Digital Voltage Regulator Operation Manual

COLD WEATHER START KIT Ceiling Mount 8000

TECHNICAL MANUAL OPERATOR S, UNIT, INTERMEDIATE (DS) AND INTERMEDIATE (GS) MAINTENANCE MANUAL FOR

Idle Timer Controller - ITC515-A Ford Transit Contact InterMotive for additional vehicle applications

Table of Contents. For latest version, visit:

ES52 Auto Start Engine Controller Installation and User Manual for the ES52 Auto Start Engine Controller.

WARRANTY INFORMATION...

EPC DC MOTOR SPEED CONTROL

Idle Timer Controller - A-ITC520-A Ford E Series Ford F250 - F Ford F250 - F550 (*B-ITC520-A) F650/F750

AEROMOTIVE Part # INSTALLATION INSTRUCTIONS

SECTION MOTORS AND VARIABLE FREQUENCY DRIVES

CARM INTERNATIONAL TOWING MODULES

Idle Timer Controller - A-ITC620-A Chevrolet Express/GMC Savana

AQUASTAR C6. (Comfort 6000) Next Generation Auto Backwash Valve System. (selectable time-pressure or remote cycle start)

Service Manual for Battery Control Center

GSC300 Auto Start Engine Controller

PRODUCT INFORMATION BULLETIN

Valcom Failsafe Unit. 1620ESv2 SERIES. Operation and Maintenance Manual

Product Specification Guide. Title: Southern States 72 kv RLSwitcher Vertical Interrupter Style Reactor Switcher

AEROMOTIVE Part # INSTALLATION INSTRUCTIONS

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING

DKG-114 MANUAL AND REMOTE START UNIT

SYMBOL LEGEND DANGER WARNING NOTE THIS INDICATES DANGER TO THE LIFE AND HEALTH OF THE USER IS APPROPRIATE PRECAUTIONS ARE NOT TAKEN

3 Phase Smart Controller

Advanced Battery Charger. 3 - stage charging capability (IUoU) 25A

VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines

I.O.M. #081 updated : 09/19/2014 INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE. Covers Models with HE Series Instrument.

Cascade CD101 Auto-Start Controller. Installation and Operations Manual Sections 40 & 75

V 2.0 DC TO AC POWER INVERTER PWRINV500012W PWRINV500024W PWRINV500036W PWRINV500048W. Instruction Manual

R-200A R-200C Digital Controller TECHNICAL MANUAL. A new standard of reliability. This manual should remain with the unit.

PRODUCT SAFETY NOTICE DEALER/INSTALLER NOTICE

3143 Production Drive Fairfeild, Ohio Model HA Installation and Service Manual

A1P OPERATING MANUAL

Single & Three-Phase Soft Starters

XENON POWER SUPPLY 4000 Watt Gladiator IV

PART # US Patent

Installation and Operation Guide. Tundra HD 2500 Power Inverter. for the. Webasto BlueCool Truck System

POOL PILOT SOFT TOUCH OPERATING, TROUBLESHOOTING AND TECHNICAL CHEAT SHEET

Model H30 Operation Manual

Connector Systems Inc. SS-20 MACHINE MANUAL

Horizontal Circuit Switchers

The Enclosed Altistart 22 Soft Start/Soft Stop Motor Controller

Platinum Split 8000 & Platinum Split 8000 Fully Ducted COLD WEATHER START KIT Installation Manual

ELECTRICAL SYSTEM UPGRADE

R800-16PCPS DUAL REDUNDANT POWER SUPPLY FOR THE R RACK USER MANUAL

Horizontal Circuit Switchers

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

DODGE CUMMINS 24V ISB

Model 930 Power Control System Instruction Manual

INSTRUCTION MANUAL INSTALLATION OPERATION MAINTENANCE

Advanced Battery Charger 0 ~ 15A 0 ~ 25A 0 ~ 35A 0 ~ 50A 0 ~ 80A. 3 - stage charging capability (IUOU) 90 ~ 264VAC (refer to de-rating curve)

Transcription:

INOVA HIGHTECH Ltd. MEP 002/003 Auto Starter Manual Complete Installation and Operating Manual for the MEP 002/003 Auto / Remote Starter for the following MEP Power Generators: MEP 002A/003A/011A/802A/803A/811A Rev. A 11/2013

Index Index 1 Introduction 2 The MEP002/003 Autostarter 3 Dip Switch Settings and Timing 4 Theory of Operation 5 Before you Begin and Tools needed 6 Installing the Auto Starter Circuit Board 7 Wiring the Auto Starter Circuit Board 8 The Start and Power Control Circuit 12 Wiring Diagram: Remote Start with 24 VDC Coil 3 Phase Contactor 14 Wiring Diagram: Remote Start with 120 VAC Coil 3 Phase Contactor 15 Wiring Diagram: Sample Automatic Transfer Switch 16 Check of Glow / Air Pre Heat Plug 17 INOVA HIGHTECH Ltd. 15115 Chestnut Street Basehor, KS 66007 U.S.A. Tel: (913) 728 2662 Web Site: http://www.inovahightech.com E-Mail: Sales@inovahightech.com 2013 INOVA HIGHTECH Ltd. Page 1 of 17

Introduction: Thank you for purchasing a IHT MEP 002/003 Autostarter. We hope that this Manual will help you to properly install our product and assure easy and problem free operation of your MEP Generator. We, at IHT developed this board with customers like you in mind. Our Autostarter is meant to ease the operation of the MEP generator in a safe and reliable way. The MEP002/003 Autostarter can be used solely to remote start the Generator or in combination with a Power Transfer Switch. The MEP002/003 Autostarter will allow you to setup the Warm Up and the Cool down time prior to engaging and disconnecting power output. The MEP002/003 Autostarter has a built in Temperature Sensor which will adjust the Pre Heat Time for the Glow Plugs and Air Intake Heaters in reference to the Ambient Temperature. The Pre Heat Time will Range for 17 sec at ambient temperatures above +30 Celsius to app. 85 sec for ambient temperatures of below -40 Celsius. The Pre Heat time can also be set at either 15sec or 45 sec if the Generator set is operated within a building at a steady ambient temperature. The MEP002/003 Autostarter also Monitors the Oil Pressure Switch and the Over Heat Switch on your MEP Generator. The monitoring starts after the initial startup and continues uninterrupted until the unit has shut down. The Oil Pressure Switch and Overheat Switch are bypassed on the MEP 002/003/004/011 Series of Power generators by means of the Switch S1 during the startup. It is extremely important to check the oil level prior to the manual startup of your Generator Set and the Oil Level should be checked on a weekly basis. The MEP002/003 Autostarter is wired in parallel to the S1 Switch of your unit. The Oil Level / Pressure can only be visually monitored by watching the Oil Pressure Gauge during Start Operation. Correct Oil Pressure should be checked prior to installing the MEP002/003 Autostarter in your set by manually starting and observing the Oil Pressure Gauge. The normal Oil Pressure for the MEP 002/003 is between 15 PSI to about 50 PSI, depending upon the Engine Oil used and the ambient Air Temperature. Please refer to the Military TECHNICAL MANUAL - OPERATION AND/OR ORGANIZATIONAL MANUAL TM-05684C/05685B-12 (MEP 003) for the correct Engine Oil s, Filters, lubricants etc. Please contact us via e-mail sales@inovahightech.com if you cannot find the correct Military Manual for your Power Generator. Page 2 of 17

The MEP002/003 Autostarter: The MEP002/003 Autostarter was designed to be an affordable Kit and to provide the user with an easy to install Auto / Remote Starter with some basic features and a reduced wiring requirements. Data Sheet: Condition normal max. Value Power +24 VDC +39 VDC Inputs +24 VDC +39 VDC Outputs 240 VAC / 5 Amp / 1/8HP 240 VAC / 5 Amp / 1/8HP Idle current 8-10 ma 20 ma Operating Temperature -40 C to +85 C -40 C to +85 C Humidity Vibration Resistance MIL-STD 100% (with Conformal Coating) 80% (without Conformal Coating, NON CONDENSING!) 14G - continues up to 360 Hz 24+ hours 100% (with Conformal Coating) 80% (without Conformal Coating, NON CONDENSING!) 14G - continues up to 360 Hz 24+ hours MIL-STD-810G (not all test performed) Timing Sequence: Task Time Selectable Initial Wake up and Temp reading 3 sec Fixed Prime 1.5 sec Fixed Prime + Pre-Heat 15 sec / 45 sec / 17 sec to 85 sec Selectable / Variable Prime + Pre-Heat + Start 15 sec Per MIL Operating Manual Warm Up 60 sec or 300 sec Selectable RUN as long as REMOTE START INPUT is ACTIVE Cool Down 120 sec, 360sec or 600 sec Selectable Shut Down 250 msec Fixed Min / Max Total Primer Time Min / Max Total Pre Heat Time 31.5 sec / 101.5 sec 30 sec / 100 sec Page 3 of 17

DIP Switch Settings DIP SWITCH Function DIP SWITCH ON POSITION DIP SWITCH OFF POSITION 1 AUX FUEL YES NO 2 Warm Up 5 min (300 sec) 1 min (60 sec) 3 Cool Down DIP2 OFF 06 min (360 sec) DIP2 ON 10 min (600 sec) DIP2 OFF DIP2 ON 02 min (120 sec) 06 min (360 sec) 4 Pre Heat FIXED TIME (select with DIP #5) AMBIENT AIR TEMPERATURE (see table) 5 Fixed Time 45 sec 15 sec Time / Ambient Air Temperature Relationship Table - Pre Heat -55 C 85.0 sec -35 C 65.5 sec -15 C 45.0 sec +05 C 23.5 sec +25 C 21.5 sec +45 C 19.0 sec -50 C 80.0 sec -30 C 60.0 sec -10 C 40.0 sec +10 C 23.0 sec +30 C 20.5 sec +50 C 18.0 sec -45 C 75.0 sec -25 C 55.0 sec -05 C 35.0 sec +15 C 22.5 sec +35 C 20.0 sec +55 C 17.5 sec -40 C 70.0 sec -20 C 50.0 sec ± 0 C 24.0 sec +20 C 22.0 sec +40 C 19.5 sec Connections (I/O Descriptions) I/O Terminal Block TB #1 OV TB #2 +24 VDC TB #3 Remote Start TB #4 Oil Pressure / Heat TB #5 Pre Heat TB #6 RUN / PRIME TB #7 AUX FUEL TB #8 START TB #9 Power On COM TB #10 Power On N/O Function Supply: Ground (0V) Supply: + 24 VDC Supply INPUT: Remote Start [Active High] INPUT: Oil Pressure / Heat [Active High] RELAYS OUTPUT: Pre Heat [Active High +24 VDC] RELAYS OUTPUT: Run / Prime [Active High +24 VDC] RELAYS OUTPUT: Aux Fuel [Active High +24 VDC] RELAYS OUTPUT: Start [Active High +24 VDC] RELAYS OUTPUT: COM contact of Relay RELAYS OUTPUT: Normally Open contact of Relay DIP Switch Settings for Warm Up and Cool Down Times Dip Switch Settings Warm Up Time Cool Down Time DIP2 Off and DIP3 Off 1 Min ( 60 sec ) 2 Min ( 120 sec) DIP2 ON and DIP3 Off 5 Min ( 300 sec ) 6 Min ( 360 sec) DIP2 Off and DIP3 ON 1 Min ( 60 sec ) 6 Min ( 360 sec) DIP2 ON and DIP3 ON 5 Min ( 300 sec ) 10 Min ( 600 sec) Page 4 of 17

Theory of Operation: The Unit is constantly connected to the 24 Volt DC Circuit. The Microcontroller and the LED BAT +24V OK draw an average idle current of app 10mA. The two 12 V batteries of the Generator have a combined 100 Ah. It would take 416 days for the Unit to drain the Batteries if the Unit would not be operated. However the original Military Manual requires for the Batteries to be disconnected if the unit is not operated for more then two weeks. The software continuously scans the Input TB #3 Remote Start for a change of state. This is an active High Input. Upon applying a High Signal the Unit will enter it s Start Phase. The DIP Switch Settings are now read to determine all necessary timing. The Outputs are now activated with the selected time delays and the periods necessary. Oil Pressure is checked upon exiting the Start Cycle. If the Input TB #3 Remote Start goes low prior to the end of the Start Phase, then the unit will stop at the end of the Start Phase. Decision Table upon exit of Start Routine and enters RUN MODE Input Condition Routine Condition OIL P = 1 + REMOTE START = 1 RUN Normal OIL P = 0 + REMOTE START = 1 OIL PRESSURE / LOW OIL CYCLE No Restart - Reset Power OIL P = 1 + REMOTE START = 0 1. POWER ON RELAY = OFF; 2. COOL DOWN CYCLE, 3. STOP Engine will run for 2 min,6 min or 10 min and Unit goes back to idle ( monitoring Remote Start Input) OIL P = 0 + REMOTE START = 0 OIL PRESSURE / LOW OIL CYCLE No Restart - Reset Power If there is no Oil Pressure and the Input Oil Pressure Heat is low then Unit enters it LOW OIL Cycle. The LED Aux Fuel will Flash and the Relay REL3 turns on and off, indicating a audio visual alarm. The unit can be reset by removing the fuse F1 for about 5 seconds or turning off the supply power by disconnecting the negative lead of the Battery or by pulling the DC Control Circuit Breaker. If the Oil Pressure Input is high up exiting the Start Cycle then the Unit will go into RUM Mode. Depending upon the selected warm up time the unit will run for this time and then turns on Relay REL5 POWER ON. Both inputs for Oil and Remote Start are continuously monitored. Please see Table Decision Table above. The Unit will go back into Idle Mode and continuously scan the Input TB #3 Remote Start for a change of state. Page 5 of 17

BEFORE YOU BEGIN! Please disconnect the 24 Volt Battery System by removing the negative lead prior to any work being performed! THE GENERATOR SET SHOULD BE IN FULLY FUNCTIONAL CONDITION, MECHANICALLY AND ELECTRICALLY PRIOR TO INSTALLATION OF THE AUTOSTARTER KIT. THIS MEANS: 01. THE UNIT HAS CORRECT OIL LEVEL AND OIL PRESSURE AND NO OIL LEAKS! 02. THE UNIT HAS ENOUGH COMPRESSION AS SPECIFIED IN THE MAINTENANCE MANUAL 03. THE UNIT DOES NOT OVERHEAT (Air Flow in enclosed rooms etc.) 04. THE AIR INTAKE IS CLEAR AND FREE 05. THE AIR FILTER IS CLEAN AND OR SET FOR COLD WEATHER OPERATIONS 06. ALL FUEL PUMPS ARE WORKING WITH CORRECT FUEL PRESSURE 07. THE FUEL FILTERS ARE CLEAN AND THERE IS NO WATER IN THE FUEL SYSTEM 08. THE GOVERNOR IS WORKING CORRECTLY 09. ALL ELECTRICAL DEVICES ARE WORKING TO SPEC (BREAKERS, SWITCHES, STARTER, ALTERNATOR etc.) 10. ALL GLOW PLUGS ARE TESTED 11. THE UNIT HAS BEEN LOAD TESTED AT FULL POWER RATING FOR AT LEAST ONE HOUR 12. THE UNIT HAS GONE THROUGH SEVERAL START UP, RUN AND POWER DOWN CYCLES SUCCESSFULLY BY MANUAL OPERATIONS 12. THE UNIT DOES NOT HAVE ANY OTHER PROBLEMS OR DAMAGE You will need the following tools: 1. Side Cutters 2. Pliers 3. Slotted Screw Driver 4. Phillips Screw Driver 5. Crimping Tool (should fit included cable shoes) 6. Razor Blade 7. Wire Strippers 8. Electric Drill 9. 5/32" Drill Bit and a drill bit for your 4 PIN Receptacle (if used) 10. Volt Ohm Meter (VOM) or Digital Multi Meter (DMM) with Continuity Tester Page 6 of 17

Installing the Auto Starter: 1. Drill all Holes. Follow the instruction below on how to apply the circuit board drill template, then just simply drill the Holes as marked on the drill template. 4 - Pin Receptacle: We recommend using a 4 PIN Receptacle to connect your Generator with your outside Control Wiring for the Remote Start and the 3 Phase Contactor Coil. This is a example of how this could look like. Drill your Hole for your receptacle. The 4 PIN MALE RECEPTACLE and 4 PIN FEMALE CONNECTOR CORD (4x 16ga) are from Allen Bradley. You are free to use any type of connector. It is recommended to use a Male Receptacle and a female connector if the Control Voltage for the Contactor is supplied by an external electrical box The best place to install the autostarter PCB is on the right hand side of the Control Cubicle. Use the enclosed drill template by simply peeling off the back and alining it on the outside off the box as seen here in the pictures 1. Pre Position the template prior to fully affixing it to the cabinet. Check that there is enough clearance on the inside off the Cabinet to accommodate the Circuit Board. The two Holes in the Bottom Row should be in the Row SERVICE INSTRUCTIONS 2. The Template should be positioned exactly 2.75" (2 3/4") from the left edge of the Cabinet to the left BLACK LINE of the Template. Affix the Template by peeling the protective cover off and stick it on the Cabinet as seen in this picture. You can now drill the Holes with a 5/32" Drill Bit. The Cabinet is made from Aluminum and can be drilled very easily. Page 7 of 17

3. After Drilling the Holes carefully deburr the Holes on the inside and outside of the Cabinet. Remove the template by peeling it back and removing any residue carefully with a razor blade. 4. Finished Installed Board. Don t forget to put the Lock Washers on before putting on the Nut! Your board should now be in the same position as in this picture and is now ready to be wired up. 2. Wiring the Circuit Board Make all connections according to the wiring instructions in the table on the next page. Attach a Fork Lug on each Side, except for the wire which connects to Switch S1 Terminal 15, which uses a Ring Lug. Make sure all connections are mechanically fully secure and cannot come loose. It is recommended to wire the OV and then +24V wires first, briefly reconnect the battery and verify that the LED BAT +24V OK on the Circuit Board is ON. Then disconnect the battery again and then proceed with making the remaining connections. It is easier to use a Fork Lug rather then a Ring Lug on connections which have already two wires attached to the Terminal. The fork lug can be inserted underneath the existing Ring Lugs without taking out the Screw. Page 8 of 17

Wiring Connections between Control Cubicle TB and Switch S1 and Autostarter TB FROM TO Control Cubicle Terminal Block [ TB ] and Switch S1 A TB 4-13 L B TB 5-10 L C TB 5-09 R X Switch S 1 Terminal 15 D TB 5-07 R E TB 5-06 R F TB 4-10 L Autostarter TB Label Number 0V TB # 1 +24V TB #2 Oil P / Temp TB #4 Pre Heat TB #5 Run / Prime TB #6 AUX Fuel TB #7 Start TB #8 L = Left Side of TB R = Right Side of TB TB = Terminal Block Page 9 of 17

Wiring the Switch S1 Terminal 15 to Terminal # 4 Pre Heat on the Circuit Board: The Pre Heat wire is connected to Terminal 15 of Switch S1in parallel with the existing wire. Use the Ring Lug for the Switch Side and the Fork Cable Lug for the Circuit Board Terminal Page 10 of 17

This concludes the wiring of the Circuit Board with the Generator Set itself. Page 11 of 17

3. Connecting the Auto Starter with the Start and Power Control Circuit After having completed the initial wiring of the circuit board with the actual circuitry, we need to be able to start and stop the Generator now with an external Control Circuit. There are two possible Options: I. With a Remote Switch without an external 3 Phase Contactor: The Remote Switch simply applies +24V to the Input Remote Start TB #3 and starts the Unit. The Generator will now cycle through all stages: Initial Power On, Prime, Preheat, Start, Run and Shutdown. The Warm Up Time and Cool down Time are controlled manually by engaging / disengaging the 3 Phase Circuit Breaker on your Generator Set. For this setup you will need only a two PIN Male Receptacle with a mating female receptacle. Connect one wire of your receptacle to TB5-10 L with a Fork Connector and the other cable to Terminal #3 Remote Start also with a fork connector. Install your remote switch at a suitable location and wire it to the female connector which connects to your Male Receptacle on your Generator. Make sure the Connector, Receptacle and Cable are NEMA 4 or 4x rated If the Generator is operated outdoors. Select the appropriate DIP Switch Settings for your particular situation. You will have to manually operate the 3 Phase Circuit Braker to switch the Load In and Out. Your Unit is now ready for operation. Page 12 of 17

II. With a Remote Switch with an external 3 Phase Contactor: The first step here is to determine of what size of Contactor you need to use which depends of what type of power the Generator is set to produce. Please locate the nameplate on you Generator: For this Model MEP-003A the Contactor Rating should be 125Amps for 120V 1 Phase 60 or 65 Amps for 120V/240V 1 Phase 40 Amps for 120V/208V 3 Phase The Contactor Rating should be for AC3 which includes heavy inductive loads and should be a few Amps higher then the maximum Output capability of the Generator. If you want to be able to change the Output configuration at a later point then simply choose a 125 Amp Three Phase Contactor, which will be able to handle all currents. IF YOU ANTICIPATE TO OPERATE YOUR GENERATOR AT 133% OF MAXIMUM POWER THEN THE CONTACTOR HAS TO HAVE A 50% HIGHER RATING THEN THE AMPERAGE ON THE NAME PLATE EXAMPLE: 104 Amp Name Plate Rating = maximum Generator Current = 138.32 Amps / 16.6 KW Recommended Contactor = 150 Amp / AC3 The contactor is operated via the Power Output Relay, which is a Normally Open Contact available on Terminals #9 and 10# on the Autostarter Circuit Board. The terminals are not labeled by purpose. The contacts of Relays [REL 5] are galvanically separated from the Generator 24 V DC Circuit as well as of the High Voltage Output. This Relays Output can switch up to 240 VAC / 5 Amp and up to 120 VDC / 5 AMP inductive Loads. The Contact Page 13 of 17

provides ample reserve to switch even the largest 250 Amp 3 Phase Contactor on the market. Wiring Diagram for Control Voltage and High Voltage Remote Start with 24 VDC Coil 3 Phase Contactor Page 14 of 17

Remote Start with 120 VAC Coil 3 Phase Contactor Page 15 of 17

Page 16 of 17

Resistance check of each Glow / Air Pre Heat Plug: The Resistance should be: 5 Ohm ± 0.25 Ohm for the following: Glow Plug: NSN 2920-00-106-1817 HEATER,MANIFOLD (Glow Plug): NSN 2920-01-040-0308 After verifying the resistance it is recommended to remove each Glow Plug, check visually for any damage and connect each Plug to 24 VDC Power-supply, capable of delivering at least 15 Amps - verifying that the entire tip of the Plug changes color to orange/red within 15 seconds - BE CAREFUL! TIP IS EXTREMELY HOT! Any Plug where the entire Tip changes Color should be replaced. If it takes about 1 Minute for either the Glow Plug or the Manifold Heater Plug to complete change color (heat up), then you have the original 1960's discontinued Glow Plugs: Glow Plug: NSN 2920-01-048-8867 [Discontinued] HEATER,MANIFOLD (Glow Plug): NSN 2920-00-757-7144 [Discontinued] and you need to change those to the new NSN Glow Plugs above. The following Manufacturers make these Glow Plugs: Onan, Champion, Cummins, Wheeler Bros., Wellman Thermal Systems Corp., E.C.A Etablissement Central DES, W A P LLC Page 17 of 17